Loading...
HomeMy WebLinkAboutWPO201000057 Checklist - Project Closeout (Administrative) 2022-06-24 WATER PROTECTION (CONSTRUCTION) FILE CLOSEOUT AT TIME OF COMPLETION (BONI) IMAGING CENTER INSTRUCTIONS RELEASE) CHECKLIST The Inspector/Management Analyst is to complete this form " ,f � 5;;, `, release; place the completed form in the WPO folder and forward to the Imaging Center for digital closeout into LaserFiche. Once items have been placed in Laser , ��� of project completion and/or bond Fiche,Imaging Center staff will forward to Centralized Filing PROJECT TITLE FULL NAME INSPECTOR: "--"- FINAL A C ION DATE: Ly/ _�M_ CountyView _____— __________ Ej Status/Status — — --___ tatus Date updated ---Hardcopy—File Folder Closeout: All items listed should be placed in project folder,in reverse chronological order(latest on top). Please check each item included in this folder. To indicate that an item is not applicable next to the check box. The Inspector/Management Analyst has the discretion to include anyitem deemed necessary to provide clarity to the file,please indicate that item on the"Other"lines provided. pp a to this file,place an"N/A" Digital Closeout Instructions: Below each item please indicate• p tded. or,if the document is already in digital format,can be saved to LaserFiche. Pleaseprovide t (Path/name)of the document in the space provided. if Imaging Center is to scan the document; he digital location ❑ Preconstruction Meeting Form ❑ Scan "av`-e'd location ❑ Grading Permit ❑ Scan /' ❑ Saved location ❑ Inspection R sts ❑ , "can ❑ Saved location ❑ thsP ion Results(Include any inspection tickets,memos,photos,etc.) ) ❑ Saved location ❑ Bond Reduction/Bond Release Notices from Inspector to Management Anal st p Scan ❑ Saved location Y ❑ Conservation Checldi t ❑ Scan ❑ Saved location 0 As-built/Constru ion Plans ❑ Sc 0 Saved location ❑ Other(Pleas explain) ❑ can 0 Saved location ❑ Other P s - At the Inspector's discretion, copies of unapproved plans/ lats' lend c 'ty to the review at a later date. If such plans are included, they should unap roved and contain a note clarifyingp �may be placed in the file if they why it was included. be clearly marked as ❑ Scan ❑ Saved location NOTES: 1) Checklist is completed and included in folder; —^ - - - WPO project folders will be accepted by the ImagingCenter when the followi>sg items are complete: 2) Documents are Acco-fastened(except plats/plans),and in chronological or 3) Documents are sufficiently identified as to which need to be scanned or savedito LaserFiche. If the above items are not complete,Imaging � de (latest documents on top); Engineer for corrective action. g Center staff will circle the incomplete item and return folder to the County Draft 12-5-2013