Loading...
HomeMy WebLinkAboutWPO201300022 Review Comments 2013-03-27Project Name: Date Completed: Reviewer: Department/Division/Agency: Reviews Comments: Review Status: Review Comments Whittington Subdivision - Phase A Monday, September 09, 2013 Ana Kilmer CommDev-Central Ops Erosion and Sediment Control Plan 8/29/2013- SWA received today. SWA needs corrections. 9/9/2013 - SWA recorded in DEED BOOK 4409, PAGE 660 Approved COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 WPO Plan Review Project: Whittington Subdivision - Phase A Number: WPO201300022 Date: 7-11-2013 Reviewer: Max Greene Phone: 296-5832 ext. 3283 This is an abbreviated review comment notice. County engineering staff is available every Thursday afternoon to discuss details of review. To schedule, please call your reviewer for an appointment. Erosion & Sediment Control: (Code Chapter 17, Article II) Y N x State standards followed, and Design Standards Manual notes and details x Adequate limits and perimeter measures out of work areas x All stages protected adequately x Adequate channels Simplify limits of construction, Provide a sediment trap at lot 79 area Stormwater Management: (Code Chapter 17, Article III) Y N Enough capture and treatment for on-site areas Enough detention storage for on-site areas Sealed hydrologic and hydraulic computations provided No fee, no review Mitigation: (Code Chapter 17, Article III) Y N Buffers and disturbed areas adequately shown Adequate plantings at 2:1, or other mitigation provided N/A This review attempts to encompass the larger compliance questions. County staff does not assume responsibility for any calculation or plan details, and cannot cover the intricacies of every plan submitted. Each plan and calculation must have a professional seal and signature to assume these responsibilities. This plan is Adequate x Not Adequate Adequate Not Adequate Adequate Not Adequate Approved (please see attached Approval Fact Sheet) x Not Approved COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Project: Whittington Subdivision – Phase A WPO201300022 Plan preparer: Dominion Engineering [fax 434-979-1681] Owner or rep.: TRIUMPH WHITTINGTON LLC [8230 Leesburg Pike] Plan received date: 17 June 2013 Date of comments: 10 July 2013 Reviewer: Max Greene The Erosion Control Plans (WPO201300022) submitted 17 June 2013 have received Engineering Review and do not appear to meet Albemarle County minimum checklist items for approval. Please adequately address the following comments for final approval: A) Stormwater Management and Mitigation Plan 1) Please post the review fee for SWM along with an updated WPO application form. B) Erosion Control Plan 1) Please remove the little “No Disturb” areas from the plan. Should the contractor be found in violation of entering a “No Disturb” area then the project will be delayed until the violation is abated. The Limits of disturbance should allow for the free flow of construction equipment and supplies to facilitate expedient grading and stabilization of the site. 2) Please widen the limits of construction for the water and sanitary sewer line installations. The contractor/operator will most likely require a minimum 40’ temporary construction easement to install the pipes and manholes. 3) Once these comments have been addressed, please submit 2 copies of the revised plans, calculations, and narratives to Current Development Engineering along with the required review fee and transmittal form. Current Development Engineering is available from 2:30-4 PM on Thursdays to discuss these review comments. Please contact Max Greene at 434-296-5832 ext. 3283 or email mgreene@albemarle.org to schedule an appointment. [17-204.f] An application for an erosion and sediment control plan that requires modifications, terms, or conditions to be included in order for it to be approved shall be deemed to be withdrawn if the owner fails to submit a revised plan addressing the omitted modifications, terms or conditions within six (6) months after the owner is informed of the omitted information as provided under paragraph (B). File: Document5 Project Name: Date Completed: Reviewer: Department/Division/Agency: Reviews Comments: Review Status: Review Comments Whittington Subdivision - Phase A Wednesday, April 03, 2013 Max Greene Engineering Erosion and Sediment Control Plan Per 17-204.E WPO plan cannot be approved without an approved site plan or Plat. Please submit a preliminary plat for review and approval. Application appears to be for the rong parcel. TMP should be 09000000000300 Denied