Loading...
HomeMy WebLinkAboutARB201400025 Staff Report 2014-02-241 ARCHITECTURAL REVIEW BOARD STAFF REPORT Project #/Name ARB-2013-25: Bojangles Review Type Advisory Review of a Special Use Permit, Preliminary Site Development Plan Parcel Identification 078000000073A2 Location 2013 Abbey Road, on the south side of Rt. 250 between the Applebee’s and the bank in the Rivanna Ridge Shopping Center Zoned Planned Development Mixed Commercial (PDMC), Entrance Corridor (EC) Owner/Applicant Rivanna Ridge Charlottesville LLC/Shimp Engineering (Justin Shimp) Magisterial District Rivanna Proposal To construct a restaurant with drive-thru and associated site improvements. Context The site is located in an established shopping center in the heavily developed commercial area of Pantops. Visibility The proposed building will be readily visible from the Entrance Corridor. The drive -thru window will be visible on the east side of the building. ARB Meeting Date April 7, 2014 Staff Contact Margaret Maliszewski 2 PROJECT HISTORY DATE APPLICATION RESULT Jan. 27, 2014 Pre-application meeting Staff met with the applicant prior to submittal to discuss potential design issues. The blank side walls of the building and the color of the awnings were subsequently revised to address staff concerns. Various The ARB reviewed and approved numerous applications for signs in the shopping center, and for the renovation of Applebee’s. Nov. 11, 2003 ARB-2003-121 The ARB approved a plan for the three outparcels of the Rivanna Ridge Shopping Center, following the review of preliminary applications. Oct. 21, 1998 ZMA-1998-20: Pantops PDMC The BOS approved a rezoning which would allow the construction of the Rivanna Ridge Shopping Center, including outparcels fronting Rt. 250. ANALYSIS REF GUIDELINE ISSUE RECOMMENDATION Structure design 1 The goal of the regulation of the design of development within the designated Entrance Corridors is to insure that new development within the corridors reflects the traditional architecture of the area. Therefore, it is the purpose of ARB review and of these Guidelines, that proposed development within the designated Entrance Corridors reflect elements of design characteristic of the significant historical landmarks, buildings, and structures of the Charlottesville and Albemarle area, and to promote orderly and attractive development within these corridors. Applicants should note that replication of historic structures is neither required nor desired. The proposed building design is compatible with forms and features of the area’s historic buildings. The brick, piers/pilasters, water table, division of the walls into three parts (base, middle, top), and the brick and cornice detailing, all help relate to the historic architecture of the area. Five windows proposed on the side walls of the building (beyond the storefront) have different proportions than the storefront windows at the front, and they are proposed as glass block windows. Glass block windows are rarely proposed in the ECs. In this case, they may be acceptable because Consider revising the proportions of the glass block windows to coordinate with the proportions of the storefront windows. Staff recommends no objection to the request for the Special Use Permit based on the design of the drive-thru window and lane. 3 New structures and substantial additions to existing structures should respect the traditions of the architecture of historically significant buildings in the Charlottesville and Albemarle area. 4 The examples contained in Appendix A should be used as a guide for building design: the standard of compatibility 3 with the area’s historic structures is not intended to impose a rigid design solution for new development. Replication of the design of the important historic sites in the area is neither intended nor desired. The Guideline’s standard of compatibility can be met through building scale, materials, and forms which may be embodied in architecture which is contemporary as well as traditional. The Guidelines allow individuality in design to accommodate varying tastes as well as special functional requirements. the focus is on the storefront windows at the front of the building. Revising the proportions of the glass block windows to match the proportions of the front windows could provide greater coordination. The original color proposed for the awnings was a bright orange. At staff’s recommendation, the color was changed. It is now proposed as a more muted shade called “copper penny” that appears to be appropriate. The drive-thru window on the east elevation is relatively small, with a simple wall-mounted awning. This basic design helps mitigate the drive- thru impacts. 9 Building forms and features, including roofs, windows, doors, materials, colors and textures should be compatible with the forms and features of the significant historic buildings in the area, exemplified by (but not limited to) the buildings described in Appendix A [of the design guidelines]. The standard of compatibility can be met through scale, materials, and forms which may be embodied in architecture which is contemporary as well as traditional. The replication of important historic sites in Albemarle County is not the objective of these guidelines. 11 The overall design of buildings should have human scale. Scale should be integral to the building and site design. The water table, brick material and windows with awnings help establish a human scale in the building. None. 5 It is also an important objective of the Guidelines to establish a pattern of compatible architectural characteristics throughout the Entrance Corridor in order to achieve unity and coherence. Building designs should demonstrate sensitivity to other nearby structures within the Entrance Corridor. Where a designated corridor is substantially developed, these Guidelines require striking a careful balance between harmonizing new development with the existing character of the corridor and achieving compatibility with the significant historic sites in the area. The red brick will relate well to the surrounding buildings. The scale, mass and height of the proposed building are coordinated with the surrounding shopping center buildings and will help maintain a cohesive look for the shopping center. These features visually connect the buildings, though physical architectural connections are not provided. None. 10 Buildings should relate to their site and the surrounding context of buildings. 12 Architecture proposed within the Entrance Corridor should use forms, shapes, scale, and materials to create a cohesive 4 whole. 14 Arcades, colonnades, or other architectural connecting devices should be used to unify groups of buildings within a development. 13 Any appearance of “blankness” resulting from building design should be relieved using design detail or vegetation, or both. The back 2/3 of the building has few doors or windows. These wall areas are mostly brick and EIFS, but the use of piers/pilasters, a water table, and the change of materials at the top of the wall establish a scale and proportions that sufficiently mitigate the blankness. None. 15 Trademark buildings and related features should be modified to meet the requirements of the Guidelines. Some changes have been made to the standard Bojangle’s design. The color of the awnings has been revised from a bright orange to a “copper” color and the amount of brick used for the walls has been increased from the original proposal. None. 16 Window glass in the Entrance Corridors should not be highly tinted or highly reflective. Window glass in the Entrance Corridors should meet the following criteria: Visible light transmittance (VLT) shall not drop below 40%. Visible light reflectance (VLR) shall not exceed 30%. Specifications on the proposed window glass should be submitted with the application for final review. Details on window glass have not yet been provided. Provide glass specs on the architectural drawings indicating that visible light transmittance (VLT) shall not drop below 40% and visible light reflectance (VLR) shall not exceed 30%. Accessory structures and equipment 17 Accessory structures and equipment should be integrated into the overall plan of development and shall, to the extent possible, be compatible with the building designs used on the site. Rooftop mechanical units are proposed. The elevation drawings show that the units do not extend above the parapet walls. None. 18 The following should be located to eliminate visibility from the Entrance Corridor street. If, after appropriate siting, these features will still have a negative visual A dumpster is proposed at the back of the site. It will be visible from the EC but it is not expected to have a Provide a dumpster screen detail on the plan. Coordinate screening 5 impact on the Entrance Corridor street, screening should be provided to eliminate visibility. a. Loading areas, b. Service areas, c. Refuse areas, d. Storage areas, e. Mechanical equipment, f. Above-ground utilities, and g. Chain link fence, barbed wire, razor wire, and similar security fencing devices. significant impact on the EC. Screening details have not yet been provided. Drive-thru related items, such as menu boards, are not shown on the plan. Such items could have an impact on the appearance of the site from the EC. materials with building materials. Revise the plan to show the locations of all drive- thru related items. Provide screening to ensure an appropriate appearance from the EC. 19 Screening devices should be compatible with the design of the buildings and surrounding natural vegetation and may consist of: a. Walls, b. Plantings, and c. Fencing. 20 Surface runoff structures and detention ponds should be designed to fit into the natural topography to avoid the need for screening. When visible from the Entrance Corridor street, these features must be fully integrated into the landscape. They should not have the appearance of engineered features. The plan shows a relocated storm pipe that doesn’t appear to negatively impact the site layout or landscaping. None. 44 Natural drainage patterns (or to the extent required, new drainage patterns) should be incorporated into the finished site to the extent possible. 21 The following note should be added to the site plan and the architectural plan: “Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated.” This note will be needed on the plans. Add the standard mechanical equipment note to the site and architectural plans. Lighting Light poles exist at the site and wall packs are shown on the architectural drawings, but detailed lighting plans have not yet been provided for review. Provide complete lighting information for review. Landscaping A detailed landscape plan has not yet been provided for review. Plants are shown on the plan, but species and sizes are not provided. Provide a complete landscape plan for review. 32 Landscaping along the frontage of Entrance Corridor streets should include the following: a. Large shade trees should be planted parallel to the Entrance Corridor Street. Such trees should be at least 3½ inches caliper (measured 6 inches above the ground) and The plan shows some trees and shrubs existing along the EC frontage, but the trees are not located consistently across the frontage. Provide a sufficient quantity of EC frontage trees to meet the 35’ spacing requirement. 6 should be of a plant species common to the area. Such trees should be located at least every 35 feet on center. b. Flowering ornamental trees of a species common to the area should be interspersed among the trees required by the preceding paragraph. The ornamental trees need not alternate one for one with the large shade trees. They may be planted among the large shade trees in a less regular spacing pattern. c. In situations where appropriate, a three or four board fence or low stone wall, typical of the area, should align the frontage of the Entrance Corridor street. d. An area of sufficient width to accommodate the foregoing plantings and fencing should be reserved parallel to the Entrance Corridor street, and exclusive of road right-of-way and utility easements. 33 Landscaping along interior roads: a. Large trees should be planted parallel to all interior roads. Such trees should be at least 2½ inches caliper (measured six inches above the ground) and should be of a plant species common to the area. Such trees should be located at least every 40 feet on center. Abbey Road runs along the south side of the site. A sanitary easement runs along the road, so trees are not located there, but shrubs are shown along the frontage. None. 34 Landscaping along interior pedestrian ways: a. Medium trees should be planted parallel to all interior pedestrian ways. Such trees should be at least 2½ inches caliper (measured six inches above the ground) and should be of a species common to the area. Such trees should be located at least every 25 feet on center. Sidewalks run along the EC and along Abbey Road. The EC frontage trees are provided between the sidewalk and the site’s travel aisle, so additional sidewalk trees aren’t needed in this case. The sanitary sewer easement precludes planting trees along Abbey Road. None. 35 Landscaping of parking areas: a. Large trees should align the perimeter of parking areas, located 40 feet on center. Trees should be planted in the interior of parking areas at the rate of one tree for every 10 parking spaces provided and should be evenly distributed throughout the interior of the parking area. b. Trees required by the preceding paragraph should The plan shows four interior parking lot trees, which meets the requirement for the 40 parking spaces that are shown. Some new shrubs are shown at the front end of the building and in parking Provide a plant schedule for review. Be sure the plans clearly show existing plants to remain and to be removed. 7 measure 2½ inches caliper (measured six inches above the ground); should be evenly spaced; and should be of a species common to the area. Such trees should be planted in planters or medians sufficiently large to maintain the health of the tree and shall be protected by curbing. c. Shrubs should be provided as necessary to minimize the parking area’s impact on Entrance Corridor streets. Shrubs should measure 24 inches in height. islands. It appears that existing shrubs in the long parking islands are to remain, but this should be further clarified on the plan. 36 Landscaping of buildings and other structures: a. Trees or other vegetation should be planted along the front of long buildings as necessary to soften the appearance of exterior walls. The spacing, size, and type of such trees or vegetation should be determined by the length, height, and blankness of such walls. b. Shrubs should be used to integrate the site, buildings, and other structures; dumpsters, accessory buildings and structures; “drive thru” windows; service areas; and signs. Shrubs should measure at least 24 inches in height. Shrubs are shown at the base of the walls below the storefront windows at the front (EC) end of the building. No plants are provided along the side walls that are primarily brick. The addition of plants along the side walls would further soften the appearance. Provide a plant schedule for review. Consider continuing the shrub planting along the two back bays of both side elevations. 37 Plant species: a. Plant species required should be as approved by the Staff based upon but not limited to the Generic Landscape Plan Recommended Species List and Native Plants for Virginia Landscapes (Appendix D). A detailed landscape plan has not yet been provided for review. 38 Plant health: The following note should be added to the landscape plan: “All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant.” The note will be needed on the plan. Provide the standard planting note on the plan. Development pattern 6 Site development should be sensitive to the existing natural landscape and should contribute to the creation of an organized development plan. This may be accomplished, to the extent practical, by preserving the trees and rolling terrain typical of the area; planting new trees along streets and pedestrian ways and choosing species that reflect native forest elements; insuring that any grading will blend into the surrounding topography The proposed plan revises the current site layout to provide a drive-thru lane around the building, two rows of angled parking at the sides of the site, and a one-way travelway between the drive-thru lane and the angled parking. The building is oriented parallel to the Staff recommends no objection to the request for the Special Use Permit based on the design of the drive-thru window and lane. 8 thereby creating a continuous landscape; preserving, to the extent practical, existing significant river and stream valleys which may be located on the site and integrating these features into the design of surrounding development; and limiting the building mass and height to a scale that does not overpower the natural settings of the site, or the Entrance Corridor. EC, with the front facing the EC and the drive-thru lane wrapping around the back of the building. The layout appears organized and appropriate for the EC. 39 The relationship of buildings and other structures to the Entrance Corridor street and to other development within the corridor should be as follows: a. An organized pattern of roads, service lanes, bike paths, and pedestrian walks should guide the layout of the site. b. In general, buildings fronting the Entrance Corridor street should be parallel to the street. Building groupings should be arranged to parallel the Entrance Corridor street. c. Provisions should be made for connections to adjacent pedestrian and vehicular circulation systems. d. Open spaces should be tied into surrounding areas to provide continuity within the Entrance Corridor. e. If significant natural features exist on the site (including creek valleys, steep slopes, significant trees or rock outcroppings), to the extent practical, then such natural features should be reflected in the site layout. If the provisions of Section 32.5.6.n of the Albemarle County Zoning Ordinance apply, then improvements required by that section should be located so as to maximize the use of existing features in screening such improvements from Entrance Corridor streets. f. The placement of structures on the site should respect existing views and vistas on and around the site. Site Grading 40 Site grading should maintain the basic relationship of the site to surrounding conditions by limiting the use of retaining walls and by shaping the terrain through the use of smooth, rounded land forms that blend with the existing terrain. Steep cut or fill sections are generally The site has already been graded. Little additional grading is anticipated. None. 9 unacceptable. Proposed contours on the grading plan shall be rounded with a ten foot minimum radius where they meet the adjacent condition. Final grading should achieve a natural, rather than engineered, appearance. Retaining walls 6 feet in height and taller, when necessary, shall be terraced and planted to blend with the landscape. 41 No grading, trenching, or tunneling should occur within the drip line of any trees or other existing features designated for preservation in the final Certificate of Appropriateness. Adequate tree protection fencing should be shown on, and coordinated throughout, the grading, landscaping and erosion and sediment control plans. There are existing trees and shrubs on site. A more detailed plan is needed to determine potential impacts and required replacements. Provide a complete landscape plan for review. 42 Areas designated for preservation in the final Certificate of Appropriateness should be clearly delineated and protected on the site prior to any grading activity on the site. This protection should remain in place until completion of the development of the site. 43 Preservation areas should be protected from storage or movement of heavy equipment within this area. SIGNS The preliminary designs show Bojangle’s signs on the front and side elevations. They appear to be internally illuminated channel letters with red faces. Details on the sign design have not yet been provided; however, it should be noted that red acrylic #2283 is not an approvable shade of red. The drawings also show stars etched into the EIFS surfaces at the curved “pediments” and in the EIFS panels at the tops of the piers/pilasters that flank the front bays. These stars are considered signage and count toward the total allowable sign area for the building. The top of a pier or pilaster isn’t a traditional location for signage; it is recommended that the stars be eliminated from those locations. Sign permits will be required for all wall signs. Note that red acrylic #2283, and its equivalents, are not approvable shades of red. Eliminate the stars from the piers and pilasters. 10 SUMMARY OF RECOMMENDATIONS Staff recommends the following as the primary points of discussion: 1. The drive-thru window and lane – location, design, appropriateness for the EC 2. The glass block windows 3. The awning color 4. The star signs 5. The overall building design 6. Shrubs along the side elevations Regarding the request for the Special Use Permit: Staff recommends that the ARB forward the following recommendation to the Planning Commission: The ARB has no objection to the request for the SP based on the design of the drive-thru window and lane as illustrated in the February 17 and February 20, 2014 architectural elevations and the February 20, 2014 conceptual site layout. Regarding the preliminary design: Staff offers the following comments on the preliminary design: 1. Consider revising the proportions of the glass block windows to coordinate with the proportions of the storefront windows. 2. Provide glass specs on the architectural drawings indicating that visible light transmittance (VLT) shall not drop below 40% and visible light reflectance (VLR) shall not exceed 30%. 3. Provide a dumpster screen detail on the plan. Screening materials should be coordinated with building materials. 4. Revise the plan to show the locations of all drive-thru related items. Provide screening to ensure an appropriate appearance from the EC. 5. Add the standard mechanical equipment note to both the site and architectural plans: “Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated.” 6. Provide complete information on lighting for review. 7. Provide a sufficient quantity of EC frontage trees to meet the 35’ on center requirement. 8. Be sure the plans clearly show existing plants to remain and to be removed. 9. Provide a plant schedule for review. 10. Consider continuing the shrub planting along the two back bays of both side elevations. 11. Provide the standard planting note on the plan: “All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overal l health of the plant.” 12. Provide a complete landscape plan for review. 13. Sign permits will be required for all wall signs. Note that red acrylic #2283, and its equivalents, are not approvable shades of red. 14. Eliminate the stars from the piers and pilasters. 11 TABLE A This report is based on the following submittal items: Sheet # Drawing Name Drawing Date/Revision Date - Color elevation drawings (2 sheets) February 17, 2014 ELEV-1 Front and left side elevation February 20, 2014 ELEV-2 Rear and right side elevation, waste enclosure options February 20, 2014 1 of 1 Conceptual Site Layout February 20, 2014 - Site photo: Bojangles site view of level pad – west on Route 250 - - Site photo: Bojangles site view of level pad – east on Route 250 (approach from below grade) - - Materials sample board: Metal roof: Pac Clad, copper penny; Aluminum storefront, Kawneer, clear anodized; Brick: Triangle Brick Co., Old South Handform; EIFS: Sto Corp., NA12-0023, Sto Powerwall 80296 fine finish -