Loading...
HomeMy WebLinkAboutSDP201300040 Review Comments 2013-06-25Project Name: Date Completed: Reviewer: Department/Division/Agency: Reviews Comments: Review Status: Review Comments Ivy Creek United Methodist Church - Final Friday, July 26, 2013 Johnathan Newberry Planning Final Site Development Plan Awaiting final approval from VDOT and Engineering. All Planning comments have been satisfied. See Recommendations Project Name: Date Completed: Reviewer: Department/Division/Agency: Reviews Comments: Review Status: Review Comments Ivy Creek United Methodist Church - Final Wednesday, July 17, 2013 Michael Koslow Engineering Final Site Development Plan Please include details for all non VDOT standard drainage structures, pipes, and cleanouts proposed on sheet C3.0 including proposed 10" perforated pipe. See Recommendations Project Name: Date Completed: Reviewer: Department/Division/Agency: Reviews Comments: Review Status: Review Comments Ivy Creek United Methodist Church - Final Saturday, July 13, 2013 Shawn Maddox Fire Rescue Final Site Development Plan 1. Please show by either a change to the plan or a note how the turn around for emergency apparatus will be provided. 2. The comment pertaining to the travel way supporting the weight of fire apparatus has been addressed. 3. The comment pertaining to the minimum clear width has been discussed. Fire Rescue will approve a plan with 18' minimum clear unobstructed width as long as there is no parking allowed along the travel way. Requested Changes Ip COMMONWEALTH Of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper, Virginia 22701 -3819 Gregory A. Whirley Commissioner of Highways July 8, 2013 Mr. J.T. Newberry County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Re: SDP - 2013 -00040 Ivy Creek United Methodist Church Dear Mr. Newberry: We have completed the review of the subject project and offer the following comments: 1. It is unclear from the site plan the method for closing the existing entrances to the parcel. The areas of the existing entrances need to be reestablished with a good stand of grass. In addition, the shoulder roadside ditch will need to be graded as necessary to provide adequate drainage. 2. On sheet C3.1, it appears that the proposed landscaping encroaches onto the prescriptive right -of -way. The landscaping should be adjusted such that the landscaping is located outside of the right -of -way. 3. The work zone for this project needs to be set up based on the 2011 Virginia Work Area Protection Manual. TTC -5.0 would be the more appropriate work zone for this project than the flagging operation detail provided on the site plan. 4. The sight lines need to originate at a point that is 14.5' off the edge of pavement of Woodlands Road. 5. The site plan needs to be signed by the design engineer. If you need additional information concerning this project, please feel free to contact me. Sincerely, , � kAt Troy Austin, P.E. Area Land Use Engineer Culpeper District VirginiaDOT.org WE KEEP VIRGINIA MOVING