Loading...
HomeMy WebLinkAboutWPO202000047 Checklist - Project Closeout (Administrative) 2022-07-20 • WATER PROTECTION (CONSTRUCTION) FILE CLOSEOUT AT TIME OF COMPLETION (BOND IMAGING CENTER INSTRUCTIOS RELEASE) CHECKLIST The Inspector/Management Analyst is to complete this form ' ! of project completion release;place the completed form in the WPO folder and forward to the Imaging Center for digital closeout LaserFiche. Once items have been placed in LaserFiche,Imaging Center staff and/or bond into will forward to Centralized Filing WPO# ,PO r PROJECT TITLE al FULL NAME INSPECTOR: FINAL ACTION DATE• Zd ZZ rCountyView— 0 Status/Status Date updated Hardcopy—File Folder. Closeout: All items listed should be placed inproject folder in chronological order(latest on top). reverse Please check each item included in this folder. To indicate that an item is not a licl ble next to the check box. The Inspector/Management Analyst has the discretion to inc de anyitem provide clarity to the file,please indicate that item on the"Other"lines provided.pp to this file,place an"N/A" deemed necessary to p lded. Digital Closeout Instructions: Below each item please indicate if Ima • or,if the document is already in digital format,can be saved to LaserFiche. Please rovide the digital location (Path/name)of the document in the space provided. �n Center is to scan the document; ❑ P• reconstruction Meeting Form ❑ Scan 0 Saved location ❑ G• rading Permit — — 0 Scan 0 Saved location ❑ Inspection Requests ❑ Scan Saved location 0 Inspection Results(Include an inspection tickets,memos,photos,etc. ❑ Scan Saved location ) ❑ B• ond Reduction/Bond Releas Notices from Inspector to Management An ❑ Scan Saved location al st ❑ C• onservation Checklist ❑ Scan Saved location ❑ As-built/Construction Plans ❑ Scan Saved location ❑ Other(Please explain) ❑ Scan 0 Saved location ❑ Other Plans - At the Inspector's discretion, copies of unapproved plans/plats may be placed in the file if they lend clarity to the review at a later date. If such plans are included unapproved and contain a note clarifying why it was included. ' they should be clearly marked as ❑ Scan 0 Saved location • NOTES: WPO project folders will be accepted by the Imaging 1) Checklist is completed and included in folder; Center when the folio g-items are complete: 2) Documents are Acco-fastened(except plats/plans),and in chronological orde I (latest documents on 3) Documents are sufficiently identified as to which need to be scanned or saved to LaserFiche. If the above items are not complete,Imaging p top); Engineer for corrective action. g Center staff will circle the incomplete item ad return folder to the County Draft 12-5-2013