Ivy Creek United Methodist Church - Final
Friday, July 26, 2013
Johnathan Newberry
Planning
Final Site Development Plan
Awaiting final approval from VDOT and Engineering. All Planning comments have been satisfied.
See Recommendations
Project Name:
Date Completed:
Reviewer:
Department/Division/Agency:
Reviews
Comments:
Review Status:
Review Comments
Ivy Creek United Methodist Church - Final
Wednesday, July 17, 2013
Michael Koslow
Engineering
Final Site Development Plan
Please include details for all non VDOT standard drainage structures, pipes, and cleanouts proposed on sheet
C3.0 including proposed 10" perforated pipe.
See Recommendations
Project Name:
Date Completed:
Reviewer:
Department/Division/Agency:
Reviews
Comments:
Review Status:
Review Comments
Ivy Creek United Methodist Church - Final
Saturday, July 13, 2013
Shawn Maddox
Fire Rescue
Final Site Development Plan
1. Please show by either a change to the plan or a note how the turn around for emergency apparatus will be
provided.
2. The comment pertaining to the travel way supporting the weight of fire apparatus has been addressed.
3. The comment pertaining to the minimum clear width has been discussed. Fire Rescue will approve a plan with
18' minimum clear unobstructed width as long as there is no parking allowed along the travel way.
Requested Changes
Ip
COMMONWEALTH Of VIRGINIA
DEPARTMENT OF TRANSPORTATION
1601 Orange Road
Culpeper, Virginia 22701 -3819
Gregory A. Whirley
Commissioner of Highways
July 8, 2013
Mr. J.T. Newberry
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Re: SDP - 2013 -00040 Ivy Creek United Methodist Church
Dear Mr. Newberry:
We have completed the review of the subject project and offer the following comments:
1. It is unclear from the site plan the method for closing the existing entrances to the parcel.
The areas of the existing entrances need to be reestablished with a good stand of grass. In
addition, the shoulder roadside ditch will need to be graded as necessary to provide
adequate drainage.
2. On sheet C3.1, it appears that the proposed landscaping encroaches onto the prescriptive
right -of -way. The landscaping should be adjusted such that the landscaping is located
outside of the right -of -way.
3. The work zone for this project needs to be set up based on the 2011 Virginia Work Area
Protection Manual. TTC -5.0 would be the more appropriate work zone for this project
than the flagging operation detail provided on the site plan.
4. The sight lines need to originate at a point that is 14.5' off the edge of pavement of
Woodlands Road.
5. The site plan needs to be signed by the design engineer.
If you need additional information concerning this project, please feel free to contact me.
Sincerely,
, � kAt
Troy Austin, P.E.
Area Land Use Engineer
Culpeper District
VirginiaDOT.org
WE KEEP VIRGINIA MOVING