Loading...
HomeMy WebLinkAboutSUB201300020 Review Comments 2013-02-12Project Name: Date Completed: Reviewer: Department/Division/Agency: Reviews Comments: Review Status: Review Comments Old Trail Village Blocks 5, 20, 21 - Final Wednesday, May 01, 2013 Johnathan Newberry Planner Z&&CD Final Plat Approved Project Name: Date Completed: Reviewer: Department/Division/Agency: Reviews Comments: Review Status: Review Comments Old Trail Village Blocks 5, 20, 21 - Final Wednesday, May 01, 2013 Joel DeNunzio VDOT Final Plat JTN: No comments received from VDOT. No Objection Project Name: Date Completed: Reviewer: Department/Division/Agency: Reviews Comments: Review Status: Review Comments Old Trail Village Blocks 5, 20, 21 - Final Thursday, April 25, 2013 Howard Lagomarsino Fire Rescue Final Plat Based on Plat dated April 10, 2013: In general - no objections to the plat... Keep in mind as this portion of the project progresses Fire Rescue's concerns will center on emergency vehicle access, room to safely iperate and adequate water supply. Below is a sampling of some of the commmon concerns that we have had with similar projects (a plat plan does not provide enough detail for complete listing of all concerns): 1.Fire apparatus access roads shall have an unobstructed width of not less than 20 feet Streets designed with on street parking shall be no less than 28 ft FC/FC for one side parking and 36 ft fc/fc for two side parking. 2. Streets with parking restricted to one side needs to be marked "No parking". 3. Cul-da-sac Radius shall not be less than 48 ft. 4. Required fire flow shall be no less then 1000 gpm @ 20 psi. 5. Hydrant locations shall be on a 500 ft spacing per travelway. Contact Fire Offical about proposed locations. See Recommendations Project Name: Date Completed: Reviewer: Department/Division/Agency: Reviews Comments: Review Status: Review Comments Old Trail Village Blocks 5, 20, 21 - Final Friday, March 29, 2013 Joel DeNunzio VDOT Final Plat I have reviewed the subject plat and have one comment. There needs to be a road connecting to Old Trail Drive at the existing Upland Drive and extending along the divide between blocks 5 and 20 to connect to the road parallel to Old Trail Drive running along the back of blocks 5, 6, and 20. Megan Oleynik Engineering Intern VDOT - Culpeper District Requested Changes Project Name: Date Completed: Reviewer: Department/Division/Agency: Reviews Comments: Review Status: Review Comments Old Trail Village Blocks 5, 20, 21 - Final Thursday, March 28, 2013 Johnathan Newberry Planner Z&&CD Final Plat 4/2/13: I consulted with Megan about Bill's request to not respond to VDOT's and my comment #4 about showing the streets within these blocks as shown on the rezoning plan. I explained to Bill that we could accept an outline of the streets along with a note on the plat that stated access to these blocks could not be provided off of Old Trail Drive (and therefore would have to come off the internal streets). Bill stated that he would contact VDOT directly and find out if this would be okay with them too. Requested Changes C:\Users\mkoslow\Documents\Current Reviews\SUB201300020 Old Trail Village Blocks 5, 20, 21 - Final\E1_FPT_MAK_SUB-2013-00020 Old Trail Village Blocks 5, 20, 21 - Final.doc County of Albemarle Department of Community Development Memorandum To: Jonathan Newberry, Project Planner From: Michael Koslow, Engineering Review (SUB201300020) Project: Old Trail Village Blocks 5, 20, 21 - Final Plat Plan preparer: Roudabush, Gale & Associates Inc. [434-977-0205] Owner or rep.: March Mountain Properties, LLC Plan received date: 8 February 2013 Date of comments: 12 March 2013 Reviewer: Michael Koslow The final subdivision plat has been reviewed: 1. Please include an indication for Block 5’s location on Vicinity Map (appears to point to 5, 20, and 21, but only call out blocks 20 & 21) or modify plat area to only include blocks 20 & 21. 2. Please indicate the proposed public road right of way, SWM easements, and sight distance easements proposed with Edenbrook Park site plan (SDP2012-00042 preliminary; not yet approved) on this final plat. Final plat approval cannot precede final site plan or WPO plan (not yet submitted) approval for Edenbrook Park. 3. Please indicate proposed water and sewer lines, proposed drainage lines and structures, fire hydrants, and proposed stormwater management facilities after approved on Edenbrook Park site and WPO plans. 4. A VDOT accepted public road or a subdivision - road bond will need to be posted for roads proposed with Edenbrook Park site plan prior to the approval of the final plat. 5. Subdivision – water & sewer (by ACSA) and WPO (ESC and SWM, by the county) bonds will need to be posted prior to the approval of the final plat. 6. Future anticipated fees associated with the engineering review of the final plat and site grading permit and inspection could include but are not limited to: Public Street plan review fee $250 / each review Erosion & Sediment Control plan review fee $300 / each review Stormwater Management plan & calcs review fee $300 / each review Grading permit and first year inspections fee $100 / disturbed acre 7. A stormwater management maintenance agreement will be required for Edenbrook Park prior to final subdivision plat approval. Project Name: Date Completed: Reviewer: Department/Division/Agency: Reviews Comments: Review Status: Review Comments Old Trail Village Blocks 5, 20, 21 - Final Tuesday, February 26, 2013 Robbie Gilmer Fire Rescue Final Plat Based on Plat dated 2/7/13 1. All roads require a 20 ft unobstructed travel way. 2. All Radii shall be a minimum of 25 ft. 3. Hydrants shall have a spacing of 500 ft per travelway. See Recommendations COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Rd. North Wing Charlottesville, VA 22902 Phone: 434-296-5832 Fax: 434-972-4126 Memorandum To: Brian Jamison, Roudabush, Gale and Associates, Inc. From: J.T. Newberry - Planner Date: March 28, 2013 Subject: SUB201300020 Old Trail, Blocks 5, 20, and 2 – Final The Albemarle County Current Development Division will grant or recommend approval of the final plat referenced above when the following comments have been addressed. [Each comment is preceded by the applicable reference in the Subdivision/Zoning Ordinances, unless otherwise specified.] 1. [14-302(A)(2)] Vicinity map. On Sheet 1, please add Block 5 to the label of blocks shown in the vicinity map. 2. [14-302(B)(2)] Name of plat preparer. On Sheet 1, please add the name of the person who prepared the plat. 3. [14-302(B)(8) and Code of Development, p. 31] Yards. On Sheet 1, please revise the setbacks for Block 5 to show “0 feet” for the front, side and rear setbacks. In a separate note, please show the setbacks for Block 20 and Block 21 to be “5 feet” for the front setback, “0 feet” for the side setback and “5 feet” for the rear setback. 4. [Rezoning Plan, Sheet 4 of 9] Transportation Plan. On Sheet 2, please show the areas reserved for the streets identified as “B” and “E” within these blocks. The standards for these streets are also shown on page 23 of the Code of Development. Please contact J.T. Newberry in the Planning Division at jnewberry@albemarle.org or 434- 296-5832, ext. 3270 for further information about any of the comments above. Engineering Comments Attached below. Please contact Michael Koslow at mkoslow@albemarle.org or 434-296-5832, ext. 3297 for further information. Fire and Rescue Based on Plat dated 2/7/13 1. All roads require a 20 ft unobstructed travel way. 2. All Radii shall be a minimum of 25 ft. 3. Hydrants shall have a spacing of 500 ft per travelway. Please contact Robbie Gilmer at rgilmer@albemarle.org or 434-296-5833for further information. VDOT Comments will be forwarded as soon as they are received. C:\Users\mkoslow\Documents\Current Reviews\SUB201300020 Old Trail Village Blocks 5, 20, 21 - Final\E1_FPT_MAK_SUB-2013-00020 Old Trail Village Blocks 5, 20, 21 - Final.doc County of Albemarle Department of Community Development Memorandum To: Jonathan Newberry, Project Planner From: Michael Koslow, Engineering Review (SUB201300020) Project: Old Trail Village Blocks 5, 20, 21 - Final Plat Plan preparer: Roudabush, Gale & Associates Inc. [434-977-0205] Owner or rep.: March Mountain Properties, LLC Plan received date: 8 February 2013 Date of comments: 12 March 2013 Reviewer: Michael Koslow The final subdivision plat has been reviewed: 1. Please include an indication for Block 5’s location on Vicinity Map (appears to point to 5, 20, and 21, but only call out blocks 20 & 21) or modify plat area to only include blocks 20 & 21. 2. Please indicate the proposed public road right of way, SWM easements, and sight distance easements proposed with Edenbrook Park site plan (SDP2012-00042 preliminary; not yet approved) on this final plat. Final plat approval cannot precede final site plan or WPO plan (not yet submitted) approval for Edenbrook Park. 3. Please indicate proposed water and sewer lines, proposed drainage lines and structures, fire hydrants, and proposed stormwater management facilities after approved on Edenbrook Park site and WPO plans. 4. A VDOT accepted public road or a subdivision - road bond will need to be posted for roads proposed with Edenbrook Park site plan prior to the approval of the final plat. 5. Subdivision – water & sewer (by ACSA) and WPO (ESC and SWM, by the county) bonds will need to be posted prior to the approval of the final plat. 6. Future anticipated fees associated with the engineering review of the final plat and site grading permit and inspection could include but are not limited to: Public Street plan review fee $250 / each review Erosion & Sediment Control plan review fee $300 / each review Stormwater Management plan & calcs review fee $300 / each review Grading permit and first year inspections fee $100 / disturbed acre 7. A stormwater management maintenance agreement will be required for Edenbrook Park prior to final subdivision plat approval.