Loading...
HomeMy WebLinkAboutWPO201900035 Checklist 2022-12-06 WPO FILE CLOSEOUT CHECKLIST WPO#- 670 G iAN CA BIR Inspections ✓ BIESC performed with approved plan. ✓ BISWM performed with As-Built plan. Required Docs(either in CV or paper copy) II ('/ CGP VAR10 for this project: N/A /tlJf} CGP VAR10 that treats SWM for this project: IQ IA L/ Albemarle County Application ✓General VPDES Permit Registration Statement Approved E&SC and SWM Plans No-7 ThLfA/ SWPPP Approved Bond Estimate OA Nutrient Credit Purchase Affidavit 4 f(M6 ' h &'I2-I°► ✓ Recorded Documents: SWM Maintenance Agreement, Easements � � 7 gor1), 9 2-i`i As-Built Construction Record Drawings/Certification ^-- Manufacturing and Installation records CiNcc,,jFs 2•5 AC FnR Pipe video gAsi}- FASEm - A Current survey fslt o/c P is y - General VPDES Permit N.O.T. t, Verify all fields;eve; reference other VAR10"comments"for swm Inspections: 2 minimum with photos. Photos of all swm bmps BIR release/reduction form Erosion Control,or SWM Performance Bond Release: For releases:(Update CV review status to"approved/complete. For reductions: Update CV review status to "denied/complete", and enter reasons for denial in the comments box.