Loading...
HomeMy WebLinkAboutWPO201800082 Checklist 2022-11-01 WPO FILE CLOSEOUT CHECKLIST WPO#- 6/6i8 0 Z/Pico(VIA AA)a TA'-+vim BIR Inspections BIESC performed with approved plan. l? BISWM performed with As-Built plan. Required Docs (either in CV or paper copy) /,q CGP VAR10 for this project: /J/A CGP VAR10 that treats SWM for this project: k/A Albemarle County Application General VPDES Permit Registration Statemen Approved E&SC and SWM Plans (/ -29-2 ) f SWPPP Approved Bond Estimate 624 1-8S� t/ Nutrient Credit Purchase Affidavit /,1 Recorded Documents: SWM Maintenance Agreement, Easements it.)/f( As-Built Construction Record Drawings/Certification Manufacturing and Installation records Pipe video Current survey f General VPDES Permit N.O.T. Verify all fields; verify still active; reference other VAR10 "comments" for swm Inspections: 2 minimum with photos. Photos of all swm bmps /./.-BIR release/reduction form Erosion Control,or SWM Performance Bond Release: ✓ For releases: Update CV review status t "approved complete". /0 -08-2 z- For reductions: Update CV review status o"denied/complete", and enter reasons for denial in the comments box.