Loading...
HomeMy WebLinkAboutSUB201400049 Review Comments Final Plat 2014-03-12Review Comments Project Name: Stonewater Subdivision - Final Final Plat Date Completed: ITuesday, June 24, 2014 Reviewer: Christopher Perez Department /Division /Agency: CD Reviews 6 -18 -14 VDOT approved the road plans, and Planning approved road plans on 6- 19 -14, and Engineering approved road plans. Once road bonds are posted its ready for approval. Road bonds posted 6 -24 -14 thus plat is ready for approval. Review Status: Approved AL &F,9 Gil County of Albemarle Department of Community Development Memorandum To: Kirk Hughes From: Christopher P. Perez, Senior Planner Division: Current Development Date: June 9, 2014 Subject: SUB2014 — 00049 Stonewater — Final Plat (townhomes lots 35 -48) The County of Albemarle Division of Zoning and Current Development will grant or recommend approval of the final subdivision plat referred to above once the following comments have been addressed: [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] 1. [Comment] This plat cannot be approved until the Road Plan revisions are approved. If there are increases to the previously standing Road Bonds these must be posted prior to County signature. Please conifer with Engineering if there will be any changes. Rev 2. Comment not addressed. Road plan (SUB2014 -47] needs to be re- submitted and approved prior to final subdivision plat approval. Please contact Engineering for the status of this plan as Michelle Roberge is the lead reviewer of the road plan. Planning staff believes there will be road bond requirements that are for required improvements of the subdivision plat. Namely, sidewalks and landscape strips. These improvements must be bonded prior to final subdivision plat approval. 2. [Comment] In reference to Lori Schweller's March 25, 2014 email: "... the notes on the townhome subdivision plat will need to be revised to refer to a Second Amendment to Declaration, attached Article IV of the Declaration, which is referred to in Note 48 of the subdivision plat, deals with common area that will ultimately be owned by the Association. Since Parcels A -I and B -I are easements over what will be Lots 42 and 43, respectively, they are not Common Area as defined in Article IV of the Declaration. Instead, I have added a new paragraph to Article V ( "Easements') to provide, for their maintenance by the Association ". Please revise Note #8 and Note #17 to provide the correct Deed Book Page Reference information of the recorded Second Amendment to Declaration which is to be set to record with Stonewater Right of Way Vacation Plat, SUB2013 -181. Please note that the County Atiorm Je approve the Amended Declaration. Rev 2. Comment addressed. Updated with DB Ref # for R/W vacation plat. [Comment] Note #16 should be revised to reference the correct Deed Book Page Reference information of the recorded Greenbelt Easement which is to be set to record with Stonewater Right of Way Vacation Plat, SUB2013 -181. Rev 2. Comment addressed. Updated with DB Ref # for R/W vacation plat. 4. [14- 302(A)4] Private Easements. The location and dimensions of all existing and proposed private easements. Existing easements shall be labeled with the deed book and page number and the name of the owner of record Based on the review of the townhomes' final site plan (SDP2013 -67) which commenced today, staff has an additional comment which may affect this plat, specifically Comment #23 from SDP2013 -67 — see below. This can either be addressed on SUB2013 -181 OR SUB2014 -49 Final Subdivision Plat, OR on another plat unrelated to the two mentioned. Regardless this comment must be addressed prior to the final site plan approval. I'm providing this comment to you to start the conversation between you and Scott on how it shall be resolved. It appears that Lori Schweller's March 25t" email w/ the attached DRAFT /unrecorded `Second Amendment to Stonewater Declaration of Covenants and Restrictions and Easements' will adequately cover the maintenance agreement portion of my comment, pending County Attorney approval of the document; however, now we need to assure the required Landscape Easements subject of my Comment #23 are depicted on one of the two plats (SUB2013 -181 OR SUB2014 -49) and set to record w/ Lori's Second Amendment to Stonewater ... prior to the final site plan is approved. "SDP2013- 67_Comment #23) [32.7.9.9(d), 32.5.2(n), 32.7.9.7(e)] Installation and Maintenance of Required Landscaping and Screening. For the required screening along Rio Road and Penfield Lane provide the dimensions of the landscape easements that these plantings are to be located in and label them on the plan. Also, prior to final site plan approval the easements shall be set to record with a maintenance agreement approved by the County Attorney. Prior to final site plan approval on the plan provide the Deed Book and Page reference number of these recorded easements. Staff suggests the applicant depict these easements on the Right of Way Vacation plat (SUB2013 -181) or the final subdivision plat (SUB201400049). Also assure to provide a maintenance agreement, for the County Attorney to review OR assure that the previous Covenants and Restrictions document covers the additional landscaping easements and then set that plat and legal document to record - Rev 1. Comment addressed. Update with DB Ref # when R/W vacation plat is recorded. [14 -303L] Sight Distance Easements. It appears that the plat incorrectly 'labels the two proposed Sight Distance Easement which first appear on the Right of Way Vacation plat (SU132013 -181) as *SE* recorded in D134364 -25. However, staff has reviewed the recorded plat being referenced and has been unable to locate the sight distance easements, notably the area of these easements was formerly Dedicated Right of Way, thus they would not have existing? Staff believes these two easements should be labeled as *SE -1* as they are proposed. Please clarify, or revise if appropriate. Rev 1. Comment addressed. 6. [14 -303Q] Water Supply. On the plat provide a note which states that the subdivision will be served by a public water supply and a public sewer supply. Rev 1. Comment addressed. 7. [Comment & 15.3] On the plat provide information regarding density for the entire development ( Stonewater single family lots and townhouse lots). Rev 1. Comment addressed. 8. [Comment] There appears to be a typographical error/ miss calculation under the Block B Area Summary. The sum of Block B area is listed as 16,167 SF; however, when the areas of Lot 43 through 48 are added staff calculated 16,168 SF. Revise if appropriate. Rev 1. Comment addressed. 9. [Comment] Above the signature line for the Agent for the BOS, assure that "SUB2014 -" is correctly filled in with the true SUB #; otherwise, remove this reference. Rev 1. Comment addressed. 10. [Comment] This plat cannot be approved until VDOT, ACSA, Engineering, Parks and Recreation, and Fire & Rescue provide their approvals. Comments will be forwarded to the applicant upon 2 receipt of these comments. Rev 1. Pending VDOT approval. All other approvals have been obtained. 11. [Comment] All bonds shall be posted prior to final subdivision plat approval. Please contact Christopher Perez at the Division of Zoning and Current Development at 296 -5832 ext. 3443 for further information. Please address all comments. 14` Iwo'l;_s t da COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper, Virginia 22701 Charles A. Kilpatrick, P.E. Commissioner May 19, 2014 Mr. Christopher Perez Senior Planner County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Re: SUB - 2013 -00181 Stonewater — Penfield Lane Right of Way Vacation SUB - 2014 -00049 Stonewater Townhomes Subdivision Plat Dear Mr. Perez: We have reviewed the final plat vacating the existing right of way along Penfield Lane dated 1219113 with revisions dated 314114 and 4129114 and the final plat for Stonewater Subdivision, Block A, Lots 35 Thru 42 and Block B, Lots 43 Thru 48 dated 3110114 with revisions dated 4129114 as submitted by Kirk Hughes & Associates. Both plats appear to reflect right of way as agreed to by Traffic Engineering as being adequate to accommodate a potential traffic signal at the intersection of Penfield Lane and Rio Road. VDOT has no objection to the proposed plats as submitted. If you need additional information concerning this project, please feel free to contact me. Sincerely, Troy Austin, P.E. Area Land Use Engineer Culpeper District WE KEEP VIRGINIA MOVING Y. County of Albemarle Department of Community Development Memorandum To: Kirk Hughes From: Christopher P. Perez, Senior Planner Division: Current Development Date: May 9, 2014 Subject: SUB2014 — 00049 Stonewater — Final Plat (townhomes lots 35 -48) The County of Albemarle Division of Zoning and Current Development will grant or recommend approval of the final subdivision plat referred to above once the following comments have been addressed: [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] 1. [Comment] This plat cannot be approved until the Road Plan revisions are approved. If there are increases to the previously standing Road Bonds these must be posted prior to County signature. Please conifer with Engineering if there will be any changes. Rev 1. Comment not addressed. Road plan (SUB2014 -47] needs to be re- submitted and approved prior to final subdivision plat approval. Please contact Engineering for the status of this plan as Michelle Roberge is the lead reviewer of the road plan. Planning staff believes there will be road bond requirements that are for required improvements of the subdivision plat. Namely, sidewalks and landscape strips. These improvements must be bonded prior to final subdivision plat approval. 2. [Comment] In reference to Lori Schweller's March 25, 2014 email ..the notes on the townhome subdivision plat will need to be revised to refer to a Second Amendment to Declaration, attached. Article IV of the Declaration, which is referred to in Note #8 of the subdivision plat, deals with common area that will ultimately be owned by the Association. Since Parcels A -1 and B -I are easements over what will be Lots 42 and 43, respectively, they are not Common Area as defined in Article IV of the Declaration. Instead, I have added a new paragraph to Article V ( "Easements') to provide for their maintenance by the Association ". Please revise Note #8 and Note #17 to provide the correct Deed Book Page Reference information of the recorded Second Amendment to Declaration which is to be set to record with Stonewater Right of Way Vacation Plat, SUB2013 -181. Please note that the County Attorney must review/ approve the Amended Declaration. Rev 1. Comment addressed. Update with DB Ref # when R/W vacation plat is recorded. [Comment] Note # 16 should be revised to reference the correct Deed Book Page Reference information of the recorded Greenbelt Easement which is to be set to record with Stonewater Right of Way Vacation Plat, SUB2013 -181. Rev 1. Comment addressed. Update with DB Ref # when R/W vacation plat is recorded. 4. [14- 302(A)4] Private Easements. The location and dimensions of all existing and proposed private easements. Existing easements shall be labeled with the deed book and page number and the name of the owner of record. Based on the review of the townhomes' final site plan (SDP2013 -67) which commenced today, staff has an additional comment which may affect this plat, specifically Comment #23 from SDP2013 -67 — see below. This can either be addressed on SUB2013 -181 OR SUB2014 -49 Final Subdivision Plat, OR on another plat unrelated to the two mentioned. Regardless this comment must be addressed prior to the final site plan approval. I'm providing this comment to you to start the conversation between you and Scott on how it shall be resolved. It appears that Lori Schweller's March 25t" email w/ the attached DRAFT /unrecorded `Second Amendment to Stonewater Declaration of Covenants and Restrictions and Easements' will adequately cover the maintenance agreement portion of my comment, pending County Attorney approval of the document; however, now we need to assure the required Landscape Easements subject of my Comment #23 are depicted on one of the two plats (SUB2013 -181 OR SUB2014 -49) and set to record w/ Lori's Second Amendment to Stonewater ... prior to the final site plan is approved. "SDP2013- 67_Comment #23) [32.7.9.9(d), 32.5.2(n), 32.7.9.7(e)] Installation and Maintenance of Required Landscaping and Screening. For the required screening along Rio Road and Penfield Lane provide the dimensions of the landscape easements that these plantings are to be located in and label them on the plan. Also, prior to final site plan approval the easements shall be set to record with a maintenance agreement approved by the County Attorney. Prior to final site plan approval on the plan provide the Deed Book and Page reference number of these recorded easements. Staff suggests the applicant depict these easements on the Right of Way Vacation plat (SUB2013 -181) or the final subdivision plat (SUB201400049). Also assure to provide a maintenance agreement for the County Attornev to review OR assure that the previous Covenants and Restrictions document covers the additional landscaping easements and then set that plat and legal document to record Rev]. Comment addressed. Update with DB Ref # when R/W vacation plat is recorded. [14 -303L] Sight Distance Easements. It appears that the plat incorrectly labels the two proposed Sight Distance Easement which first appear on the Right of Way Vacation plat (SUB2013 -181) as *SE* recorded in D134364 -25. However, staff has reviewed the recorded plat being referenced and has been unable to locate the sight distance easements, notably the area of these easements was formerly Dedicated Right of Way, thus they would not have existing? Staff believes these two easements should be labeled as *SE -1 * as they are proposed. Please clarify, or revise if appropriate. Rev 1. Comment addressed. 6. [14 -303Q] Water Supply. On the plat provide a note which states that the subdivision will be served by a public water supply and a public sewer supply. Rev 1. Comment addressed. 7. [Comment & 15.31 On the plat provide information regarding density for the entire development ( Stonewater single family lots and townhouse lots). Rev 1. Comment addressed. 8. [Comment] There appears to be a typographical error/ miss calculation under the Block B Area Summary. The sum of Block B area is listed as 16,167 SF; however, when the areas of Lot 43 through 48 are added staff calculated 16,168 SF. Revise if appropriate. Rev 1. Comment addressed. 9. [Comment] Above the signature line for the Agent for the BOS, assure that "SUB20142" is correctly filled in with the true SUB #; otherwise, remove this reference. Rev 1. Comment addressed. 10. [Comment] This plat cannot be approved until VDOT, ACSA, Engineering, Parks and Recreation, and Fire & Rescue provide their approvals. Comments will be forwarded to the applicant upon 2 receipt of these comments. Rev 1. Pending VDOT approval. All other approvals have been obtained. 11. [Comment] All bonds shall be posted prior to final subdivision plat approval. Please contact Christopher Perez at the Division of Zoning and Current Development at 296 -5832 ext. 3443 for further information. Please address all comments. Christopher Perez From: Christopher Perez Sent: Friday, May 09, 2014 1:49 PM To: Ana Kilmer; Michelle Roberge; Ana Kilmer Subject: Stonewater-Order of operations Stonewater- Order of operations (Please note that this is a little different than we discussed over the phone,please review the information below and let me know if you have any questions). 1) Stonewater R/W vacation plat ISUB2013-1811 — pending VDOT approval. Once we receive VDOT approval we're good to go to the next step. After we obtain VDOT approval the applicant needs to submit the signed plat and all of the signed deeds to the County. A couple of the deeds require Tom Foley's signature. Once we have Tom's signature on the applicable deeds we can approve the R/W vacation plat. Applicant then records it in the Clerk's Office. 2)Road plan (SUB2014-47] needs to be re-submitted and approved (currently we're without any revised road plans since the ft review). Once the road plan is approved then comes the final subdivision plat. We need to assure final subdivision plat [SUB2014-49] is ready for approval (all approvals shall be obtained), also assure that the R/W vacation plats DB PG#s are on the plat,then we need to do the bonding of the Water and Sewer, and the Road Bond (to include sidewalks and landscape strip). To do that the applicant needs a bond estimate request and the $250 fee to Ana Kilmer. Once the bonds estimates are provided to the applicant from Engineering the applicant shall post the bonds prior to final subdivision plat approval. The bonding of all required improvements of the subdivision plat must happen prior to final subdivision plat approval, this includes the sidewalk and the landscape strip, a bond for these improvements shall be calculated. The street trees and the onsite landscaping are required by the site plan and do not need to be bonded prior to final sub plat approval. 3) Townhome Final site plan [SDP2013-67] —needs to be updated to have DB PG#s from recorded R/W vacation plat and final sub plat. Then we can approve the site plan provided all other approvals are obtained. The bonding of all the landscaping for townhome landscaping(to include street trees, landscaping for canopy, parking and screening)shall take place through Zoning, defined as a Site Bond. We don't need these bonds prior to site plan approval, it's just that the applicant cannot get a CO till the site bond is posted 4) Please note that no grading can begin until the E&S bonds are posted. To do that the applicant needs a bond estimate request and fee to Ana Kilmer. Once the bonds estimates are provided to the applicant by Engineering the applicant shall post the bonds. The subdivision plat and the site plan can be approved prior to this bond being posted but no grading can take place till this is posted. Christopher P. Perez Senior Planner Department of Community Development 1County of Albemarle,Virginia 401 McIntire Road 1 Charlottesville,VA 22902 434.296.5832 ext.3443 1 Christopher Perez From: Jeremy Lynn Olynn @serviceauthority.org] Sent: Thursday, May 01, 2014 10:07 AM To: 'Kirk Hughes' Cc: Christopher Perez Subject: RE: SUB201400049 Townhome Final Plat Kirk, This revised plat adequately addresses our comments. Jeremy M. Lynn, P.E. Senior Civil Engineer Albemarle County Service Authority 168 Spotnap Road, Charlottesville, VA 22911 (434) 977 -4511 ext. 114 Like us on Facebook at www.facebook.com /acsaconnect From: Kirk Hughes [mailto:kirk @khals.net] Sent: Thursday, May 01, 2014 10:02 AM To: 'Jeremy Lynn' Cc: Christopher P. Perez Subject: RE: SUB201400049 Townhome Final Plat Jeremy- The attached is for your review and approval. If you need a hard copy I can drop off at lunch. Kirk Jeremy, I'll revise accordingly and send you a review copy. Thanks for your assistance, Kirk From: Jeremy Lynn [mailto: jlynn(a)serviceauthority.org] Sent: Tuesday, April 08, 2014 3:02 PM To: 'Kirk Hughes' Subject: RE: SUB201400049 Townhome Final Plat We really only need about 5 feet behind the meters. Jeremy M. Lynn, P.E. Senior Civil Engineer Albemarle County Service Authority 168 Spotnap Road, Charlottesville, VA 22911 (434) 977 -4511 ext. 114 Like us on Facebook at www.facebook.com /acsaconnect From: Kirk Hughes [mailto: kirk@khals.net] Sent: Tuesday, April 08, 2014 3:01 PM To: 'Jeremy Lynn' Subject: RE: SUB201400049 Townhome Final Plat Jeremy, I don't believe the owner would object. I was trying to be consistent with Tom's direction. So, as I understand the easement should extend 10' left and right; 10' to the rear into the lots and centered on the meters. Kirk From: Jeremy Lynn [ mailto: jlynn(aOserviceauthorit) .org] Sent: Tuesday, April 08, 2014 2:49 PM To: 'Kirk Hughes' Subject: RE: SUB201400049 Townhome Final Plat 1 and 3 are addressed. With 2, it seems that additional width is appropriate due to the services lines not being perpendicular to the main. Does the owner object to granting the additional easements? Jeremy M. Lynn, P.E. Senior Civil Engineer Albemarle County Service Authority 168 Spotnap Road, Charlottesville, VA 22911 (434) 977 -4511 ext. 114 Like us on Facebook at www.facebook.com /acsaconnect From: Kirk Hughes [mai Ito: kirk(aOkhals. net] Sent: Tuesday, April 08, 2014 2:39 PM To: 'Jeremy Lynn' Subject: RE: SUB201400049 Townhome Final Plat Jeremy, See comment below. Thanks, Kirk From: Jeremy Lynn [ma i Ito: jlynn(aOserviceauthority.org] Sent: Tuesday, April 08, 2014 11:27 AM To: kirk(&khals.net Subject: FW: SUB201400049 Townhome Final Plat Jeremy M. Lynn, P.E. Senior Civil Engineer Albemarle County Service Authority 168 Spotnap Road, Charlottesville, VA 22911 (434) 977 -4511 ext. 114 Like us on Facebook at www.facebook.com /acsaconnect From: Jeremy Lynn [ma i Ito: jlynn(aOserviceauthority.org] Sent: Friday, April 04, 2014 2:06 PM To: 'Alex Morrison' Subject: RE: SUB201400049 Townhome Final Plat Alex, Below are my comments: 1. For the sewer easement related to Note 14, extend the easement area to the edge of the R/W. [Kirk's Comment] I will modify the plat, is a total easement width = 20.91' ok. No reason to leave such a small gap. 2. Easement widths for meters should be 20 feet.[Kirk's Comment] Tom Garrison approved the 10' width on the earlier plat and I'll trying to be consistent. The copper service lines are being pulled out to avoid trees, requiring a greater width. 3. Ensure that sewer easement behind Lot 48 extends to the property Iine.[Kirk's Comment] Easement line extends to the adjoining property line and I can add clarification on the plat. Jeremy M. Lynn, P.E. Senior Civil Engineer Albemarle County Service Authority 168 Spotnap Road, Charlottesville, VA 22911 (434) 977 -4511 ext. 114 Like us on Facebook at www.facebook.com /acsaconnect From: Alex Morrison [ma i Ito: amorrison(a serviceauthorit .org] Sent: Thursday, April 03, 2014 10:45 AM To: ilvnn(d )serviceauthority.org Subject: FW: SUB201400049 Townhome Final Plat Jeremy, See below and attached. I printed a copy and placed it in your mailbox. The printed copy is on 11x17" but is not to scale, it had to be reduced to fit the paper. I can print out a scaled copy of pages 2 -3 if you would like. If not, let me know if you have comment or if the plat is approved. Thank you. Alexander J. Morrison, EIT Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (0) 434 - 977 -4511 Ext. 116 (F) 434 - 979 -0698 From: Kirk Hughes [mailto:kirk(aOkhals.net] Sent: Wednesday, April 02, 2014 6:59 PM To: Alex Morrison Subject: SUB201400049 Townhome Final Plat Alex, Please find attached a working copy of my plat. I have redrawn the plat to a scale of 1 " =15' to give clarity to the easements detail. I hope this will help with your review. Should you have any questions or need additional information please contact me. Thanks, Kirk Kirk Hughes, L.S. Principal KIklk Kirk Hughes & Associates Land Surveyors & Planners 220 East High Street Charlottesville, VA 22902 (434) 296 -6942, Ext.108 (434) 295 -7540 Fax kirkCaD.khals.net http: / /goo.gl /ma ps /81afD APlease consider the environment before printing this email. / R COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper, Virgin a 22701 Charles A. Kilpatrick, P.E. Commissioner April 29, 2014 Mr. Christopher Perez Senior Planner County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Re: SUB - 2014 -00049 Dear Mr. Perez: We have reviewed the final plat for Stonewater Subdivision, Block A, Lots 35 thru 42 and Block B, Lots 43 thru 48 dated March 10, 2014 as submitted by Kirk Hughes & Associates and offer the following comments: 1. In order to accommodate a potential traffic signal at the intersection of Rio Road and Penfield Lane, the right -of -way on Lots 42 and 43 should be revised to match the right - of -way shown on the attached detail. If you need additional information concerning this project, please feel free to contact me. Sincerely, -1 AA1 Troy Austin, P.E. Area Land Use Engineer Culpeper District WE KEEP VIRGINIA MOVING Review Comments Project Name: Stonewater Subdivision - Final Final Plat Date Completed: IMonday, April 07, 2014 Reviewer: Robbie Gilmer Department /Division /Agency: Fire Rescue Reviews Review Status: No Objection Review Comments Project Name: Stonewater Subdivision - Final Final Plat Date Completed: Tuesday, April 01, 2014 Reviewer: Dan Mahon Department /Division /Agency: Parks Reviews 4 -1 -14 in person conversation with Dan, he has no issues with the proposal. Review Status: No Objection Review Comments Project Name: Stonewater Subdivision - Final Final Plat Date Completed: IThursday, March 27, 2014 Reviewer: Glenn Brooks Department /Division /Agency: Engineering Reviews Based on plat dated 3/10/14 No Comments or objections Review Status: No Objection Review Comments Project Name: Stonewater Subdivision - Final Final Plat Date Completed: Thursday, March 27, 2014 Reviewer: Andrew Slack Department /Division /Agency: E911 Reviews Approved Review Status: Approved Y. County of Albemarle Department of Community Development Memorandum To: Kirk Hughes From: Christopher P. Perez, Senior Planner Division: Current Development Date: March 26, 2014 Subject: SUB2014 — 00049 Stonewater — Final Plat (townhomes lots 35 -48) The County of Albemarle Division of Zoning and Current Development will grant or recommend approval of the final subdivision plat referred to above once the following comments have been addressed: [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] 1. [Comment] This plat cannot be approved until the Road Plan revisions are approved. If there are increases to the previously standing Road Bonds these must be posted prior to County signature. Please conifer with Engineering if there will be any changes. 2. [Comment] In reference to Lori Schweller's March 25, 2014 email: ..the notes on the townhome subdivision plat will need to be revised to refer to a Second Amendment to Declaration, attached. Article IV of the Declaration, which is referred to in Note #8 of the subdivision plat, deals with common area that will ultimately be owned by the Association. Since Parcels A -1 and B -I are easements over what will be Lots 42 and 43, respectively, they are not Common Area as defined in Article IV of the Declaration. Instead, I have added a new paragraph to Article V ( "Easements') to provide for their maintenance by the Association ". Please revise Note #8 and Note #17 to provide the correct Deed Book Page Reference information of the recorded Second Amendment to Declaration which is to be set to record with Stonewater Right of Way Vacation Plat, SUB2013 -181. Please note that the County Attorney must review/ approve the Amended Declaration. 3. [Comment] Note #16 should be revised to reference the correct Deed Book Page Reference information of the recorded Greenbelt Easement which is to be set to record with Stonewater Right of Way Vacation Plat, SUB2013 -181. 4. [14- 302(A)4] Private Easements. The location and dimensions of all existing and proposed private easements. Existing easements shall be labeled with the deed book and page number and the name of the owner of record. Based on the review of the townhomes' final site plan (SDP2013 -67) which commenced today, staff has an additional comment which may affect this plat, specifically Comment #23 from SDP2013 -67 — see below. This can either be addressed on SUB2013 -181 OR SUB2014 -49 Final Subdivision Plat, OR on another plat unrelated to the two mentioned. Regardless this comment must be addressed prior to the final site plan approval. I'm providing this comment to you to start the conversation between you and Scott on how it shall be resolved. It appears that Lori Schweller's March 25th email w/ the attached DRAFT /unrecorded `Second Amendment to Stonewater Declaration of Covenants and Restrictions and Easements' will adequately cover the maintenance agreement portion of my comment, pending County Attorney approval of the document; however, now we need to assure the required Landscape Easements subject of my Comment #23 are depicted on one of the two plats (SUB2013 -181 OR SUB2014 -49) and set to record w/ Lori's Second Amendment to Stonewater... prior to the final site plan is approved. "SDP2013- 67_Comment #23) [32.7.9.9(d), 32.5.2(n), 32.7.9.7(e)] Installation and Maintenance of Required Landscaping and Screening. For the required screening along Rio Road and Penfield Lane provide the dimensions of the landscape easements that these plantings are to be located in and label them on the plan. Also, prior to final site plan approval the easements shall be set to record with a maintenance agreement approved by the County Attorney. Prior to final site plan approval on the plan provide the Deed Book and Page reference number of these recorded easements. Staff suggests the applicant depict these easements on the Right of Way Vacation plat (SUB2013 -181) or the final subdivision plat (SUB201400049). Also assure to provide a maintenance agreement for the County Attorney to review OR assure that the previous Covenants and Restrictions document covers the additional landscaping easements and then set that plat and legal document to record. " [14 -303L] Sight Distance Easements. It appears that the plat incorrectly labels the two proposed Sight Distance Easement which first appear on the Right of Way Vacation plat (SUB2013 -181) as *SE* recorded in DB4364 -25. However, staff has reviewed the recorded plat being referenced and has been unable to locate the sight distance easements, notably the area of these easements was formerly Dedicated Right of Way, thus they would not have existing? Staff believes these two easements should be labeled as *SE -1 * as they are proposed. Please clarify, or revise if appropriate. 6. [14 -303Q] Water Supply. On the plat provide a note which states that the subdivision will be served by a public water supply and a public sewer supply. 7. [Comment & 15.31 On the plat provide information regarding density for the entire development (Stonewater single family lots and townhouse lots). 8. [Comment] There appears to be a typographical error / miss calculation under the Block B Area Summary. The sum of Block B area is listed as 16,167 SF; however, when the areas of Lot 43 through 48 are added staff calculated 16,168 SF. Revise if appropriate. 9. [Comment] Above the signature line for the Agent for the BOS, assure that "SUB2014 -" is correctly filled in with the true SUB #; otherwise, remove this reference. 10. [Comment] This plat cannot be approved until VDOT, ACSA, Engineering, Parks and Recreation, and Fire & Rescue provide their approvals. Comments will be forwarded to the applicant upon receipt of these comments. Please contact Christopher Perez at the Division of Zoning and Current Development at 296 -5832 ext. 3443 for further information. Please address all comments. 2 Review Comments Project Name: Stonewater Subdivision - Final Final Plat Date Completed: Monday, March 24, 2014 Reviewer: Jay Schlothauer Department /Division /Agency: Inspections Reviews Based on plat dated March 10, 2014. No comments or conditions. Review Status: No Objection