HomeMy WebLinkAboutWPO201300011 Review Comments 2013-02-07Project Name: Date Completed: Reviewer: Department/Division/Agency: Reviews Comments: Review Status: Review Comments FIFTH STREET STATION Tuesday, April 09, 2013 Max Greene Engineering Erosion and Sediment Control Plan Called designer and asked for clarification on outlet structure for Sediment Trap/Basin. Requested Changes Rc[N COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,Room 227 Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 Project: Fifth Street Station WPO201300011 Plan preparer: Bohler Engineering [fax 540-349-0321] Owner or rep.: Avon Holdings LLC Plan received date: 06 February 2013 Date of comments: 15 March 2013 Reviewer: Max Greene The Water Protection Plans(WP0201300011)submitted 12 February 2013 have received Engineering Review and do not appear to meet Albemarle County minimum checklist items for approval. Please adequately address the following comments for final approval: 1. This plan appears to be an amendment to the WPO201100100 New Era Properties,LLC Site- Avon Street Extended water protection plan for a waste area. Please show the previously approved grading and make this an actual amendment to the previously approved plans. 2. Perimeter erosion control measures do not appear to meet the minimum requirements of the State and County. Please show sediment control structures designed for the coinciding drainage areas. Sediment traps and basins may be required for approval. 3. Diversions appear to direct concentrated storm flows over critical slopes and will require temporary slope drains and energy dissipaters. 4. Silt fence is shown above the proposed site. Please explain. 5. Diversions need to be designed for the corresponding drainage areas and accurately depicted on the plan sheet. 6. Rock check dams do not work as shown. 7. Please show Std. & Spec. 3.03 (CRS)on the plan sheet. 8. Limits of disturbance will encompass all erosion control measures and any other work to be performed by this application. 9. Please show the headwater storage area for pipe inlets on the plan for construction and inspection. Road should be a minimum 18"above the headwater depth. 10. Temporary access roads will require turn-around areas adequately sized for the anticipated vehicles that will be utilizing this access. 11. Page 2 of 6 appears to be a boilerplate from another project. Please explain purpose of this page. `L"1=igineering Review Comments Page 2 of 2 12. Please update the E&SC narrative to match the plans. Albemarle County Design Standards Manual link: http://www.albemarle.org/upload/images/forms center/departments/community development/forms/desig n standards manual/Albemarle County Design Standards_Manual 22Oct2012.pdf Once these comments have been addressed,please submit 2 copies of the revised plans, calculations, and narratives to Current Development Engineering. Current Development Engineering is available from 2:30-4 PM on Thursdays to discuss these review comments. Please contact Max Greene at 434-296-5832 ext. 3283 or email mgreene @albemarle.org to schedule an appointment. [17-204.f1 An application for an erosion and sediment control plan that requires modifications,terms,or conditions to be included in order for it to be approved shall be deemed to be withdrawn if the owner fails to submit a revised plan addressing the omitted modifications,terms or conditions within six(6)months after the owner is informed of the omitted information as provided under paragraph(B).