Stormwater Pollution Prevention Plan (SWPPP)
For Construction Activities At:
Project Name: Boar's Head Pool Renovation
Name:
Name:
Address: 200 Wellington Drive
Charlottesville, Virginia
22903
Prepared by:
Prepared for:
SWPPP Preparation Date: 02/06/20223
(This document is to be made publicly available according to 9VAC25-880-70, Part II, section D)
Issued — 10/2022 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
CONTENTS: (from Albemarle County Code Sec. 17-405)
1. Registration statement
2. Notice of general permit coverage
3. Nature of activity
4. Erosion and Sediment Control Plan (included in Section 13)
5. Stormwater Management Plan (included in Section 13)
6. Pollution Prevention Plan (included in Section 13)
7. Discharges to impaired waters, surface waters within an applicable TMDL wasteload
allocation, and exceptional waters.
8. Qualified personnel
9. Signed Certification
10. Delegation of authority
11. General permit copy
12. Inspection logs
13. Approved Drawings/Plans
Issued — 10/2022 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 1. Registration statement
(Provide a signed completed copy of the DEQ registration statement)
Issued — 10/2022 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY PERMIT #:
GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM PLAN/ID #:
CONSTRUCTION ACTIVITIES (VAR10) TECHNICAL CRITERIA: 1113 ❑ IIC ❑
REGISTRATION STATEMENT 2019
Application type. ❑ NEW PERMIT ISSUANCE
(CHOOSE ONE) ❑ MODIFICATION WITH ACREAGE INCREASE
❑ MODIFICATION WITHOUT ACREAGE INCREASE
❑ EXISTING PERMIT RE -ISSUANCE
Section I. Operator/Permittee Information.
A. Construction Activity Operator (Permittee). The person or entity that is applying for permit coverage and will have
operational control over construction activities to ensure compliance with the general permit. A person with
signatory authority for this operator must sign the certification in Section V. (per Part III. K. of the VAR10 Permit).
Operator Name:
Contact person:
Address:
City, State and Zip Code:
Phone Number:
Primary and CC Email:
B. Electronic correspondence. To receive an emailed coverage letter or to pay by credit card, you must choose YES
and include a valid email. May we transmit correspondence electronically? YES ❑ NO ❑
Section II. Construction Activity Information.
A.
Include a site map showing the location of the existing or proposed land -disturbing activities, the limits of land
disturbance, construction entrances and all waterbodies receiving stormwater discharges from the site.
B.
Project site location information.
Construction Activity Name:
Address:
City and/or County and Zip Code:
Construction Activity Entrance Location
(description, street address and/or
latitude/longitude in decimal degrees):
Latitude and Longitude
(6-digit, decimal degrees format):
C.
Acreage totals for all land -disturbing activities to be included under this permit coverage. Report to the nearest
one -hundredth of an acre.
Total land area of development (include entire area to be
disturbed as approved in the Stormwater Management Plan):
Primary estimated area to be disturbed (include portions with
Erosion and Sediment Control Plan approval only):
Off -site estimated area to be disturbed (if applicable):
D.
Property Owner Status:
FEDERAL ❑ STATE ❑ PUBLIC ❑ PRIVATE ❑
E.
Nature of the Construction Activity Description (i.e. commercial,
industrial, residential, agricultural, environmental, utility):
F.
Municipal Separate Storm Sewer System (MS4) name(s) (if the
site is discharging to a MS4):
G.
Estimated Project Dates (MM/DD/YYYY).
Start Date:
Completion Date:
H.
Is this construction activity part of a larger common plan of
development or sale?
YES ❑ NO ❑
Rev 11/2020 PAGE 1 16
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019
1. 6`h Order Hydrologic Unit Code (HUC) and Receiving Water Name(s). Include additional areas on a separate page.
HUC T NAME(S) OF RECEIVING WATERBODY
Section III. Off -site Support Activity Location Information.
List all off -site support activities and excavated material disposal areas being utilized for this project. Include additional
areas on a separate page.
Off -site Activity Name:
Address:
City or County:
Off -site Activity Entrance Location (description, street
address and/or latitude/longitude in decimal degrees):
Latitude and Longitude (6-digit, decimal degrees format):
Is this off -site activity an excavated material disposal
area?
YES ❑ NO ❑
If this off -site activity is an excavated material disposal
area, list the contents of the excavated fill material:
Will a separate VPDES permit cover this off -site activity?
YES ❑ NO ❑
Section IV. Other Information.
A.
A stormwater pollution prevention plan (SWPPP) must be prepared in accordance with the requirements of the
General VPDES Permit for Discharges of Stormwater from Construction Activities prior to submitting the
Registration Statement. By signing the Registration Statement, the operator is certifying that the SWPPP has been
prepared.
B.
Has an Erosion and Sediment Control Plan been
submitted to the VESC Authority for review?
YES ❑ NO ❑
Erosion and Sediment Control Plan Approval Date (for
the estimated area to be disturbed MM/DD/YYYY):
C.
Has land -disturbance commenced?
YES ❑ NO ❑
D.
Annual Standards and Specifications. If this project is utilizing approved Annual Standards and Specifications
(AS&S), attached the completed AS&S Entity Form.
AS&S Entity Name (if different from the Operator
identified in Section I):
E.
Billing information (leave blank if same as the Operator identified in Section I. above). This entity will receive
Annual Permit Maintenance and Permit Modification Fee invoices (if applicable).
Billing Name:
Contact Name:
Address:
City, State and Zip Code:
Phone Number:
Primary and CC Email:
Rev 11/2020 PAGE 2 16
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019
Section V. Certification. A person representing the operator as identified in Section I. A. and meeting the requirements
of 9VAC25-880-70. Part III. K must physically sign this certification. A typed signature is not acceptable. Please note that
operator is defined in 9VAC25-870-10 as follows:
"Operator" means the owner or operator of any facility or activity subject to the Act and this chapter. In the context of stormwater
associated with a large or small construction activity, operator means any person associated with a construction project that meets
either of the following two criteria: (i) the person has direct operational control over construction plans and specifications, including
the ability to make modifications to those plans and specifications or (ii) the person has day-to-day operational control of those
activities at a project that are necessary to ensure compliance with a stormwater pollution prevention plan for the site or other state
permit or VSMP authority permit conditions (i.e., they are authorized to direct workers at a site to carry out activities required by the
stormwater pollution prevention plan or comply with other permit conditions). In the context of stormwater discharges from
Municipal Separate Storm Sewer Systems (MS4s), operator means the operator of the regulated MS4 system.
9VAC25-880-70. Part III. K. Signatory Requirements. Registration Statement. All Registration Statements shall be signed as follows:
a. For a corporation: by a responsible corporate officer. For the purpose of this chapter, a responsible corporate officer
means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or
any other person who performs similar policy -making or decision -making functions for the corporation; or (ii) the manager
of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management
decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major
capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term
compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or
actions taken to gather complete and accurate information for state permit application requirements; and where authority
to sign documents has been assigned or delegated to the manager in accordance with corporate procedures;
b. For a partnership or sole proprietorship: by a general partner or,the proprietor, respectively; or
c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official.
For purposes of this chapter, a principal executive officer of a public agency includes: (i) the chief executive officer of the
agency or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the
agency.
Certification: "I certify under penalty of law that I have read and understand this Registration Statement and that this
document and all attachments were prepared in accordance with a system designed to assure that qualified personnel
properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage
the system or those persons directly responsible for gathering the information, the information submitted is to the best
of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting
false information including the possibility of fine and imprisonment for knowing violations."
Printed Name:
Signature (signed in ink):
Date Signed:
Section VI. Submittal Instructions. Submit this form to the VSMP Authority. If the locality is the VSMP Authority, please
send your Registration Statement submittal directly to the locality; do NOT send this form to DEQ. A list of local VSMP
Authorities is available here: VSMP Authorities.
If DEQ is the VSMP Authority, please send to: If the locality is the VSMP Authority, please send to:
Department of Environmental Quality
Office of Stormwater Management Suite 1400
PO Box 1105
Richmond VA 23218
constructiongp@deg.virginia.gov
Rev 11/2020 PAGE 3 16
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019 INSTRUCTIONS
PLEASE DO NOT PRINT OR SUBMIT
This Registration Statement is for coverage under the General VPDES Permit for Discharges of Stormwater from Construction Activities. This form
covers the following permit actions: new permit issuance, existing permit modification with an increase in acreage, existing permit modifications
that result in a plan modification but do not result in an increase in disturbed acreage, and reissuance of an active permit coverage.
Application type. Select NEW PERMIT ISSUANCE to obtain a new permit coverage. Modifications are for modifying an existing, active permit
coverage. Select MODIFICATION WITH ACREAGE INCREASE when the previously approved acreage(s) increases (permit modifications are not
performed for decreases in acreage unless they result in plan changes — see Modification WITHOUT Acreage Increase). Select MODIFICATION
WITHOUT ACREAGE INCREASE when there is a change to the site design resulting in a change to the approved plans with no increase in acreage(s)
Select EXISTING PERMIT REISSUANCE to extend an expiring permit coverage for the next permit cycle and include the existing permit number.
Section I. Operator/Permittee Information.
A. Construction Activity Operator (Permittee). The person or entity that is applying for permit coverage and will have operational control over
construction activities to ensure compliance with the general permit. For companies, use the complete, active, legal entity name as registered with
a state corporation commission. Entities that are considered operators commonly consist of the property owner, developer of a project (the party
with control of project plans and specifications), or general contractor (the party with day-to-day operational control of the activities at the project
site that are necessary to ensure compliance with the general permit). If an individual person is listed as the operator, that person (or a legal
representative of) must sign the certification in Section V. An operator may be one of the following:
9VAC25-870-10. Definitions
"Operator" means the owner or operator of any facility or activity subject to the Act and this chapter. In the context of stormwater associated with a
large or small construction activity, operator means any person associated with a construction project that meets either of the following two
criteria: (i) the person has direct operational control over construction plans and specifications, including the ability to make modifications to those
plans and specifications or (if) the person has day-to-day operational control of those activities at a project that are necessary to ensure compliance
with a stormwater pollution prevention plan for the site or other state permit or V5MP authority permit conditions (i.e., they are authorized to direct
workers at a site to carry out activities required by the stormwater pollution prevention plan or comply with other permit conditions). In the context
of stormwater discharges from Municipal Separate Storm Sewer Systems (MS4), operator means the operator of the regulated MS4 system.
"Owner" means the Commonwealth or any of its political subdivisions including, but not limited to, sanitation district commissions and authorities,
and any public or private institution, corporation, association, firm or company organized or existing under the laws of this or any other state or
country, or any officer or agency of the United States, or any person or group of persons acting individually or as a group that owns, operates,
charters, rents, or otherwise exercises control over or is responsible for any actual or potential discharge of sewage, industrial wastes, or other
wastes or pollutants to state waters, or any facility or operation that has the capability to alter the physical, chemical, or biological properties of
state waters in contravention of § 62.1-44.5 of the Code of Virginia, the Act and this chapter.
"Person" means any individual, corporation, partnership, association, state, municipality, commission, or political subdivision of a state,
governmental body, including a federal, state, or local entity as applicable, any interstate body or any other legal entity.
B. May we transmit correspondence electronically? If you choose YES to this question and provide an email address in Section I. A., all
correspondence, forms, invoices and notifications will be transmitted by email to the operator. This will also give the operator the ability to pay by
credit card and to receive Dermit coverage aooroval letters immediately uoon Dermit aooroval.
Section II. Construction Activity Information.
A. A site map indicating the location of the existing or proposed land -disturbing activities, the limits of land disturbance, construction entrances
and all water bodies receiving stormwater discharges from the site must be included with the submittal of this form. Aerial imagery maps or
topographic maps showing the required items are acceptable. Plan sheet sized site maps are not required. Please consult your VSMP authority if
you have additional questions regarding site map requirements.
B. Construction Activity Name and location. Provide a descriptive project name (it is helpful to use the same naming convention as listed on the
Stormwater Management plans), 911 street address (if available), city/county of the construction activity, and the 6-digit latitude and longitude in
decimal degrees format for the centroid, main construction entrance or start and end points for linear projects (i.e. 37.1234N/-77.1234W).
C. Acreage totals for all land -disturbing activities, on- and off -site, to be included under this permit. Acreages are to be reported to the nearest
one -hundredth acre (two decimal places; i.e. 1.15 acres). Provide the total acreage of the primary development site as approved on the
Stormwater Management Plans and the primary on -site estimated acreage to be disturbed by the construction activity as approved under the
Erosion and Sediment Control Plans. The off -site estimated area to be disturbed is the sum of the disturbed acreages for all off -site support
activities to be covered under this general permit. Do not include the off -site acreage totals in the primary, on -site total and estimated disturbed
acreage totals. Permit fees are calculated based on your disturbed acreage total for all on- and off -site areas being disturbed under this permit
coverage (the sum of all on -site and off -site disturbed acreages).
D. Property owner status. The status of the construction activity property owner. Any property not owned by a government entity or agency (i.e.
federal, state or local governments) is PRIVATE.
Rev 11/2020 PAGE 4 16
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019 INSTRUCTIONS
PLEASE DO NOT PRINT OR SUBMIT
E. Nature of the construction activity description. Choose the designation that best describes the post -construction use of this project (you may
choose more than one). (i.e. Residential, Commercial, Industrial, Agricultural, Environmental, Educational, Oil and Gas, Utility, Transportation,
Institutional, etc.). Describe the post -construction use of the project (i.e. Commercial — one new office building and associated parking and
utilities; Transportation — Linear roads, sidewalks and utilities; Agricultural-3 Poultry Houses, etc.).
F. Municipal Separate Storm Sewer System (MS4) name(s) if discharging to a MS4. If stormwater is discharged through a MS4 (either partially or
completely), provide the name of the MS4(s) that will be receiving water from this construction activity. The MS4 name is typically the town, city,
county, institute or federal facility where the construction activity is located.
G. Estimated project dates. Provide the estimated project start date and completion date in Month/Day/Year or MM/DD/YYYY format (i.e.
07/30/2019).
H. Is this construction activity is part of a larger common plan of development or sale? "Common plan of development or sale" means a contiguous
area where separate and distinct construction activities may be taking place at different times on different schedules per 9VAC25-870-50.
Definitions. Le. a subdivision, commercial development, business park, etc.
I. 6th Order Hydrologic Unit Code (HUC) and associated Receiving Water Name(s). Provide all 6th order HUCs and receiving waterbody names, for
the primary site and any Off -site areas included under this permit coverage, that could potentially receive stormwater runoff discharging from this
activity. The HUC can be either a 12-digit number (i.e. 0208010101) or 2-letter, 2-number code (i.e. JL52). Include additional HUCs or receiving
waters on a separate page. You may utilize DEQ!s web -based GIS application, VEGIS, to obtain this information.
• VEGIS application link: DEas VEGIS Mapping Application
• Instructions for utilizing DE(Xs VEGIS application link: CGP-GIS HUC Instructions
Section III. Off -site Support Activity Location Information.
This general permit also authorizes stormwater discharges from support activities (e.g., concrete or asphalt batch plants, equipment staging yards,
material storage areas, excavated material disposal areas, borrow areas) located on -site or off -site provided that (i) the support activity is directly
related to a construction activity that is required to have general permit coverage; (ii) the support activity is not a commercial operation, nor does
it serve multiple unrelated construction activities by different operators; (III) the support activity does not operate beyond the completion of the
construction activity it supports; (iv) the support activity is identified in the Registration Statement at the time of general permit coverage; (v)
appropriate control measures are identified in a SWPPP and implemented to address the discharges from the support activity areas; and (vi) all
applicable state, federal, and local approvals are obtained for the support activity.
Off -site activity name and location information. Provide a descriptive off -site project name, 911 street address (if available), construction entrance
location (address or decimal degrees coordinates and description), city/county and the 6-digit latitude and longitude in decimal degrees (i.e.
37.1234N, 77.1234W) of all off -site support activities. Indicate whether the off -site support activity will be covered under this general permit or a
separate VPDES permit.
If excavated material (i.e., fill) will be transported off -site for disposal, the name and physical location address, when available, of all off -site
excavated material disposal areas including city or county; 6-digit latitude and longitude in decimal degrees (i.e. 37.1234N, 77.1234W) and the
contents of the excavated material.
List additional off -site areas to be included under this permit coverage on a separate page. Off -site areas not included on this registration will need
to obtain coverage under a separate VPDES permit.
Section IV. Other Information.
A. A stormwater pollution prevention plan (SWPPP) must be prepared prior to submitting the Registration Statement per 9VAC25-880. See
9VAC25-880-70. Part II. of the General Permit for the SWPPP requirements.
B. If the Erosion and Sediment Control Plan for the estimated area to be disturbed listed in Section II. C. has been submitted to the VESC Authority
for review and plan approval, choose YES. If you are submitting this application to reissue an existing permit coverage, please provide the date that
the VESC Authority approved the Erosion and Sediment Control Plan for the estimated area to be disturbed.
C. If land disturbance has commenced, choose YES. "Land disturbance" or "land -disturbing activity" means a man-made change to the land surface
that may result in soil erosion or has the potential to change its runoff characteristics, including construction activity such as the clearing, grading,
excavating, or filling of land per §62.1-44.15:24. Definitions.
D. If this project is using approved Annual Standards and Specifications (AS&S), attach the completed AS&S Entity Form.
If the AS&S Entity is different from the operator identified in Section I. A., list the AS&S Entity Name. The AS&S entity is the entity or agency that
holds the approved annual standards & specification. Please indicate if this project is also requesting a plan waiver.
• AS&S Entity Form link: Annual Standards and Specifications Entity Information Form
Rev 11/2020 PAGE 5 16
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019
Section V. Certification. A person representing the operator as identified in Section I. A. and meeting the requirements
of 9VAC25-880-70. Part III. K must physically sign this certification. A typed signature is not acceptable. Please note that
operator is defined in 9VAC25-870-10 as follows:
"Operator" means the owner or operator of any facility or activity subject to the Act and this chapter. In the context of stormwater
associated with a large or small construction activity, operator means any person associated with a construction project that meets
either of the following two criteria: (i) the person has direct operational control over construction plans and specifications, including
the ability to make modifications to those plans and specifications or (ii) the person has day-to-day operational control of those
activities at a project that are necessary to ensure compliance with a stormwater pollution prevention plan for the site or other state
permit or VSMP authority permit conditions (i.e., they are authorized to direct workers at a site to carry out activities required by the
stormwater pollution prevention plan or comply with other permit conditions). In the context of stormwater discharges from
Municipal Separate Storm Sewer Systems (MS4s), operator means the operator of the regulated MS4 system.
9VAC25-880-70. Part III. K. Signatory Requirements. Registration Statement. All Registration Statements shall be signed as follows:
a. For a corporation: by a responsible corporate officer. For the purpose of this chapter, a responsible corporate officer
means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or
any other person who performs similar policy -making or decision -making functions for the corporation; or (ii) the manager
of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management
decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major
capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term
compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or
actions taken to gather complete and accurate information for state permit application requirements; and where authority
to sign documents has been assigned or delegated to the manager in accordance with corporate procedures;
b. For a partnership or sole proprietorship: by a general partner or,the proprietor, respectively; or
c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official.
For purposes of this chapter, a principal executive officer of a public agency includes: (i) the chief executive officer of the
agency or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the
agency.
Certification: "I certify under penalty of law that I have read and understand this Registration Statement and that this
document and all attachments were prepared in accordance with a system designed to assure that qualified personnel
properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage
the system or those persons directly responsible for gathering the information, the information submitted is to the best
of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting
false information including the possibility of fine and imprisonment for knowing violations."
Printed Name:
Signature (signed in ink):
Date Signed:
Section VI. Submittal Instructions. Submit this form to the VSMP Authority. If the locality is the VSMP Authority, please
send your Registration Statement submittal directly to the locality; do NOT send this form to DEQ. A list of local VSMP
Authorities is available here: VSMP Authorities.
If DEQ is the VSMP Authority, please send to: If the locality is the VSMP Authority, please send to:
Department of Environmental Quality
Office of Stormwater Management Suite 1400
PO Box 1105
Richmond VA 23218
constructiongp@deg.virginia.gov
Rev 11/2020 PAGE 3 16
Section 2. Notice of general permit coverage
(This notice is to be posted near the main entrance according to 9VAC25-880-70, Part II, section C.)
(Provide a copy of the DEQ coverage letter when obtained)
Issued — 10/2022 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
COMMONWEALTH of VIRGINIA
DEPARTMENT OF ENVIRONMENTAL QUALITY
General Permit No.: VAR10
Effective Date: July 1, 2014
Expiration Date: June 30, 2019
GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION
ACTIVITIES
AUTHORIZATION TO DISCHARGE UNDER THE VIRGINIA STORMWATER MANAGEMENT
PROGRAM AND THE VIRGINIA STORMWATER MANAGEMENT ACT
In compliance with the provisions of the Clean Water Act, as amended, and pursuant to the Virginia
Stormwater Management Act and regulations adopted pursuant thereto, operators of construction
activities are authorized to discharge to surface waters within the boundaries of the Commonwealth of
Virginia, except those specifically named in State Water Control Board regulations that prohibit such
discharges.
The authorized discharge shall be in accordance with this cover page, Part I - Discharge Authorization
and Special Conditions, Part II - Stormwater Pollution Prevention Plan, and Part III - Conditions
Applicable to All VPDES Permits as set forth herein.
General Permit No.: VAR10
Page 1 of 21
PART
DISCHARGE AUTHORIZATION AND SPECIAL CONDITIONS
A. Coverage under this general permit.
1. During the period beginning with the date of coverage under this general permit and lasting until the
general permit's expiration date, the operator is authorized to discharge stormwater from construction
activities.
2. This general permit also authorizes stormwater discharges from support activities (e.g., concrete or
asphalt batch plants, equipment staging yards, material storage areas, excavated material disposal
areas, borrow areas) located on -site or off -site provided that:
a. The support activity is directly related to the construction activity that is required to have general
permit coverage for discharges of stormwater from construction activities;
b. The support activity is not a commercial operation, nor does it serve multiple unrelated
construction activities by different operators;
c. The support activity does not operate beyond the completion of the last construction activity it
supports;
d. The support activity is identified in the registration statement at the time of general permit
coverage;
e. Appropriate control measures are identified in a stormwater pollution prevention plan and
implemented to address the discharges from the support activity areas; and
f. All applicable state, federal, and local approvals are obtained for the support activity.
B. Limitations on coverage
1. Post -construction discharges. This general permit does not authorize stormwater discharges that
originate from the site after construction activities have been completed and the site, including any
support activity sites covered under the general permit registration, has undergone final stabilization.
Post -construction industrial stormwater discharges may need to be covered by a separate VPDES
permit.
2. Discharges mixed with nonstormwater. This general permit does not authorize discharges that are
mixed with sources of nonstormwater, other than those discharges that are identified in Part I E
(Authorized nonstormwater discharges) and are in compliance with this general permit.
3. Discharges covered by another state permit. This general permit does not authorize discharges of
stormwater from construction activities that have been covered under an individual permit or required
to obtain coverage under an alternative general permit.
4. Impaired waters and TMDL limitation. Discharges of stormwater from construction activities to surface
waters identified as impaired in the 2012 § 305(b)/303(d) Water Quality Assessment Integrated
Report or for which a TMDL wasteload allocation has been established and approved prior to the
term of this general permit for (i) sediment or a sediment -related parameter (i.e., total suspended
solids or turbidity) or (ii) nutrients (i.e., nitrogen or phosphorus) are not eligible for coverage under this
general permit unless the operator develops, implements, and maintains a SWPPP that minimizes
the pollutants of concern and, when applicable, is consistent with the assumptions and requirements
of the approved TMDL wasteload allocations. In addition, the operator shall implement the following
items:
General Permit No.: VAR10
Page 2 of 21
a. The impaired water(s), approved TMDL(s), and pollutant(s) of concern, when applicable, shall be
identified in the SWPPP;
b. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days
after final grade is reached on any portion of the site;
c. Nutrients shall be applied in accordance with manufacturer's recommendations or an approved
nutrient management plan and shall not be applied during rainfall events; and
d. The applicable SWPPP inspection requirements specified in Part II F 2 shall be amended as
follows:
(1) Inspections shall be conducted at a frequency of (i) at least once every four business days or
(ii) at least once every five business days and no later than 48 hours following a measurable
storm event. In the event that a measurable storm event occurs when there are more than 48
hours between business days, the inspection shall be conducted on the next business day;
and
(2) Representative inspections used by utility line installation, pipeline construction, or other
similar linear construction activities shall inspect all outfalls discharging to surface waters
identified as impaired or for which a TMDL wasteload allocation has been established and
approved prior to the term of this general permit.
5. Exceptional waters limitation. Discharges of stormwater from construction activities not previously
covered under the general permit issued in 2009 to exceptional waters identified in 9VAC25-260-30 A
3 c are not eligible for coverage under this general permit unless the operator implements the
following:
a. The exceptional water(s) shall be identified in the SWPPP;
b. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days
after final grade is reached on any portion of the site;
c. Nutrients shall be applied in accordance with manufacturer's recommendations or an approved
nutrient management plan and shall not be applied during rainfall events; and
d. The applicable SWPPP inspection requirements specified in Part II F 2 shall be amended as
follows:
(1) Inspections shall be conducted at a frequency of (i) at least once every four business days or
(ii) at least once every five business days and no later than 48 hours following a measurable
storm event. In the event that a measurable storm event occurs when there are more than 48
hours between business days, the inspection shall be conducted on the next business day;
and
(2) Representative inspections used by utility line installation, pipeline construction, or other
similar linear construction activities shall inspect all outfalls discharging to exceptional waters.
6. There shall be no discharge of floating solids or visible foam in other than trace amounts.
C. Commingled discharges. Discharges authorized by this general permit may be commingled with other
sources of stormwater that are not required to be covered under a state permit, so long as the
commingled discharge is in compliance with this general permit. Discharges authorized by a separate
state or VPDES permit may be commingled with discharges authorized by this general permit so long as
all such discharges comply with all applicable state and VPDES permit requirements.
General Permit No.: VAR10
Page 3 of 21
D. Prohibition of nonstormwater discharges. Except as provided in Parts I A 2, 1 C, and I E, all discharges
covered by this general permit shall be composed entirely of stormwater associated with construction
activities. All other discharges including the following are prohibited:
1. Wastewater from washout of concrete;
2. Wastewater from the washout and cleanout of stucco, paint, form release oils, curing compounds,
and other construction materials;
3. Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance;
4. Oils, toxic substances, or hazardous substances from spills or other releases; and
5. Soaps, solvents, or detergents used in equipment and vehicle washing.
E. Authorized nonstormwater discharges. The following nonstormwater discharges from construction
activities are authorized by this general permit when discharged in compliance with this general permit:
1. Discharges from firefighting activities;
2. Fire hydrant flushings;
3. Waters used to wash vehicles or equipment where soaps, solvents, or detergents have not been
used and the wash water has been filtered, settled, or similarly treated prior to discharge;
4. Water used to control dust that has been filtered, settled, or similarly treated prior to discharge;
5. Potable water sources, including uncontaminated waterline flushings;
6. Routine external building wash down where soaps, solvents or detergents have not been used and
the wash water has been filtered, settled, or similarly treated prior to discharge;
7. Pavement wash waters where spills or leaks of toxic or hazardous materials have not occurred (or
where all spilled or leaked material has been removed prior to washing); where soaps, solvents, or
detergents have not been used; and where the wash water has been filtered, settled, or similarly
treated prior to discharge;
8. Uncontaminated air conditioning or compressor condensate;
9. Uncontaminated ground water or spring water;
10. Foundation or footing drains where flows are not contaminated with process materials such as
solvents;
11. Uncontaminated excavation dewatering, including dewatering of trenches and excavations that have
been filtered, settled, or similarly treated prior to discharge; and
12. Landscape irrigation.
F. Termination of general permit coverage.
1. The operator of the construction activity shall submit a notice of termination in accordance with
9VAC25-880-60 to the VSMP authority after one or more of the following conditions have been met:
General Permit No.: VAR10
Page 4 of 21
a. Necessary permanent control measures included in the SWPPP for the site are in place and
functioning effectively and final stabilization has been achieved on all portions of the site for which
the operator is responsible. When applicable, long term responsibility and maintenance
requirements shall be recorded in the local land records prior to the submission of a notice of
termination;
b. Another operator has assumed control over all areas of the site that have not been finally
stabilized and obtained coverage for the ongoing discharge;
c. Coverage under an alternative VPDES or state permit has been obtained; or
d. For residential construction only, temporary soil stabilization has been completed and the
residence has been transferred to the homeowner.
2. The notice of termination should be submitted no later than 30 days after one of the above conditions
in subdivision 1 of this subsection is met. Authorization to discharge terminates at midnight on the
date that the notice of termination is submitted for the conditions set forth in subdivisions 1 b through
1 d of this subsection. Termination of authorizations to discharge for the conditions set forth in
subdivision 1 a of this subsection shall be effective upon notification from the department that the
provisions of subdivision 1 a of this subsection have been met or 60 days after submittal of the notice
of termination, whichever occurs first.
3. The notice of termination shall be signed in accordance with Part III K of this general permit.
G. Water quality protection.
1. The operator must select, install, implement and maintain control measures as identified in the
SWPPP at the construction site that minimize pollutants in the discharge as necessary to ensure that
the operator's discharge does not cause or contribute to an excursion above any applicable water
quality standard.
2. If it is determined by the department that the operator's discharges are causing, have reasonable
potential to cause, or are contributing to an excursion above any applicable water quality standard,
the department, in consultation with the VSMP authority, may take appropriate enforcement action
and require the operator to:
a. Modify or implement additional control measures in accordance with Part II B to adequately
address the identified water quality concerns;
b. Submit valid and verifiable data and information that are representative of ambient conditions and
indicate that the receiving water is attaining water quality standards; or
c. Submit an individual permit application in accordance with 9VAC25-870-410 B 3.
All written responses required under this chapter must include a signed certification consistent with Part
III K.
General Permit No.: VAR10
Page 5 of 21
PART II
STORMWATER POLLUTION PREVENTION PLAN
A stormwater pollution prevention plan (SWPPP) shall be developed prior to the submission of a
registration statement and implemented for the construction activity, including any support activity,
covered by this general permit. SWPPPs shall be prepared in accordance with good engineering
practices. Construction activities that are part of a larger common plan of development or sale and disturb
less than one acre may utilize a SWPPP template provided by the department and need not provide a
separate stormwater management plan if one has been prepared and implemented for the larger
common plan of development or sale.
The SWPPP requirements of this general permit may be fulfilled by incorporating by reference other plans
such as a spill prevention control and countermeasure (SPCC) plan developed for the site under § 311 of
the federal Clean Water Act or best management practices (BMP) programs otherwise required for the
facility provided that the incorporated plan meets or exceeds the SWPPP requirements of Part II A. All
plans incorporated by reference into the SWPPP become enforceable under this general permit. If a plan
incorporated by reference does not contain all of the required elements of the SWPPP, the operator must
develop the missing elements and include them in the SWPPP.
Any operator that was authorized to discharge under the general permit issued in 2009, and that intends
to continue coverage under this general permit, shall update its stormwater pollution prevention plan to
comply with the requirements of this general permit no later than 60 days after the date of coverage under
this general permit.
A. Stormwater pollution prevention plan contents. The SWPPP shall include the following items
1. General information.
a. A signed copy of the registration statement, if required, for coverage under the general VPDES
permit for discharges of stormwater from construction activities;
b. Upon receipt, a copy of the notice of coverage under the general VPDES permit for discharges of
stormwater from construction activities (i.e., notice of coverage letter);
c. Upon receipt, a copy of the general VPDES permit for discharges of stormwater from construction
activities;
d. A narrative description of the nature of the construction activity, including the function of the
project (e.g., low density residential, shopping mall, highway, etc.);
e. A legible site plan identifying:
(1) Directions of stormwater flow and approximate slopes anticipated after major grading
activities;
(2) Limits of land disturbance including steep slopes and natural buffers around surface waters
that will not be disturbed;
(3) Locations of major structural and nonstructural control measures, including sediment basins
and traps, perimeter dikes, sediment barriers, and other measures intended to filter, settle, or
similarly treat sediment, that will be installed between disturbed areas and the undisturbed
vegetated areas in order to increase sediment removal and maximize stormwater infiltration;
(4) Locations of surface waters;
General Permit No.: VAR10
Page 6 of 21
(5) Locations where concentrated stormwater is discharged;
(6) Locations of support activities, when applicable and when required by the VSMP authority,
including but not limited to (i) areas where equipment and vehicle washing, wheel wash
water, and other wash water is to occur; (ii) storage areas for chemicals such as acids, fuels,
fertilizers, and other lawn care chemicals; (iii) concrete wash out areas; (iv) vehicle fueling
and maintenance areas; (v) sanitary waste facilities, including those temporarily placed on
the construction site; and (vi) construction waste storage; and
(7) When applicable, the location of the on -site rain gauge or the methodology established in
consultation with the VSMP authority used to identify measurable storm events for inspection
purposes.
2. Erosion and sediment control plan.
An erosion and sediment control plan approved by the VESCP authority as authorized under the
Erosion and Sediment Control Regulations (9VAC25-840), an "agreement in lieu of a plan" as
defined in 9VAC25-840-10 from the VESCP authority, or an erosion and sediment control plan
prepared in accordance with annual standards and specifications approved by the department.
Any operator proposing a new stormwater discharge from construction activities that is not
required to obtain erosion and sediment control plan approval from a VESCP authority or does
not adopt department -approved annual standards and specifications shall submit the erosion and
sediment control plan to the department for review and approval.
All erosion and sediment control plans shall include a statement describing the maintenance
responsibilities required for the erosion and sediment controls used.
c. A properly implemented approved erosion and sediment control plan, "agreement in lieu of a
plan," or erosion and sediment control plan prepared in accordance with department -approved
annual standards and specifications, adequately:
(1) Controls the volume and velocity of stormwater runoff within the site to minimize soil erosion;
(2) Controls stormwater discharges, including peak flow rates and total stormwater volume, to
minimize erosion at outlets and to minimize downstream channel and stream bank erosion;
(3) Minimizes the amount of soil exposed during the construction activity;
(4) Minimizes the disturbance of steep slopes;
(5) Minimizes sediment discharges from the site in a manner that addresses (i) the amount,
frequency, intensity, and duration of precipitation; (ii) the nature of resulting stormwater
runoff; and (iii) soil characteristics, including the range of soil particle sizes present on the
site;
(6) Provides and maintains natural buffers around surface waters, directs stormwater to
vegetated areas to increase sediment removal, and maximizes stormwater infiltration, unless
infeasible;
(7) Minimizes soil compaction and, unless infeasible, preserves topsoil;
(8) Ensures that stabilization of disturbed areas will be initiated immediately whenever any
clearing, grading, excavating, or other land -disturbing activities have permanently ceased on
any portion of the site, or temporarily ceased on any portion of the site and will not resume for
a period exceeding 14 days; and
General Permit No.: VAR10
Page 7 of 21
(9) Utilizes outlet structures that withdraw stormwater from the surface (i.e., above the
permanent pool or wet storage water surface elevation), unless infeasible, when discharging
from sediment basins or sediment traps.
3. Stormwater management plan.
New construction activities. A stormwater management plan approved by the VSMP authority as
authorized under the Virginia Stormwater Management Program (VSMP) Regulation (9VAC25-
870), or an "agreement in lieu of a stormwater management plan" as defined in 9VAC25-870-10
from the VSMP authority, or a stormwater management plan prepared in accordance with annual
standards and specifications approved by the department. Any operator proposing a new
stormwater discharge from construction activities that is not required to obtain stormwater
management plan approval from a VSMP authority or does not adopt department -approved
annual standards and specifications shall submit the stormwater management plan to the
department for review and approval.
Existing construction activities. Any operator that was authorized to discharge under the general
permit issued in 2009, and that intends to continue coverage under this general permit, shall
ensure compliance with the requirements of 9VAC25-870-93 through 9VAC25-870-99 of the
VSMP Regulation, including but not limited to the water quality and quantity requirements. The
SWPPP shall include a description of, and all necessary calculations supporting, all post -
construction stormwater management measures that will be installed prior to the completion of
the construction process to control pollutants in stormwater discharges after construction
operations have been completed. Structural measures should be placed on upland soils to the
degree possible. Such measures must be designed and installed in accordance with applicable
VESCP authority, VSMP authority, state, and federal requirements, and any necessary permits
must be obtained.
4. Pollution prevention plan. A pollution prevention plan that addresses potential pollutant -generating
activities that may reasonably be expected to affect the quality of stormwater discharges from the
construction activity, including any support activity. The pollution prevention plan shall:
a. Identify the potential pollutant -generating activities and the pollutant that is expected to be
exposed to stormwater;
b. Describe the location where the potential pollutant -generating activities will occur, or if identified
on the site plan, reference the site plan;
c. Identify all nonstormwater discharges, as authorized in Part I E of this general permit, that are or
will be commingled with stormwater discharges from the construction activity, including any
applicable support activity;
d. Identify the person responsible for implementing the pollution prevention practice or practices for
each pollutant -generating activity (if other than the person listed as the qualified personnel);
e. Describe the pollution prevention practices and procedures that will be implemented to:
(1) Prevent and respond to leaks, spills, and other releases including (i) procedures for
expeditiously stopping, containing, and cleaning up spills, leaks, and other releases; and (ii)
procedures for reporting leaks, spills, and other releases in accordance with Part III G;
(2) Prevent the discharge of spilled and leaked fuels and chemicals from vehicle fueling and
maintenance activities (e.g., providing secondary containment such as spill berms, decks,
spill containment pallets, providing cover where appropriate, and having spill kits readily
available);
General Permit No.: VAR10
Page 8 of 21
(3) Prevent the discharge of soaps, solvents, detergents, and wash water from construction
materials, including the clean-up of stucco, paint, form release oils, and curing compounds
(e.g., providing (i) cover (e.g., plastic sheeting or temporary roofs) to prevent contact with
stormwater; (ii) collection and proper disposal in a manner to prevent contact with
stormwater; and (iii) a similarly effective means designed to prevent discharge of these
pollutants);
(4) Minimize the discharge of pollutants from vehicle and equipment washing, wheel wash water,
and other types of washing (e.g., locating activities away from surface waters and stormwater
inlets or conveyance and directing wash waters to sediment basins or traps, using filtration
devices such as filter bags or sand filters, or using similarly effective controls);
(5) Direct concrete wash water into a leak -proof container or leak -proof settling basin. The
container or basin shall be designed so that no overflows can occur due to inadequate sizing
or precipitation. Hardened concrete wastes shall be removed and disposed of in a manner
consistent with the handling of other construction wastes. Liquid concrete wastes shall be
removed and disposed of in a manner consistent with the handling of other construction wash
waters and shall not be discharged to surface waters;
(6) Minimize the discharge of pollutants from storage, handling, and disposal of construction
products, materials, and wastes including (i) building products such as asphalt sealants,
copper flashing, roofing materials, adhesives, and concrete admixtures; (ii) pesticides,
herbicides, insecticides, fertilizers, and landscape materials; and (iii) construction and
domestic wastes such as packaging materials, scrap construction materials, masonry
products, timber, pipe and electrical cuttings, plastics, Styrofoam, concrete, and other trash or
building materials;
(7) Prevent the discharge of fuels, oils, and other petroleum products, hazardous or toxic wastes,
and sanitary wastes; and
(8) Address any other discharge from the potential pollutant -generating activities not addressed
above; and
Describe procedures for providing pollution prevention awareness of all applicable wastes,
including any wash water, disposal practices, and applicable disposal locations of such wastes, to
personnel in order to comply with the conditions of this general permit. The operator shall
implement the procedures described in the SWPPP.
5. SWPPP requirements for discharges to impaired waters, surface waters with an applicable TMDL
wasteload allocation established and approved prior to the term of this general permit, and
exceptional waters. The SWPPP shall:
a. Identify the impaired water(s), approved TMDL(s), pollutant(s) of concern, and exceptional waters
identified in 9VAC25-260-30 A 3 c, when applicable;
b. Provide clear direction that:
(1) Permanent or temporary soil stabilization shall be applied to denuded areas within seven
days after final grade is reached on any portion of the site;
(2) Nutrients shall be applied in accordance with manufacturer's recommendations or an
approved nutrient management plan and shall not be applied during rainfall events; and
(3) A modified inspection schedule shall be implemented in accordance with Part I B 4 or Part I B
5.
General Permit No.: VAR10
Page 9 of 21
6. Qualified personnel. The name, phone number, and qualifications of the qualified personnel
conducting inspections required by this general permit.
7. Delegation of authority. The individuals or positions with delegated authority, in accordance with Part
III K, to sign inspection reports or modify the SWPPP.
8. SWPPP signature. The SWPPP shall be signed and dated in accordance with Part III K.
B. SWPPP amendments, modification, and updates.
1. The operator shall amend the SWPPP whenever there is a change in the design, construction,
operation, or maintenance that has a significant effect on the discharge of pollutants to surface waters
and that has not been previously addressed in the SWPPP.
2. The SWPPP must be amended if, during inspections or investigations by the operator's qualified
personnel, or by local, state, or federal officials, it is determined that the existing control measures are
ineffective in minimizing pollutants in discharges from the construction activity. Revisions to the
SWPPP shall include additional or modified control measures designed and implemented to correct
problems identified. If approval by the VESCP authority, VSMP authority, or department is necessary
for the control measure, revisions to the SWPPP shall be completed no later than seven calendar
days following approval. Implementation of these additional or modified control measures must be
accomplished as described in Part II G.
3. The SWPPP must clearly identify the contractor(s) that will implement and maintain each control
measure identified in the SWPPP. The SWPPP shall be amended to identify any new contractor that
will implement and maintain a control measure.
4. The operator shall update the SWPPP no later than seven days following any modification to its
implementation. All modifications or updates to the SWPPP shall be noted and shall include the
following items:
a. A record of dates when:
(1) Major grading activities occur;
(2) Construction activities temporarily or permanently cease on a portion of the site; and
(3) Stabilization measures are initiated;
b. Documentation of replaced or modified controls where periodic inspections or other information
have indicated that the controls have been used inappropriately or incorrectly and where modified
as soon as possible;
c. Areas that have reached final stabilization and where no further SWPPP or inspection
requirements apply;
d. All properties that are no longer under the legal control of the operator and the dates on which the
operator no longer had legal control over each property;
e. The date of any prohibited discharges, the discharge volume released, and what actions were
taken to minimize the impact of the release;
f. Measures taken to prevent the reoccurrence of any prohibited discharge; and
g. Measures taken to address any evidence identified as a result of an inspection required under
Part 11 F.
General Permit No.: VAR10
Page 10 of 21
5. Amendments, modifications, or updates to the SWPPP shall be signed in accordance with Part III K
C. Public Notification. Upon commencement of land disturbance, the operator shall post conspicuously a
copy of the notice of coverage letter near the main entrance of the construction activity. For linear
projects, the operator shall post the notice of coverage letter at a publicly accessible location near an
active part of the construction project (e.g., where a pipeline crosses a public road). The operator shall
maintain the posted information until termination of general permit coverage as specified in Part I F.
D. SWPPP availability.
1. Operators with day-to-day operational control over SWPPP implementation shall have a copy of the
SWPPP available at a central location on -site for use by those identified as having responsibilities
under the SWPPP whenever they are on the construction site.
2. The operator shall make the SWPPP and all amendments, modifications, and updates available upon
request to the department, the VSMP authority, the EPA, the VESCP authority, local government
officials, or the operator of a municipal separate storm sewer system receiving discharges from the
construction activity. If an on -site location is unavailable to store the SWPPP when no personnel are
present, notice of the SWPPP's location must be posted near the main entrance of the construction
site.
3. The operator shall make the SWPPP available for public review in an electronic format or in hard
copy. Information for public access to the SWPPP shall be posted and maintained in accordance with
Part II C. If not provided electronically, public access to the SWPPP may be arranged upon request at
a time and at a publicly accessible location convenient to the operator or his designee but shall be no
less than once per month and shall be during normal business hours. Information not required to be
contained within the SWPPP by this general permit is not required to be released.
E. SWPPP implementation. The operator shall implement the SWPPP and subsequent amendments,
modifications, and updates from commencement of land disturbance until termination of general permit
coverage as specified in Part I F.
1. All control measures must be properly maintained in effective operating condition in accordance with
good engineering practices and, where applicable, manufacturer specifications. If a site inspection
required by Part II F identifies a control measure that is not operating effectively, corrective action(s)
shall be completed as soon as practicable, but no later than seven days after discovery or a longer
period as established by the VSMP authority, to maintain the continued effectiveness of the control
measures.
2. If site inspections required by Part II F identify an existing control measure that needs to be modified
or if an additional control measure is necessary for any reason, implementation shall be completed
prior to the next anticipated measurable storm event. If implementation prior to the next anticipated
measurable storm event is impracticable, then alternative control measures shall be implemented as
soon as practicable, but no later than seven days after discovery or a longer period as established by
the VSMP authority.
F. SWPPP Inspections.
1. Personnel responsible for on -site and off -site inspections. Inspections required by this general permit
shall be conducted by the qualified personnel identified by the operator in the SWPPP. The operator
is responsible for insuring that the qualified personnel conduct the inspection.
2. Inspection schedule.
a. Inspections shall be conducted at a frequency of:
General Permit No.: VAR10
Page 11 of 21
(1) At least once every five business days; or
(2) At least once every 10 business days and no later than 48 hours following a measurable
storm event. In the event that a measurable storm event occurs when there are more than 48
hours between business days, the inspection shall be conducted no later than the next
business day.
b. Where areas have been temporarily stabilized or land -disturbing activities will be suspended due
to continuous frozen ground conditions and stormwater discharges are unlikely, the inspection
frequency may be reduced to once per month. If weather conditions (such as above freezing
temperatures or rain or snow events) make discharges likely, the operator shall immediately
resume the regular inspection frequency.
c. Representative inspections may be utilized for utility line installation, pipeline construction, or
other similar linear construction activities provided that:
(1) Temporary or permanent soil stabilization has been installed and vehicle access may
compromise the temporary or permanent soil stabilization and potentially cause additional
land disturbance increasing the potential for erosion;
(2) Inspections occur on the same frequency as other construction activities;
(3) Control measures are inspected along the construction site 0.25 miles above and below each
access point (i.e., where a roadway, undisturbed right-of-way, or other similar feature
intersects the construction activity and access does not compromise temporary or permanent
soil stabilization); and
(4) Inspection locations are provided in the report required by Part II F.
3. Inspection requirements.
a. As part of the inspection, the qualified personnel shall:
(1) Record the date and time of the inspection and when applicable the date and rainfall amount
of the last measurable storm event;
(2) Record the information and a description of any discharges occurring at the time of the
inspection;
(3) Record any land -disturbing activities that have occurred outside of the approved erosion and
sediment control plan;
(4) Inspect the following for installation in accordance with the approved erosion and sediment
control plan, identification of any maintenance needs, and evaluation of effectiveness in
minimizing sediment discharge, including whether the control has been inappropriately or
incorrectly used:
(a) All perimeter erosion and sediment controls, such as silt fence;
(b) Soil stockpiles, when applicable, and borrow areas for stabilization or sediment trapping
measures;
(c) Completed earthen structures, such as dams, dikes, ditches, and diversions for
stabilization;
General Permit No.: VAR10
Page 12 of 21
(d) Cut and fill slopes;
(e) Sediment basins and traps, sediment barriers, and other measures installed to control
sediment discharge from stormwater;
(f) Temporary or permanent channel, flume, or other slope drain structures installed to
convey concentrated runoff down cut and fill slopes;
(g) Storm inlets that have been made operational to ensure that sediment laden stormwater
does not enter without first being filtered or similarly treated; and
(h) Construction vehicle access routes that intersect or access paved roads for minimizing
sediment tracking;
(5) Inspect areas that have reached final grade or that will remain dormant for more than 14 days
for initiation of stabilization activities;
(6) Inspect areas that have reached final grade or that will remain dormant for more than 14 days
for completion of stabilization activities within seven days of reaching grade or stopping work;
(7) Inspect for evidence that the approved erosion and sediment control plan, "agreement in lieu
of a plan," or erosion and sediment control plan prepared in accordance with department -
approved annual standards and specifications has not been properly implemented. This
includes but is not limited to:
(a) Concentrated flows of stormwater in conveyances such as rills, rivulets or channels that
have not been filtered, settled, or similarly treated prior to discharge, or evidence thereof;
(b) Sediment laden or turbid flows of stormwater that have not been filtered or settled to
remove sediments prior to discharge;
(c) Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins
that discharge to surface waters. Inlets and catch basins with failing sediments controls
due to improper installation, lack of maintenance, or inadequate design are considered
unprotected;
(d) Sediment deposition on any property (including public and private streets) outside of the
construction activity covered by this general permit;
(e) Required stabilization has not been initiated or completed on portions of the site;
(f) Sediment basins without adequate wet or dry storage volume or sediment basins that
allow the discharge of stormwater from below the surface of the wet storage portion of
the basin;
(g) Sediment traps without adequate wet or dry storage or sediment traps that allow the
discharge of stormwater from below the surface of the wet storage portion of the trap;
and
(h) Land disturbance outside of the approved area to be disturbed;
(8) Inspect pollutant generating activities identified in the pollution prevention plan for the proper
implementation, maintenance and effectiveness of the procedures and practices;
(9) Identify any pollutant generating activities not identified in the pollution prevention plan; and
General Permit No.: VAR10
Page 13 of 21
(10) Identify and document the presence of any evidence of the discharge of pollutants prohibited
by this general permit.
4. Inspection report. Each inspection report shall include the following items:
a. The date and time of the inspection and when applicable, the date and rainfall amount of the last
measurable storm event;
b. Summarized findings of the inspection;
c. The location(s) of prohibited discharges;
d. The location(s) of control measures that require maintenance;
e. The location(s) of control measures that failed to operate as designed or proved inadequate or
inappropriate for a particular location;
f. The location(s) where any evidence identified under Part II F 3 a (7) exists;
g. The location(s) where any additional control measure is needed that did not exist at the time of
inspection;
h. A list of corrective actions required (including any changes to the SWPPP that are necessary) as
a result of the inspection or to maintain permit compliance;
i. Documentation of any corrective actions required from a previous inspection that have not been
implemented; and
j. The date and signature of the qualified personnel and the operator or its duly authorized
representative.
The inspection report and any actions taken in accordance with Part II must be retained by the operator
as part of the SWPPP for at least three years from the date that general permit coverage expires or is
terminated. The inspection report shall identify any incidents of noncompliance. Where an inspection
report does not identify any incidents of noncompliance, the report shall contain a certification that the
construction activity is in compliance with the SWPPP and this general permit. The report shall be signed
in accordance with Part III K of this general permit.
G. Corrective actions.
1. The operator shall implement the corrective action(s) identified as a result of an inspection as soon as
practicable but no later than seven days after discovery or a longer period as approved by the VSMP
authority. If approval of a corrective action by a regulatory authority (e.g., VSMP authority, VESCP
authority, or the department) is necessary, additional control measures shall be implemented to
minimize pollutants in stormwater discharges until such approvals can be obtained.
2. The operator may be required to remove accumulated sediment deposits located outside of the
construction activity covered by this general permit as soon as practicable in order to minimize
environmental impacts. The operator shall notify the VSMP authority and the department as well as
obtain all applicable federal, state, and local authorizations, approvals, and permits prior to the
removal of sediments accumulated in surface waters including wetlands.
General Permit No.: VAR10
Page 14 of 21
PART III
CONDITIONS APPLICABLE TO ALL VPDES PERMITS
NOTE: Discharge monitoring is not required for this general permit. If the operator chooses to monitor
stormwater discharges or control measures, the operator must comply with the requirements of
subsections A, B, and C, as appropriate.
A. Monitoring.
1. Samples and measurements taken for the purpose of monitoring shall be representative of the
monitoring activity.
2. Monitoring shall be conducted according to procedures approved under 40 CFR Part 136 or
alternative methods approved by the U.S. Environmental Protection Agency, unless other procedures
have been specified in this general permit. Analyses performed according to test procedures
approved under 40 CFR Part 136 shall be performed by an environmental laboratory certified under
regulations adopted by the Department of General Services (1 VAC30-45 or 1 VAC30-46).
3. The operator shall periodically calibrate and perform maintenance procedures on all monitoring and
analytical instrumentation at intervals that will ensure accuracy of measurements.
B. Records.
1. Monitoring records and reports shall include:
a. The date, exact place, and time of sampling or measurements;
b. The individual(s) who performed the sampling or measurements;
c. The date(s) and time(s) analyses were performed;
d. The individual(s) who performed the analyses;
e. The analytical techniques or methods used; and
f. The results of such analyses.
2. The operator shall retain records of all monitoring information, including all calibration and
maintenance records and all original strip chart recordings for continuous monitoring instrumentation,
copies of all reports required by this general permit, and records of all data used to complete the
registration statement for this general permit, for a period of at least three years from the date of the
sample, measurement, report or request for coverage. This period of retention shall be extended
automatically during the course of any unresolved litigation regarding the regulated activity or
regarding control standards applicable to the operator, or as requested by the board.
C. Reporting monitoring results.
1. The operator shall update the SWPPP to include the results of the monitoring as may be performed in
accordance with this general permit, unless another reporting schedule is specified elsewhere in this
general permit.
2. Monitoring results shall be reported on a discharge monitoring report (DMR); on forms provided,
approved or specified by the department; or in any format provided that the date, location, parameter,
method, and result of the monitoring activity are included.
General Permit No.: VAR10
Page 15 of 21
3. If the operator monitors any pollutant specifically addressed by this general permit more frequently
than required by this general permit using test procedures approved under 40 CFR Part 136 or using
other test procedures approved by the U.S. Environmental Protection Agency or using procedures
specified in this general permit, the results of this monitoring shall be included in the calculation and
reporting of the data submitted in the DMR or reporting form specified by the department.
4. Calculations for all limitations which require averaging of measurements shall utilize an arithmetic
mean unless otherwise specified in this general permit.
D. Duty to provide information. The operator shall furnish, within a reasonable time, any information which
the board may request to determine whether cause exists for modifying, revoking and reissuing, or
terminating this general permit or to determine compliance with this general permit. The board,
department, EPA, or VSMP authority may require the operator to furnish, upon request, such plans,
specifications, and other pertinent information as may be necessary to determine the effect of the wastes
from his discharge on the quality of surface waters, or such other information as may be necessary to
accomplish the purposes of the CWA and the Virginia Stormwater Management Act. The operator shall
also furnish to the board, department, EPA, or VSMP authority, upon request, copies of records required
to be kept by this general permit.
E. Compliance schedule reports. Reports of compliance or noncompliance with, or any progress reports
on, interim and final requirements contained in any compliance schedule of this general permit shall be
submitted no later than 14 days following each schedule date.
F. Unauthorized stormwater discharges. Pursuant to § 62.1-44.5 of the Code of Virginia, except in
compliance with a state permit issued by the department, it shall be unlawful to cause a stormwater
discharge from a construction activity.
G. Reports of unauthorized discharges. Any operator who discharges or causes or allows a discharge of
sewage, industrial waste, other wastes or any noxious or deleterious substance or a hazardous
substance or oil in an amount equal to or in excess of a reportable quantity established under either 40
CFR Part 110, 40 CFR Part 117, 40 CFR Part 302, or § 62.1-44.34:19 of the Code of Virginia that occurs
during a 24-hour period into or upon surface waters or who discharges or causes or allows a discharge
that may reasonably be expected to enter surface waters, shall notify the Department of Environmental
Quality of the discharge immediately upon discovery of the discharge, but in no case later than within 24
hours after said discovery. A written report of the unauthorized discharge shall be submitted to the
department and the VSMP authority within five days of discovery of the discharge. The written report shall
contain:
1. A description of the nature and location of the discharge;
2. The cause of the discharge;
3. The date on which the discharge occurred;
4. The length of time that the discharge continued;
5. The volume of the discharge;
6. If the discharge is continuing, how long it is expected to continue;
7. If the discharge is continuing, what the expected total volume of the discharge will be; and
8. Any steps planned or taken to reduce, eliminate and prevent a recurrence of the present discharge or
any future discharges not authorized by this general permit.
General Permit No.: VAR10
Page 16 of 21
Discharges reportable to the department and the VSMP authority under the immediate reporting
requirements of other regulations are exempted from this requirement.
H. Reports of unusual or extraordinary discharges. If any unusual or extraordinary discharge including a
"bypass" or "upset," as defined herein, should occur from a facility and the discharge enters or could be
expected to enter surface waters, the operator shall promptly notify, in no case later than within 24 hours,
the department and the VSMP authority by telephone after the discovery of the discharge. This
notification shall provide all available details of the incident, including any adverse effects on aquatic life
and the known number of fish killed. The operator shall reduce the report to writing and shall submit it to
the department and the VSMP authority within five days of discovery of the discharge in accordance with
Part III 1 2. Unusual and extraordinary discharges include but are not limited to any discharge resulting
from:
1. Unusual spillage of materials resulting directly or indirectly from processing operations;
2. Breakdown of processing or accessory equipment;
3. Failure or taking out of service of some or all of the facilities; and
4. Flooding or other acts of nature.
1. Reports of noncompliance. The operator shall report any noncompliance which may adversely affect
surface waters or may endanger public health.
1. An oral report to the department and the VSMP authority shall be provided within 24 hours from the
time the operator becomes aware of the circumstances. The following shall be included as
information that shall be reported within 24 hours under this subdivision:
a. Any unanticipated bypass; and
b. Any upset that causes a discharge to surface waters.
2. A written report shall be submitted within five days and shall contain:
a. A description of the noncompliance and its cause;
b. The period of noncompliance, including exact dates and times, and if the noncompliance has not
been corrected, the anticipated time it is expected to continue; and
c. Steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance.
The department may waive the written report on a case -by -case basis for reports of noncompliance
under Part III I if the oral report has been received within 24 hours and no adverse impact on surface
waters has been reported.
3. The operator shall report all instances of noncompliance not reported under Part III 1 1 or 2 in writing
as part of the SWPPP. The reports shall contain the information listed in Part 111 1 2.
NOTE: The reports required in Part III G, H and I shall be made to the department and the VSMP
authority. Reports may be made by telephone, email, or by fax. For reports outside normal working hours,
leaving a recorded message shall fulfill the immediate reporting requirement. For emergencies, the
Virginia Department of Emergency Management maintains a 24-hour telephone service at 1-800-468-
8892.
General Permit No.: VAR10
Page 17 of 21
4. Where the operator becomes aware of a failure to submit any relevant facts, or submittal of incorrect
information in any report, including a registration statement, to the department or the VSMP authority,
the operator shall promptly submit such facts or correct information.
J. Notice of planned changes.
1. The operator shall give notice to the department and the VSMP authority as soon as possible of any
planned physical alterations or additions to the permitted facility or activity. Notice is required only
when:
The operator plans an alteration or addition to any building, structure, facility, or installation that
may meet one of the criteria for determining whether a facility is a new source in 9VAC25-870-
420;
b. The operator plans an alteration or addition that would significantly change the nature or increase
the quantity of pollutants discharged. This notification applies to pollutants that are not subject to
effluent limitations in this general permit; or
2. The operator shall give advance notice to the department and VSMP authority of any planned
changes in the permitted facility or activity, which may result in noncompliance with state permit
requirements.
K. Signatory requirements.
1. Registration statement. All registration statements shall be signed as follows:
For a corporation: by a responsible corporate officer. For the purpose of this chapter, a
responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the
corporation in charge of a principal business function, or any other person who performs similar
policy -making or decision -making functions for the corporation; or (ii) the manager of one or more
manufacturing, production, or operating facilities, provided the manager is authorized to make
management decisions that govern the operation of the regulated facility including having the
explicit or implicit duty of making major capital investment recommendations, and initiating and
directing other comprehensive measures to assure long-term compliance with environmental laws
and regulations; the manager can ensure that the necessary systems are established or actions
taken to gather complete and accurate information for state permit application requirements; and
where authority to sign documents has been assigned or delegated to the manager in
accordance with corporate procedures;
b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or
c. For a municipality, state, federal, or other public agency: by either a principal executive officer or
ranking elected official. For purposes of this chapter, a principal executive officer of a public
agency includes: (i) the chief executive officer of the agency or (ii) a senior executive officer
having responsibility for the overall operations of a principal geographic unit of the agency.
2. Reports, etc. All reports required by this general permit, including SWPPPs, and other information
requested by the board or the department shall be signed by a person described in Part III K 1 or by a
duly authorized representative of that person. A person is a duly authorized representative only if:
a. The authorization is made in writing by a person described in Part III K 1;
b. The authorization specifies either an individual or a position having responsibility for the overall
operation of the regulated facility or activity such as the position of plant manager, operator of a
well or a well field, superintendent, position of equivalent responsibility, or an individual or position
having overall responsibility for environmental matters for the operator. (A duly authorized
General Permit No.: VAR10
Page 18 of 21
representative may thus be either a named individual or any individual occupying a named
position); and
c. The signed and dated written authorization is included in the SWPPP. A copy must be provided to
the department and VSMP authority, if requested.
3. Changes to authorization. If an authorization under Part III K 2 is no longer accurate because a
different individual or position has responsibility for the overall operation of the construction activity, a
new authorization satisfying the requirements of Part III K 2 shall be submitted to the VSMP authority
as the administering entity for the board prior to or together with any reports or information to be
signed by an authorized representative.
4. Certification. Any person signing a document under Part III K 1 or 2 shall make the following
certification:
"I certify under penalty of law that I have read and understand this document and that this document
and all attachments were prepared in accordance with a system designed to assure that qualified
personnel properly gathered and evaluated the information submitted. Based on my inquiry of the
person or persons who manage the system, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information, including the
possibility of fine and imprisonment for knowing violations."
L. Duty to comply. The operator shall comply with all conditions of this general permit. Any state permit
noncompliance constitutes a violation of the Virginia Stormwater Management Act and the Clean Water
Act, except that noncompliance with certain provisions of this general permit may constitute a violation of
the Virginia Stormwater Management Act but not the Clean Water Act. Permit noncompliance is grounds
for enforcement action; for state permit termination, revocation and reissuance, or modification; or denial
of a state permit renewal application.
The operator shall comply with effluent standards or prohibitions established under § 307(a) of the Clean
Water Act for toxic pollutants within the time provided in the regulations that establish these standards or
prohibitions or standards for sewage sludge use or disposal, even if this general permit has not yet been
modified to incorporate the requirement.
M. Duty to reapply. If the operator wishes to continue an activity regulated by this general permit after the
expiration date of this general permit, the operator shall submit a new registration statement at least 90
days before the expiration date of the existing general permit, unless permission for a later date has been
granted by the board. The board shall not grant permission for registration statements to be submitted
later than the expiration date of the existing general permit.
N. Effect of a state permit. This general permit does not convey any property rights in either real or
personal property or any exclusive privileges, nor does it authorize any injury to private property or
invasion of personal rights, or any infringement of federal, state or local law or regulations.
O. State law. Nothing in this general permit shall be construed to preclude the institution of any legal
action under, or relieve the operator from any responsibilities, liabilities, or penalties established pursuant
to any other state law or regulation or under authority preserved by § 510 of the Clean Water Act. Except
as provided in general permit conditions on 'bypassing" (Part III U) and "upset' (Part III V), nothing in this
general permit shall be construed to relieve the operator from civil and criminal penalties for
noncompliance.
P. Oil and hazardous substance liability. Nothing in this general permit shall be construed to preclude the
institution of any legal action or relieve the operator from any responsibilities, liabilities, or penalties to
which the operator is or may be subject under §§ 62.1-44.34:14 through 62.1-44.34:23 of the State Water
Control Law or § 311 of the Clean Water Act.
General Permit No.: VAR10
Page 19 of 21
Q. Proper operation and maintenance. The operator shall at all times properly operate and maintain all
facilities and systems of treatment and control (and related appurtenances), which are installed or used
by the operator to achieve compliance with the conditions of this general permit. Proper operation and
maintenance also includes effective plant performance, adequate funding, adequate staffing, and
adequate laboratory and process controls, including appropriate quality assurance procedures. This
provision requires the operation of back-up or auxiliary facilities or similar systems, which are installed by
the operator only when the operation is necessary to achieve compliance with the conditions of this
general permit.
R. Disposal of solids or sludges. Solids, sludges or other pollutants removed in the course of treatment or
management of pollutants shall be disposed of in a manner so as to prevent any pollutant from such
materials from entering surface waters and in compliance with all applicable state and federal laws and
regulations.
S. Duty to mitigate. The operator shall take all steps to minimize or prevent any discharge in violation of
this general permit that has a reasonable likelihood of adversely affecting human health or the
environment.
T. Need to halt or reduce activity not a defense. It shall not be a defense for an operator in an
enforcement action that it would have been necessary to halt or reduce the permitted activity in order to
maintain compliance with the conditions of this general permit.
U. Bypass.
1. 'Bypass," as defined in 9VAC25-870-10, means the intentional diversion of waste streams from any
portion of a treatment facility. The operator may allow any bypass to occur that does not cause
effluent limitations to be exceeded, but only if it also is for essential maintenance to ensure efficient
operation. These bypasses are not subject to the provisions of Part III U 2 and 3.
2. Notice.
a. Anticipated bypass. If the operator knows in advance of the need for a bypass, the operator shall
submit prior notice to the department, if possible at least 10 days before the date of the bypass.
b. Unanticipated bypass. The operator shall submit notice of an unanticipated bypass as required in
Part III I.
3. Prohibition of bypass.
a. Except as provided in Part III U 1, bypass is prohibited, and the board or department may take
enforcement action against an operator for bypass unless:
(1) Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage.
Severe property damage means substantial physical damage to property, damage to the
treatment facilities that causes them to become inoperable, or substantial and permanent
loss of natural resources that can reasonably be expected to occur in the absence of a
bypass. Severe property damage does not mean economic loss caused by delays in
production;
(2) There were no feasible alternatives to the bypass, such as the use of auxiliary treatment
facilities, retention of untreated wastes, or maintenance during normal periods of equipment
downtime. This condition is not satisfied if adequate back-up equipment should have been
installed in the exercise of reasonable engineering judgment to prevent a bypass that
occurred during normal periods of equipment downtime or preventive maintenance; and
(3) The operator submitted notices as required under Part III U 2.
General Permit No.: VAR10
Page 20 of 21
b. The department may approve an anticipated bypass, after considering its adverse effects, if the
department determines that it will meet the three conditions listed in Part III U 3 a.
V. Upset.
1. An "upset," as defined in 9VAC25-870-10, means an exceptional incident in which there is
unintentional and temporary noncompliance with technology -based state permit effluent limitations
because of factors beyond the reasonable control of the operator. An upset does not include
noncompliance to the extent caused by operational error, improperly designed treatment facilities,
inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation.
2. An upset constitutes an affirmative defense to an action brought for noncompliance with technology -
based state permit effluent limitations if the requirements of Part III V 4 are met. A determination
made during administrative review of claims that noncompliance was caused by upset, and before an
action for noncompliance, is not a final administrative action subject to judicial review.
3. An upset does not include noncompliance to the extent caused by operational error, improperly
designed treatment facilities, inadequate treatment facilities, lack of preventative maintenance, or
careless or improper operation.
4. An operator who wishes to establish the affirmative defense of upset shall demonstrate, through
properly signed, contemporaneous operating logs or other relevant evidence that:
a. An upset occurred and that the operator can identify the cause(s) of the upset;
b. The permitted facility was at the time being properly operated;
c. The operator submitted notice of the upset as required in Part III I; and
d. The operator complied with any remedial measures required under Part III S.
5. In any enforcement proceeding, the operator seeking to establish the occurrence of an upset has the
burden of proof.
W. Inspection and entry. The operator shall allow the department as the board's designee, the VSMP
authority, EPA, or an authorized representative of either entity (including an authorized contractor), upon
presentation of credentials and other documents as may be required by law to:
1. Enter upon the operator's premises where a regulated facility or activity is located or conducted, or
where records must be kept under the conditions of this general permit;
2. Have access to and copy, at reasonable times, any records that must be kept under the conditions of
this general permit;
3. Inspect and photograph at reasonable times any facilities, equipment (including monitoring and
control equipment), practices, or operations regulated or required under this general permit; and
4. Sample or monitor at reasonable times, for the purposes of ensuring state permit compliance or as
otherwise authorized by the Clean Water Act or the Virginia Stormwater Management Act, any
substances or parameters at any location.
For purposes of this section, the time for inspection shall be deemed reasonable during regular business
hours, and whenever the facility is discharging. Nothing contained herein shall make an inspection
unreasonable during an emergency.
General Permit No.: VAR10
Page 21 of 21
X. State permit actions. State permits may be modified, revoked and reissued, or terminated for cause.
The filing of a request by the operator for a state permit modification, revocation and reissuance, or
termination, or a notification of planned changes or anticipated noncompliance does not stay any state
permit condition.
Y. Transfer of state permits.
1. State permits are not transferable to any person except after notice to the department. Except as
provided in Part III Y 2, a state permit may be transferred by the operator to a new operator only if the
state permit has been modified or revoked and reissued, or a minor modification made, to identify the
new operator and incorporate such other requirements as may be necessary under the Virginia
Stormwater Management Act and the Clean Water Act.
2. As an alternative to transfers under Part III Y 1, this state permit maybe automatically transferred to a
new operator if:
a. The current operator notifies the department at least 30 days in advance of the proposed transfer
of the title to the facility or property;
b. The notice includes a written agreement between the existing and new operators containing
specific date for transfer of state permit responsibility, coverage, and liability between them; and
c. The department does not notify the existing operator and the proposed new operator of its intent
to modify or revoke and reissue the state permit. If this notice is not received, the transfer is
effective on the date specified in the agreement mentioned in Part III Y 2 b.
3. For ongoing construction activity involving a change of operator, the new operator shall accept and
maintain the existing SWPPP, or prepare and implement a new SWPPP prior to taking over
operations at the site.
Z. Severability. The provisions of this general permit are severable, and if any provision of this general
permit or the application of any provision of this state permit to any circumstance, is held invalid, the
application of such provision to other circumstances and the remainder of this general permit shall not be
affected thereby.
Section 3. Nature of activity
(Provide a detailed narrative of the construction activities. Include or reference a construction schedule and
sequence. Include all phasing.)
Issued — 10/2022 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 4. Erosion and Sediment Control Plan.
(Include the approved Erosion & Sediment Control Plan in Section 13. Do not reference only.)
Issued — 10/2022 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
PROTECT DESCRIPTION
THIS PROJECT PROPOSES IMPROVEMENTS TO THE VIOL AND CONCRETE DECK AT THE BOAR'S HEM SPORTS CLUB.
PROTECT ITEMS WILL INCLUDE THE REMOVAL OF THE EXISTING CONCRETE DECK, THE EXISTING POOLS AND
ASSOCIATED MLITIES. THE PROPOSED ITEMS WILL INCLUDE AN UPDATED IAP POOL, A RECREATIONAL POOL, AN
UPORTED POOL DECK AND ASSOCIATED AMENITIES, AND UNDATED UTILITIES. THE LIMITS OF DISTURBANCE IS 1.I0
ACRES.
ADJACENT PROPERTY
THESE IMPROVEMENTS ARE BEING MADE WITHIN THE PROPERTY BOUNDARY. THE PROPERTY IS LOCATED WITHIN BOAR'S
CW B RESORT COMPLEX. THE PROPERTY IS BOUNDED BY BOARS HEAD PROPERTY TO THE NORTH, WEST AND SOUTH.
RESIDENTIAL PROPERTIES BORDER THE SIRE TO THE WEST. BIRDWORO GOV COURSE IS LOCATED TO THE SOUTHEAST,
BOARS HEAD LANE SIDE RESORT TO THE NORTH AND THE VIRGINIA TENNIS FACILITY TO THE SODUTWEST.
EXISTING SITE CONDITIONS
THE EXISTING SITE CONDITIONS INCLUDE A 6 LANE LAP POOL, TWO RECREATIONAL MODS, ASSOCIATED POOL
ACCESSORIES AND A PAY GROUND. AN EXISTING SITE WALL SURROUNDS THE SITE TO THE WEST AND NORTH THAT
WILL REMAIN IN THE POST DEVELOPED CONDITIONS. IN THE EXISTING CONDITIONS, THE POOL IS ACCESSED THROUGH
THE SPORTS CLUB ENTRANCE THAT IS CONNECTED TO THE POOL DECK. THE ASSO L VI EO PARKING 15 LOCATED TO THE
OFF -SIRE AREAS
NO OFF -SIDE AREAS WILL BE DISTURBED AS APART OF THIS PROJECT.
CRITICAL EROSION AREAS
NO CRITICAL EROSION AREA EXIST.
EROSION AND SEDIMENT CONTROL MEASURES
UNLESS LL OTHERWISE INDICATED, AVEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES
SHALL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE
CURRENT ADDITION OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. THE MINIMUM STANDARDS OF
TIE VESCH SHALL BE ADHERED TO UNLESS OTHERWISE WAIVED OR APPROVED BY A VARIANCE BY LOCAL AUTHORITIES
HAVING JURISDICTION.
EROSION AND SEDIMENT CONTROL MAINTENANCE
ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED IN ACCORDANCE WITH VESCH AND THE
CONSTRUCTION SEQUENCE, INCLUDING THE INSPECTION OF ALL MEASURES AMR ALL RAIN EVENTS.
STRUCTURAL PRACTICES:
1. TEMPORARY CONSTRUCTION ENTRANCE - 3.02 A TEMPORARY CONSTRUCTION ENTRANCE SHALL BE PROVIDED AT
THE LOCATION INDICATED ON THE PUNS. IT IS IMPERATIVE TIATTIIS MEASURE BE MAINTAINED THROUGHOUT
CONSTRUCTION. ITS PURPOSE IS TO REDUCE THE AMOUNT OF MUD TRANSPORTED ONTO PAVED PUBLIC ROADS BY
MOTOR VEHICLES OR RUNOFF.
2. SILT FENCE BARRIER -3.05SILT FENCE SEDIEMENT BARRIERS SHALL BE INSTALLED WWNSLOPE OF ARMS WITH
MINIMAL GRADES TO FILTER SETREMENF LADEN RUNOFF FROM SHEET FLOW AS INDICATED. I15 EXPOSE IS TO
PREVENT SEDIMENT FROM LEAVING THE SIZE.
3. STORM DRAIN INLET PROTECTION -3.07 STONE FILTERS SHALL BE PLACED AT THE INLET OF ALL DRAINAGE
STRUCTURES AS INDICATED ON PUFF$. I15 PURPOSE IS TO PREVENT SEDIMENT FROM ENTERING THE STORM
DRAINAGE SYSTEM POOR TO PERMANENT STABLZATION.
4. DUST CONTROL -3.39DUST CONTROL IS TO BE USED THROUGH THE SIZE IN AREAS SUBJECT TO SURFACE AND AIR
MOVEMENT
5. TREE PROTECTION-3.38 PROTECTION OF DESIRABLE TRESS FROM MECHANICAL AND OTHER IWUSRY DURING LAND
DISTURBING AND CONSTRUCTION ACTIVITY.
VEGETATIVE PRACTICES:
6. TEMPORARY SEEDING -3.31 ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR MORE THAN 30 DAYS SHALL
BE SEEDED WITH FAST GERMINATING TEMPORARY VEGETATION IMMEDIATELY FOLLOWING GRADING OF THOSE
AREAS. SELECTION OFTHE SEED MIXTURE SHALLDEPEND ONTHE TIME OFYMR UISAPPLIED.
7. PERMANENT SEEDING -3.32 FOLLOWING GRADING ACTIVITIES, ESTABLISH PERENNIALVEGETATIVE COVER BY
PLANTING SEED TO REDUCE EROSION, STABILIZE DISTURBED ARMS, AND ENHANCE NATURAL BEAUTY.
MANAGEMENT STRATEGIES
1. PROVIDE SEDIMENT TRAPPING MEASURES AS A FIRST STEP IN GRADING, SEED AND MULCH IMMEDIATELY
FOLLOWING INSTALLATION.
2. PROVIDE TEMPORARY SEEDING OR OTHER STABILIZATION IMMEDIATELY AFTER GRADING.
3. ISOLATE TRENCHING FOR UTIUTIE$ AND DRAINAGE FROM DOWNSTREAM CONVEYANCES IN ORDER TO MINIMIZE
PERIMETER CONTROLS.
4. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE MAINTAINED UNTIL THEY ARE NO LONGER REQUIRED
TO COMPLY WITH THE CONTRACT DOCUMENTS OR STATE LAW.
PERMANENT STABILIZATION
ALL NON -PAVED AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH PERMANENT SEEDING IMMEDIATELY
FOLLOWING FINISHED GRADING. SEEDING SHALL BE IN ACCORDANCE WITH SITE. B SPEC. 3.32, PERMANENT SEEDING.
SEED TYPE SHALL BE AS SPECIFIED FOR'MINIMUM CARE LAWNS' AND "GENERAL SLOPES" M THE HANDBOOK FOR
SLOPES LESS THAN 3:1. MR SLOPES GREATER THAN 3:1, SEED TYPE SHALL BE AS SPECIFIED FOR -DOW MAINTENANCE
SLOPES' IN TABLE 3.32-D OF THE HANDBOOK. FOR MULCH (STRAW OR FIBER) SHALL MUSED ON ALL SEEDED
SURFACES. IN All SEEDING OPERATIONS SEED, FERTILIZER AND UME SHALL BE APPLIED PRIOR TO MULCHING.
SEQUENCE OF INSTALLATION
PHASEI
1. A PRE -CONSTRUCTION MEETING IS REQUIRED WITH ALBEMARLE COUNTY EAR INSPECTOR, CONTRACTOR, OWNER,
ANDENGINEER. THIS MEETING SHALL TAKE PLACE AT THE COMMUNITY DEVELOPMENT OFFICE. CLEARINGUMITS
MUST BE FLAGGED PRIOR TO THE MEETING WITH ONE (1) WEEK OF NOTICE.
2. INSTAII CONSTRUCTION ENTRANCE, TEMPORARY SEEDING, DUST CONTRO , INLET PROTECTION, SILT FENCE, AND
TREE PROTECTION. NO WORK SHALL BEGIN IN THOSE AREAS UNTIL ALL EST MEASURES IN THOSE AREAS ARE
INSTALLED.
3. AMR ALL EROSION AND SEDIMENT CONTROL MEASURES ARE IN PUCE, SUE WORK CAN BEGIN.
4. BEGIN DEMOLITION OPTIC POOL DECK, THE VIOLTILI S, AND ASSOCIATED UTIES.
5. USE DUST CONTROL AND SEED ALL DENUDED AREAS PER VISOR STANDARDS.
PHASE II
1. FINE GRADE PROJECT AREA, APPLY PERMANENT SOIL STABNZATION TO THESE AREAS WITHIN SEVEN DAYS AFTER
FINAL GRADE IS ACHIEVED.
2. APPLY PERMANENT SOIL STABILIZATION TO THESE AREAS WITHIN SEVEN DAYS AMR FINAL GRADE IS ACHIEVED.
SILT FENCE AND INLET PROTECTION MUST BE MAINTAINED THROUGH GRADING AND CONSTRUCTION.
3. ONCE CONSTRUCTION IS COMPLETE AND ALL CONTRIBUTING AREAS ARE STABILIZED, EROSION CONTROL MEASURES
CAN BE REMOVED UPON APPROVAL FROM THE EDS INSPECTOR.
GENERAL CONSTRUCTION NOTES FOR EROSION AND
SEDIMENT CONTROL
1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE
WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL
INSPECTION.
2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM
STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA
REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS.
3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP INCLEARING.
4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PAN SHALL BE MAINTAINED ON THE SUE AT ALL TIMES.
S. PRIOR TO COMMENCING HAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS
(INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A
SUPPLEMENTARY EROSION CONTROL PUN TO THE OWNER MR RENEW AND APPROVAL BY THE PLAN APPROVING
AUIHORRV.
6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY
TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY.
I. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND
DISTURBING ACTIVITIES AND DURING SUE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED.
S. DURING DEWATERING OPERATIONS, WATER WILL BE BUMPED INTO AN APPROVED FILTERING DEVICE.
9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH
RUNOFF -PRODUCING EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE
EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY.
10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA.
11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INERT MATERIALS ONLY,
TREE OF ROUTS, STUMPS, WOOD, RUBBISH, AND OTHER DEBRIS.
12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 2 DAYS OF COMPLETION PER ZONING ORDINANCE SECTION
5.1.28.
13. ALLINERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF THE CODE OF ALBEMARLE.
14. BORROW, FILL OR WASTE ACTNUY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS
OF 7:OOAN TO 9:OOPM.
15. BORROW , FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A WE MANNER THAT MAINTAINS LATERAL SUPPORT, OR
ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND
SIRUCTI0.ESAMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE OF SUGGS, SINKING, OR COLLAPSE.
16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL,MAINTAIN, REMOVE OR CONVERT TO PERMANENT
SU RMWATER MANAGEMENT FACUFFIES WHERE APPLICABLE ALL EROSION CONTROL MEASURES REQUIRED BY THIS
PUN REGARDLESS OF THE SALE OF ANY LOT, UNIT, BUILDING OR OTHER PORTION OF THE PROPERTY.
17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75 LBS/ACRE, AND
IN THE MONTHS OF SEPTEMBER TO FEBRUARY TO CONSIST A 50/50 MIX OF ANNUAL RYEGMSS AND CEREAL WINTER
RYE, OR IN MARCH AND APRIL TO CONSIST OF ANNUAL NE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN
MILLET. STRAW MULCH IS TO BE APPLIED AT SOLBS/1005F. ALTERNATIVES ARE SUBJECT TO APPROVAL BY THE COUNTY
EROSION CONTROL INSPECTOR.
18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH. AGRICULTURAL
GRADE UMERSTONE SHALL BE APPLIED AT 901M/10005F, INCORPORATED I WO THE TOP 4-6 INCHES OF SOIL.
FERTILIZER SHALL BE APPUED AT 1000LBS/ACRE AND CONSIST OF A 10-20-10 NUTRIENT MIX. PERMANENT SEEDING
SHALL BE APPLIED AT 180LBS/ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND 0-5% PERENNIAL
RYEGRASS OR KENTUCKY BLUEGRASS. STRAW MULCH IS TO BE APPLIED AT 8000S/100SF. ALTERNATIVES ARE SUBLEQ
W APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR.
19. MAINTENANCE: ALL MEASURES SHALL BE INSPECTED WEEKLY AND AFTER EACH RNNFALL EVENT. ANY DAMAGE OR
CLOGGING TO STRUCTURAL MEASURES SHALL BE REPAIRED IMMEDIATELY. SILT TRAPS SHALL BE LEANED WHEN 50%
OF THE WET STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED ARMS SHALL BE RESEEDED WHEN NECESSARY
TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DYKES WHICH COLLET SEDIMENT TO HALF THEIR
HEIGHT MUST BE CLEANED AND REPAIRED IMMEDIATELY.
20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS OF FINAL SIZE
STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED, SUBJECT TO APPROVAL BY THE CWNIY EROSION
CONTROL INSPECTOR.
21. THIS PLAN SHALL BE VOID IF THE OWNER DOES NOT OBTAIN A PERMU WTIHIN S YEAR OF THE DATE OF APPROVAL.
(WATER PROTECTION ORDINANCE SECTION 17-2WG.)
22. PERMANENT VEGETATION SHALL REINSTALLED ON ALL DENUDED AREAS WITHIN NINE(9) MONTHS AFTER THE DATE
THE HAND DISTURBING ACTIVITY COMMENCED. (WATER PROTECTION ORDINANCE SECTION 17-207B)
GENERAL EROSION AND SEDIMENT CONTROL NOTES:
ES-1: UNLESS OTHERWISE INDICATED, CONSTRUCT AND MAINTAIN ALL VEGETATIVE AND STRUCTURAL EROSION AND
SEDIMENT CONTROL PRACTICES ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE 1ATE$T
EDITION OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00
EROSION AND SEDIMENT CONTROL REGULATIONS.
ES-2: THE METROLING EROSION AND SEDIMENT CONTROL AUTHORITY WILL MAKE A CONTINUING REVIEW AND
EVALUATION OF THE METHODS AND EFFECTIVENESS OF THE EROSION CONTROL MEAN.
ES-3: PUCE ALL EROSION AND SEDIMENT CONTROL MEASURES PRIOR TO OR AS THE FIRST STEP IN CLEARING, GRADING,
OR LAND DISTURBANCE.
ES-4: MAINTAIN A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PUN ON THE SUE AT ALL TIMES.
ES-5 : PRIOR TO COMMENCING LAND -DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE MEANS
INCLUDING BUT NOT LIMITED TO OFFSUE BORROW OR WASTE AREA SUBMIT A SUPPLEMENTARY EROSION
MR REVIEW
PAN TO THEPTANCEER/ENGINEER AND THE CONTROLLING EROSION AND SEDIMENT CONTROL AUTHORITY
FOR REVIEW AND ACCEPTANCE.
ES-6: PROVIDE ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS
DETERMINED BY THE RESPONSIBLE LOUD DISTURBER. (MODIFIED NOTE)
ES-7 ALL DISTURBED AREAS SHALL DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING
LAND -DISTURBING ACTIVITIES AND DURING SUE DEVELOPMENT.
E$-8: DURING DEWAIERING OPERATIONS, PUMP WATER IWO AN APPROVED METERING DEVICE.
ES-9 : INSPECT ALL EROSION CONTROL MEASURES DAILY AND AFTER EACH RUNOFF- PRODUCING RAINFALL EVENT. MAKE
ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES
IMMEDIATELY.
8OlW INFORMATION:
4D - ASHE LOAM, 15 TO 25 PERCEW SLOPES, 20 TO 40INCHES TO ETHIC BEDROCK, SOMEWHAT EXCESSIVELY DRAINED,
HYDROLOGICAL SOIL GROUP B
190 - MINNIE ELIE LOAM, 2TO7 PERCENT SLOPES, 60 TO 120INCHES TO PARMITHIC BEDROCK, WELL DRAINED,
HYDROLOGIC SOIL GROUP B
19C - MINNIEVILIE LOAM, 7 TO 15 PERCENT SLOPES, 60 TO 120INCHES TO PARALITHIC BEDROCK, WELL ORAINED,
HYDROLOGICAL SOIL GROUP B
MINIMUM STANDARDS:
AN EROSION AND SEDIMENT CONTROL PROGRAM ADOPTED BY A DISTRICT OR LOCALITY MUST BE CONSISTENT WITH
THE FOLLOWING CRITERIA, TECHNIQUES AND METHODS:
MS-1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED ARMS WITHIN SEVEN DAYS
AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE
APPLIED WITHIN SEVEN DAYS TO DENUDED ARMS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN
DORMANT FOR LONGER THAN 30 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE
TO BE LEFT DORMANT FOR MORE THAN ONE YEAR.
MS-2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW AREAS SHALL BE STABILIZED OR
PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT l5 RESPONSIBLE FOR THE TEMPORARY
PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS
AND SOIL INTENTIONALLY TRANSPORTED FROM THE M03EC SITE.
MS-3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE
PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A
GROUND COVER IS ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION.
MS-4. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO
TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LOUD -DISTURBING ACDVFFY AND SHALL BE
MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PUCE.
MS-5. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND
DIVERSIONS IMMEDIATELY AFTER INSTALLATION.
MS-6. SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL
DRAINAGE AREA TO BE SERVED BY THE TRAP OR WIN.
A. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF
DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES.
B. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER
THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE
CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE OUTFALL
SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY OF THE BASIN DURING A 25-YEAR
STORM OF 24-HOUR DURATION. RUNOFF COEFFICIENTS USED IN RUNOFF CALCUUTIONS SHALL CORRESPOND
TO A BARE EARTH CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST WHILE THE SEDIMENT BASIN IS
UTILIZED.
MSJ. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION.
SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION
SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED.
MS-8. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN
ADEQUATE TEMPORARY OR PERMANENT CHANNEL FLUME OR SLOPE OWN STRUCTURE.
MS-9. WHENEVER WATER SEEMS MOM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER
PROTECTION SHALL BE PROVIDED.
MS-10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED $0 THAT
SEDIMENT -LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR
OTHERWISE TREATED TO REMOVE SEDIMENT.
MS-11. BEFORE NEWLY CONSTRUCTED SIFORMWATER CONVEYANCE CHANNELS OR PIPES PRE MADE OPERATIONAL,
ADEQUATE WRITE PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE
INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL.
MS -II. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE
ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT
POSSIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF
CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY
NONERODIBLE COVER MATERIALS.
M$-13. WHEN A ILLE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY
SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL
SHALL BE PROVIDED.
MS-14. ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO WORKING IN OR CROSSING ENE
WATERCOURSE$ SHALL BE MET.
MS-15. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AMR WORK IN THE
WATERCOURSE IS COMPLETED.
MS-16. UNDERGROUND UTILITY UNIES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN
ADDITION TO OTHER APPLICABLE CRITERIA:
A. NO MORE THAN 500 UNMR FEET OF TRENCH MAY BE OPENED AT ONE TIME.
B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES.
C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED
SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT GOES NOT ADVERSELY
AFFECT FLOWING STREAMS OR OFF -SUE PROPERTY.
D. MATERIAL USED FOR&IDKFILUNG TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE
EROSION AND PROMOTE STABILIZATION.
E. RESIABIUZATON SHALL BE ACCOMPUSHED IN ACCORDANCE WITH THESE REGULATIONS.
I. APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH.
MS-17. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL
BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICUHARTRACKING ONTO THE PAVEDSURFACE.
WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE
CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED MOM THE ROADS BY
SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING
SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY
TO INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER LAND -DISTURBING ACTIVITIES.
MS-18. ALL TEMORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AMR
FINAL SUE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS
OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL
AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED
TO PREVENT FURTHER EROSION AND SEDIMENTATION.
MS-19. PROPERTIES AND WATERWAYS DOWNSTREAM MOM DEVELOPMENT SUES SHALL BE PROTECTED FROM
SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW
RAT OF STORMWATER RUNOFF MR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE
WITH THE STANDARDS AND CRITERIA LISTED IN THE VIRGINIA EROSION AND SEDIMENT CONTROL
HANDBOOK, CHAPTER 8 PAGES 20-24.
O�46ALTH CA \0
sr
C:u\SPAN R'..Mm
' I rt. U-0_ 171 51
'g�pF2/6/23 g
�p ONA] ENO
CL
D
O
z
O
OZAOCy2O23
KLAXI G R
YEXNNIED BY
K. IUUZ ER
CHEpZo BY
SHOWALTER
WA
Z
0
r
\Q
0
Z
Lu
L1
J
0
0
o-
r)
r)
Q
Lu
�n
LL
co
W
A
W
Q
On
0)
F
z
Z
J
ix
ix
Z
0
V
z
Z
W
Ln
Cn
Z
0
Ln
ix
W
57562
C3.O
CONSTRUCTION OPERATIONS RELATIVE TO THE LOCATION OF
PROTECTEDTREES
MAXIMUM LIMITS
OF CLEARING AND
GRADING �
PROPOSED GRPDING
/J IN
T�
WBERE
GRUFFNESS
S
LESS THAN 5'
PERSPECTIVE VIEW, PERSPECTIVE VIEW
PLASTIC FENCE METALFENCE
Q2
❑p
9.10u
El
EMU
STANDARD ORANGE VINYL OR PLASTIC CONSTRUCTION FENCE ATTACHED TO
PO$T$ (PRE-WTATHEREDNOOO, GALVANIZED STEEL IRON CR THICK P
PLASTIC), AT LEAST H0' ABOVE FINISH GRADE WITH SPAN BEIN£EN POSTS NO
GREATER THAN 6' ON CENTER EVERY NINTH POST SBALL CONTAIN A WARNING
SIGN THAT CLEARLY IDENTIFIES LEE FENCE AEA TREE PROTECTION FENCE
0
PIPEOUTLETCONDITIONS
i
\��1� •I�
ll AREAWTH NO
MERV DEFINED CHANNEL
CLOTH FOR BIT E PERIMETER
NOTES:
1, APRON PINING MAY BE RIPMP, GROUTED RIPRAP, GABION BASKET, CR
CONCRETE.
2.P IS THE LENGTH OF THE DIFFUSE APRON AS CALCULATED USING
PLATES 3163 AND 3. 160.
3, J=1IA S TIMES THE MAXIMUM STONE DIAMETER, BUT NOT LESS THAN 8
INCHES.
9B8 I O
TABLE S3-D
SITE SPECIFIC SEEDING MIXTURES FOR PIEDMONT AREA
TOTAL LBS, PERACRE
MINIMUM CARE LAWN
COMMERCIPL OR RESIDENTIAL 175-200 MU
KENTICKY 31 OR TURF -TYPE TALL FESCUE wl1
IMPROVED PERENNIAL RYEGRAES 0.5%
KENRICKYBLUEGRPSS 0.5%
GENERAL SLOPE 13'1 OR LESS)
KENNCKY 31 FESCUE
1.LBS.
RED TOP GRARR
2 LOS.
SEASONAL NURSE CROP'
2(I LOS.
1. LOS
LOW#1AINTENANCE SLOPE(STEEPER THAN 311
NENTUCKY 3I FESCUE
1. LOS.
RED TOP GRASS
2 LOS.
SEASONAL NURSE CROP
20 LOS.
CROWNVETCH"
20 LOS.
1. LOS.
USE SEASONAL NURSE CROP IN ACCORDANCE WITH SEEDING RATES
AS STATED BELOW'.
FEBRUARY 1ALB THROUGH APRIL ANNUAL WE
MAY I ST THROUGH AUGUST 15TH FESTAL MILLET
AUGUST I6TH THROUGH OCTOBER ANNUAL WE
NOVEMBER THROUGH FEBRUARY 11H WINTER WE
"SUBSTITUTE SERICEA LESPEDEZA FOR CROWNYETCH FAST OF
FPRMVILLE, VA (MAY THROUGH SEPTEMBER USE HULLED SERICEA, ALL
OTHER PERIODS, USE UNHULLED SERICEAI. IF FIATPEA IS USED IN LIEU
OFCROWTNETCH, INCREASERATETO.LBSIACRE ALLLEGUMESEED
MUST BE PROPERLY INOCULATED WEEPING LOVEGRASS MAY BE
ADDED TOANY SLOPE OR LOW-MNNTENANCE MIX DURING WARMER
SEEDING PERIODS, ADD 10.2B LBSIACRE IN MIXES.
TABLE $114B
ACCEPTABLETEMPORARY SEEDING PLANT INTERNE$
'QUICK REFERENCE FOR ALL REGICNS'
PILMDNGDATES SPECIES DATE(LBSIACRE)
SEPT.1-FEB . 15 5B3UMIXOF
ANNUALRYEGRASS
(LOLIUM MULTI-FLORUM)
8
0.100
CEREAL(VNNTER) RYE
(SECALECEREALE)
FEB. 16-ARE . 30 ANNUALRYEGRASS
80-1.
(LOLIUM MULTI-FLORUM)
MAY 1-AUG, 31 GERMAN MILLET
50
(SETARIA ITALICA)
SIDE ELEVATION
IOGNEARRVION OF
REss NIDEGREGG m RATK,u n FGw n
PWIVIEw Go
�1y Fq��1IFq�ry(('33yy
bE RSVef
f 2�Qa. A .j.%Kf8
1. SETTIENABS..
HI
Ezl�Oi
EXURENDITINTOTHETRENCH
FLOM /
SHEET FLOW INSTPLIATON
ryFBSFFcnvE VIFw1
'F'.
..Jc
gi
b
ORAINAGEWAYINSTAI-kTION
(FRONT ELEVATION)
SILT FENCE DROP INLET PROTECTION
iS
VOFNA
u u - AT TG
PERSPECTIVE VIEWS
EARRAMME 7 tN
LJ
OETAILA
ELEVATION OF STAKE AND FABRIC ORIENTATION
THIS METHOD �1450T PRORATION IS APPL� MERE THE NUCT DRANSA
RRAT�Y FIAT AREA (SLOPE NOGRFwTA THI s%)MERE THE INLET GIIIRETOR
OVERLAND OAS NOT EXCtmRG I c F8) ARE TVEIN LT THE MCTHOO SHALL NOT
APPITY TO NUCIN RECEIVING CONCENTRATED FLOORS, SUCH � IN ATNEET OR
O�46ALTH Of4 \0C'
Goa W.q
QIDnI M'.MTEA�
Lw V 8'8}]151
'ggpF2/6/23 Xg�
\gyp 's "MAI ETLQ`<'
CL
D
0
Z
0
02/OCy2023
KUMPBSER
PEARSOED SY
K. BARGER
CHEERED SY
SHOWALTER
SI
NIA
57562
C3.1
EROSION CONTROL LEGEND
: � : DNN�ar�NINGRNNGN.oIN�
WIL A9 (PDE
F �AAF— snFEry EEIvt
3.01
\ \
mRNI
® caxsiwrnox ECE
3M
— M NI RNAE
3AI
\
`
® mLEr iROlEC1Ipi
3AI
1
E9MPNEM1TEEEOIx6
3.JE
THIS TOPOGRAPHIC SURVEY WAS COMPLETED UNDER THE
I OlR£CTANO RESPONSIBLE CHARGE OF PAUL N HUBER FROM
J
AN ACTUAL GROUND SURVEY MADE UNDER MY SUPERVISION;
xu¢xlxC
J.Js
I iNAT THE ORIGINAL OA TA WAS OBTAINED ON THE
H` 2012 THISSASE MAPAND
—TP ThCC Ixal[Cnpu HNCE
/1`FOLLOWINGDATES'MAY
QIGITALGEOSPATNL OA IS INCLUDING ME TAOATA MEETS
/ M1TWIMUMACCURACYSTANDAROBUNLESSOTHERWISENOTED
H,so maN/aer
INrvIN e..
MVIN= Tib'YNOPE
N-<
_
� �
u'cm \v
i Ilse nroES`
'/,T l, s
EDGE OF FUND i I
'
SOIL TYPE:
I
MHS
TS MU
54OPV 66
V,
INVIN- 148'B'PVC I
lNV OUT = 5C0.15' B' PVL
\I
aw,sso.,v
\ m 11 avc
/
� I\ 1 \
a g
lNVAN =521'B"PLC
(Nf
lNV IN= 5C j 78' 8'PVC[SE) '
/ INV0UT=53N14'18-META GAP 1=
/ \ \ \ $N
—41
1 1 9w-sre SF
1
11 q \
/ I g LIMITS OF
I OISTUD ES
� Im
I I ly
I 1
1 \
1
1
11 \
MHS J TOP 299'
(NOUN=SPA 9'B'PVC
/ INV OUT=5USS3559'B"PVCJ
/ MHS
/ TOP5ET9AL
INVAN=531.A5' 113 WVL
INVIN=539.8-M TAL
,NVOUT=531.03'18'METAL
I- INVIN=551.95'8"PVC
INVOUT=551biB"PVC
\ L
11 / INV IN=56173'
l5"CMP
I I
� I III
I /
a Ile,
��
i'00'l
I'IRRGHN/ I I—
A,i FENCE \ �� laa "" w
rz W
d R
' o scrwrE \ MU TS �3 \rznx
SOILTYPE
19c
d
. \ \ >
USE EXISTING CHNN
LINK FENCE AS SAFETY
FENCE
NA
O
mJvaFl Y
TS
,
` \ \�\
\v0
�3
✓GsrErvo wan
ssnxs a �� MU
�A"{vLLL
L
IIMIT30
[N$$]]11JJppE
Gei
a'cGL ��
A
MW
19
LI
v�y
Ip
mm`L
\ITAGI
f\
_ SOGorE
RMvPA,Ai1N7,,d-
\
R
U'Gp1
cdac. Brarss
F �1
TRENCH
GRAIN
\
cwvc.sTA Rs
corvc. aao
1a,=EE
RL
�G 4.
' TRENCH
' DRAIN
SOIL TYPE. U
9Aiv
,V�b
R—
1
1
\II
I
REn/alry \RwaoaEU of
TRENCH
NIR�`
DRAIN /
`4 RNE9
xul9s
`_
FF559.9]
RS
A.
=5U.B9
I
CNLRE,
mJ
�� BOALEJ=1tl
sa ao'
A�d
0�4611.iH CA \0C'
��u\JMRY q'715J
Lw V p'0 }]151
'g�pF2/6/23 g
\gyp �SYONAL ENO
CL
D
O
w
z
O
02/OTy2023
K.&1RGER
oe.B.IN
K. BARGER
CH ] A) IN
SHOWALTER
MAE
w
a
a
J
z
Z
0
z
w
Lu
w
016
_O
Ln
0
w
57562
C3.2
EROSION CONTROL LEGEND M;T„pL,TH OA \O�
MXS 0• 4
TOP umlrs oL CLUMMG um SEEDING
INVlN=552 AS 9- Ic �c Z
\ / INVOUT=5536i8'PVC — — — — — ED4axEn ONmE UO;V\QTRV q'..qm
AF � pF— SPiFT FENS J.OI Q�
1%i INVINc56f.13' `1/6/23
15"CMP O4Y
CE ® COrvSrxVCnOn ErmlurvCE Jd]
1 � I� �O �]IONnt ENON
SF
�f 3f 51LTFExCF }05
THIS TOPOGRAPHICSIBLEY GE OMPL£TEIS UNDER FR
1 I
THE
OIRECTANO RESPONSIBLECXARGE OF PAULN XUBER FROM IF INLE*PIDIECIIDN }D] Ne
AN ACTUAL GROUND SUFV£VMAOE UNDER MVSUPERVISION: ,
TXAT THE ORIGINAL DATA WAS 09TAlNEO ON TXE
FOCLOWINGOATES-MAYl0LlI,033 THlSBASE-MAPANO 1 / 1 / OP Oxn[T wm[rnax 3.1x ne
OIGITALGEOSPATIALOATAINCLUOINGMETAOATA MEETS I �E
MINIMUMACCUFACVSTANOAROSUNLEBSOTHERWISENOT£D \ y/\ T$ rtmwuav SEEomG 3.3E i ev
l,ISDn.AxxME y ^\NL� / �' C� V P$ PERMANENT SEEDING 3.J] 1.Itl
S
9Ar (\ , / MU V 3.35 Q o $ O
MVGUTZ'7 fs"= GKO� MU muLdmG ff W m$ e
Ve sD crtaTe a.W _` , % ♦ TP —Tp MEE moTErnon PENCE 3.R any^ h
urvouT=saa. ss is DG 3.» o t p
vMGrN��SIon END SEGMENT CONMO U.S.r Samxunon NUMBER€ Cn
PROPOSED STORM SEWER SYSTEM TO BE 'g w
EDGE OFPoNO / �' I 1 �/" � la/G C DESIGNEIL—ADHERS. PROVIDE INLETPROTECTION
`V \ 4 ONALLINLETSAS MEYAREINSTALLED. e
OP PS
`\\ \ ^r
t xv'Ive'
6
J
TOP 54766' \ l
IWIN=54146-146'8"PVC \1 1 / ``' ';'ate / / \ OI/O6/2023
INVOUT=50035'B'PVC ' II duwx ev
� a , Po5
y \ / ` �//��\I UNIFT{IS OF K.&1RGER aw-sso ]a \I1\ 11\ ..4+ gW oNCRESCE: • DevCMED Gv
IP4 aw K BARGER
CM.D ON
MXS 1 \ \\ \ \ 'K \ `I .'a S- : • ]. SHOWALTER
TOP54S 18'
WVGV=SG21'8"PVC(Nf_�.l
INVAN=544J8'B"PVC(SEI \ ` A' • f-2p
INVWT=633 f4'18"METAL \ \\ ` IP ��` \� • .
Iw-ssus $I � 1 `- T •
i P
zI SF ..air. / \ CCxG5 rwm5 LOxu vnO - T
, � /
\ \ l \1l /
iLIMAS OFF: Q Q_ #
T DISNRBONCE: / /'
i1.macREs
W z F a
Im I \ \� IF U' Z p
Y''rII I 1 L_` j p y
I1 e \ • s . TT -suss J U
O�Z:�
4, Z
IUSEHDIES, R5 Q 0 ggS9Lu
=a zil
MH99S
\ v3
Ln $wj
TOP 0
INVIN=5441"PVC
INOUT=s5'8PC 3€
QO w6t
1 0
/ mIRS
i
MHS re[mrlN urvosx rvr000tn
TOP54293'METAL
,
INV,45' 18"
,V£
lN=534.13'B"PVC 1 E
INV OUT=53f AA'18"METAL I
$_
SCALE 1'=3tl ® f
® II T T 57562 c €
�I
C3.3 91
Section 5. Stormwater Management Plan
(Include the approved Stormwater Management Plan in Section 13. Do not reference only.)
Issued — 10/2022 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
\LTH 0, � \O�
` \ ` ` • `• / �1i'., e]PIiVAEYLDP'ATER�
E.E
g
lb
�W� xxv
`• ` \ 1 r'/�� � w O KBARGER
�a"y i • 0.68
P�R�ED By
K. BAR aER
0.008 / • • t. sHow.uTER
NOTE FOOLAREAS \�\-'\} 0.007 •
1 1 EKCWDEOFROMSTORM L.`t •
DRAINhBF AREA', POOL `+
OV RFLOWTORE •
CAPTURED BY SANITARY
SYSTEM. REFER To ' D3 0.9
Pool FI
D0.03
FOR DETAILS
/
\ 1 1
\1. O
2
1 1 �� v `0 V ♦vv � � I --I
1 n
>
---- -' W z w ;
I` III v. vvv i < J
o Q
Q
1 ^ \> DRAINAGE a a y
KEY 0 £ of Q a w g
11 I ACRES = Z �sgp LL
1 11 1 11 I $8
I 1 9
57562 c
C5.1 91
WATER QUALITY ANALYSIS
SITE DATA
LIMITS OF DISTURBANCE:1 10 ACRES
PRE DEVELOPED AREA
IMPERVIOUS =061 ACRES
MANAGED TURF =049 ACRES
FOREST =00 ACRES
POST DEVELOPED AREA
IMPERVIOUS=085 ACRES
MANAGED TURF =025 ACRES
FOREST =00 ACRES
TOTAL LOAD REDUCTION REQUIRED (FROG)= 0,71
LBMR
TREATMENT PROPOSED
sTORMWATER CREDITS TO BE PURCHASED=0.T1 LRWR
WATER QUANTITY CALCULATIONS FOR
AREA OF ANALYSIS 1
IN THE PREDEVELOPED CONDITIONS RUNOFF FROM THE SITE IS CAPTURED IN STORM
DRAINS A THROUGHOUT THE SITE ARFTHE EXSTING STORM SYSTEM OUTFALIS INTO THE
POND TO THE NORTH OF THE SITE. BASED ON THE PROPOSED OALCUTATIONS THE PIPE
SYSTEM PROVIDES ADEQUATE CONVEYANCE FOR THE 2 AND 10 YEAR STORM TO DISCHARGE
INTO THE POND WITHOUT EROSION OR FLOODING SATISFYING WAC25 871T 6B 1A AND
WA H3TRfi6.0 C WITHOUT THE NEED FOR DETENTION. REFER TO SHEET ON 1 FOR THE
DRAINAGE AREA TO THE BOND.
TOTAL FLDWS TO THE STORMWATER MANAGEMENT POND
PRE -DEVELOPED Q2=3.69 CFS PRE DEVELOPED ON=0.9a CFS
POST DEVELOPED Qs=Aa9 CFS POST DEVELOPED Qo=T20 CFS
WATER QUANTITY CALCULATIONS FOR
AREA DRAINING TO THE SOUTH
THERE IS SMALL PORTION OF THE SIDE THAT IS NOT CAPTURED IN THE sTORMWATER
SYSTEM. THIS AREA FLOWS TO THE WEST IN BOTH THE PRE AND POST DEVELOPED
CCNDMIONs. ENERGY BAIANCE MD FLOOD PROTECTON ARE SHOWN TO BE SATISFIED FOR
THIS AREA THROUGH REDUCTION IN TOTAL AREA FLOWING THAT WAY.
CHANNEL PROTECTION:
O S to — wi RVw ..TRVu ,-1
S IC 8E0 30 CFS' (0017 ACFpy(0.0061 ACFII
OK O.ta CFs SOMCFS
WE TO THE DECREASE IN DRAINAGE AREA THE POST DEVELOPED FLDNS ARE LESS THAN
THE PRE. THEREFORE, BVAC2 70,66E Is SATISFIED THROUGH SUBSECTION p,MEETING
ENERGY BNANCE.
FLOOD PROTECTION:
POST -DEVELOPED D,s PRE -DEVELOPED Go
CK Ca2CFS(POSZ-0E OPEDQdSC93CFS(PRE-DEVELOPEDQ,4
WE TO THE CHANGE IN OVERWND FLOW, THE SHEET FLOW AREAHAS BEEN REDUCED SO
THATTHEP0.TDEVELOPED10YEARFLOWSC FSITEISLESSTHANTHEPRESATISFYING
FLOOD PROTECTION REQUIREMENTS.
LIMBS OF DISTURBANCE;
�'//� I ��✓ � I 110 ACRE$ �/� I
//� / ' \ �� �S/��+1� // I � I��I •�) � �// Icy, �
ANALrsIS POINT
y i
PRE -DEVELOPED
n
AREA TO THE SOUTH;
IMPV. AREA 0W AC.
PERV. AREA 0 OR AC.
\
CN:33
TC:6MIN.
1\
\
z\\
1\\
IMPV.FANALYSISI �T`\
AREA 03T AC.
OR
LAREA'O.ta AC. �GW Q
.AREA RaBAC. 1 V
�O 1
I
IIIIIIIIIIIIdI.
UNDISTURBED ROOF DUNN AREA
TO EXISTING TRENCH DRAIN; 10
DRAINAGE AREA TO REMAIN THE 10
SAME IN FINAL CONDITION', ;
REFER TO SHEET C5. 1 ,
♦
B
S Q
7
i
POST DEVELOPED 1 /
AREA TO THE SOUTH
IMPV. AREIA
PEW AREI'005 AC
CN'T3 \
TC: fi MIN_
\
\
1
1
\
1\\
i\\
V AREA
91
0l�6\LTH OfV \0
BRAN .
lio \ 03051I51
'.ybpF2/6/23 ��
2
�e
iE
-E
£AS
Ce„
a Age O
re o
e$ 5
02/OCy2023
�MN By
KBARGER
NI=1aEDNY
• K. IMAGER
• FRPHN Y
• • J. SHOWALTER
sc e
1•-30
C 8
I--1
O o 3
Z Z
LI..I W a
Lu
W > i
Ja `
0=a
O'
Lu
V/ a�Lu y
Lu
♦� Qm Q gb
a 2f g
inLn
$5
I♦ O c
j Q %E
` UNDISTURBED ROOF THAN AREA
TO PROPOSED STORMWATER A
O
@
4
'. PIPE; DRAINAGE AREA TO REMAIN
5
THE SAME IN FINAL CONDITION;, ;
�¢
A REFER TO SHEET CS 1
999;555
£p
�
ES
82$8
57562
10 0l
11
♦
j
C6.O
�f
STORMWATER MANAGMENT NARRATIVE
IN THE PRE -DEVELOPED CONDITIONS RUNOFF FROM THE SUM IS CAPTURED IN STORM
DRAINS THROUGHOUT THE SITE AREA LIFE EXISTING STORM SYSTEM OUTFALIS INTO THE
POND TO THE NORTH OF THE SITE. LIFE DISRIRBED DRAINAGE AREA IS LESS THAN 1%OF
THE OVERALL DRAINAGE AREATO THE POND REACHING THE LIMITS OF REQUIRED
ANALYSIS IN THE POND PER 9VAC25A70B 0 A AND 9VAC25 870 M C A THE OVERPLL
DRAINAGE AREA TO LIFE POND IS APPROXIMATELY 1]] ACRES. THE OVERALL LIMITS OF
DISTURBANCE 1S 110 ACRES. THE EXISTING PIPE THAT GOES UNDER WEWNGTON CRIME
WILL BE UPGRADED TO PREVENT EROSION AND FLOODING IN THE PoST DEVELOPED
CONDITIONS SATISFYING CHANNEL FLOOD PROTECTION REQUIREMENTS.
O�y\LTH OfV \0
Qua
"., e]ixiY LL1ER�
l ic\ U305]I51
'.ybpF2/6/23 �Ag"
2
�e
iE
-E
g
£AS
`age o
re o
e8 5
SCALE r=zo° ,�
\ _ - •_-" Y , 11, lii, _ \,; r_ '_ 1 ///' �_ ♦ l' _�_i�� _ _ ,1/ 1\ \1 ♦��,,1 I, +,' III%� - 'i i-�=� `�
`I _ _,_ � \-`//\\1 Irr ```I \I II '_\ III /II ' '\', 1„1\I \\i�\\1\'/ !I``\I ' ,r(��',/� //,'♦'rll/ ___�,\\`\ �_
'/' - '_ O _� _ `� \'ll'I ' ,IIII/ /'"\ I �%' _ //1/ `, 111 `\` t \', \\\ - \ _ y�f%`�,i `,%\ 1j1 _�_' I, ♦I
' _ _ _ '_ _ _ _ _ \♦\\ II'I/ 'IIII l�l////,,'�' _�� / /r / /,' / �� I I' \1\ '\1 ' 'B � _ \"' `^ 11 ORTP
_ _ __--_-_ _-;'_-'____r _� r /,q,' I/n�l'i'ii'I !�: - �.�,/,','�'/ Illr �r IIII '"i �>/,�i-_ --�`/' ♦♦1' , __ -
__
__ '-_' "_ �'c--___ _ ♦,dll` ,;;1. ' I / Ill, 11 � / I/ ✓j I /� , //'/ l ' \ _ Sib,,, '/,/_-_ _ rpl I ,r __ 02/06/2023
___ _em�`::,__'rN / wawa By
_ - _ - �l u' i \Ili / ,
_,s__ OIII' �'♦ Il' '� rll l l' '\� R,'/G :' _ '/�, '�' `Y \♦`V^ r _ _ __ __ 11' _I
_ _ _ -_ -_ '/' _ '' _ _ - I'11` ` /// ' I 1 ♦�//, g , `\ I I \'4' _- __ ___ _ KSAR(iER
By
____ _ _ /„ 1 •
' '� ___'—_— -_-_ n _-___- - --_ `-'bl �♦♦ ♦1 Ili � I Ilrll - ' � - 'ice - - __ �� - ,�/�.' �,/ ��',-_'�: _ _ ____ - _ _ •
°,111 - _ _ _ _ _ __ / _ � `� � I , I / / / I I \ ,' I _ _ _ _ I / _ ____ _ __ � _ �� _ _ _v • J. SHOWALTER
Illll /I �_ _ ♦` I ♦Y
xllll Ill///' _ _ 132 _ _�' _'S /ll_ f I = Ili' __ ♦I _ -
_ Ill, A ", U♦ _ _
III 11 \I'lll ` //Il/�///,i%/ � II Illld! ♦, O♦ n r-� `\T _� � ___ _ -
/IIII-
/�1� % I Il�r //' ____-iI''ll i''/' \♦\\ O`\1 U♦ III ` � � ___ ____ _______ _ _ �!9 /'/'(' '1' - /'///' __
�-�_ 0'° 0 ♦CI of - -- ,- s$''"� " _ _ ,i/ ��/ - -
____
IIII♦'♦`\1`1��,�'�>_,\\\IIII _ �- _ __ / � _ _ _ - __ /1 I ,11\ ` -_ r'11/I 'Ni♦%' / ♦ � #
_ O
II -
♦ 1 'I 1 , _ _ _ _ _ I _ W Q
1 1 1 Lw
`�/l,' � ___ \III'/1'/ `111+ _ / _ i /`I Imo' _\ __ ♦11 '__ H', _ 111 `I I', Z E
', ___//'///i' ```- I I' I111 _ _ _ B2p, `_`ate __ _ ♦��\ '1 ___ \ - _ / _ �/ `�
�20 P
-�11" _ _\` ♦`1\I\\I ,)\\\\\IIII/ll _ _ _ O /i5 ` \1\ ,'�, ,` IJ''' /I >
_ r/,,/,/'l, 1, , .�♦";„111,♦\v . ---- __ =-' _ "-_-_-- --__ _ �.-DRAINAGE AREA: 173AC.
J' �
Nil1______-_ _ -=�-_�__,\\�..,.\� \ �` - -__l\_ _�'�
IIII/ II♦ 11 / _ Il, i,\\\ II III \\\♦\\\\♦\I\`11♦ _ __ - ` __ ` \ - I\♦ �� _ O Z Lu
,Illll I,IIII/`111111,11I11\11\\♦\\I1\\'111♦` __ _'__7=-� �1` `♦'\ __ `' ♦I ''' ' I 11�//II, I`,' I1 I11"♦'1'I( I11....11,11111111111111 _ _ _ _ ,'lt_` __ �%- \�\1 ♦ ,'ll ,' - I''''f ' - ,/I 011
11 I `„li ♦\:v '�i� rl y11IJl,n4,lnll♦\\`II\1� __ _ -"'a „-:-_�.♦�f--�i �.:c'- ' � wJ �wII^1 =
'1 I111♦ ♦♦\♦� 111 IIII,II111 I111j 11111 _ _ `'1\/ , Sv y9
,11 �XIIII I' I♦ _ _-- S
�`' - II'♦` _=1I III I111„ �L _ _ �-__�_-___� - �\11♦II'11♦\` _ _ _ _ _
♦ \` - `I III11`, _,J_ Ilplll r' ''g /
__r �'I'♦�� __,IIII♦♦\\ _�?„'�'N _ _
III111'I'I - _ SL
rlllllllll I'll' - � -
1 _ 111
/II _
_ ��-'__ I _ _ " 11 AWYY313 _ I _
_-- O
-- i
- - - I - - IIICc Ln
-- 'I40
II
' ___ '' n- lip-=-= /,/ ,4i�// /r'^�' `_' _- -" ___ - - �\�\`�l�a y'+'1i-F\♦,I' I _ --�'� ,1 2
___ _� _ _ __ -_C\, ____ py ull\♦ 'I `�: ��:. `♦ ____ � _ _ _ ___ _ c _ '_ ♦�`♦ .I11, O�II --_-/I�11 _ ,/ 8.
1 �� II/4i i/O/r//,I, ,�`�= � ��l l ,'I\ Iq /♦_- i ,l// F
'____� - __ __ - __ ___,� Ily/ -\I � { ___�-__ --_�-____- _-_ -_ ___ � `-I, A.>p' 1 III'' � d _- ♦y � �:
I n_-___ __Z08 :'/ -_,l II// i,%h2 �__ __---__' _- __ b Il `\ I' I `' ',SR.. '/Ill I\`♦ loe xo. f
♦\'' -- /'i/, _ '' /n llll(I�(?n_.: "-_-__--- ___ __ f ''ti _ ',F IIII `♦I', Ill ' i�� / I S
%;, _ _ 1 ,r�♦ 1_r c r - 6` _1'�' �`� ` 11 _ /`I / 57562 cf
=r; ♦°i__==',-'. '''��'i'�s��'%"'' -`_ = P __ "'III"\/:" _ '� - __ - _ ' j: _ i:i"/' \ ♦ �..
Section 6. Pollution Prevention Plan.
(reference County Code 17-404 and State Regulation 9VAC25-880-70 part H section A.4)
A. Plan showing pollution activities and prevention practices
(Include the Pollution Prevention Plan in Section 13 on which all of the following activity locations are clearly
marked. Keep this plan up-to-date with ongoing site changes and inspections.)
B. Sources of Pollutants, locations, and prevention practices
Issued — 10/2022 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
EROSION CONTROL LEGEND
,s � : UMR�C1�xIN0MIDDMDIxO
WIL AP DMDE
GAF—
NTI7Y RE
3.01
\
\
®
caxsiwrnox EmRMICE
3.DE
— M
mi/elIE
3AI
\
\
®
mLET iADlEC -
3AI
\
1
EWINEWMEDIx6
3.3E
THIS TOPOGRAPHIC SURVEY WAS COMPLETED UNDER THE
I DIR£CTANO RESPONSIBLE CHARGE OF PAUL N HUBER FROM
AN ACTUAL GROUND SURVEY MADE UNDER MY SUPERVISION;
xu¢xlx0
3.35
I iNAT THE ORIGINAL CATAWAS OBTAINED ON THE
FOLLOWINGDATES' MAY 10.11, 2012 THISSASE MAPAND
—TV
ThEEW ai[rnpu I[xC[
3'M
/1`
QIGITAL GEOSPA TNL OA TA INCLUDING METAOATAMEETS
M1TWIMUMACCURACYSTANDAROS UNLESS OTHERWISE NOTED
wNIAFIVIGMMID SEDIMENT
MWWNOL DKVM RRMFu ONNUM3
INVOUi-N2
/ Baai[
` s�DPW
//
EDGE OF POND i %�Ls, ,
'
SOIL Tree `
y
I
MHS
TOP54Z66'
£1
J
INVIN-54146'B'PVC
NVOUT-5CB15'B"PVC I
y
tw
/
DONOREIEwawgUT.
MORTAR MIXING
` STATNkI
TOP SH"a'
lNV IN = 5V 3 21' B" PVC (N)
lNV IN= 5C j lB' 6"PVC(SE)
/ INVWT=53N4'18'METAL \ 11
/ \ /
41
1
/ I �
/ I g LIMITS OF
/ 101STU RACRES
/ I \
i I Ism
I I H
I I �
I I �
I I >
I I
MHS
J 1 OP 55299'
INVIN=51T pSS'S.PVC
WVOUT=53559'B"PVC
/ , 1
/ MHS
/ INVIN=531.A5TOP 54293'
'WMETAL
INVIN=GM 13'ZVI`
l OUT=531.43'18'METAL
I
INVIN=552.95'8"PVC
INVOUT-551.6rS.PVC
�11
INVIN=56173'
l5"CMP
CONSTRUCTION
ETO TELLER.
RNNC+4lIEETO SEOCAION /
IN AN ACCESSIBLE LOCATION.
//rTGILETS
EMPoRARY
CONSTRUC
ABOVE GROUND FUEL CONTNNER MATH
IMPERMEA9IE HFAW-MIE18L LINER. VOLUME
SUFFICIENT TO CONtMN STOREDRAGE
A
V.D.0 U 1O% LGM ERTI=STORAGE ARFA
FOR ACIDS FUELS FEr■RTILRERS ETC.
y
SOIL TYPE.
19B
�, 11AIR3 /
2
SCALE t'=21Y
RTR
0�4611.iH CA \0C'
Oyu 15J 7 \1MRY q'
Lw V p'0}151
'g�pF2/6/23 g
\gyp ONAL ENO
gE
E
sae
oE�
CF
U)
z
0
02/OTy2023
K.MRGER
ce.B.IN
K. BARGER
ME DIN
SHOWALTE
1"=21Y
z
0
O
Z
Lu
J
d
W
2
�QE�L
W
w
a
x
a
Z
3
Z
0
zZ
W
W
Q'
a
z
0
M
J
n
57562
EROSION CONTROL LEGEND ,%T,.iLTy Op \O�
G 4
,ROR5 f )t limns of UEEwNGum GMowG
F
\ / INNOUT=5538.8'PVC SGu>aEw DrvmE OGIV\1M{Y q'.LLTEE�
J.ND
0'0}]151
`II 11 /"�3i' INVINc56f.13' SRF F— uFFIr F EnI..,1�6�23 g
1 15"1M1 �/����'i�yOY(
CE ' K Y COrvSxVCnOn E,wMrvCE JdE
vIONAt EN
BE SILTfExCF }03
\ 'I IF �,R;� 1rv1E*mortrnory 307 NF
/ OF oxxET wm[rnax 3.1x � 8
T$ RFIPoMav SFEDG.G 3.3E g?
,m,sounmwir y R0'� ' /v G,/ WNSTRUCTION TRAILER. PS PEamnnear SEEDING 3.Jx �ti
3
- 22 111 � 9 / / i RAIN GAUGE TO BE LOCATED oLL_o
MVmvw,SHcuv V / r ' IN AN ACCESSIBLE LOCATION. MU mVEdmG a
ONUTN Sll i is �Gpt� '. Y / / 3.35 g W s n p
,sl lS cB.aTE •a . ♦ TP —TP ,PEENIYID on RGDE 3.39 zg dm ACp
V O
uwouT..sf2255 is 1 1� yR\ / / ,/ /' q \`� ♦ - MORTAR MIXING DG 3.N o p
N" 4nSTATION
/ 1 1 ��/' /' I s J` ; �P\ -� - nPG,rvNOTE: xPseoMExrmxrxo x noaoar mmxunon xunaE
l/ PROPOSED STORM SEWER SYSTEM TO BE 'g w
ONA FOGEOFPONO / I 1 (` ,� DESIGNED BY OTHERS. PROVIDE INLET PROTECTION
4 2 LLINLETSASTHEYAREINSTALLED
\` \ C- VFHICIE EM
N ICUIE WA311'JUT. \ , r
WASHARFA `\ ,
TPORARY ,yxh /'� '•a••_ 'y / '/' % / \_ �- - \ TOILETS
` I, f,ONSTRUCTION
DUMPSTER W/COVER
11 11 / .iy
MISS £; 65 DATE
INVIN 64146 a PVC 11 1 / = / � / T C DI/OS/
INVOUT 500358 PVC duwN. eY
PHONEEABLE HFVELCONTAINERWJTH
IMPERMEABLE CONTAN TORELINERVOWME DESIGNED6
t ,t+ ER
SVFFICIENTTOCONTAISEL) SEOFUELEDRAGEA cevp,ED eY
VOWME*tx%(G4gDEISEy. STORAGEAREA
ACIDS FUELS, FERTILIZERS ETC. • KBARGER
AI
\ \ I MobJ. SHOWALTER
• 5CS TOPi1 \ , \ __'
ININ-54311'B'PVC(N)
SLVE
INV
I \�\
INVWT=533 f4'iB'METAL \11 ` � ���`` \�• •
Iw-ssus I � 1 `- / •
cW+G 5Tnm5 coxc°aO -
ENEGS
I
w
LIMITS OF Q (n
T DISTURBANCE' 1 / ' \ Q y9
1 IAOACRES / = 3
A
was
g
m = a
\ �i 00Z=
a
/ w< LIJ
§ O TQ DO
11 1\ 1 a O MHS
TOP55299'
INVlN=544.19'B"PVL
INvour=sus9'a'vvc
ca
1 0 @@}g
\ ;1
MHB reEmr,x uvo[re rvr000tn o[ctt . �
TOP 542'A" 1 �
MVlN=53145' 18'METAL £
INVlN=534.13'B"PVL 1 E
INVOUT=531AI III... ,
$_
SCALE 1"=3tl ® f
11 T 57562 c €
$s
PPP-1 Y7
et
Pollutant, or Pollutant Location on site Prevention Practices,
Generating Activity Control Measures
C. Sources of Pollutants continued. Common activities and minimum control and prevention
practices
Pollutant, or Pollutant
Location on site
Prevention Practices,
Generating Activity
Control Measures
Follow Erosion and Sediment Control
Clearing, grading, excavating, and an-
Land disturbance area
Plan. Dispose of clearing debris at
stabilized areas
acceptable disposal sites. Seed and mulch,
or sod within 7 days of land clearing
Cover storm drain inlets and use drip pans
Paving operations
Roads and driveways
and absorbent/oil dry for all paving
machines to limit leaks ands ills
Direct concrete wash water into a leak -
Concrete washout and
Current location and detail shown on
proof container or leak -proof settling basin
cement waste
plan
that is designed so that no overflows can
occur
Enclose or cover material storage areas.
Mix paint indoors in a containment area or
Structure construction, stucco,
Structures
in a flat unpaved area. Prevent the
painting, and cleaning
discharge of soaps, solvents, detergents
and wash water, paint, form release oils
and curing compounds.
Water shall be filtered, settled or similarly
Dewatering operations
Dewatering sites shown on plan
treated prior to discharge as shown on
plan.
Designated areas for material delivery and
Material delivery and storage
Designated area shown on plan
storage. Placed near construction
entrances, away from waterways and
drainage paths
Material use during building process
Building areas
Follow manufacturer's instructions.
MSDS's attached.
Waste collection area will not receive a
substantial amount of runoff from upland
areas and does not drain directly to a
waterway. Containers have lids covered
Issued — 10/2022 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Pollutant, or Pollutant
Location on site
Prevention Practices,
Generating Activity
Control Measures
Solid waste disposal
Current designated container areas on
before periods of rain, or are in a covered
plan
area. Scheduled collection to prevent
overfilling. MATERIALS NOT TO BE
BURIED ON -SITE
Convenient and well -maintained portable
sanitary facilities will be provided, and
Sanitary waste
Current locations shown on plan
located away from waterways or inlets.
Such facilities shall be regularly
maintained.
Apply fertilizers in accordance with
Landscaping operations
Landscape areas shown on plan
manufacturer's recommendations and not
during rainfall events
To be treated in a sediment basin or better
Wash Waters
Wash areas shown on plan
control as specified on plan. Minimize
the discharge of pollutants from
equipment and vehicle washing
Vehicle and equipment washing
Designated areas and details shown on
Provide containment and filtering for all
plan
wash waters per the plan
Minimization of exposure to precipitation and stormwater. Minimize the exposure of building materials, building products,
construction wastes, trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary waste, and other materials
present on the site to precipitation and to stormwater.
(Identify all non-stormwater discharges to occur on your site. Keep this plan up-to-date with ongoing site
changes and inspections. See CGP, 9VAC25-880-70 section E for examples of non-stormwater discharges.)
iron-stormwater
Discharge Pollutants or Pollutant Location on Site
Constituents
E. Persons responsible for pollution prevention practices
Issued — 10/2022 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
(Provide the names and contact information for all persons responsible for prevention practices as listed above.)
F. Response and reporting practices
Minimize discharges from spills and leaks. Minimize the discharge of pollutants from spills and leaks and implement chemical spill
and leak prevention and response procedures as follows.
Respond to all spills, leaks and discharges as follows;
Report all spills, leaks and discharges as follows;
(Provide detailed response and reporting practices according to 9VAC25-880-70, Part II, section AA.e.)
G. Pollution Prevention Awareness
(Describe training and procedures to provide awareness and compliance for all measures in this document;
waste management, wash waters, prevention measures, etc.)
Issued — 10/2022 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 7. Discharges to impaired waters, surface waters within an applicable TMDL
wasteload allocation, and exceptional waters.
(Provide detailed measures for any applicable TMDL)
Issued — 10/2022 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 8. Qualified personnel
The following personnel are responsible for inspections;
(Provide the name, telephone number, and qualifications of the qualified personnel conducting inspections.)
Issued — 10/2022 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 9. Signed Certification
(Provide certification according to 9VAC25-870-370. For purposes of plan review and approvals, this
certification should be the owner of the property, the same signature as appears on the bonds and
applications. Another operator can be designated on the delegation of authority form to follow.)
CERTIFICATION
"I certify under penalty of law that I have read and understand this document and that this document and all attachments
were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated
the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly
responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true,
accurate, and complete. I am aware that there are significant penalties for submitting false information, including the
possibility of fine and imprisonment for knowing violations."
Owner/Operator Name:
Company:
Title:
Signature:
Date:
Issued — 10/2022 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 10. Delegation of authority.
(Provide the persons or positions with authority to sign inspection reports or to modify the stormwater pollution
prevention plan. A formal, signed delegation of authority is needed.)
Delegation of Authority
I, (name), hereby designate the person or specifically described position below to be a
duly authorized representative for the purpose of overseeing compliance with environmental requirements,
including the Construction General Permit, at the construction site. The
designee is authorized to sign any reports, stormwater pollution prevention plans and all other documents
required by the permit.
(name of person or position)
(company)
(address)
(city, state, zip)
(phone)
By signing this authorization, I confirm that I meet the requirements to make such a designation as set forth in
the Construction General Permit (CGP), and that the designee above meets the definition of a "duly
authorized representative".
Operator Name:
Company:
Title:
Signature:
Date:
Issued — 10/2022 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 11. General permit copy
(Provide a copy of the construction general permit, 9VAC25-880)
Issued — 10/2022 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
COMMONWEALTH of VIRGINIA
DEPARTMENT OF ENVIRONMENTAL QUALITY
General Permit No.: VAR10
Effective Date: July 1, 2014
Expiration Date: June 30, 2019
GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION
ACTIVITIES
AUTHORIZATION TO DISCHARGE UNDER THE VIRGINIA STORMWATER MANAGEMENT
PROGRAM AND THE VIRGINIA STORMWATER MANAGEMENT ACT
In compliance with the provisions of the Clean Water Act, as amended, and pursuant to the Virginia
Stormwater Management Act and regulations adopted pursuant thereto, operators of construction
activities are authorized to discharge to surface waters within the boundaries of the Commonwealth of
Virginia, except those specifically named in State Water Control Board regulations that prohibit such
discharges.
The authorized discharge shall be in accordance with this cover page, Part I - Discharge Authorization
and Special Conditions, Part II - Stormwater Pollution Prevention Plan, and Part III - Conditions
Applicable to All VPDES Permits as set forth herein.
General Permit No.: VAR10
Page 1 of 21
PART
DISCHARGE AUTHORIZATION AND SPECIAL CONDITIONS
A. Coverage under this general permit.
1. During the period beginning with the date of coverage under this general permit and lasting until the
general permit's expiration date, the operator is authorized to discharge stormwater from construction
activities.
2. This general permit also authorizes stormwater discharges from support activities (e.g., concrete or
asphalt batch plants, equipment staging yards, material storage areas, excavated material disposal
areas, borrow areas) located on -site or off -site provided that:
a. The support activity is directly related to the construction activity that is required to have general
permit coverage for discharges of stormwater from construction activities;
b. The support activity is not a commercial operation, nor does it serve multiple unrelated
construction activities by different operators;
c. The support activity does not operate beyond the completion of the last construction activity it
supports;
d. The support activity is identified in the registration statement at the time of general permit
coverage;
e. Appropriate control measures are identified in a stormwater pollution prevention plan and
implemented to address the discharges from the support activity areas; and
f. All applicable state, federal, and local approvals are obtained for the support activity.
B. Limitations on coverage
1. Post -construction discharges. This general permit does not authorize stormwater discharges that
originate from the site after construction activities have been completed and the site, including any
support activity sites covered under the general permit registration, has undergone final stabilization.
Post -construction industrial stormwater discharges may need to be covered by a separate VPDES
permit.
2. Discharges mixed with nonstormwater. This general permit does not authorize discharges that are
mixed with sources of nonstormwater, other than those discharges that are identified in Part I E
(Authorized nonstormwater discharges) and are in compliance with this general permit.
3. Discharges covered by another state permit. This general permit does not authorize discharges of
stormwater from construction activities that have been covered under an individual permit or required
to obtain coverage under an alternative general permit.
4. Impaired waters and TMDL limitation. Discharges of stormwater from construction activities to surface
waters identified as impaired in the 2012 § 305(b)/303(d) Water Quality Assessment Integrated
Report or for which a TMDL wasteload allocation has been established and approved prior to the
term of this general permit for (i) sediment or a sediment -related parameter (i.e., total suspended
solids or turbidity) or (ii) nutrients (i.e., nitrogen or phosphorus) are not eligible for coverage under this
general permit unless the operator develops, implements, and maintains a SWPPP that minimizes
the pollutants of concern and, when applicable, is consistent with the assumptions and requirements
of the approved TMDL wasteload allocations. In addition, the operator shall implement the following
items:
General Permit No.: VAR10
Page 2 of 21
a. The impaired water(s), approved TMDL(s), and pollutant(s) of concern, when applicable, shall be
identified in the SWPPP;
b. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days
after final grade is reached on any portion of the site;
c. Nutrients shall be applied in accordance with manufacturer's recommendations or an approved
nutrient management plan and shall not be applied during rainfall events; and
d. The applicable SWPPP inspection requirements specified in Part II F 2 shall be amended as
follows:
(1) Inspections shall be conducted at a frequency of (i) at least once every four business days or
(ii) at least once every five business days and no later than 48 hours following a measurable
storm event. In the event that a measurable storm event occurs when there are more than 48
hours between business days, the inspection shall be conducted on the next business day;
and
(2) Representative inspections used by utility line installation, pipeline construction, or other
similar linear construction activities shall inspect all outfalls discharging to surface waters
identified as impaired or for which a TMDL wasteload allocation has been established and
approved prior to the term of this general permit.
5. Exceptional waters limitation. Discharges of stormwater from construction activities not previously
covered under the general permit issued in 2009 to exceptional waters identified in 9VAC25-260-30 A
3 c are not eligible for coverage under this general permit unless the operator implements the
following:
a. The exceptional water(s) shall be identified in the SWPPP;
b. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days
after final grade is reached on any portion of the site;
c. Nutrients shall be applied in accordance with manufacturer's recommendations or an approved
nutrient management plan and shall not be applied during rainfall events; and
d. The applicable SWPPP inspection requirements specified in Part II F 2 shall be amended as
follows:
(1) Inspections shall be conducted at a frequency of (i) at least once every four business days or
(ii) at least once every five business days and no later than 48 hours following a measurable
storm event. In the event that a measurable storm event occurs when there are more than 48
hours between business days, the inspection shall be conducted on the next business day;
and
(2) Representative inspections used by utility line installation, pipeline construction, or other
similar linear construction activities shall inspect all outfalls discharging to exceptional waters.
6. There shall be no discharge of floating solids or visible foam in other than trace amounts.
C. Commingled discharges. Discharges authorized by this general permit may be commingled with other
sources of stormwater that are not required to be covered under a state permit, so long as the
commingled discharge is in compliance with this general permit. Discharges authorized by a separate
state or VPDES permit may be commingled with discharges authorized by this general permit so long as
all such discharges comply with all applicable state and VPDES permit requirements.
General Permit No.: VAR10
Page 3 of 21
D. Prohibition of nonstormwater discharges. Except as provided in Parts I A 2, 1 C, and I E, all discharges
covered by this general permit shall be composed entirely of stormwater associated with construction
activities. All other discharges including the following are prohibited:
1. Wastewater from washout of concrete;
2. Wastewater from the washout and cleanout of stucco, paint, form release oils, curing compounds,
and other construction materials;
3. Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance;
4. Oils, toxic substances, or hazardous substances from spills or other releases; and
5. Soaps, solvents, or detergents used in equipment and vehicle washing.
E. Authorized nonstormwater discharges. The following nonstormwater discharges from construction
activities are authorized by this general permit when discharged in compliance with this general permit:
1. Discharges from firefighting activities;
2. Fire hydrant flushings;
3. Waters used to wash vehicles or equipment where soaps, solvents, or detergents have not been
used and the wash water has been filtered, settled, or similarly treated prior to discharge;
4. Water used to control dust that has been filtered, settled, or similarly treated prior to discharge;
5. Potable water sources, including uncontaminated waterline flushings;
6. Routine external building wash down where soaps, solvents or detergents have not been used and
the wash water has been filtered, settled, or similarly treated prior to discharge;
7. Pavement wash waters where spills or leaks of toxic or hazardous materials have not occurred (or
where all spilled or leaked material has been removed prior to washing); where soaps, solvents, or
detergents have not been used; and where the wash water has been filtered, settled, or similarly
treated prior to discharge;
8. Uncontaminated air conditioning or compressor condensate;
9. Uncontaminated ground water or spring water;
10. Foundation or footing drains where flows are not contaminated with process materials such as
solvents;
11. Uncontaminated excavation dewatering, including dewatering of trenches and excavations that have
been filtered, settled, or similarly treated prior to discharge; and
12. Landscape irrigation.
F. Termination of general permit coverage.
1. The operator of the construction activity shall submit a notice of termination in accordance with
9VAC25-880-60 to the VSMP authority after one or more of the following conditions have been met:
General Permit No.: VAR10
Page 4 of 21
a. Necessary permanent control measures included in the SWPPP for the site are in place and
functioning effectively and final stabilization has been achieved on all portions of the site for which
the operator is responsible. When applicable, long term responsibility and maintenance
requirements shall be recorded in the local land records prior to the submission of a notice of
termination;
b. Another operator has assumed control over all areas of the site that have not been finally
stabilized and obtained coverage for the ongoing discharge;
c. Coverage under an alternative VPDES or state permit has been obtained; or
d. For residential construction only, temporary soil stabilization has been completed and the
residence has been transferred to the homeowner.
2. The notice of termination should be submitted no later than 30 days after one of the above conditions
in subdivision 1 of this subsection is met. Authorization to discharge terminates at midnight on the
date that the notice of termination is submitted for the conditions set forth in subdivisions 1 b through
1 d of this subsection. Termination of authorizations to discharge for the conditions set forth in
subdivision 1 a of this subsection shall be effective upon notification from the department that the
provisions of subdivision 1 a of this subsection have been met or 60 days after submittal of the notice
of termination, whichever occurs first.
3. The notice of termination shall be signed in accordance with Part III K of this general permit.
G. Water quality protection.
1. The operator must select, install, implement and maintain control measures as identified in the
SWPPP at the construction site that minimize pollutants in the discharge as necessary to ensure that
the operator's discharge does not cause or contribute to an excursion above any applicable water
quality standard.
2. If it is determined by the department that the operator's discharges are causing, have reasonable
potential to cause, or are contributing to an excursion above any applicable water quality standard,
the department, in consultation with the VSMP authority, may take appropriate enforcement action
and require the operator to:
a. Modify or implement additional control measures in accordance with Part II B to adequately
address the identified water quality concerns;
b. Submit valid and verifiable data and information that are representative of ambient conditions and
indicate that the receiving water is attaining water quality standards; or
c. Submit an individual permit application in accordance with 9VAC25-870-410 B 3.
All written responses required under this chapter must include a signed certification consistent with Part
III K.
General Permit No.: VAR10
Page 5 of 21
PART II
STORMWATER POLLUTION PREVENTION PLAN
A stormwater pollution prevention plan (SWPPP) shall be developed prior to the submission of a
registration statement and implemented for the construction activity, including any support activity,
covered by this general permit. SWPPPs shall be prepared in accordance with good engineering
practices. Construction activities that are part of a larger common plan of development or sale and disturb
less than one acre may utilize a SWPPP template provided by the department and need not provide a
separate stormwater management plan if one has been prepared and implemented for the larger
common plan of development or sale.
The SWPPP requirements of this general permit may be fulfilled by incorporating by reference other plans
such as a spill prevention control and countermeasure (SPCC) plan developed for the site under § 311 of
the federal Clean Water Act or best management practices (BMP) programs otherwise required for the
facility provided that the incorporated plan meets or exceeds the SWPPP requirements of Part II A. All
plans incorporated by reference into the SWPPP become enforceable under this general permit. If a plan
incorporated by reference does not contain all of the required elements of the SWPPP, the operator must
develop the missing elements and include them in the SWPPP.
Any operator that was authorized to discharge under the general permit issued in 2009, and that intends
to continue coverage under this general permit, shall update its stormwater pollution prevention plan to
comply with the requirements of this general permit no later than 60 days after the date of coverage under
this general permit.
A. Stormwater pollution prevention plan contents. The SWPPP shall include the following items
1. General information.
a. A signed copy of the registration statement, if required, for coverage under the general VPDES
permit for discharges of stormwater from construction activities;
b. Upon receipt, a copy of the notice of coverage under the general VPDES permit for discharges of
stormwater from construction activities (i.e., notice of coverage letter);
c. Upon receipt, a copy of the general VPDES permit for discharges of stormwater from construction
activities;
d. A narrative description of the nature of the construction activity, including the function of the
project (e.g., low density residential, shopping mall, highway, etc.);
e. A legible site plan identifying:
(1) Directions of stormwater flow and approximate slopes anticipated after major grading
activities;
(2) Limits of land disturbance including steep slopes and natural buffers around surface waters
that will not be disturbed;
(3) Locations of major structural and nonstructural control measures, including sediment basins
and traps, perimeter dikes, sediment barriers, and other measures intended to filter, settle, or
similarly treat sediment, that will be installed between disturbed areas and the undisturbed
vegetated areas in order to increase sediment removal and maximize stormwater infiltration;
(4) Locations of surface waters;
General Permit No.: VAR10
Page 6 of 21
(5) Locations where concentrated stormwater is discharged;
(6) Locations of support activities, when applicable and when required by the VSMP authority,
including but not limited to (i) areas where equipment and vehicle washing, wheel wash
water, and other wash water is to occur; (ii) storage areas for chemicals such as acids, fuels,
fertilizers, and other lawn care chemicals; (iii) concrete wash out areas; (iv) vehicle fueling
and maintenance areas; (v) sanitary waste facilities, including those temporarily placed on
the construction site; and (vi) construction waste storage; and
(7) When applicable, the location of the on -site rain gauge or the methodology established in
consultation with the VSMP authority used to identify measurable storm events for inspection
purposes.
2. Erosion and sediment control plan.
An erosion and sediment control plan approved by the VESCP authority as authorized under the
Erosion and Sediment Control Regulations (9VAC25-840), an "agreement in lieu of a plan" as
defined in 9VAC25-840-10 from the VESCP authority, or an erosion and sediment control plan
prepared in accordance with annual standards and specifications approved by the department.
Any operator proposing a new stormwater discharge from construction activities that is not
required to obtain erosion and sediment control plan approval from a VESCP authority or does
not adopt department -approved annual standards and specifications shall submit the erosion and
sediment control plan to the department for review and approval.
All erosion and sediment control plans shall include a statement describing the maintenance
responsibilities required for the erosion and sediment controls used.
c. A properly implemented approved erosion and sediment control plan, "agreement in lieu of a
plan," or erosion and sediment control plan prepared in accordance with department -approved
annual standards and specifications, adequately:
(1) Controls the volume and velocity of stormwater runoff within the site to minimize soil erosion;
(2) Controls stormwater discharges, including peak flow rates and total stormwater volume, to
minimize erosion at outlets and to minimize downstream channel and stream bank erosion;
(3) Minimizes the amount of soil exposed during the construction activity;
(4) Minimizes the disturbance of steep slopes;
(5) Minimizes sediment discharges from the site in a manner that addresses (i) the amount,
frequency, intensity, and duration of precipitation; (ii) the nature of resulting stormwater
runoff; and (iii) soil characteristics, including the range of soil particle sizes present on the
site;
(6) Provides and maintains natural buffers around surface waters, directs stormwater to
vegetated areas to increase sediment removal, and maximizes stormwater infiltration, unless
infeasible;
(7) Minimizes soil compaction and, unless infeasible, preserves topsoil;
(8) Ensures that stabilization of disturbed areas will be initiated immediately whenever any
clearing, grading, excavating, or other land -disturbing activities have permanently ceased on
any portion of the site, or temporarily ceased on any portion of the site and will not resume for
a period exceeding 14 days; and
General Permit No.: VAR10
Page 7 of 21
(9) Utilizes outlet structures that withdraw stormwater from the surface (i.e., above the
permanent pool or wet storage water surface elevation), unless infeasible, when discharging
from sediment basins or sediment traps.
3. Stormwater management plan.
New construction activities. A stormwater management plan approved by the VSMP authority as
authorized under the Virginia Stormwater Management Program (VSMP) Regulation (9VAC25-
870), or an "agreement in lieu of a stormwater management plan" as defined in 9VAC25-870-10
from the VSMP authority, or a stormwater management plan prepared in accordance with annual
standards and specifications approved by the department. Any operator proposing a new
stormwater discharge from construction activities that is not required to obtain stormwater
management plan approval from a VSMP authority or does not adopt department -approved
annual standards and specifications shall submit the stormwater management plan to the
department for review and approval.
Existing construction activities. Any operator that was authorized to discharge under the general
permit issued in 2009, and that intends to continue coverage under this general permit, shall
ensure compliance with the requirements of 9VAC25-870-93 through 9VAC25-870-99 of the
VSMP Regulation, including but not limited to the water quality and quantity requirements. The
SWPPP shall include a description of, and all necessary calculations supporting, all post -
construction stormwater management measures that will be installed prior to the completion of
the construction process to control pollutants in stormwater discharges after construction
operations have been completed. Structural measures should be placed on upland soils to the
degree possible. Such measures must be designed and installed in accordance with applicable
VESCP authority, VSMP authority, state, and federal requirements, and any necessary permits
must be obtained.
4. Pollution prevention plan. A pollution prevention plan that addresses potential pollutant -generating
activities that may reasonably be expected to affect the quality of stormwater discharges from the
construction activity, including any support activity. The pollution prevention plan shall:
a. Identify the potential pollutant -generating activities and the pollutant that is expected to be
exposed to stormwater;
b. Describe the location where the potential pollutant -generating activities will occur, or if identified
on the site plan, reference the site plan;
c. Identify all nonstormwater discharges, as authorized in Part I E of this general permit, that are or
will be commingled with stormwater discharges from the construction activity, including any
applicable support activity;
d. Identify the person responsible for implementing the pollution prevention practice or practices for
each pollutant -generating activity (if other than the person listed as the qualified personnel);
e. Describe the pollution prevention practices and procedures that will be implemented to:
(1) Prevent and respond to leaks, spills, and other releases including (i) procedures for
expeditiously stopping, containing, and cleaning up spills, leaks, and other releases; and (ii)
procedures for reporting leaks, spills, and other releases in accordance with Part III G;
(2) Prevent the discharge of spilled and leaked fuels and chemicals from vehicle fueling and
maintenance activities (e.g., providing secondary containment such as spill berms, decks,
spill containment pallets, providing cover where appropriate, and having spill kits readily
available);
General Permit No.: VAR10
Page 8 of 21
(3) Prevent the discharge of soaps, solvents, detergents, and wash water from construction
materials, including the clean-up of stucco, paint, form release oils, and curing compounds
(e.g., providing (i) cover (e.g., plastic sheeting or temporary roofs) to prevent contact with
stormwater; (ii) collection and proper disposal in a manner to prevent contact with
stormwater; and (iii) a similarly effective means designed to prevent discharge of these
pollutants);
(4) Minimize the discharge of pollutants from vehicle and equipment washing, wheel wash water,
and other types of washing (e.g., locating activities away from surface waters and stormwater
inlets or conveyance and directing wash waters to sediment basins or traps, using filtration
devices such as filter bags or sand filters, or using similarly effective controls);
(5) Direct concrete wash water into a leak -proof container or leak -proof settling basin. The
container or basin shall be designed so that no overflows can occur due to inadequate sizing
or precipitation. Hardened concrete wastes shall be removed and disposed of in a manner
consistent with the handling of other construction wastes. Liquid concrete wastes shall be
removed and disposed of in a manner consistent with the handling of other construction wash
waters and shall not be discharged to surface waters;
(6) Minimize the discharge of pollutants from storage, handling, and disposal of construction
products, materials, and wastes including (i) building products such as asphalt sealants,
copper flashing, roofing materials, adhesives, and concrete admixtures; (ii) pesticides,
herbicides, insecticides, fertilizers, and landscape materials; and (iii) construction and
domestic wastes such as packaging materials, scrap construction materials, masonry
products, timber, pipe and electrical cuttings, plastics, Styrofoam, concrete, and other trash or
building materials;
(7) Prevent the discharge of fuels, oils, and other petroleum products, hazardous or toxic wastes,
and sanitary wastes; and
(8) Address any other discharge from the potential pollutant -generating activities not addressed
above; and
Describe procedures for providing pollution prevention awareness of all applicable wastes,
including any wash water, disposal practices, and applicable disposal locations of such wastes, to
personnel in order to comply with the conditions of this general permit. The operator shall
implement the procedures described in the SWPPP.
5. SWPPP requirements for discharges to impaired waters, surface waters with an applicable TMDL
wasteload allocation established and approved prior to the term of this general permit, and
exceptional waters. The SWPPP shall:
a. Identify the impaired water(s), approved TMDL(s), pollutant(s) of concern, and exceptional waters
identified in 9VAC25-260-30 A 3 c, when applicable;
b. Provide clear direction that:
(1) Permanent or temporary soil stabilization shall be applied to denuded areas within seven
days after final grade is reached on any portion of the site;
(2) Nutrients shall be applied in accordance with manufacturer's recommendations or an
approved nutrient management plan and shall not be applied during rainfall events; and
(3) A modified inspection schedule shall be implemented in accordance with Part I B 4 or Part I B
5.
General Permit No.: VAR10
Page 9 of 21
6. Qualified personnel. The name, phone number, and qualifications of the qualified personnel
conducting inspections required by this general permit.
7. Delegation of authority. The individuals or positions with delegated authority, in accordance with Part
III K, to sign inspection reports or modify the SWPPP.
8. SWPPP signature. The SWPPP shall be signed and dated in accordance with Part III K.
B. SWPPP amendments, modification, and updates.
1. The operator shall amend the SWPPP whenever there is a change in the design, construction,
operation, or maintenance that has a significant effect on the discharge of pollutants to surface waters
and that has not been previously addressed in the SWPPP.
2. The SWPPP must be amended if, during inspections or investigations by the operator's qualified
personnel, or by local, state, or federal officials, it is determined that the existing control measures are
ineffective in minimizing pollutants in discharges from the construction activity. Revisions to the
SWPPP shall include additional or modified control measures designed and implemented to correct
problems identified. If approval by the VESCP authority, VSMP authority, or department is necessary
for the control measure, revisions to the SWPPP shall be completed no later than seven calendar
days following approval. Implementation of these additional or modified control measures must be
accomplished as described in Part II G.
3. The SWPPP must clearly identify the contractor(s) that will implement and maintain each control
measure identified in the SWPPP. The SWPPP shall be amended to identify any new contractor that
will implement and maintain a control measure.
4. The operator shall update the SWPPP no later than seven days following any modification to its
implementation. All modifications or updates to the SWPPP shall be noted and shall include the
following items:
a. A record of dates when:
(1) Major grading activities occur;
(2) Construction activities temporarily or permanently cease on a portion of the site; and
(3) Stabilization measures are initiated;
b. Documentation of replaced or modified controls where periodic inspections or other information
have indicated that the controls have been used inappropriately or incorrectly and where modified
as soon as possible;
c. Areas that have reached final stabilization and where no further SWPPP or inspection
requirements apply;
d. All properties that are no longer under the legal control of the operator and the dates on which the
operator no longer had legal control over each property;
e. The date of any prohibited discharges, the discharge volume released, and what actions were
taken to minimize the impact of the release;
f. Measures taken to prevent the reoccurrence of any prohibited discharge; and
g. Measures taken to address any evidence identified as a result of an inspection required under
Part 11 F.
General Permit No.: VAR10
Page 10 of 21
5. Amendments, modifications, or updates to the SWPPP shall be signed in accordance with Part III K
C. Public Notification. Upon commencement of land disturbance, the operator shall post conspicuously a
copy of the notice of coverage letter near the main entrance of the construction activity. For linear
projects, the operator shall post the notice of coverage letter at a publicly accessible location near an
active part of the construction project (e.g., where a pipeline crosses a public road). The operator shall
maintain the posted information until termination of general permit coverage as specified in Part I F.
D. SWPPP availability.
1. Operators with day-to-day operational control over SWPPP implementation shall have a copy of the
SWPPP available at a central location on -site for use by those identified as having responsibilities
under the SWPPP whenever they are on the construction site.
2. The operator shall make the SWPPP and all amendments, modifications, and updates available upon
request to the department, the VSMP authority, the EPA, the VESCP authority, local government
officials, or the operator of a municipal separate storm sewer system receiving discharges from the
construction activity. If an on -site location is unavailable to store the SWPPP when no personnel are
present, notice of the SWPPP's location must be posted near the main entrance of the construction
site.
3. The operator shall make the SWPPP available for public review in an electronic format or in hard
copy. Information for public access to the SWPPP shall be posted and maintained in accordance with
Part II C. If not provided electronically, public access to the SWPPP may be arranged upon request at
a time and at a publicly accessible location convenient to the operator or his designee but shall be no
less than once per month and shall be during normal business hours. Information not required to be
contained within the SWPPP by this general permit is not required to be released.
E. SWPPP implementation. The operator shall implement the SWPPP and subsequent amendments,
modifications, and updates from commencement of land disturbance until termination of general permit
coverage as specified in Part I F.
1. All control measures must be properly maintained in effective operating condition in accordance with
good engineering practices and, where applicable, manufacturer specifications. If a site inspection
required by Part II F identifies a control measure that is not operating effectively, corrective action(s)
shall be completed as soon as practicable, but no later than seven days after discovery or a longer
period as established by the VSMP authority, to maintain the continued effectiveness of the control
measures.
2. If site inspections required by Part II F identify an existing control measure that needs to be modified
or if an additional control measure is necessary for any reason, implementation shall be completed
prior to the next anticipated measurable storm event. If implementation prior to the next anticipated
measurable storm event is impracticable, then alternative control measures shall be implemented as
soon as practicable, but no later than seven days after discovery or a longer period as established by
the VSMP authority.
F. SWPPP Inspections.
1. Personnel responsible for on -site and off -site inspections. Inspections required by this general permit
shall be conducted by the qualified personnel identified by the operator in the SWPPP. The operator
is responsible for insuring that the qualified personnel conduct the inspection.
2. Inspection schedule.
a. Inspections shall be conducted at a frequency of:
General Permit No.: VAR10
Page 11 of 21
(1) At least once every five business days; or
(2) At least once every 10 business days and no later than 48 hours following a measurable
storm event. In the event that a measurable storm event occurs when there are more than 48
hours between business days, the inspection shall be conducted no later than the next
business day.
b. Where areas have been temporarily stabilized or land -disturbing activities will be suspended due
to continuous frozen ground conditions and stormwater discharges are unlikely, the inspection
frequency may be reduced to once per month. If weather conditions (such as above freezing
temperatures or rain or snow events) make discharges likely, the operator shall immediately
resume the regular inspection frequency.
c. Representative inspections may be utilized for utility line installation, pipeline construction, or
other similar linear construction activities provided that:
(1) Temporary or permanent soil stabilization has been installed and vehicle access may
compromise the temporary or permanent soil stabilization and potentially cause additional
land disturbance increasing the potential for erosion;
(2) Inspections occur on the same frequency as other construction activities;
(3) Control measures are inspected along the construction site 0.25 miles above and below each
access point (i.e., where a roadway, undisturbed right-of-way, or other similar feature
intersects the construction activity and access does not compromise temporary or permanent
soil stabilization); and
(4) Inspection locations are provided in the report required by Part II F.
3. Inspection requirements.
a. As part of the inspection, the qualified personnel shall:
(1) Record the date and time of the inspection and when applicable the date and rainfall amount
of the last measurable storm event;
(2) Record the information and a description of any discharges occurring at the time of the
inspection;
(3) Record any land -disturbing activities that have occurred outside of the approved erosion and
sediment control plan;
(4) Inspect the following for installation in accordance with the approved erosion and sediment
control plan, identification of any maintenance needs, and evaluation of effectiveness in
minimizing sediment discharge, including whether the control has been inappropriately or
incorrectly used:
(a) All perimeter erosion and sediment controls, such as silt fence;
(b) Soil stockpiles, when applicable, and borrow areas for stabilization or sediment trapping
measures;
(c) Completed earthen structures, such as dams, dikes, ditches, and diversions for
stabilization;
General Permit No.: VAR10
Page 12 of 21
(d) Cut and fill slopes;
(e) Sediment basins and traps, sediment barriers, and other measures installed to control
sediment discharge from stormwater;
(f) Temporary or permanent channel, flume, or other slope drain structures installed to
convey concentrated runoff down cut and fill slopes;
(g) Storm inlets that have been made operational to ensure that sediment laden stormwater
does not enter without first being filtered or similarly treated; and
(h) Construction vehicle access routes that intersect or access paved roads for minimizing
sediment tracking;
(5) Inspect areas that have reached final grade or that will remain dormant for more than 14 days
for initiation of stabilization activities;
(6) Inspect areas that have reached final grade or that will remain dormant for more than 14 days
for completion of stabilization activities within seven days of reaching grade or stopping work;
(7) Inspect for evidence that the approved erosion and sediment control plan, "agreement in lieu
of a plan," or erosion and sediment control plan prepared in accordance with department -
approved annual standards and specifications has not been properly implemented. This
includes but is not limited to:
(a) Concentrated flows of stormwater in conveyances such as rills, rivulets or channels that
have not been filtered, settled, or similarly treated prior to discharge, or evidence thereof;
(b) Sediment laden or turbid flows of stormwater that have not been filtered or settled to
remove sediments prior to discharge;
(c) Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins
that discharge to surface waters. Inlets and catch basins with failing sediments controls
due to improper installation, lack of maintenance, or inadequate design are considered
unprotected;
(d) Sediment deposition on any property (including public and private streets) outside of the
construction activity covered by this general permit;
(e) Required stabilization has not been initiated or completed on portions of the site;
(f) Sediment basins without adequate wet or dry storage volume or sediment basins that
allow the discharge of stormwater from below the surface of the wet storage portion of
the basin;
(g) Sediment traps without adequate wet or dry storage or sediment traps that allow the
discharge of stormwater from below the surface of the wet storage portion of the trap;
and
(h) Land disturbance outside of the approved area to be disturbed;
(8) Inspect pollutant generating activities identified in the pollution prevention plan for the proper
implementation, maintenance and effectiveness of the procedures and practices;
(9) Identify any pollutant generating activities not identified in the pollution prevention plan; and
General Permit No.: VAR10
Page 13 of 21
(10) Identify and document the presence of any evidence of the discharge of pollutants prohibited
by this general permit.
4. Inspection report. Each inspection report shall include the following items:
a. The date and time of the inspection and when applicable, the date and rainfall amount of the last
measurable storm event;
b. Summarized findings of the inspection;
c. The location(s) of prohibited discharges;
d. The location(s) of control measures that require maintenance;
e. The location(s) of control measures that failed to operate as designed or proved inadequate or
inappropriate for a particular location;
f. The location(s) where any evidence identified under Part II F 3 a (7) exists;
g. The location(s) where any additional control measure is needed that did not exist at the time of
inspection;
h. A list of corrective actions required (including any changes to the SWPPP that are necessary) as
a result of the inspection or to maintain permit compliance;
i. Documentation of any corrective actions required from a previous inspection that have not been
implemented; and
j. The date and signature of the qualified personnel and the operator or its duly authorized
representative.
The inspection report and any actions taken in accordance with Part II must be retained by the operator
as part of the SWPPP for at least three years from the date that general permit coverage expires or is
terminated. The inspection report shall identify any incidents of noncompliance. Where an inspection
report does not identify any incidents of noncompliance, the report shall contain a certification that the
construction activity is in compliance with the SWPPP and this general permit. The report shall be signed
in accordance with Part III K of this general permit.
G. Corrective actions.
1. The operator shall implement the corrective action(s) identified as a result of an inspection as soon as
practicable but no later than seven days after discovery or a longer period as approved by the VSMP
authority. If approval of a corrective action by a regulatory authority (e.g., VSMP authority, VESCP
authority, or the department) is necessary, additional control measures shall be implemented to
minimize pollutants in stormwater discharges until such approvals can be obtained.
2. The operator may be required to remove accumulated sediment deposits located outside of the
construction activity covered by this general permit as soon as practicable in order to minimize
environmental impacts. The operator shall notify the VSMP authority and the department as well as
obtain all applicable federal, state, and local authorizations, approvals, and permits prior to the
removal of sediments accumulated in surface waters including wetlands.
General Permit No.: VAR10
Page 14 of 21
PART III
CONDITIONS APPLICABLE TO ALL VPDES PERMITS
NOTE: Discharge monitoring is not required for this general permit. If the operator chooses to monitor
stormwater discharges or control measures, the operator must comply with the requirements of
subsections A, B, and C, as appropriate.
A. Monitoring.
1. Samples and measurements taken for the purpose of monitoring shall be representative of the
monitoring activity.
2. Monitoring shall be conducted according to procedures approved under 40 CFR Part 136 or
alternative methods approved by the U.S. Environmental Protection Agency, unless other procedures
have been specified in this general permit. Analyses performed according to test procedures
approved under 40 CFR Part 136 shall be performed by an environmental laboratory certified under
regulations adopted by the Department of General Services (1 VAC30-45 or 1 VAC30-46).
3. The operator shall periodically calibrate and perform maintenance procedures on all monitoring and
analytical instrumentation at intervals that will ensure accuracy of measurements.
B. Records.
1. Monitoring records and reports shall include:
a. The date, exact place, and time of sampling or measurements;
b. The individual(s) who performed the sampling or measurements;
c. The date(s) and time(s) analyses were performed;
d. The individual(s) who performed the analyses;
e. The analytical techniques or methods used; and
f. The results of such analyses.
2. The operator shall retain records of all monitoring information, including all calibration and
maintenance records and all original strip chart recordings for continuous monitoring instrumentation,
copies of all reports required by this general permit, and records of all data used to complete the
registration statement for this general permit, for a period of at least three years from the date of the
sample, measurement, report or request for coverage. This period of retention shall be extended
automatically during the course of any unresolved litigation regarding the regulated activity or
regarding control standards applicable to the operator, or as requested by the board.
C. Reporting monitoring results.
1. The operator shall update the SWPPP to include the results of the monitoring as may be performed in
accordance with this general permit, unless another reporting schedule is specified elsewhere in this
general permit.
2. Monitoring results shall be reported on a discharge monitoring report (DMR); on forms provided,
approved or specified by the department; or in any format provided that the date, location, parameter,
method, and result of the monitoring activity are included.
General Permit No.: VAR10
Page 15 of 21
3. If the operator monitors any pollutant specifically addressed by this general permit more frequently
than required by this general permit using test procedures approved under 40 CFR Part 136 or using
other test procedures approved by the U.S. Environmental Protection Agency or using procedures
specified in this general permit, the results of this monitoring shall be included in the calculation and
reporting of the data submitted in the DMR or reporting form specified by the department.
4. Calculations for all limitations which require averaging of measurements shall utilize an arithmetic
mean unless otherwise specified in this general permit.
D. Duty to provide information. The operator shall furnish, within a reasonable time, any information which
the board may request to determine whether cause exists for modifying, revoking and reissuing, or
terminating this general permit or to determine compliance with this general permit. The board,
department, EPA, or VSMP authority may require the operator to furnish, upon request, such plans,
specifications, and other pertinent information as may be necessary to determine the effect of the wastes
from his discharge on the quality of surface waters, or such other information as may be necessary to
accomplish the purposes of the CWA and the Virginia Stormwater Management Act. The operator shall
also furnish to the board, department, EPA, or VSMP authority, upon request, copies of records required
to be kept by this general permit.
E. Compliance schedule reports. Reports of compliance or noncompliance with, or any progress reports
on, interim and final requirements contained in any compliance schedule of this general permit shall be
submitted no later than 14 days following each schedule date.
F. Unauthorized stormwater discharges. Pursuant to § 62.1-44.5 of the Code of Virginia, except in
compliance with a state permit issued by the department, it shall be unlawful to cause a stormwater
discharge from a construction activity.
G. Reports of unauthorized discharges. Any operator who discharges or causes or allows a discharge of
sewage, industrial waste, other wastes or any noxious or deleterious substance or a hazardous
substance or oil in an amount equal to or in excess of a reportable quantity established under either 40
CFR Part 110, 40 CFR Part 117, 40 CFR Part 302, or § 62.1-44.34:19 of the Code of Virginia that occurs
during a 24-hour period into or upon surface waters or who discharges or causes or allows a discharge
that may reasonably be expected to enter surface waters, shall notify the Department of Environmental
Quality of the discharge immediately upon discovery of the discharge, but in no case later than within 24
hours after said discovery. A written report of the unauthorized discharge shall be submitted to the
department and the VSMP authority within five days of discovery of the discharge. The written report shall
contain:
1. A description of the nature and location of the discharge;
2. The cause of the discharge;
3. The date on which the discharge occurred;
4. The length of time that the discharge continued;
5. The volume of the discharge;
6. If the discharge is continuing, how long it is expected to continue;
7. If the discharge is continuing, what the expected total volume of the discharge will be; and
8. Any steps planned or taken to reduce, eliminate and prevent a recurrence of the present discharge or
any future discharges not authorized by this general permit.
General Permit No.: VAR10
Page 16 of 21
Discharges reportable to the department and the VSMP authority under the immediate reporting
requirements of other regulations are exempted from this requirement.
H. Reports of unusual or extraordinary discharges. If any unusual or extraordinary discharge including a
"bypass" or "upset," as defined herein, should occur from a facility and the discharge enters or could be
expected to enter surface waters, the operator shall promptly notify, in no case later than within 24 hours,
the department and the VSMP authority by telephone after the discovery of the discharge. This
notification shall provide all available details of the incident, including any adverse effects on aquatic life
and the known number of fish killed. The operator shall reduce the report to writing and shall submit it to
the department and the VSMP authority within five days of discovery of the discharge in accordance with
Part III 1 2. Unusual and extraordinary discharges include but are not limited to any discharge resulting
from:
1. Unusual spillage of materials resulting directly or indirectly from processing operations;
2. Breakdown of processing or accessory equipment;
3. Failure or taking out of service of some or all of the facilities; and
4. Flooding or other acts of nature.
1. Reports of noncompliance. The operator shall report any noncompliance which may adversely affect
surface waters or may endanger public health.
1. An oral report to the department and the VSMP authority shall be provided within 24 hours from the
time the operator becomes aware of the circumstances. The following shall be included as
information that shall be reported within 24 hours under this subdivision:
a. Any unanticipated bypass; and
b. Any upset that causes a discharge to surface waters.
2. A written report shall be submitted within five days and shall contain:
a. A description of the noncompliance and its cause;
b. The period of noncompliance, including exact dates and times, and if the noncompliance has not
been corrected, the anticipated time it is expected to continue; and
c. Steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance.
The department may waive the written report on a case -by -case basis for reports of noncompliance
under Part III I if the oral report has been received within 24 hours and no adverse impact on surface
waters has been reported.
3. The operator shall report all instances of noncompliance not reported under Part III 1 1 or 2 in writing
as part of the SWPPP. The reports shall contain the information listed in Part 111 1 2.
NOTE: The reports required in Part III G, H and I shall be made to the department and the VSMP
authority. Reports may be made by telephone, email, or by fax. For reports outside normal working hours,
leaving a recorded message shall fulfill the immediate reporting requirement. For emergencies, the
Virginia Department of Emergency Management maintains a 24-hour telephone service at 1-800-468-
8892.
General Permit No.: VAR10
Page 17 of 21
4. Where the operator becomes aware of a failure to submit any relevant facts, or submittal of incorrect
information in any report, including a registration statement, to the department or the VSMP authority,
the operator shall promptly submit such facts or correct information.
J. Notice of planned changes.
1. The operator shall give notice to the department and the VSMP authority as soon as possible of any
planned physical alterations or additions to the permitted facility or activity. Notice is required only
when:
The operator plans an alteration or addition to any building, structure, facility, or installation that
may meet one of the criteria for determining whether a facility is a new source in 9VAC25-870-
420;
b. The operator plans an alteration or addition that would significantly change the nature or increase
the quantity of pollutants discharged. This notification applies to pollutants that are not subject to
effluent limitations in this general permit; or
2. The operator shall give advance notice to the department and VSMP authority of any planned
changes in the permitted facility or activity, which may result in noncompliance with state permit
requirements.
K. Signatory requirements.
1. Registration statement. All registration statements shall be signed as follows:
For a corporation: by a responsible corporate officer. For the purpose of this chapter, a
responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the
corporation in charge of a principal business function, or any other person who performs similar
policy -making or decision -making functions for the corporation; or (ii) the manager of one or more
manufacturing, production, or operating facilities, provided the manager is authorized to make
management decisions that govern the operation of the regulated facility including having the
explicit or implicit duty of making major capital investment recommendations, and initiating and
directing other comprehensive measures to assure long-term compliance with environmental laws
and regulations; the manager can ensure that the necessary systems are established or actions
taken to gather complete and accurate information for state permit application requirements; and
where authority to sign documents has been assigned or delegated to the manager in
accordance with corporate procedures;
b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or
c. For a municipality, state, federal, or other public agency: by either a principal executive officer or
ranking elected official. For purposes of this chapter, a principal executive officer of a public
agency includes: (i) the chief executive officer of the agency or (ii) a senior executive officer
having responsibility for the overall operations of a principal geographic unit of the agency.
2. Reports, etc. All reports required by this general permit, including SWPPPs, and other information
requested by the board or the department shall be signed by a person described in Part III K 1 or by a
duly authorized representative of that person. A person is a duly authorized representative only if:
a. The authorization is made in writing by a person described in Part III K 1;
b. The authorization specifies either an individual or a position having responsibility for the overall
operation of the regulated facility or activity such as the position of plant manager, operator of a
well or a well field, superintendent, position of equivalent responsibility, or an individual or position
having overall responsibility for environmental matters for the operator. (A duly authorized
General Permit No.: VAR10
Page 18 of 21
representative may thus be either a named individual or any individual occupying a named
position); and
c. The signed and dated written authorization is included in the SWPPP. A copy must be provided to
the department and VSMP authority, if requested.
3. Changes to authorization. If an authorization under Part III K 2 is no longer accurate because a
different individual or position has responsibility for the overall operation of the construction activity, a
new authorization satisfying the requirements of Part III K 2 shall be submitted to the VSMP authority
as the administering entity for the board prior to or together with any reports or information to be
signed by an authorized representative.
4. Certification. Any person signing a document under Part III K 1 or 2 shall make the following
certification:
"I certify under penalty of law that I have read and understand this document and that this document
and all attachments were prepared in accordance with a system designed to assure that qualified
personnel properly gathered and evaluated the information submitted. Based on my inquiry of the
person or persons who manage the system, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information, including the
possibility of fine and imprisonment for knowing violations."
L. Duty to comply. The operator shall comply with all conditions of this general permit. Any state permit
noncompliance constitutes a violation of the Virginia Stormwater Management Act and the Clean Water
Act, except that noncompliance with certain provisions of this general permit may constitute a violation of
the Virginia Stormwater Management Act but not the Clean Water Act. Permit noncompliance is grounds
for enforcement action; for state permit termination, revocation and reissuance, or modification; or denial
of a state permit renewal application.
The operator shall comply with effluent standards or prohibitions established under § 307(a) of the Clean
Water Act for toxic pollutants within the time provided in the regulations that establish these standards or
prohibitions or standards for sewage sludge use or disposal, even if this general permit has not yet been
modified to incorporate the requirement.
M. Duty to reapply. If the operator wishes to continue an activity regulated by this general permit after the
expiration date of this general permit, the operator shall submit a new registration statement at least 90
days before the expiration date of the existing general permit, unless permission for a later date has been
granted by the board. The board shall not grant permission for registration statements to be submitted
later than the expiration date of the existing general permit.
N. Effect of a state permit. This general permit does not convey any property rights in either real or
personal property or any exclusive privileges, nor does it authorize any injury to private property or
invasion of personal rights, or any infringement of federal, state or local law or regulations.
O. State law. Nothing in this general permit shall be construed to preclude the institution of any legal
action under, or relieve the operator from any responsibilities, liabilities, or penalties established pursuant
to any other state law or regulation or under authority preserved by § 510 of the Clean Water Act. Except
as provided in general permit conditions on 'bypassing" (Part III U) and "upset' (Part III V), nothing in this
general permit shall be construed to relieve the operator from civil and criminal penalties for
noncompliance.
P. Oil and hazardous substance liability. Nothing in this general permit shall be construed to preclude the
institution of any legal action or relieve the operator from any responsibilities, liabilities, or penalties to
which the operator is or may be subject under §§ 62.1-44.34:14 through 62.1-44.34:23 of the State Water
Control Law or § 311 of the Clean Water Act.
General Permit No.: VAR10
Page 19 of 21
Q. Proper operation and maintenance. The operator shall at all times properly operate and maintain all
facilities and systems of treatment and control (and related appurtenances), which are installed or used
by the operator to achieve compliance with the conditions of this general permit. Proper operation and
maintenance also includes effective plant performance, adequate funding, adequate staffing, and
adequate laboratory and process controls, including appropriate quality assurance procedures. This
provision requires the operation of back-up or auxiliary facilities or similar systems, which are installed by
the operator only when the operation is necessary to achieve compliance with the conditions of this
general permit.
R. Disposal of solids or sludges. Solids, sludges or other pollutants removed in the course of treatment or
management of pollutants shall be disposed of in a manner so as to prevent any pollutant from such
materials from entering surface waters and in compliance with all applicable state and federal laws and
regulations.
S. Duty to mitigate. The operator shall take all steps to minimize or prevent any discharge in violation of
this general permit that has a reasonable likelihood of adversely affecting human health or the
environment.
T. Need to halt or reduce activity not a defense. It shall not be a defense for an operator in an
enforcement action that it would have been necessary to halt or reduce the permitted activity in order to
maintain compliance with the conditions of this general permit.
U. Bypass.
1. 'Bypass," as defined in 9VAC25-870-10, means the intentional diversion of waste streams from any
portion of a treatment facility. The operator may allow any bypass to occur that does not cause
effluent limitations to be exceeded, but only if it also is for essential maintenance to ensure efficient
operation. These bypasses are not subject to the provisions of Part III U 2 and 3.
2. Notice.
a. Anticipated bypass. If the operator knows in advance of the need for a bypass, the operator shall
submit prior notice to the department, if possible at least 10 days before the date of the bypass.
b. Unanticipated bypass. The operator shall submit notice of an unanticipated bypass as required in
Part III I.
3. Prohibition of bypass.
a. Except as provided in Part III U 1, bypass is prohibited, and the board or department may take
enforcement action against an operator for bypass unless:
(1) Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage.
Severe property damage means substantial physical damage to property, damage to the
treatment facilities that causes them to become inoperable, or substantial and permanent
loss of natural resources that can reasonably be expected to occur in the absence of a
bypass. Severe property damage does not mean economic loss caused by delays in
production;
(2) There were no feasible alternatives to the bypass, such as the use of auxiliary treatment
facilities, retention of untreated wastes, or maintenance during normal periods of equipment
downtime. This condition is not satisfied if adequate back-up equipment should have been
installed in the exercise of reasonable engineering judgment to prevent a bypass that
occurred during normal periods of equipment downtime or preventive maintenance; and
(3) The operator submitted notices as required under Part III U 2.
General Permit No.: VAR10
Page 20 of 21
b. The department may approve an anticipated bypass, after considering its adverse effects, if the
department determines that it will meet the three conditions listed in Part III U 3 a.
V. Upset.
1. An "upset," as defined in 9VAC25-870-10, means an exceptional incident in which there is
unintentional and temporary noncompliance with technology -based state permit effluent limitations
because of factors beyond the reasonable control of the operator. An upset does not include
noncompliance to the extent caused by operational error, improperly designed treatment facilities,
inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation.
2. An upset constitutes an affirmative defense to an action brought for noncompliance with technology -
based state permit effluent limitations if the requirements of Part III V 4 are met. A determination
made during administrative review of claims that noncompliance was caused by upset, and before an
action for noncompliance, is not a final administrative action subject to judicial review.
3. An upset does not include noncompliance to the extent caused by operational error, improperly
designed treatment facilities, inadequate treatment facilities, lack of preventative maintenance, or
careless or improper operation.
4. An operator who wishes to establish the affirmative defense of upset shall demonstrate, through
properly signed, contemporaneous operating logs or other relevant evidence that:
a. An upset occurred and that the operator can identify the cause(s) of the upset;
b. The permitted facility was at the time being properly operated;
c. The operator submitted notice of the upset as required in Part III I; and
d. The operator complied with any remedial measures required under Part III S.
5. In any enforcement proceeding, the operator seeking to establish the occurrence of an upset has the
burden of proof.
W. Inspection and entry. The operator shall allow the department as the board's designee, the VSMP
authority, EPA, or an authorized representative of either entity (including an authorized contractor), upon
presentation of credentials and other documents as may be required by law to:
1. Enter upon the operator's premises where a regulated facility or activity is located or conducted, or
where records must be kept under the conditions of this general permit;
2. Have access to and copy, at reasonable times, any records that must be kept under the conditions of
this general permit;
3. Inspect and photograph at reasonable times any facilities, equipment (including monitoring and
control equipment), practices, or operations regulated or required under this general permit; and
4. Sample or monitor at reasonable times, for the purposes of ensuring state permit compliance or as
otherwise authorized by the Clean Water Act or the Virginia Stormwater Management Act, any
substances or parameters at any location.
For purposes of this section, the time for inspection shall be deemed reasonable during regular business
hours, and whenever the facility is discharging. Nothing contained herein shall make an inspection
unreasonable during an emergency.
General Permit No.: VAR10
Page 21 of 21
X. State permit actions. State permits may be modified, revoked and reissued, or terminated for cause.
The filing of a request by the operator for a state permit modification, revocation and reissuance, or
termination, or a notification of planned changes or anticipated noncompliance does not stay any state
permit condition.
Y. Transfer of state permits.
1. State permits are not transferable to any person except after notice to the department. Except as
provided in Part III Y 2, a state permit may be transferred by the operator to a new operator only if the
state permit has been modified or revoked and reissued, or a minor modification made, to identify the
new operator and incorporate such other requirements as may be necessary under the Virginia
Stormwater Management Act and the Clean Water Act.
2. As an alternative to transfers under Part III Y 1, this state permit maybe automatically transferred to a
new operator if:
a. The current operator notifies the department at least 30 days in advance of the proposed transfer
of the title to the facility or property;
b. The notice includes a written agreement between the existing and new operators containing
specific date for transfer of state permit responsibility, coverage, and liability between them; and
c. The department does not notify the existing operator and the proposed new operator of its intent
to modify or revoke and reissue the state permit. If this notice is not received, the transfer is
effective on the date specified in the agreement mentioned in Part III Y 2 b.
3. For ongoing construction activity involving a change of operator, the new operator shall accept and
maintain the existing SWPPP, or prepare and implement a new SWPPP prior to taking over
operations at the site.
Z. Severability. The provisions of this general permit are severable, and if any provision of this general
permit or the application of any provision of this state permit to any circumstance, is held invalid, the
application of such provision to other circumstances and the remainder of this general permit shall not be
affected thereby.
Section 12. Inspection logs
(Provide templates for your inspections. Requirements are listed in 9VAC25-880-70, Part II, section B and F.)
Issued — 10/2022 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 13. Approved Drawings/Plans
(Provide approved Erosion & Sediment Control Plan, Stormwater Management Plan, and Pollution Prevention
Plan.)
Issued — 10/2022 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
STORM WATER INSPECTIONS FOR VSMP GENERAL PERMIT LAND DISTRIBUTING ACTIVITIES Page I
PROJECT:
MONITORING FOR THE WEEK BEGINNING:
DATE AND TIME OF INSPECTION:
RAINFALL:
Date of Rain Amount Inches Initials
EROSION AND SEDIMENT CONTROL FACILITIES INSPECTED:
(Inspections shall be conducted according to Part IIF2 of the
Permit. However, if the discharges of stormwater from
construction activities are to surface waters identified as
imparied, inspections shall be conducted according to Part
IB4d.)
Facility Identification
Date and Time of
Inspection
Operating Properly
(YIN)
Description of
inspection
observations
OBSERVATION OF RUNOFF AT
OUTFALLS:
(Inspections shall be conducted according to Part IIF2 of the
Permit. However, if the discharges of stormwater from
construction activities are to surface waters identified as
imparied, inspections shall be conducted according to Part
IB4d.)
By this signature, I certify that this report is
accurate and complete to the best of my
knowledge:
Qualified Personnel
By this signature, I certify that the contruction
activity is in compliance with the SW PP and
general permit.
Qualified Personnel
ceritication statement on page 3 shall be signed.
By this signature, I certify that this report is
accurate and complete to the best of my
knowledge:
Operator/Duly Authorized Representative
By this signature, I certify that the contruction
activity is in compliance with the SWPP and
general permit.
Operator/Duly Authorized Representative
Stormwater Discharge
Outfall Identification
Date
Clarity
Floating Solids
Suspended
Solids
Oil Sheen
Otherobvious
indicators of
stormwater
pollution (list
and describe)
Visible
sediment
leavingthe
site?(Y/N)
If yes, describe actions
taken to prevent future
releases (may need to
attach additional
information)
Describemeasurestakento
clean up sediment outside
of disturbed limits (may
need to attach additional
information)
Clarity: Choose the number which best describes the clarity of the discharge where I is clear and 10 is very cloudy
Floating Solids: Choose the number which best describes the amount of floating solids in the discharge where 1 is no solids and 10 the surface us covered in floating solids
Suspended Solids: Choose the number which best describes the amount of suspended solids in the discharge where 1 is no solids and 10 is extremely muddy.
Oil Sheen: Is there an oil sheen in the stormwater discharge (Y or N)?
STORM WATER INSPECTIONS FOR VSMP GENERAL PERMIT LAND DISTRIBUTING ACTIVITIES Page I
PROJECT:
MONITORING FOR THE WEEK BEGINNING:
DATE AND TIME OF INSPECTION:
RAINFALL:
Date of Rain Amount Inches Initials
EROSION AND SEDIMENT CONTROL FACILITIES INSPECTED:
(Inspections shall be conducted according to Part IIF2 of the
Permit. However, if the discharges of stormwater from
construction activities are to surface waters identified as
imparied, inspections shall be conducted according to Part
IB4d.)
Facility Identification
Date and Time of
Inspection
Operating Properly
(YIN)
Description of
inspection
observations
OBSERVATION OF RUNOFF AT
OUTFALLS:
(Inspections shall be conducted according to Part IIF2 of the
Permit. However, if the discharges of stormwater from
construction activities are to surface waters identified as
imparied, inspections shall be conducted according to Part
IB4d.)
By this signature, I certify that this report is
accurate and complete to the best of my
knowledge:
Qualified Personnel
By this signature, I certify that the contruction
activity is in compliance with the SW PP and
general permit.
Qualified Personnel
ceritication statement on page 3 shall be signed.
By this signature, I certify that this report is
accurate and complete to the best of my
knowledge:
Operator/Duly Authorized Representative
By this signature, I certify that the contruction
activity is in compliance with the SWPP and
general permit.
Operator/Duly Authorized Representative
Stormwater Discharge
Outfall Identification
Date
Clarity
Floating Solids
Suspended
Solids
Oil Sheen
Otherobvious
indicators of
stormwater
pollution (list
and describe)
Visible
sediment
leavingthe
site?(Y/N)
If yes, describe actions
taken to prevent future
releases (may need to
attach additional
information)
Describemeasurestakento
clean up sediment outside
of disturbed limits (may
need to attach additional
information)
Clarity: Choose the number which best describes the clarity of the discharge where I is clear and 10 is very cloudy
Floating Solids: Choose the number which best describes the amount of floating solids in the discharge where 1 is no solids and 10 the surface us covered in floating solids
Suspended Solids: Choose the number which best describes the amount of suspended solids in the discharge where 1 is no solids and 10 is extremely muddy.
Oil Sheen: Is there an oil sheen in the stormwater discharge (Y or N)?
STORM WATER INSPECTIONS FOR VSMP GENERAL PERMIT LAND DISTRIBUTING ACTIVITIES Page I
PROJECT:
MONITORING FOR THE WEEK BEGINNING:
DATE AND TIME OF INSPECTION:
RAINFALL:
Date of Rain Amount Inches Initials
EROSION AND SEDIMENT CONTROL FACILITIES INSPECTED:
(Inspections shall be conducted according to Part IIF2 of the
Permit. However, if the discharges of stormwater from
construction activities are to surface waters identified as
imparied, inspections shall be conducted according to Part
IB4d.)
Facility Identification
Date and Time of
Inspection
Operating Properly
(YIN)
Description of
inspection
observations
OBSERVATION OF RUNOFF AT
OUTFALLS:
(Inspections shall be conducted according to Part IIF2 of the
Permit. However, if the discharges of stormwater from
construction activities are to surface waters identified as
imparied, inspections shall be conducted according to Part
IB4d.)
By this signature, I certify that this report is
accurate and complete to the best of my
knowledge:
Qualified Personnel
By this signature, I certify that the contruction
activity is in compliance with the SW PP and
general permit.
Qualified Personnel
ceritication statement on page 3 shall be signed.
By this signature, I certify that this report is
accurate and complete to the best of my
knowledge:
Operator/Duly Authorized Representative
By this signature, I certify that the contruction
activity is in compliance with the SWPP and
general permit.
Operator/Duly Authorized Representative
Stormwater Discharge
Outfall Identification
Date
Clarity
Floating Solids
Suspended
Solids
Oil Sheen
Otherobvious
indicators of
stormwater
pollution (list
and describe)
Visible
sediment
leavingthe
site?(Y/N)
If yes, describe actions
taken to prevent future
releases (may need to
attach additional
information)
Describemeasurestakento
clean up sediment outside
of disturbed limits (may
need to attach additional
information)
Clarity: Choose the number which best describes the clarity of the discharge where I is clear and 10 is very cloudy
Floating Solids: Choose the number which best describes the amount of floating solids in the discharge where 1 is no solids and 10 the surface us covered in floating solids
Suspended Solids: Choose the number which best describes the amount of suspended solids in the discharge where 1 is no solids and 10 is extremely muddy.
Oil Sheen: Is there an oil sheen in the stormwater discharge (Y or N)?