Loading...
HomeMy WebLinkAboutSDP201300006 Review Comments 2013-01-22Project Name: Date Completed: Reviewer: Department/Division/Agency: Reviews Comments: Review Status: Review Comments Peabody School - Major Friday, November 22, 2013 Megan Yaniglos Planning Major Amendment Administrative Approval Project Name: Date Completed: Reviewer: Department/Division/Agency: Reviews Comments: Review Status: Review Comments Peabody School - Major Tuesday, June 25, 2013 Robbie Gilmer Fire Rescue Major Amendment Based on plans dated 6/13/13 No objections or comments No Objection Project Name: Date Completed: Reviewer: Department/Division/Agency: Reviews Comments: Review Status: Review Comments Peabody School - Major Thursday, June 20, 2013 Megan Yaniglos Planning Major Amendment No Objection County of Albemarle Department of Community Development Memorandum Project: Peabody School – Major Amendment (SDP2013-00006) Plan preparer: Collins Engineering [tel 434-293-3719] Owner or rep.: Peabody School Plan received date: 29 January 2013 13 June 2013 Date of comments: 21 February 2013 18 June 2013 Reviewer: Michael Koslow Review coordinator: Megan Yaniglos The third submittal for the Major Amendment for the Peabody School site plan (SDP2013-00006), received 13 June 2013, has been reviewed by engineering staff. 1. Proposed site plan major amendment appears to disturb > 10,000 sft and appears to introduce additional impervious surface to the site. Please submit a WPO plan set to address erosion and sediment control and stormwater management. (Rev1) Comment has been addressed (see WPO2013-00033). 2. Final submittal will need to be professionally signed, sealed, and dated [18-32.6.1]. (Rev1) Comment has been addressed. 3. Please provide written documentation for construction permission or easement vacation for existing 60’ undisturbed buffer with DB1342 PG 238, 239 Plat DB 1102 PG 722. (Rev1) Comment has been addressed. 4. Please propose a stormwater management easement for proposed expanded bio-filter or alternate stormwater management facility on site. (Rev1) Please submit an easement plat to record easement proposed for SWM facility. 5. Due to existing 15’ gas line easement as identified on sheet 2 in conflict with proposed drainage pipe #3 as shown on sheet 4, please identify location for gas line or steps contractor should take to ensure excavation will not hit this existing gas line. (Rev1) Please include the test dig note requirement to protect both proposed pipe 1 and 3 on sheet 4. 6. It appears that, as designed, there could be a Zoning violation for the 10’ x 16’ parking spaces located adjacent to the proposed segmental block retaining wall shown on sheet 3. Please detail grade this area and indicate the thickness of the proposed wall. Two feet of proposed grass are required for an overhanging vehicle when the spaces are 16’ deep. (Rev1) Comment has been addressed. 7. Please provide drainage computations. (Rev1) Comment has been addressed. Current Development Engineering is available from 2:30-4 PM on Thursdays to discuss these review comments. Please contact Michael Koslow at 434-296-5832 ext. 3297 or email mkoslow@albemarle.org to schedule an appointment File: C:\Users\mkoslow\Documents\CurrentReviews\SDP201300006 Peabody School - Major\E2_MAJ_MAK_SDP201300006.doc Project Name: Date Completed: Reviewer: Department/Division/Agency: Reviews Comments: Review Status: Review Comments Peabody School - Major Tuesday, June 18, 2013 Michael Koslow Engineering Major Amendment project review superceded by resubmittal on 6/13/2013 See Recommendations 1 County of Albemarle Department of Community Development ________________________________________________________________________ Memorandum To: Scott Collins (scott@collins-engineering.com) From: Megan Yaniglos- Senior Planner Division: Planning Services Date: March 7, 2013 Rev1: May 23, 2013 Subject: SDP-2013-006 Peabody School- Major Site Plan Amendment The Planner for the Planning Services Division of the Albemarle County Department Community Development will recommend approve the plan referred to above when the following items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) [Each comment is preceded by the applicable reference to the Albemarle County Code.] 1. [32.5.2(a)] Revise the title to state ‘Major Site Plan Amendment’ and not final site plan on all sheets. Rev1: Comment addressed. 2. [32.5.2(a)] Revise the zoning district to state ‘PUD-Commercial’ instead of just PUD. Rev1: Comment addressed. 3. [32.5.2(a)] All conditions of the special use permit will need to be added to the sheets. This amendment cannot be approved until the SP is approved. Rev1: Comment not addressed. I do not see the verbatim language for the conditions of the special use permit. 4. [32.5.2(a)] The building setback for this property is 30 feet from public rights of way. Revise and show the setback on the property. The multi-purpose building will need meet this requirement. Rev1: Comment addressed. 5. [32.5.2(b)] State the height of all buildings, including the proposed multi-purpose building. Rev1: Comment addressed. 6. [32.5.2(b)] Show the dimensions for all sidewalks. Is the 5 foot width typical? Rev1: Comment addressed. 7. [32.5.2(i)] Show the existing entrance off of Southern Parkway on the demolition plan. Also show it to be closed and replanted after construction. Rev1: Show the proposed landscaping on the landscape plan for this closure. 8. [32.5.2(b)] The landscaping along the proposed parking lot and multi-purpose building will need to include some evergreen trees for screen. Revise the landscape plan to include recommended evergreen trees per the County’s plant list. 2 Rev1: Provide additional evergreen trees or large shrubs along the edge where the multi-purpose building is located. The condition of the special use permit requires screening in this area. Additional comments from revised plan. 1. [32.5.2(n); 4.12.16] The retaining wall width shown is not accurate. This type of wall will be wider that what is shown, according to the detail that was provided. These segmented walls “lean” into the slope they are holding and are offset. Looking at the plan, especially in the area by the parking lot and existing transformer to remain, it appears that this wall will run into the transformer, or will cause issues with the parking spaces to be only 16’ in length where a 2’ overhang is required. This reduction in depth of the parking area will not be approved, unless we can be assured that the 2’ will remain. The existing transformer may need to be relocated as a result. 2. [32.7.2.3] The new parking lot does not provide a safe way for pedestrians to walk to the main entrance of the existing school, which is located in the existing parking area. Pedestrians must walk in the parking lot up to the building. This is not acceptable. Provide a sidewalk from the parking lot up to the main entrance of the existing building. 3. [4.2] What you are showing for grading as it relates to critical slopes is concerning. While you are staying out of the critical slopes area as shown on the plan, when the construction happens these slopes will more than likely be disturbed. To be safe, it would be best if you applied for the waiver to disturb these slopes. 4. [32.7.9.4(b)] Provide tree protection fencing along the existing tree line to the west of the property. You are grading right up against the tree line and these trees need to be protected. We assured the board of supervisors that no trees would be disturbed in this area, and this needs to be shown. Also, the tree conservation checklist must be signed and dated. 5. [32.7.9.5 (e)] Provide landscaping in accordance with this section, all around the new parking lot where adjacent to public streets, this includes Stoney Ridge Road. Please contact Megan Yaniglos at the Department of Community Development 296-5832 ext. 3004 for further information. Project Name: Date Completed: Reviewer: Department/Division/Agency: Reviews Comments: Review Status: Review Comments Peabody School - Major Monday, May 13, 2013 Shawn Maddox Fire Rescue Major Amendment 1. A fire hydrant needs to be added on site. The hose lay to serve the new structure exceeds the maximum 500' hose lay requirement. A hydrant placed in the vicinity of the existing turn around would serve the fire department connection and provide a hose lay that meets the current requirements of less than 500'. 2. The new turn around that is provided must be marked as a fire lane to ensure parking will not obstruct emergency apparatus. Requested Changes Project Name: Date Completed: Reviewer: Department/Division/Agency: Reviews Comments: Review Status: Review Comments Peabody School - Major Monday, May 06, 2013 Jay Schlothauer Inspections Major Amendment Based on plans revised April 26, 2013. No further comments or conditions. No Objection COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 April 4, 2013 Scott Collins Collins Engineering RE: SDP-2013-006 Peabody School- Major Site Plan Amendment Mr. Collins: Your major site plan amendment has been reviewed. In order for the plan to be approved the revisions to the attached comments are required. Staff has provided references to provisions of Chapter 18 of the Code of the County of Albemarle. The Code is kept up to date by the County Attorney’s office. The Code may found on the County Attorney’s website which may be found under “Departments and Services” at Albemarle.org. In accord with the provisions of Section 32.4.3.5 of Chapter 18 of the Code if the developer fails to submit a revised final site plan to address all of the requirements within six (6) months after the date of site review, March 7, 2013, the application shall be deemed to have been voluntarily withdrawn by the developer. If you have any questions about the comments please feel free to contact me. Sincerely, Megan Yaniglos Senior Planner Planning Division Project Name: Date Completed: Reviewer: Department/Division/Agency: Reviews Comments: Review Status: Review Comments Peabody School - Major Wednesday, March 06, 2013 Joel DeNunzio VDOT Major Amendment No Objection 1 County of Albemarle Department of Community Development ________________________________________________________________________ Memorandum To: Scott Collins (scott@collins-engineering.com) From: Megan Yaniglos- Senior Planner Division: Planning Services Date: March 7, 2013 Subject: SDP-2013-006 Peabody School- Major Site Plan Amendment The Planner for the Planning Services Division of the Albemarle County Department Community Development will recommend approve the plan referred to above when the following items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) [Each comment is preceded by the applicable reference to the Albemarle County Code.] 1. [32.5.2(a)] Revise the title to state ‘Major Site Plan Amendment’ and not final site plan on all sheets. 2. [32.5.2(a)] Revise the zoning district to state ‘PUD-Commercial’ instead of just PUD. 3. [32.5.2(a)] All conditions of the special use permit will need to be added to the sheets. This amendment cannot be approved until the SP is approved. 4. [32.5.2(a)] The building setback for this property is 30 feet from public rights of way. Revise and show the setback on the property. The multi-purpose building will need meet this requirement. 5. [32.5.2(b)] State the height of all buildings, including the proposed multi-purpose building. 6. [32.5.2(b)] Show the dimensions for all sidewalks. Is the 5 foot width typical? 7. [32.5.2(i)] Show the existing entrance off of Southern Parkway on the demolition plan. Also show it to be closed and replanted after construction. 8. [32.5.2(b)] The landscaping along the proposed parking lot and multi-purpose building will need to include some evergreen trees for screen. Revise the landscape plan to include recommended evergreen trees per the County’s plant list. Please contact Megan Yaniglos at the Department of Community Development 296-5832 ext. 3004 for further information. County of Albemarle Department of Community Development Memorandum Project: Peabody School – Major Amendment (SDP2013-00006) Plan preparer: Collins Engineering [tel 434-293-3719] Owner or rep.: Peabody School Plan received date: 29 January 2013 Date of comments: 21 February 2013 Reviewer: Michael Koslow Review coordinator: Megan Yaniglos The first submittal for the Major Amendment for the Peabody School site plan (SDP2013-00006), received 29 January 2012, has been reviewed by engineering staff. 1. Proposed site plan major amendment appears to disturb > 10,000 sft and appears to introduce additional impervious surface to the site. Please submit a WPO plan set to address erosion and sediment control and stormwater management. 2. Final submittal will need to be professionally signed, sealed, and dated [18-32.6.1]. 3. Please provide written documentation for construction permission or easement vacation for existing 60’ undisturbed buffer with DB1342 PG 238, 239 Plat DB 1102 PG 722. 4. Please propose a stormwater management easement for proposed expanded bio-filter or alternate stormwater management facility on site. 5. Due to existing 15’ gas line easement as identified on sheet 2 in conflict with proposed drainage pipe #3 as shown on sheet 4, please identify location for gas line or steps contractor should take to ensure excavation will not hit this existing gas line. 6. It appears that, as designed, there could be a Zoning violation for the 10’ x 16’ parking spaces located adjacent to the proposed segmental block retaining wall shown on sheet 3. Please detail grade this area and indicate the thickness of the proposed wall. Two feet of proposed grass are required for an overhanging vehicle when the spaces are 16’ deep. 7. Please provide drainage computations. Current Development Engineering is available from 2:30-4 PM on Thursdays to discuss these review comments. Please contact Michael Koslow at 434-296-5832 ext. 3297 or email mkoslow@albemarle.org to schedule an appointment File: C:\Users\mkoslow\Documents\Current Reviews\SDP201300006 Peabody School - Major\E1_MAJ_MAK_SDP201300006.doc Project Name: Date Completed: Reviewer: Department/Division/Agency: Reviews Comments: Review Status: Review Comments Peabody School - Major Wednesday, February 06, 2013 Jay Schlothauer Inspections Major Amendment Based on plans dated January 22, 2013. Due to the increased number of parking spaces, three of them must be wheelchair accessible. Of those three spaces, one must be van-accessible. Clearly indicate the locations of new and existing accessible parking spaces, with their associated striped access aisles and curb cuts. Requested Changes Project Name: Date Completed: Reviewer: Department/Division/Agency: Reviews Comments: Review Status: Review Comments Peabody School - Major Tuesday, February 05, 2013 Andrew Slack E911 Major Amendment Approved. Approved Project Name: Date Completed: Reviewer: Department/Division/Agency: Reviews Comments: Review Status: Review Comments Peabody School - Major Monday, February 04, 2013 Shawn Maddox Fire Rescue Major Amendment Based on Peabody School - Final Site Plan Amendment dated 1/22/2013. 1. The fire department connection is not shown on the plan. The fire hydrant requested to be within 50ft of the fire department connection is not shown on the plan. Requested Changes