FIFTH STREET STATION
Tuesday, April 09, 2013
Max Greene
Engineering
Erosion and Sediment Control Plan
Called designer and asked for clarification on outlet structure for Sediment Trap/Basin.
Requested Changes
Rc[N
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road,Room 227
Charlottesville,Virginia 22902-4596
Phone(434)296-5832 Fax(434)972-4126
Project: Fifth Street Station WPO201300011
Plan preparer: Bohler Engineering [fax 540-349-0321]
Owner or rep.: Avon Holdings LLC
Plan received date: 06 February 2013
Date of comments: 15 March 2013
Reviewer: Max Greene
The Water Protection Plans(WP0201300011)submitted 12 February 2013 have received
Engineering Review and do not appear to meet Albemarle County minimum checklist items for
approval. Please adequately address the following comments for final approval:
1. This plan appears to be an amendment to the WPO201100100 New Era Properties,LLC Site-
Avon Street Extended water protection plan for a waste area. Please show the previously
approved grading and make this an actual amendment to the previously approved plans.
2. Perimeter erosion control measures do not appear to meet the minimum requirements of the State
and County. Please show sediment control structures designed for the coinciding drainage areas.
Sediment traps and basins may be required for approval.
3. Diversions appear to direct concentrated storm flows over critical slopes and will require
temporary slope drains and energy dissipaters.
4. Silt fence is shown above the proposed site. Please explain.
5. Diversions need to be designed for the corresponding drainage areas and accurately depicted on
the plan sheet.
6. Rock check dams do not work as shown.
7. Please show Std. & Spec. 3.03 (CRS)on the plan sheet.
8. Limits of disturbance will encompass all erosion control measures and any other work to be
performed by this application.
9. Please show the headwater storage area for pipe inlets on the plan for construction and inspection.
Road should be a minimum 18"above the headwater depth.
10. Temporary access roads will require turn-around areas adequately sized for the anticipated vehicles
that will be utilizing this access.
11. Page 2 of 6 appears to be a boilerplate from another project. Please explain purpose of this page.
`L"1=igineering Review Comments
Page 2 of 2
12. Please update the E&SC narrative to match the plans.
Albemarle County Design Standards Manual link:
http://www.albemarle.org/upload/images/forms center/departments/community development/forms/desig
n standards manual/Albemarle County Design Standards_Manual 22Oct2012.pdf
Once these comments have been addressed,please submit 2 copies of the revised plans, calculations, and
narratives to Current Development Engineering.
Current Development Engineering is available from 2:30-4 PM on Thursdays to discuss these review
comments. Please contact Max Greene at 434-296-5832 ext. 3283 or email mgreene @albemarle.org to
schedule an appointment.
[17-204.f1 An application for an erosion and sediment control plan that requires modifications,terms,or conditions to be
included in order for it to be approved shall be deemed to be withdrawn if the owner fails to submit a revised plan addressing the
omitted modifications,terms or conditions within six(6)months after the owner is informed of the omitted information as
provided under paragraph(B).