HomeMy WebLinkAboutZMA201400003 Application 2023-02-03COLLINS INC -' 20 IRETT ST, SUITE K CHARLOTTESVILLE VA 22902
434.293.3719 PH 434.293.2813 FX
www.colIins-engineering.com
May 19, 2014
County of Albemarle
Community Development
401 McIntire Road
Charlottesville, VA 22902
Boulders Subdivision — Planned Unit Development Rezoning Application
Prouosah
A planned unit development is being proposed north of NGIC on property currently owned by
Next Generation, LLC. The existing zoning of the property is both PRD and Rural area. The
original PRD on a portion of the property allowed up to 350 units to be developed. The
applicant would like to request a rezoning amendment to allow for a neighborhood development
of single family and multi -family units between 535 units and 770 units, and a small commercial
development of up to 30,OOOSF of area for commercial use. The tax map and parcels for this
proposed development are 03300-00-00-001DO, 03300-00-00-00100, and 03300-00-00-01000.
The total acreage of the property is 145.6 acres. The site is located within the Rio Magisterial
District.
The project will provide needed public housing in this area. NGIC is a large employer in the
county, and this housing will fill the need to help accommodate the employees who are
relocating to Charlottesville to work at this facility and other areas in Charlottesville. The
proposed commercial area will help provide neighborhood commercial amenities to this
neighborhood.
Comnrehensive Plan:
The proposed development is consistent with the comprehensive plan for this area The entire
area to be rezoned is located in the comprehensive growth area. The comprehensive plan calls
for this area to be a mixture of urban density and neighborhood density, with a small urban
mixed use center. Our proposed plan is consistent with the densities proposed within the
comprehensive plan for this area. The development has higher density around the centers and
transitions to lower neighborhood density throughout the development.
The comprehensive plan also calls for a second connection of Boulders Drive to Route 29, which
is provided in this application plan. This connection will be provided when warranted by the
traffic demand, based on the proposed 527 traffic study that will accompany this rezoning.
Public Facilities and Infrastructure:
The proposed development is located within the growth area and is also located within the
Albemarle County service district for Water and sewer. The owner of this parcel has installed
water and sewer out to the property and developed a sewer pump station to service the entire
drainage shed. The station was eventually taken into the ACSA system with the agreement that
this land would be included within the service are for the water and sewer.
The owner also developed and constructed a roadway from Route 29 to this proposed property to
accommodate up to 30,000 vehicles/day. This roadway will be extended through the property
and connected back to US Route 29 to create a second point of access for the properties served
from the roadway.
Impacts to the Environmental Features:
The proposed project will have a minimal effect on the existing environmental features on the
property. There are a number of critical slopes on the property that have been identified by the
county to be preserved. This development has created common open space areas around these
critical slope areas and is intending to preserve most of these critical slope areas. There are a
small amount of impacts to the preserved slopes to accommodate the roadway transportation
network through the property. These impacts occur in two locations where the transportation
roadways impact the preserved critical slopes. Both of these locations are necessary to provide
access to future property and to make connections back to existing roadways.
The biggest environmental impact will be from the extension of Boulders road back to US Route
29. This second connection, while required, will result in a crossing of Herring Branch to tie-in
to US Route 29. This will be a stream crossing and a crossing of a stream with an existing flood
plain.
Profffers:
Proffers will be proposed with this project to offset the impacts of the development, in
accordance with the Albemarle County proffer requirements. Proffers will be included on the
residential units over the existing 350 units from the original PRD on the property. In addition,
affordable housing will be proffered as well, in accordance with the Albemarle County
requirements for the units over 350. A final proffer statement will be submitted during the
review of the rezoning.
Please contact me with any questions or requests for additional information pertaining to this
Rezoning Application request.
Sincerely,
Scott Collins, PE
COLLINS
May 19, 2014
County of Albemarle
Community Development
401 McIntire Road
Charlottesville, VA 22902
20 IRETT ST, SUITE K CHARLOTTESVILLE VA 22902
434.293.3719 PH 434-293.2813 FK
www-callins-engi neeri ng.cam
Boulders Subdivision — Planned Unit Development Rezoning Application
Pronosal•
A planned unit development is being proposed north of NGIC on property currently owned by
Next Generation, LLC. The existing zoning of the property is both PRD and Rural area. The
original PRD on a portion of the property allowed up to 350 units to be developed. The
applicant would like to request a rezoning amendment to allow for a neighborhood development
of single family and multi -family units between 535 units and 770 units, and a small commercial
development of up to 30,000SF of area for commercial use. The tax map and parcels for this
proposed development are 03300-00-00-0011310, 03300-00-00-00100, and 03300-00-00-01000.
The total acreage of the property is 145.6 acres. The site is located within the Rio Magisterial
District.
The project will provide needed public housing in this area. NGIC is a large employer in the
county, and this housing will fill the need to help accommodate the employees who are
relocating to Charlottesville to work at this facility and other areas in Charlottesville. The
proposed commercial area will help provide neighborhood commercial amenities to this
neighborhood.
Comprehensive Plan:
The proposed development is consistent with the comprehensive plan for this area. The entire
area to be rezoned is located in the comprehensive growth area. The comprehensive plan calls
for this area to be a mixture of urban density and neighborhood density, with a small urban
mixed use center. Our proposed plan is consistent with the densities proposed within the
comprehensive plan for this area. The development has higher density around the centers and
transitions to lower neighborhood density throughout the development.
The comprehensive plan also calls for a second connection of Boulders Drive to Route 29, which
is provided in this application plan. This connection will be provided when warranted by the
traffic demand, based on the proposed 527 traffic study that will accompany this rezoning.
Public Facilities and Infrastructure:
The proposed development is located within the growth area and is also located within the
Albemarle County service district for Water and sewer. The owner of this parcel has installed
water and sewer out to the property and developed a sewer pump station to service the entire
drainage shed. The station was eventually taken into the ACSA system with the agreement that
this land would be included within the service are for the water and sewer.
The owner also developed and constructed a roadway from Route 29 to this proposed property to
accommodate up to 30,000 vehicles/day. This roadway will be extended through the property
and connected back to US Route 29 to create a second point of access for the properties served
from the roadway.
Impacts to the Environmental Features:
The proposed project will have a minimal effect on the existing environmental features on the
property. There are a number of critical slopes on the property that have been identified by the
county to be preserved. This development has created common open space areas around these
critical slope areas and is intending to preserve most of these critical slope areas. There are a
small amount of impacts to the preserved slopes to accommodate the roadway transportation
network through the property. These impacts occur in two locations where the transportation
roadways impact the preserved critical slopes. Both of these locations are necessary to provide
access to future property and to make connections back to existing roadways.
The biggest environmental impact will be from the extension of Boulders road back to US Route
29. This second connection, while required, will result in a crossing of Herring Branch to tie-in
to US Route 29. This will be a stream crossing and a crossing of a stream with an existing flood
plain.
Profffers:
Proffers will be proposed with this project to offset the impacts of the development, in
accordance with the Albemarle County proffer requirements. Proffers will be included on the
residential units over the existing 350 units from the original PRD on the property. In addition,
affordable housing will be proffered as well, in accordance with the Albemarle County
requirements for the units over 350. A final proffer statement will be submitted during the
review of the rezoning.
Please contact me with any questions or requests for additional information pertaining to this
Rezoning Application request.
Sincerely,
Scott Collins. PE
COLLINS - - 20 RRETT ST, SUITE K CHARLOTTESVILLE VA 22902
434.293.3719 PH 434.293.2813 FX
www.col I Ins-engl neerl ng.co m
May 19, 2014
County of Albemarle
Community Development
401 McIntire Road
Charlottesville, VA 22902
Boulders Subdivision — Planned Unit Development Rezoning Application
Proposal:
A planned unit development is being proposed north of NGIC on property currently owned by
Next Generation, LLC. The existing zoning of the property is both PRD and Rural area. The
original PRD on a portion of the property allowed up to 350 units to be developed. The
applicant would like to request a rezoning amendment to allow for a neighborhood development
of single family and multi-fanrily units between 535 units and 770 units, and a small commercial
development of up to 30,000SF of area for commercial use. The tax map and parcels for this
proposed development are 03300-00-00-001D0, 03300-00-00-00100, and 03300-00-00-01000.
The total acreage of the property is 145.6 acres_ The site is located within the Rio Magisterial
District.
The project will provide needed public housing in this area. NGIC is a large employer in the
county, and this housing will fill the need to help accommodate the employees who are
relocating to Charlottesville to work at this facility and other areas in Charlottesville. The
proposed commercial area will help provide neighborhood commercial amenities to this
neighborhood.
Comprehensive Plan:
The proposed development is consistent with the comprehensive plan for this area. The entire
area to be rezoned is located in the comprehensive growth area. The comprehensive plan calls
for this area to be a mixture of urban density and neighborhood density, with a small urban
mixed use center. Our proposed plan is consistent with the densities proposed within the
comprehensive plan for this area. The development has higher density around the centers and
transitions to lower neighborhood density throughout the development.
The comprehensive plan also calls for a second connection of Boulders Drive to Route 29, which
is provided in this application plan. This connection will be provided when warranted by the
traffic demand, based on the proposed 527 traffic study that will accompany this rezoning.
Public Facilities and Infrastructure:
The proposed development is located within the growth area and is also located within the
Albemarle County service district for Water and sewer. The owner of this parcel has installed
water and sewer out to the property and developed a sewer pump station to service the entire
drainage shed. The station was eventually taken into the ACSA system with the agreement that
this land would be included within the service are for the water and sewer.
The owner also developed and constructed a roadway from Route 29 to this proposed property to
accommodate up to 30,000 vehicles/day. This roadway will be extended through the property
and connected back to US Route 29 to create a second point of access for the properties served
from the roadway.
Imuacts to the Environmental Features:
The proposed project will have a minimal effect on the existing environmental features on the
property. There are a number of critical slopes on the property that have been identified by the
county to be preserved. This development has created common open space areas around these
critical slope areas and is intending to preserve most of these critical slope areas. There are a
small amount of impacts to the preserved slopes to accommodate the roadway transportation
network through the property. These impacts occur in two locations where the transportation
roadways impact the preserved critical slopes. Both of these locations are necessary to provide
access to future property and to make connections back to existing roadways.
The biggest environmental impact will be from the extension of Boulders road back to US Route
29. This second connection, while required, will result in a crossing of Herring Branch to tie-in
to US Route 29. This will be a stream crossing and a crossing of a stream with an existing flood
plain.
Profffers:
Proffers will be proposed with this project to offset the impacts of the development, in
accordance with the Albemarle County proffer requirements. Proffers will be included on the
residential units over the existing 350 units from the original PRD on the property. In addition,
affordable housing will be proffered as well, in accordance with the Albemarle County
requirements for the units over 350. A final proffer statement will be submitted during the
review of the rezoning.
Please contact me with any questions or requests for additional information pertaining to this
Rezoning Application request.
Sincerely,
Scott Collins. PE
COLLINS - 20 3RETT ST, SUITE K CHARLOTTESVILLE VA 22902
434.293.3719 PH 434.293.2813 F%
www.col T i n s-eng i n eering. co m
May 19, 2014
County of Albemarle
Community Development
401 McIntire Road
Charlottesville, VA 22902
Boulders Subdivision — Planned Unit Development Rezoning Application
Proposal:
A planned unit development is being proposed north of NGIC on property currently owned by
Next Generation, LLC. The existing zoning of the property is both PRD and Rural area. The
original PRD on a portion of the property allowed up to 350 units to be developed. The
applicant would like to request a rezoning amendment to allow for a neighborhood development
of single family and multi -family units between 535 units and 770 units, and a small commercial
development of up to 30,000SF of area for commercial use. The tax map and parcels for this
proposed development are 03300-00-00-001D0, 03300-00-00-00100, and 03300-00-00-01000.
The total acreage of the property is 145.6 acres. The site is located within the Rio Magisterial
District.
The project will provide needed public housing in this area. NGIC is a large employer in the
county, and this housing will fill the need to help accommodate the employees who are
relocating to Charlottesville to work at this facility and other areas in Charlottesville. The
proposed commercial area will help provide neighborhood commercial amenities to this
neighborhood
Comprehensive Plan:
The proposed development is consistent with the comprehensive plan for this area. The entire
area to be rezoned is located in the comprehensive growth area. The comprehensive plan calls
for this area to be a mixture of urban density and neighborhood density, with a small urban
mixed use center. Our proposed plan is consistent with the densities proposed within the
comprehensive plan for this area. The development has higher density around the centers and
transitions to lower neighborhood density throughout the development.
The comprehensive plan also calls for a second connection of Boulders Drive to Route 29, which
is provided in this application plan. This connection will be provided when warranted by the
traffic demand, based on the proposed 527 traffic study that will accompany this rezoning.
Public Facilities and Infrastructure:
The proposed development is located within the growth area and is also located within the
Albemarle County service district for Water and sewer. The owner of this parcel has installed
water and sewer out to the property and developed a sewer pump station to service the entire
drainage shed. The station was eventually taken into the ACSA system with the agreement that
this land would be included within the service are for the water and sewer.
The owner also developed and constructed a roadway from Route 29 to this proposed property to
accommodate up to 30,000 vehicles/day. This roadway will be extended through the property
and connected back to US Route 29 to create a second point of access for the properties served
from the roadway.
Imuacts to the Environmental Features:
The proposed project will have a minimal effect on the existing environmental features on the
property. There are a number of critical slopes on the property that have been identified by the
county to be preserved. This development has created common open space areas around these
critical slope areas and is intending to preserve most of these critical slope areas. There are a
small amount of impacts to the preserved slopes to accommodate the roadway transportation
network through the property. These impacts occur in two locations where the transportation
roadways impact the preserved critical slopes. Both of these locations are necessary to provide
access to future property and to make connections back to existing roadways.
The biggest environmental impact will be from the extension of Boulders road back to US Route
29. This second connection, while required, will result in a crossing of Herring Branch to tie-in
to US Route 29. This will be a stream crossing and a crossing of a stream with an existing flood
plain.
Profffers:
Proffers will be proposed with this project to offset the impacts of the development, in
accordance with the Albemarle County proffer requirements. Proffers will be included on the
residential units over the existing 350 units from the original PRD on the property. In addition,
affordable housing will be proffered as well, in accordance with the Albemarle County
requirements for the units over 350. A final proffer statement will be submitted during the
review of the rezoning.
Please contact me with any questions or requests for additional information pertaining to this
Rezoning Application request.
Sincerely,
Scott Collins, PE
COLLINS
20 RRETT ST, SUITE K CHARLOTTESVILLE VA 22902
434.293.3719 PH 434.293.2913 FK
www.collins-engineering.com
May 19, 2014
County of Albemarle
Community Development
401 McIntire Road
Charlottesville, VA 22902
Boulders Subdivision —Planned Unit Development Rezoning Application
Proposal:
A planned unit development is being proposed north of NGIC on property currently owned by
Next Generation, LLC. The existing zoning of the property is both PRD and Rural area. The
original PRD on a portion of the property allowed up to 350 units to be developed. The
applicant would like to request a rezoning amendment to allow for a neighborhood development
of single family and multi -family units between 535 units and 770 units, and a small commercial
development of up to 30,000SF of area for commercial use. The tax map and parcels for this
proposed development are 03300-00-00-001D0, 03300-00-00-00100, and 03300-00-00-01000.
The total acreage of the property is 145.6 acres. The site is located within the Rio Magisterial
District.
The project will provide needed public housing in this area. NGIC is a large employer in the
county, and this housing will fill the need to help accommodate the employees who are
relocating to Charlottesville to work at this facility and other areas in Charlottesville. The
proposed commercial area will help provide neighborhood commercial amenities to this
neighborhood.
Comprehensive Plan:
The proposed development is consistent with the comprehensive plan for this area. The entire
area to be rezoned is located in the comprehensive growth area. The comprehensive plan calls
for this area to be a mixture of urban density and neighborhood density, with a small urban
mixed use center. Our proposed plan is consistent with the densities proposed within the
comprehensive plan for this area. The development has higher density around the centers and
transitions to lower neighborhood density throughout the development.
The comprehensive plan also calls for a second connection of Boulders Drive to Route 29, which
is provided in this application plan. This connection will be provided when warranted by the
traffic demand, based on the proposed 527 traffic study that will accompany this rezoning.
Public Facilities and Infrastructure:
The proposed development is located within the growth area and is also located within the
Albemarle County service district for Water and sewer. The owner of this parcel has installed
water and sewer out to the property and developed a sewer pump station to service the entire
drainage shed. The station was eventually taken into the ACSA system with the agreement that
this land would be included within the service are for the water and sewer.
The owner also developed and constructed a roadway from Route 29 to this proposed property to
accommodate up to 30,000 vehicles; day. This roadway will be extended through the property
and connected back to US Route 29 to create a second point of access for the properties served
from the roadway.
Impacts to the Environmental Features:
The proposed project will have a minimal effect on the existing environmental features on the
property. There are a number of critical slopes on the property that have been identified by the
county to be preserved. This development has created common open space areas around these
critical slope areas and is intending to preserve most of these critical slope areas. There are a
small amount of impacts to the preserved slopes to accommodate the roadway transportation
network through the property. These impacts occur in two locations where the transportation
roadways impact the preserved critical slopes. Both of these locations are necessary to provide
access to fixture property and to make connections back to existing roadways.
The biggest environmental impact will be from the extension of Boulders road back to US Route
29. This second connection, while required, will result in a crossing of Herring Branch to tie-in
to US Route 29. This will be a stream crossing and a crossing of a stream with an existing flood
plain.
Profffers:
Proffers will be proposed with this project to offset the impacts of the development, in
accordance with the Albemarle County proffer requirements. Proffers will be included on the
residential units over the existing 350 units from the original PRD on the property. In addition,
affordable housing will be proffered as well, in accordance with the Albemarle County
requirements for the units over 350. A final proffer statement will be submitted during the
review of the rezoning.
Please contact me with any questions or requests for additional information pertaining to this
Rezoning Application request.
Sincerely,
Scott Collins, PE
COLLINS
20 3RETT ST, SUITE K CHARLOTTESVILLE VA 22902
434.293.3719 PH 434.293.2913 FK
www.coll i r. s-englneering.com
May 19, 2014
County of Albemarle
Community Development
401 McIntire Road
Charlottesville, VA 22902
Boulders Subdivision — Planned Unit Development Rezoning Application
Proposal:
A planned unit development is being proposed north ofNGIC on property currently owned by
Next Generation, LLC. The existing zoning of the property is both PRD and Rural area. The
original PRD on a portion of the property allowed up to 350 units to be developed. The
applicant would like to request a rezoning amendment to allow for a neighborhood development
of single family and multi -family units between 535 units and 770 units, and a small commercial
development of up to 30,000SF of area for commercial use. The tax map and parcels for this
proposed development are 03300-00-00-001D0, 03300-00-00-00100, and 03300-00-00-01000.
The total acreage of the property is 145.6 acres. The site is located within the Rio Magisterial
District.
The project will provide needed public housing in this area. NGIC is a large employer in the
county, and this housing will fill the need to help accommodate the employees who are
relocating to Charlottesville to work at this facility and other areas in Charlottesville. The
proposed commercial area will help provide neighborhood commercial amenities to this
neighborhood.
Comprehensive Plan:
The proposed development is consistent with the comprehensive plan for this area. The entire
area to be rezoned is located in the comprehensive growth area. The comprehensive plan calls
for this area to be a mixture of urban density and neighborhood density, with a small urban
mixed use center. Our proposed plan is consistent with the densities proposed within the
comprehensive plan for this area. The development has higher density around the centers and
transitions to lower neighborhood density throughout the development.
The comprehensive plan also calls for a second connection of Boulders Drive to Route 29, which
is provided in this application plan. This connection will be provided when warranted by the
traffic demand, based on the proposed 527 traffic study that will accompany this rezoning.
Public Facilities and Infrastructure:
The proposed development is located within the growth area and is also located within the
Albemarle County service district for Water and sewer. The owner of this parcel has installed
water and sewer out to the property and developed a sewer pump station to service the entire
drainage shed. The station was eventually taken into the ACSA system with the agreement that
this land would be included within the service are for the water and sewer.
The owner also developed and constructed a roadway from Route 29 to this proposed property to
accommodate up to 30,000 vehicles/day. This roadway will be extended through the property
and connected back to US Route 29 to create a second point of access for the properties served
from the roadway.
Impacts to the Environmental Features:
The proposed project will have a minimal effect on the existing environmental features on the
property. There are a number of critical slopes on the property that have been identified by the
county to be preserved. This development has created common open space areas around these
critical slope areas and is intending to preserve most of these critical slope areas. There are a
small amount of impacts to the preserved slopes to accommodate the roadway transportation
network through the property. These impacts occur in two locations where the transportation
roadways impact the preserved critical slopes. Both of these locations are necessary to provide
access to future property and to make connections back to existing roadways.
The biggest environmental impact will be from the extension of Boulders road back to US Route
29. This second connection, while required, will result in a crossing of Herring Branch to tie-in
to US Route 29. This will be a stream crossing and a crossing of a stream with an existing flood
plain.
Profffers:
Proffers will be proposed with this project to offset the impacts of the development, in
accordance with the Albemarle County proffer requirements. Proffers will be included on the
residential units over the existing 350 units from the original PRD on the property. In addition,
affordable housing will be proffered as well, in accordance with the Albemarle County
requirements for the units over 350. A final proffer statement will be submitted during the
review of the rezoning.
Please contact me with any questions or requests for additional information pertaining to this
Rezoning Application request.
Sincerely,
Scott Collins, PE
COLLINS
2C RRETT ST, SUITE K CHARLOTTESVILLE VA 22902
434.293.3719 PH 434.293.2813 FX
www.coiIlns-eng[neering.com
May 19, 2014
County of Albemarle
Community Development
401 McIntire Road
Charlottesville, VA 22902
Boulders Subdivision — Planned Unit Development Rezoning Application
Proposal:
A planned unit development is being proposed north of NGIC on property currently owned by
Next Generation, LLC. The existing zoning of the property is both PRD and Rural area. The
original PRD on a portion of the property allowed up to 350 units to be developed. The
applicant would like to request a rezoning amendment to allow for a neighborhood development
of single family and multi -family units between 535 units and 770 units, and a small commercial
development of up to 30,000SF of area for commercial use. The tax map and parcels for this
proposed development are 03300-00-00-001D0, 03300-00-00-00100, and 03300-00-00-01000.
The total acreage of the property is 145.6 acres. The site is located within the Rio Magisterial
District.
The project will provide needed public housing in this area. NGIC is a large employer in the
county, and this housing will fill the need to help accommodate the employees who are
relocating to Charlottesville to work at this facility and other areas in Charlottesville. The
proposed commercial area will help provide neighborhood commercial amenities to this
neighborhood
Comprehensive Plan:
The proposed development is consistent with the comprehensive plan for this area. The entire
area to be rezoned is located in the comprehensive growth area. The comprehensive plan calls
for this area to be a mixture of urban density and neighborhood density, with a small urban
mixed use center. Our proposed plan is consistent with the densities proposed within the
comprehensive plan for this area. The development has higher density around the centers and
transitions to lower neighborhood density throughout the development.
The comprehensive plan also calls for a second connection of Boulders Drive to Route 29, which
is provided in this application plan. This connection will be provided when warranted by the
traffic demand, based on the proposed 527 traffic study that will accompany this rezoning.
Public Facilities and Infrastructure:
The proposed development is located within the growth area and is also located within the
Albemarle County service district for Water and sewer. The owner of this parcel has installed
water and sewer out to the property and developed a sewer pump station to service the entire
drainage shed. The station was eventually taken into the ACSA system with the agreement that
this land would be included within the service are for the water and sewer.
The owner also developed and constructed a roadway from Route 29 to this proposed property to
accommodate up to 30,000 vehiclesiday. This roadway will be extended through the property
and connected back to US Route 29 to create a second point of access for the properties served
from the roadway.
Impacts to the Environmental Features:
The proposed project will have a minimal effect on the existing environmental features on the
property. There are a number of critical slopes on the property that have been identified by the
county to be preserved. This development has created common open space areas around these
critical slope areas and is intending to preserve most of these critical slope areas. There are a
small amount of impacts to the preserved slopes to accommodate the roadway transportation
network through the property. These impacts occur in two locations where the transportation
roadways impact the preserved critical slopes. Both of these locations are necessary to provide
access to future property and to make connections back to existing roadways.
The biggest environmental impact will be from the extension of Boulders road back to US Route
29. This second connection, while required, will result in a crossing of Herring Branch to tie-in
to US Route 29. This will be a stream crossing and a crossing of a stream with an existing flood
plain.
Profffers:
Proffers will be proposed with this project to offset the impacts of the development, in
accordance with the Albemarle County proffer requirements. Proffers will be included on the
residential units over the existing 350 units from the original PRD on the property. In addition,
affordable housing will be proffered as well, in accordance with the Albemarle County
requirements for the units over 350. A final proffer statement will be submitted during the
review of the rezoning.
Please contact me with any questions or requests for additional information pertaining to this
Rezoning Application request.
Sincerely,
Scott Collins, PE
COLLINS
2C RRETT ST. SUITE K CHARLOTTESVILLE VA 22902
434.293.3719 PH 434.293.2813 F%
www.coillns-engineering.com
May 19, 2014
County of Albemarle
Community Development
401 McIntire Road
Charlottesville, VA 22902
Boulders Subdivision — Planned Unit Development Rezoning Application
Proposal:
A planned unit development is being proposed north of NGIC on property currently owned by
Next Generation, LLC. The existing zoning of the property is both PRD and Rural area. The
original PRD on a portion of the property allowed up to 350 units to be developed. The
applicant would like to request a rezoning amendment to allow for a neighborhood development
of single family and multi -family units between 535 units and 770 units, and a small commercial
development of up to 30,000SF of area for commercial use. The tax map and parcels for this
proposed development are 03300-00-00-001D0, 03300-00-00-00100, and 03300-00-00-01000.
The total acreage of the property is 145.6 acres. The site is located within the Rio Magisterial
District.
The project will provide needed public housing in this area. NGIC is a large employer in the
county, and this housing will fill the need to help accommodate the employees who are
relocating to Charlottesville to work at this facility and other areas in Charlottesville. The
proposed commercial area will help provide neighborhood commercial amenities to this
neighborhood.
Comprehensive Plan:
The proposed development is consistent with the comprehensive plan for this area. The entire
area to be rezoned is located in the comprehensive growth area The comprehensive plan calls
for this area to be a mixture of urban density and neighborhood density, with a small urban
mixed use center. Our proposed plan is consistent with the densities proposed within the
comprehensive plan for this area. The development has higher density around the centers and
transitions to lower neighborhood density throughout the development.
The comprehensive plan also calls for a second connection of Boulders Drive to Route 29, which
is provided in this application plan. This connection will be provided when warranted by the
traffic demand, based on the proposed 527 traffic study that will accompany this rezoning.
Public Facilities and Infrastructure:
The proposed development is located within the growth area and is also located within the
Albemarle County service district for Water and sewer. The owner of this parcel has installed
water and sewer out to the property and developed a sewer pump station to service the entire
drainage shed. The station was eventually taken into the ACSA system with the agreement that
this land would be included within the service are for the water and sewer.
The owner also developed and constructed a roadway from Route 29 to this proposed property to
accommodate up to 30,000 vehicles/day. This roadway will be extended through the property
and connected back to US Route 29 to create a second point of access for the properties served
from the roadway.
Imuacts to the Environmental Features:
The proposed project will have a minimal effect on the existing environmental features on the
property. There are a number of critical slopes on the property that have been identified by the
county to be preserved. This development has created common open space areas around these
critical slope areas and is intending to preserve most of these critical slope areas. There are a
small amount of impacts to the preserved slopes to accommodate the roadway transportation
network through the property. These impacts occur in two locations where the transportation
roadways impact the preserved critical slopes. Both of these locations are necessary to provide
access to future property and to make connections back to existing roadways.
The biggest environmental impact will be from the extension of Boulders road back to US Route
29. This second connection, while required, will result in a crossing of Hering Branch to tie-in
to US Route 29. This will be a stream crossing and a crossing of a stream with an existing flood
plain.
Profffers:
Proffers will be proposed with this project to offset the impacts of the development, in
accordance with the Albemarle County proffer requirements. Proffers will be included on the
residential units over the existing 350 units from the original PRD on the property. In addition,
affordable housing will be proffered as well, in accordance with the Albemarle County
requirements for the units over 350. A final proffer statement will be submitted during the
review of the rezoning.
Please contact me with any questions or requests for additional information pertaining to this
Rezoning Application request.
Sincerely,
Scott Collins, PE
COLLINS
May 19, 2014
County of Albemarle
Community Development
401 McIntire Road
Charlottesville, VA 22902
2C RRETT ST, SUITE K CHARLOTTESVILLE VA 22902
434.293.3719 PH 434.293.2813 F%
www.collins-engineering.com
Boulders Subdivision — Planned Unit Development Rezoning Application
Proposal:
A planned unit development is being proposed north of NGIC on property currently owned by
Next Generation, LLC. The existing zoning of the property is both PRD and Rural area. The
original PRD on a portion of the property allowed up to 350 units to be developed. The
applicant would like to request a rezoning amendment to allow for a neighborhood development
of single family and multi -family units between 535 units and 770 units, and a small commercial
development of up to 30,000SF of area for commercial use. The tax map and parcels for this
proposed development are 03300-00-00-001D0, 03300-00-00-00100, and 03300-00-00-01000.
The total acreage of the property is 145.6 acres. The site is located within the Rio Magisterial
District.
The project will provide needed public housing in this area. NGIC is a large employer in the
county, and this housing will fill the need to help accommodate the employees who are
relocating to Charlottesville to work at this facility and other areas in Charlottesville. The
proposed commercial area will help provide neighborhood commercial amenities to this
neighborhood
Comprehensive Plan:
The proposed development is consistent with the comprehensive plan for this area. The entire
area to be rezoned is located in the comprehensive growth area. The comprehensive plan calls
for this area to be a mixture of urban density and neighborhood density, with a small urban
mixed use center. Our proposed plan is consistent with the densities proposed within the
comprehensive plan for this area. The development has higher density around the centers and
transitions to lower neighborhood density throughout the development.
The comprehensive plan also calls for a second connection of Boulders Drive to Route 29, which
is provided in this application plan. This connection will be provided when warranted by the
traffic demand, based on the proposed 527 traffic study that will accompany this rezoning.
Public Facilities and Infrastructure:
The proposed development is located within the growth area and is also located within the
Albemarle County service district for Water and sewer. The owner of this parcel has installed
water and sewer out to the property and developed a sewer pump station to service the entire
drainage shed. The station was eventually taken into the ACSA system with the agreement that
this land would be included within the service are for the water and sewer.
The owner also developed and constructed a roadway from Route 29 to this proposed property to
accommodate up to 30,000 vehicles/day. This roadway will be extended through the property
and connected back to US Route 29 to create a second point of access for the properties served
from the roadway.
Impacts to the Environmental Features:
The proposed project will have a minimal effect on the existing environmental features on the
property. There are a number of critical slopes on the property that have been identified by the
county to be preserved. This development has created common open space areas around these
critical slope areas and is intending to preserve most of these critical slope areas. There are a
small amount of impacts to the preserved slopes to accommodate the roadway transportation
network through the property. These impacts occur in two locations where the transportation
roadways impact the preserved critical slopes. Both of these locations are necessary to provide
access to future property and to make connections back to existing roadways.
The biggest environmental impact will be from the extension of Boulders road back to US Route
29. This second connection, while required, will result in a crossing of Herring Branch to tie-in
to US Route 29. This will be a stream crossing and a crossing of a stream with an existing flood
plain.
Profffers:
Proffers will be proposed with this project to offset the impacts of the development, in
accordance with the Albemarle County proffer requirements. Proffers will be included on the
residential units over the existing 350 units from the original PRD on the property. In addition,
affordable housing will be proffered as well, in accordance with the Albemarle County
requirements for the units over 350. A final proffer statement will be submitted during the
review of the rezoning.
Please contact me with any questions or requests for additional information pertaining to this
Rezoning Application request.
Sincerely,
Scott Collins, PE
COLLINS -
2i .RRETT ST, SUITE K CHARLOTTESVILLE VA 22902
434.293.3719 PH 434.293.2813 i%
www.collin 5-engineering. cam
May 19, 2014
County of Albemarle
Community Development
401 McIntire Road
Charlottesville, VA 22902
Boulders Subdivision — Planned Unit Development Rezoning Application
Pry
A planned unit development is being proposed north of NGIC on property currently owned by
Next Generation, LLC. The existing zoning of the property is both PRD and Rural area. The
original PRD on a portion of the property allowed up to 350 units to be developed. The
applicant would like to request a rezoning amendment to allow for a neighborhood development
of single family and multi -family units between 535 units and 770 units, and a small commercial
development of up to 30,000SF of area for commercial use. The tax map and parcels for this
proposed development are 03300-00-00-001D0, 03300-00-00-00100, and 03300-00-00-01000.
The total acreage of the property is 145.6 acres. The site is located within the Rio Magisterial
District.
The project will provide needed public housing in this area. NGIC is a large employer in the
county, and this housing will fill the need to help accommodate the employees who are
relocating to Charlottesville to work at this facility and other areas in Charlottesville. The
proposed commercial area will help provide neighborhood commercial amenities to this
neighborhood.
Comprehensive Plan:
The proposed development is consistent with the comprehensive plan for this area. The entire
area to be rezoned is located in the comprehensive growth area. The comprehensive plan calls
for this area to be a mixture of urban density and neighborhood density, with a small urban
mixed use center. Our proposed plan is consistent with the densities proposed within the
comprehensive plan for this area. The development has higher density around the centers and
transitions to lower neighborhood density throughout the development.
The comprehensive plan also calls for a second connection of Boulders Drive to Route 29, which
is provided in this application plan. This connection will be provided when warranted by the
traffic demand, based on the proposed 527 traffic study that will accompany this rezoning.
Public Facilities and Infrastructure:
The proposed development is located within the growth area and is also located within the
Albemarle County service district for Water and sewer. The owner of this parcel has installed
water and sewer out to the property and developed a sewer pump station to service the entire
drainage shed. The station was eventually taken into the ACSA system with the agreement that
this land would be included within the service are for the water and sewer.
The owner also developed and constructed a roadway from Route 29 to this proposed property to
accommodate up to 30,000 vehicles/day. This roadway will be extended through the property
and connected back to US Route 29 to create a second point of access for the properties served
from the roadway.
Impacts to the Environmental Features:
The proposed project will have a minimal effect on the existing environmental features on the
property. There are a number of critical slopes on the property that have been identified by the
county to be preserved. This development has created common open space areas around these
critical slope areas and is intending to preserve most of these critical slope areas. There are a
small amount of impacts to the preserved slopes to accommodate the roadway transportation
network through the property. These impacts occur in two locations where the transportation
roadways impact the preserved critical slopes. Both of these locations are necessary to provide
access to future property and to make connections back to existing roadways.
The biggest environmental impact will be from the extension of Boulders road back to US Route
29. This second connection, while required, will result in a crossing of Herring Branch to tie-in
to US Route 29. This will be a stream crossing and a crossing of a stream with an existing flood
plain.
Profffers:
Proffers will be proposed with this project to offset the impacts of the development, in
accordance with the Albemarle County proffer requirements. Proffers will be included on the
residential units over the existing 350 units from the original PRD on the property. In addition;
affordable housing will be proffered as well, in accordance with the Albemarle County
requirements for the units over 350. A final proffer statement will be submitted during the
review of the rezoning.
Please contact me with any questions or requests for additional information pertaining to this
Rezoning Application request.
Sincerely,
Scott Collins, PE
COLLINS
2C RRETT ST, SUITE K CHARLOTTESVILLE VA 22902
434.293.3719 PH 434.293.2813 FX
www.collins-engineering.com
May 19, 2014
County of Albemarle
Community Development
401 McIntire Road
Charlottesville, VA 22902
Boulders Subdivision — Planned Unit Development Rezoning Application
Proposal:
A planned unit development is being proposed north of NGIC on property currently owned by
Next Generation, LLC. The existing zoning of the property is both PRD and Rural area. The
original PRD on a portion of the property allowed up to 350 units to be developed. The
applicant would like to request a rezoning amendment to allow for a neighborhood development
of single family and multi -family units between 535 units and 770 units, and a small commercial
development of up to 30,000SF of area for commercial use. The tax map and parcels for this
proposed development are 03300-00-00-001D0, 03300-00-00-00100, and 03300-00-00-01000.
The total acreage of the property is 145.6 acres. The site is located within the Rio Magisterial
District.
The project will provide needed public housing in this area. NGIC is a large employer in the
county, and this housing will fill the need to help accommodate the employees who are
relocating to Charlottesville to work at this facility and other areas in Charlottesville. The
proposed commercial area will help provide neighborhood commercial amenities to this
neighborhood.
Comprehensive Plan:
The proposed development is consistent with the comprehensive plan for this area. The entire
area to be rezoned is located in the comprehensive growth area. The comprehensive plan calls
for this area to be a mixture of urban density and neighborhood density, with a small urban
mixed use center. Our proposed plan is consistent with the densities proposed within the
comprehensive plan for this area. The development has higher density around the centers and
transitions to lower neighborhood density throughout the development.
The comprehensive plan also calls for a second connection of Boulders Drive to Route 29, which
is provided in this application plan. This connection will be provided when warranted by the
traffic demand, based on the proposed 527 traffic study that will accompany this rezoning.
Public Facilities and Infrastructure:
The proposed development is located within the growth area and is also located within the
Albemarle County service district for Water and sewer. The owner of this parcel has installed
water and sewer out to the property and developed a sewer pump station to service the entire
drainage shed. The station was eventually taken into the ACSA system with the agreement that
this land would be included within the service are for the water and sewer.
The owner also developed and constructed a roadway from Route 29 to this proposed property to
accommodate up to 30,000 vehicles/day. This roadway will be extended through the property
and connected back to US Route 29 to create a second point of access for the properties served
from the roadway.
Impacts to the Environmental Features:
The proposed project will have a minimal effect on the existing environmental features on the
property. There are a number of critical slopes on the property that have been identified by the
county to be preserved. This development has created common open space areas around these
critical slope areas and is intending to preserve most of these critical slope areas. There are a
small amount of impacts to the preserved slopes to accommodate the roadway transportation
network through the property. These impacts occur in two locations where the transportation
roadways impact the preserved critical slopes. Both of these locations are necessary to provide
access to future property and to make connections back to existing roadways.
The biggest environmental impact will be from the extension of Boulders road back to US Route
29. This second connection, while required, will result in a crossing of Herring Branch to tie-in
to US Route 29. This will be a stream crossing and a crossing of a stream with an existing flood
plain.
Profffers:
Proffers will be proposed with this project to offset the impacts of the development, in
accordance with the Albemarle County proffer requirements. Proffers will be included on the
residential units over the existing 350 units from the original PRD on the property. In addition,
affordable housing will be proffered as well, in accordance with the Albemarle County
requirements for the units over 350. A final proffer statement will be submitted during the
review of the rezoning.
Please contact me with any questions or requests for additional information pertaining to this
Rezoning Application request.
Sincerely,
Scott Collins, PE
IM COLLINS ENS:NF
May 19, 2014
County of Albemarle
Community Development
401 McIntire Road
Charlottesville, VA 22902
2t RRETT ST, SUITE K CHARLOTTESVILLE VA 22902
434.293.3719 PH 434.293.2813 FX
www.collins-engineering.com
Boulders Subdivision — Planned Unit Development Rezoning Application
Pronosal•
A planned unit development is being proposed north of NGIC on property currently owned by
Next Generation, LLC. The existing zoning of the property is both PRD and Rural area. The
original PRD on a portion of the property allowed up to 350 units to be developed. The
applicant would like to request a rezoning amendment to allow for a neighborhood development
of single family and multi -family units between 535 units and 770 units, and a small commercial
development of up to 30,000SF of area for commercial use. The tax map and parcels for this
proposed development are 03300-00-00-001D0, 03300-00-00-00100, and 03300-00-00-01000.
The total acreage of the property is 145.6 acres. The site is located within the Rio Magisterial
District.
The project will provide needed public housing in this area. NGIC is a large employer in the
county, and this housing will fill the need to help accommodate the employees who are
relocating to Charlottesville to work at this facility and other areas in Charlottesville. The
proposed commercial area will help provide neighborhood commercial amenities to this
neighborhood.
Comprehensive Plan:
The proposed development is consistent with the comprehensive plan for this area. The entire
area to be rezoned is located in the comprehensive growth area. The comprehensive plan calls
for this area to be a mixture of urban density and neighborhood density, with a small urban
mixed use center. Our proposed plan is consistent with the densities proposed within the
comprehensive plan for this area. The development has higher density around the centers and
transitions to lower neighborhood density throughout the development.
The comprehensive plan also calls for a second connection of Boulders Drive to Route 29, which
is provided in this application plan. This connection will be provided when warranted by the
traffic demand, based on the proposed 527 traffic study that will accompany this rezoning.
Public Facilities and Infrastructure:
The proposed development is located within the growth area and is also located within the
Albemarle County service district for Water and sewer. The owner of this parcel has installed
water and sewer out to the property and developed a sewer pump station to service the entire
drainage shed. The station was eventually taken into the ACSA system with the agreement that
this land would be included within the service are for the water and sewer.
The owner also developed and constructed a roadway from Route 29 to this proposed property to
accommodate up to 30,000 vehicles/day. This roadway will be extended through the property
and connected back to US Route 29 to create a second point of access for the properties served
from the roadway.
Impacts to the Environmental Features:
The proposed project will have a minimal effect on the existing environmental features on the
property. There are a number of critical slopes on the property that have been identified by the
county to be preserved. This development has created common open space areas around these
critical slope areas and is intending to preserve most of these critical slope areas. There are a
small amount of impacts to the preserved slopes to accommodate the roadway transportation
network through the property. These impacts occur in two locations where the transportation
roadways impact the preserved critical slopes. Both of these locations are necessary to provide
access to future property and to make connections back to existing roadways.
The biggest environmental impact will be from the extension of Boulders road back to US Route
29. This second connection, while required, will result in a crossing of Herring Branch to tie-in
to US Route 29. This will be a stream crossing and a crossing of a stream with an existing flood
plain.
Profffers:
Proffers will be proposed with this project to offset the impacts of the development, in
accordance with the Albemarle County proffer requirements. Proffers will be included on the
residential units over the existing 350 units from the original PRD on the property. In addition,
affordable housing will be proffered as well, in accordance with the Albemarle County
requirements for the units over 350. A final proffer statement will be submitted during the
review of the rezoning.
Please contact me with any questions or requests for additional information pertaining to this
Rezoning Application request.
Sincerely,
Scott Collins, PE
COLLINS
2( RRETT ST, SUITE K CHARLOTTESVILLE VA 22902
434.293.3719 PH 434-293-2813 FX
www.collins-engineering.com
May 19, 2014
County of Albemarle
Community Development
401 McIntire Road
Charlottesville, VA 22902
Boulders Subdivision — Planned Unit Development Rezoning Application
Pr000sal•
A planned unit development is being proposed north of NGIC on property currently owned by
Next Generation, LLC. The existing zoning of the property is both PRD and Rural area. The
original PRD on a portion of the property allowed up to 350 units to be developed. The
applicant would like to request a rezoning amendment to allow for a neighborhood development
of single family and multi -family units between 535 units and 770 units, and a small commercial
development of up to 30,000SF of area for commercial use. The tax map and parcels for this
proposed development are 03300-00-00-001D0, 03300-00-00-00100, and 03300-00-00-01000.
The total acreage of the property is 145.6 acres. The site is located within the Rio Magisterial
District.
The project will provide needed public housing in this area. NGIC is a large employer in the
county, and this housing will fill the need to help accommodate the employees who are
relocating to Charlottesville to work at this facility and other areas in Charlottesville. The
proposed commercial area will help provide neighborhood commercial amenities to this
neighborhood
Comprehensive Plan:
The proposed development is consistent with the comprehensive plan for this area. The entire
area to be rezoned is located in the comprehensive growth area. The comprehensive plan calls
for this area to be a mixture of urban density and neighborhood density, with a small urban
mixed use center. Our proposed plan is consistent with the densities proposed within the
comprehensive plan for this area. The development has higher density around the centers and
transitions to lower neighborhood density throughout the development.
The comprehensive plan also calls for a second connection of Boulders Drive to Route 29, which
is provided in this application plan. This connection will be provided when warranted by the
traffic demand, based on the proposed 527 traffic study that will accompany this rezoning.
Public Facilities and Infrastructure:
The proposed development is located within the growth area and is also located within the
Albemarle County service district for Water and sewer. The owner of this parcel has installed
water and sewer out to the property and developed a sewer pump station to service the entire
drainage shed. The station was eventually taken into the ACSA system with the agreement that
this land would be included within the service are for the water and sewer.
The owner also developed and constructed a roadway from Route 29 to this proposed property to
accommodate up to 30,000 vehicles'day. This roadway -Mll be extended through the property
and connected back to US Route 29 to create a second point of access for the properties served
from the roadway.
Imuacts to the Environmental Features:
The proposed project will have a minimal effect on the existing environmental features on the
property. There are a number of critical slopes on the property that have been identified by the
county to be preserved. This development has created common open space areas around these
critical slope areas and is intending to preserve most of these critical slope areas. There are a
small amount of impacts to the preserved slopes to accommodate the roadway transportation
network through the property. These impacts occur in two locations where the transportation
roadways impact the preserved critical slopes. Both of these locations are necessary to provide
access to future property and to make connections back to existing roadways.
The biggest environmental impact will be from the extension of Boulders road back to US Route
29. This second connection, while required, will result in a crossing of Herring Branch to tie-in
to US Route 29. This will be a stream crossing and a crossing of a stream with an existing flood
plain.
Profffers:
Proffers will be proposed with this project to offset the impacts of the development, in
accordance with the Albemarle County proffer requirements. Proffers will be included on the
residential units over the existing 350 units from the original PRD on the property. In addition,
affordable housing will be proffered as well, in accordance with the Albemarle County
requirements for the units over 350. A fatal proffer statement will be submitted during the
review of the rezoning.
Please contact me with any questions or requests for additional information pertaining to this
Rezoning Application request.
Sincerely,
Scott Collins, PE
COLLINS 2e RRETT STD SUITE K CHARLOTTESVILLE VA 22902
434.293.3719 PH 434.293.2813 F%
www.colIins-engineering.com
May 19, 2014
County of Albemarle
Community Development
401 McIntire Road
Charlottesville, VA 22902
Boulders Subdivision — Planned Unit Development Rezoning Application
Proposal:
A planned unit development is being proposed north of NGIC on property currently owned by
Next Generation, LLC. The existing zoning of the property is both PRD and Rural area. The
original PRD on a portion of the property allowed up to 350 units to be developed. The
applicant would like to request a rezoning amendment to allow for a neighborhood development
of single family and multi -family units between 535 units and 770 units, and a small commercial
development of up to 30,000SF of area for commercial use. The tax map and parcels for this
proposed development are 03300-00-00-001D0, 03300-00-00-00100, and 03300-00-00-01000.
The total acreage of the property is 145.6 acres. The site is located within the Rio Magisterial
District.
The project will provide needed public housing in this area. NGIC is a large employer in the
county, and this housing will fill the need to help accommodate the employees who are
relocating to Charlottesville to work at this facility and other areas in Charlottesville. The
proposed commercial area will help provide neighborhood commercial amenities to this
neighborhood.
Comurehensive Plan:
The proposed development is consistent with the comprehensive plan for this area. The entire
area to be rezoned is located in the comprehensive growth area. The comprehensive plan calls
for this area to be a mixture of urban density and neighborhood density, with a small urban
mixed use center. Our proposed plan is consistent with the densities proposed within the
comprehensive plan for this area. The development has higher density around the centers and
transitions to lower neighborhood density throughout the development.
The comprehensive plan also calls for a second connection of Boulders Drive to Route 29, which
is provided in this application plan. This connection will be provided when warranted by the
traffic demand, based on the proposed 527 traffic study that will accompany this rezoning.
Public Facilities and Infrastructure:
The proposed development is located within the growth area and is also located within the
Albemarle County service district for Water and sewer. The owner of this parcel has installed
water and sewer out to the property and developed a sewer pump station to service the entire
drainage shed. The station was eventually taken into the ACSA system with the agreement that
this land would be included within the service are for the water and sewer.
The owner also developed and constructed a roadway from Route 29 to this proposed property to
accommodate up to 30,000 vehicles/day. This roadway will be extended through the property
and connected back to US Route 29 to create a second point of access for the properties served
from the roadway.
Imaacts to the Environmental Features:
The proposed project will have a minimal effect on the existing environmental features on the
property. There are a number of critical slopes on the property that have been identified by the
county to be preserved. This development has created common open space areas around these
critical slope areas and is intending to preserve most of these critical slope areas. There are a
small amount of impacts to the preserved slopes to accommodate the roadway transportation
network through the property. These impacts occur in two locations where the transportation
roadways impact the preserved critical slopes. Both of these locations are necessary to provide
access to future property and to make connections back to existing roadways.
The biggest environmental impact will be from the extension of Boulders road back to US Route
29. This second connection, while required, will result in a crossing of Herring Branch to tie-in
to US Route 29. This will be a stream crossing and a crossing of a stream with an existing flood
plain.
Profffers:
Proffers will be proposed with this project to offset the impacts of the development, in
accordance with the Albemarle County proffer requirements. Proffers will be included on the
residential units over the existing 350 units from the original PRD on the property. In addition,
affordable housing will be proffered as well, in accordance with the Albemarle County
requirements for the units over 350. A final proffer statement will be submitted during the
review of the rezoning.
Please contact me with any questions or requests for additional information pertaining to this
Rezoning Application request.
Sincerely,
Scott Collins, PE
COLLINS _ .:71
2C RRETT ST, SUITE K CHARLOTTESVILLE VA 22902
434.293.3719 PH 434.293.2813 FX
www.collins-engineering.com
May 19, 2014
County of Albemarle
Community Development
401 McIntire Road
Charlottesville, VA 22902
Boulders Subdivision — Planned Unit Development Rezoning Application
Proposal:
A planned unit development is being proposed north of NGIC on property currently owned by
Next Generation, LLC. The existing zoning of the property is both PRD and Rural area. The
original PRD on a portion of the property allowed up to 350 units to be developed. The
applicant would like to request a rezoning amendment to allow for a neighborhood development
of single family and multi -family units between 535 units and 770 units, and a small commercial
development of up to 30,000SF of area for commercial use. The tax map and parcels for this
proposed development are 03300-00-00-001D0, 03300-00-00-00100, and 03300-00-00-01000.
The total acreage of the property is 145.6 acres. The site is located within the Rio Magisterial
District.
The project will provide needed public housing in this area. NGIC is a large employer in the
county, and this housing will fill the need to help accommodate the employees who are
relocating to Charlottesville to work at this facility and other areas in Charlottesville. The
proposed commercial area will help provide neighborhood commercial amenities to this
neighborhood.
Comprehensive Plan:
The proposed development is consistent with the comprehensive plan for this area. The entire
area to be rezoned is located in the comprehensive growth area. The comprehensive plan calls
for this area to be a mixture of urban density and neighborhood density, with a small urban
mixed use center. Our proposed plan is consistent with the densities proposed within the
comprehensive plan for this area. The development has higher density around the centers and
transitions to lower neighborhood density throughout the development.
The comprehensive plan also calls for a second connection of Boulders Drive to Route 29, which
is provided in this application plan. This connection will be provided when warranted by the
traffic demand, based on the proposed 527 traffic study that will accompany this rezoning.
Public Facilities and Infrastructure:
The proposed development is located within the growth area and is also located within the
Albemarle County service district for Water and sewer. The owner of this parcel has installed
water and sewer out to the property and developed a sewer pump station to service the entire
drainage shed. The station was eventually taken into the ACSA system with the agreement that
this land would be included within the service are for the water and sewer.
The owner also developed and constructed a roadway from Route 29 to this proposed property to
accommodate up to 30,000 vehicles/day. This roadway will be extended through the property
and connected back to US Route 29 to create a second point of access for the properties served
from the roadway.
Impacts to the En-Oronmental Features:
The proposed project will have a minimal effect on the existing environmental features on the
property. There are a number of critical slopes on the property that have been identified by the
county to be preserved. This development has created common open space areas around these
critical slope areas and is intending to preserve most of these critical slope areas. There are a
small amount of impacts to the preserved slopes to accommodate the roadway transportation
network through the property. These impacts occur in two locations where the transportation
roadways impact the preserved critical slopes. Both of these locations are necessary to provide
access to future property and to make connections back to existing roadways.
The biggest environmental impact will be from the extension of Boulders road back to US Route
29. This second connection, while required, will result in a crossing of Herring Branch to tie-in
to US Route 29. This will be a stream crossing and a crossing of a stream with an existing flood
plain.
Profffers:
Proffers will be proposed with this project to offset the impacts of the development, in
accordance with the Albemarle County proffer requirements. Proffers will be included on the
residential units over the existing 350 units from the original PRD on the property. In addition,
affordable housing will be proffered as well, in accordance with the Albemarle County
requirements for the units over 350. A final proffer statement will be submitted during the
review of the rezoning.
Please contact me with any questions or requests for additional information pertaining to this
Rezoning Application request.
Sincerely,
Scott Collins, PE
�COLLINS
2l .RRETT ST, SUITE K CHARLOTTESVILLE VA 22902
434.293.3719 PH 434.293.2813 FX
www.coIIins-engIneering.com
May 19, 2014
County of Albemarle
Community Development
401 McIntire Road
Charlottesville, VA 22902
Boulders Subdivision — Planned Unit Development Rezoning Application
Proposal:
A planned unit development is being proposed north of NGIC on property currently owned by
Next Generation, LLC. The existing zoning of the property is both PRD and Rural area. The
original PRD on a portion of the property allowed up to 350 units to be developed. The
applicant would like to request a rezoning amendment to allow for a neighborhood development
of single family and multi -family units between 535 units and 770 units, and a small commercial
development of up to 30,000SF of area for commercial use. The tax map and parcels for this
proposed development are 03300-00-00-001D0, 03300-00-00-00100, and 03300-00-00-01000.
The total acreage of the property is 145.6 acres. The site is located within the Rio Magisterial
District.
The project will provide needed public housing in this area. NGIC is a large employer in the
county, and this housing will fill the need to help accommodate the employees who are
relocating to Charlottesville to work at this facility and other areas in Charlottesville. The
proposed commercial area will help provide neighborhood commercial amenities to this
neighborhood.
Comprehensive Plan:
The proposed development is consistent with the comprehensive plan for this area. The entire
area to be rezoned is located in the comprehensive growth area. The comprehensive plan calls
for this area to be a mixture of urban density and neighborhood density, with a small urban
mixed use center. Our proposed plan is consistent with the densities proposed within the
comprehensive plan for this area. The development has higher density around the centers and
transitions to lower neighborhood density throughout the development.
The comprehensive plan also calls for a second connection of Boulders Drive to Route 29, which
is provided in this application plan. This connection will be provided when warranted by the
traffic demand, based on the proposed 527 traffic study that will accompany this rezoning.
Public Facilities and Infrastructure:
The proposed development is located within the growth area and is also located within the
Albemarle County service district for Water and sewer. The owner of this parcel has installed
water and sewer out to the property and developed a sewer pump station to service the entire
drainage shed. The station was eventually taken into the ACSA system with the agreement that
this land would be included within the service are for the water and sewer.
The owner also developed and constructed a roadway from Route 29 to this proposed property to
accommodate up to 30,000 vehicles/day. This roadway will be extended through the property
and connected back to US Route 29 to create a second point of access for the properties served
from the roadway.
Impacts to the Environmental Features:
The proposed project will have a minimal effect on the existing environmental features on the
property. There are a number of critical slopes on the property that have been identified by the
county to be preserved. This development has created common open space areas around these
critical slope areas and is intending to preserve most of these critical slope areas. There are a
small amount of impacts to the preserved slopes to accommodate the roadway transportation
network through the property. These impacts occur in two locations where the transportation
roadways impact the preserved critical slopes. Both of these locations are necessary to provide
access to future property and to make connections back to existing roadways.
The biggest environmental impact will be from the extension of Boulders road back to US Route
29. This second connection, while required, will result in a crossing of Herring Branch to tie-in
to US Route 29. This will be a stream crossing and a crossing of a stream with an existing flood
plain.
Profffers:
Proffers will be proposed with this project to offset the impacts of the development, in
accordance with the Albemarle County proffer requirements. Proffers will be included on the
residential units over the existing 350 units from the original PRD on the property. In addition,
affordable housing will be proffered as well, in accordance with the Albemarle County
requirements for the units over 350. A final proffer statement will be submitted during the
review of the rezoning.
Please contact me with any questions or requests for additional information pertaining to this
Rezoning Application request.
Sincerely,
Scott Collins, PE
f COLLINS -
2C RRETT ST, SUITE K CHARLOTTESVILLE VA 22902
434.293.3719 PH 434.293.2813 FX
www.collins-engineering.com
May 19, 2014
County of Albemarle
Community Development
401 McIntire Road
Charlottesville, VA 22902
Boulders Subdivision — Planned Unit Development Rezoning Application
Proposal:
A planned unit development is being proposed north of NGIC on property currently owned by
Next Generation, LLC. The existing zoning of the property is both PRD and Rural area. The
original PRD on a portion of the property allowed up to 350 units to be developed. The
applicant would like to request a rezoning amendment to allow for a neighborhood development
of single family and multi -family units between 535 units and 770 units, and a small commercial
development of up to 30,0005F of area for commercial use. The tax map and parcels for this
proposed development are 03300-00-00-001D0, 03300-00-00-00100, and 03300-00-00-01000.
The total acreage of the property is 145.6 acres. The site is located within the Rio Magisterial
District.
The project will provide needed public housing in this area. NGIC is a large employer in the
county, and this housing will fill the need to help accommodate the employees who are
relocating to Charlottesville to work at this facility and other areas in Charlottesville. The
proposed commercial area will help provide neighborhood commercial amenities to this
neighborhood.
Comprehensive Plan:
The proposed development is consistent with the comprehensive plan for this area. The entire
area to be rezoned is located in the comprehensive growth area. The comprehensive plan calls
for this area to be a mixture of urban density and neighborhood density, with a small urban
mixed use center. Our proposed plan is consistent with the densities proposed within the
comprehensive plan for this area. The development has higher density around the centers and
transitions to lower neighborhood density throughout the development.
The comprehensive plan also calls for a second connection of Boulders Drive to Route 29, which
is provided in this application plan. This connection will be provided when warranted by the
traffic demand, based on the proposed 527 traffic study that will accompany this rezoning.
Public Facilities and Infrastructure:
The proposed development is located within the growth area and is also located within the
Albemarle County service district for Water and sewer. The owner of this parcel has installed
water and sewer out to the property and developed a sewer pump station to service the entire
drainage shed. The station was eventually taken into the ACSA system with the agreement that
this land would be included within the service are for the water and sewer.
The owner also developed and constructed a roadway from Route 29 to this proposed property to
accommodate up to 30,000 vehicles/day. This roadway will be extended through the property
and connected back to US Route 29 to create a second point of access for the properties served
from the roadway.
Impacts to the Environmental Features:
The proposed project will have a minimal effect on the existing environmental features on the
property. There are a number of critical slopes on the property that have been identified by the
county to be preserved. This development has created common open space areas around these
critical slope areas and is intending to preserve most of these critical slope areas. There are a
small amount of impacts to the preserved slopes to accommodate the roadway transportation
network through the property. These impacts occur in two locations where the transportation
roadways impact the preserved critical slopes. Both of these locations are necessary to provide
access to future property and to make connections back to existing roadways.
The biggest environmental impact will be from the extension of Boulders road back to US Route
29. This second connection, while required, will result in a crossing of Herring Branch to tie-in
to US Route 29. This will be a stream crossing and a crossing of a stream with an existing flood
plain.
Profffers:
Proffers will be proposed with this project to offset the impacts of the development, in
accordance with the Albemarle County proffer requirements. Proffers will be included on the
residential units over the existing 350 units from the original PRD on the property. In addition,
affordable housing will be proffered as well, in accordance with the Albemarle County
requirements for the units over 350. A final proffer statement will be submitted during the
review of the rezoning.
Please contact me with any questions or requests for additional information pertaining to this
Rezoning Application request.
Sincerely,
Scott Collins, PE