Loading...
HomeMy WebLinkAboutSDP201300004 Review Comments 2013-01-22Project Name: Date Completed: Reviewer: Department/Division/Agency: Reviews Comments: Review Status: Review Comments Ivy Creek United Methodist Church - Initial Monday, June 10, 2013 Ron Higgins Zoning Initial Site Plan JTN: I let the applicants know that I confirmed with Ron that removing any trees to accommodate the Health Department would not violate condition #4 of their SP, but they would need to show any trees to be removed on their revised final site plan. See Recommendations Project Name: Date Completed: Reviewer: Department/Division/Agency: Reviews Comments: Review Status: Review Comments Ivy Creek United Methodist Church - Initial Thursday, June 06, 2013 Josh Kirtley Health Department Initial Site Plan JTN: Josh and I met with a member of the building committee and Abe from Terra Eng. onsite to discuss options. Josh examined the existing septic system and requested changes. On 6/10, Keith Woodard informed me that Josh and Pete Kesecker were working to redesign the system. Requested Changes OFALg GfRGINiP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,Room 227 Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 Project: Ivy Creek Methodist Church (WPO2013-00004) Plan preparer: Terra Engineering and Land Solutions,P.C. [tel 540-337-4591] Owner or rep.: Ivy Creek United Methodist Church Plan received date: 15 January 2013 Date of comments: 11 March 2013 Reviewer: Michael Koslow The first erosion and sediment control and stormwater management plan (WP020I300004) submitted 15 January 2013 has received Engineering Review and does not appear to meet Albemarle County minimum checklist items for approval. Please adequately address the following comments for final approval: A. Title Information 1) Each sheet of final WPO plan set will require a professional engineer's signature and date for approval(review copies do not need to be signed). B. Existing Conditions Information 1) Please include the existing conditions sheet with the WPO submittal. 2) Please visually confirm the topographic survey conditions and note as such on the plans. Topography over one year old must be field verified by designer. 3) Please include a benchmark location and elevation for reference. An existing utility or other known position will suffice. 4) Please identify existing easement for existing utilities including overhead electric lines and underground gas main shown on sheet C2.0 by deed book and page number. C. Erosion and Sediment Control Plan 1) Please address contractor parking and staging areas. If these areas will require additional land disturbance,please include those additional land disturbance areas with ESC plan. 2) Please include dust control with ESC plan. 3) Please indicate either trees to remain or trees to be saved for each tree within the limits of construction of clarity. 4) Please retract silt fence and expand diversion dike behind site east to a relatively flat location (recommend elevation 550). Silt fence should only be placed in flat locations(ideally along a contour line). engineering Review Comments - Page 2 of 3 5) Please provide an adequate channel analysis for runoff from proposed construction.Analysis needs to be carried further downstream compared with submitted MS-19 computations shown on p. 28 of SWM Report dated 10/31/2012. Analysis could be proven given: a) adherence to VESCH MS-19 requirements(see 4VAC50-30-40,MS-19 sec.b(1)): The applicant shall demonstrate that total drainage area to the point of analysis within the channel is one hundred times greater than the contributing drainage areas of the project in question. A report or plan depiction with analysis to this point could prove channel adequacy. b) adherence to VA code 10.1-603.4(7): essentially,the required condition for an on-site solution without looking downstream for a 24 hour 1.5,2, and 10-year intensity event- (post-development)Peak flow rate<=Pf*Vf/Vp Where Pf=peak flow rate in a forested condition Vf=runoff volume in a forested condition Vp=runoff volume proposed D. Stormwater Management Plan 1) Please include a proposed stormwater management easement around proposed bioretention filter Please note due to proposed filter media, it appears BMP facility is intended to be a bio-filter. Please remove references to pond and basin from plans and computations. 2) Proposed bio-filter should not include a clay liner as identified on Note 2 above detail 1-5.0"Bio- Filter Combined with Detention Basin"on sheet C7.0. 3) Please include a cross section of the proposed berm(could modify SWM Pond Riser Outlet to show entire barrel length through berm). Please draw cross section to a scale for reference(e.g. the 10"orifice appears to be shown smaller than it actually is proposed in the detail). 4) Because the bio-filter was designed without an emergency spillway,please increase the berm elevation to provide 2' of freeboard above the 100 year storm elevation. 5) On p. 4 of Stormwater Calculations,please specify rainfall event frequency basis for intensities shown in pre-development and post-development conditions. 6) Please identify dimensions and material for riser base for riser outlet base proposed on sheet C7.0. 7) Please include a forebay for bio-filter proposed on sheet C7.0. Forebay area must be sized for 25%of bio-filter's floor area. This area cannot be considered for treatment(no filter media); however it can be included for detention. 8) Please label floor area for bio-filter proposed on sheet C7.0. Engineering Review Comments Page 3 of 3 Current Development Engineering is available from 2:30-4 PM on Thursdays to discuss these review comments. Please contact Michael Koslow at 434-296-5832 ext. 3297 or email mkoslownalbemarle.org to schedule an appointment. [17-204.f] An application for an erosion and sediment control plan that requires modifications,terms,or conditions to be included in order for it to be approved shall be deemed to be withdrawn if the owner fails to submit a revised plan addressing the omitted modifications,terms or conditions within six(6)months after the owner is informed of the omitted information as provided under paragraph(B). Project Name: Date Completed: Reviewer: Department/Division/Agency: Reviews Comments: Review Status: Review Comments Ivy Creek United Methodist Church - Initial Wednesday, March 06, 2013 Johnathan Newberry Planning Initial Site Plan Correct application was dropped off (but still checked incorrect box on page 2). Transmitted Engineering folder to Glenn Brooks on 1/30/13. Comments: 1.[32.5.2.a] General Information Under the “Project Data” section on Sheet C1.0, please add the conditions of special use permit SP201000010, as well as the present uses of abutting parcels. Please also add the total number of sheets to the bottom of each sheet. 2.[32.5.2.b] Information regarding the proposed use. Please add information about the maximum height of all structures, the maximum amount of impervious cover of the site and the maximum amount of paved parking and other vehicular circulation areas. 3.[32.5.2.c] Phase lines The Zoning Division would like to confirm safe and convenient access throughout construction. If phasing is planned, please show phase lines and the proposed timing of development. 4.[32.5.2.m] Ingress and egress Please show the distance to the centerline of the nearest existing street intersection from the proposed ingress and egress. 5.[32.5.2.n] Existing and proposed improvements Please show all existing outdoor lighting and provide a lighting plan that meets of the requirements of special use permit SP201000010 Condition #3. On a recent site visit, the existing light pole marked “VP RF 25” did not appear to be a full cut-off fixture. 6.[32.5.2.s] Additional information Please illustrate or note on the plan compliance with all special use permit conditions. Requested Changes Project Name: Date Completed: Reviewer: Department/Division/Agency: Reviews Comments: Review Status: Review Comments Ivy Creek United Methodist Church - Initial Tuesday, March 05, 2013 Michael Koslow Engineering Initial Site Plan Please include a landscape plan to demonstrate limits of proposed turf and landscaping proposed to close existing entrance as identified on sheet C3.0. See Recommendations COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Project: Ivy Creek Methodist - Initial SDP201300004 Plan preparer: Terra Engineering [tel 540-337-4591] Owner or rep.: Ivy Creek Methodist Church [tel 434-973-4793] Plan received date: 31 January 2013 Date of comments: 4 March 2013 Reviewer: Michael Koslow Review coordinator: JT Newberry The first initial site plan and comps submittal (SDP201300004) submitted 22 January 2013 has received Engineering Review and does not appear to meet Albemarle County minimum checklist items for approval. This review does not include a review of Erosion & Sediment Control or Stormwater Management. Please adequately address the following comments for initial site plan approval: A. Existing Conditions Information 1) Please label all existing pipes and drainage structures with a unique number for reference. 2) Please include the date for field verification of the topographic information. All topography should be at least visually field verified by the designer with the last year. 3) Please include a benchmark location and elevation for reference. An existing utility or other known position will suffice. 4) Please identify existing easement for existing utilities including overhead electric lines and underground gas main shown on sheet C2.0 by deed book and page number. B. Proposed Plan View Information 1) Please label maximum height of proposed timber retaining wall shown on sheet C3.0. 2) Please label all proposed pipes and drainage structures (including slotted drain pipe) with a unique number for reference. 3) Please include proposed easements for: a) Apparent temporary grading for biofilter outlet shown on sheet C3.0. b) Stormwater management easements for biofilter and infiltration trench shown on sheet C3.0. Engineering Review Comments Page 2 of 3 c) Sight distance easement for west approach to entrance shown on sheet C3.0 4) Please provide a detail or material type for Curb Islands proposed on sheet C3.0. 5) Please identify width of proposed sidewalk on sheet C3.0. Sidewalk adjacent to parking areas must be a minimum of 6’ wide. 6) Please confirm limits of paving for proposed entrance on sheet C3.0. 7) Enclosed drainage must be in 15” minimum diameter pipes with manholes at junctions for maintenance. It appears there is a redundant drainage conveyance with proposed 6” HDPE pipe running parallel to proposed infiltration trench. Conveyance of roof drainage across proposed access road could be achieved with a slotted vane drain pipe or trench drain. 8) Please label all proposed pipes and drainage structures with unique numbers for reference. Please adequately address the following comments for final site plan approval: C. Application Information 1) Owner is required to provide a completed copy of the standard stormwater maintenance agreement and fee for recordation for any stormwater management facilities. 2) Prior to final site plan approval, a separate set of Water Protection Ordinance plans must be approved including: stormwater management plan and erosion and sediment control plan. 3) Prior to final site plan approval: • water protection ordinance – erosion and sediment control and stormwater management and • water and sewer bonds must be calculated by the county (water and sewer bonds are calculated by ACSA) and paid by owner after receipt of a Bond Request Form from owner. D. Title Information 1) Each sheet of final site plan will require a professional engineer’s signature and date. E. Plan Detail Information 1) Please provide proposed traffic volume or calculations for pavement section thicknesses for the proposed entrance pavement section on sheet C4.0. Engineering Review Comments Page 3 of 3 2) Please include county general construction notes from Design Standards Manual. 3) Please provide detail for bedding material proposed for proposed infiltration trench if needed (see also comment B7). F. Drainage Profiles 1) Please include drainage profiles for all proposed pipes and ditches. G. Drainage Computations 1) Please include drainage computations. Community Development Engineering is available from 2:30-4 PM on Thursdays to discuss these review comments. Please contact Michael Koslow at 434-296-5832 ext. 3297 or email mkoslow@albemarle.org to schedule an appointment. File: C:\Users\mkoslow\Documents\Current Reviews\SDP201300004 Ivy Creek Methodist - Initial\CDDE1_ISP_MAK_Ivy Creek Methodist - Initial_SDP201300004.doc Project Name: Date Completed: Reviewer: Department/Division/Agency: Reviews Comments: Review Status: Review Comments Ivy Creek United Methodist Church - Initial Wednesday, February 06, 2013 Jay Schlothauer Inspections Initial Site Plan Based on plans dated October 31, 2012. No comments or conditions. No Objection Project Name: Date Completed: Reviewer: Department/Division/Agency: Reviews Comments: Review Status: Review Comments Ivy Creek United Methodist Church - Initial Monday, February 04, 2013 Shawn Maddox Fire Rescue Initial Site Plan Review based on Final Site Development Plan dated 10-31-2012. 1. The 18' proposed gravel drive shall have a 20' minimum unobstructed width. 2. The proposed gravel drive shall be capable of supporting the imposed load of fire apparatus weighing at least 75,000lbs. 3. Dead end fire apparatus access roads in excess of 150ft shall be provided with width and turnaround provisions. See VA Statewide Fire Prevention Code Table D103.4 for exampls. 4. Please provide turning radius for each turn in the proposed gravel drive and any other travel ways on the site plan. Requested Changes