Loading...
HomeMy WebLinkAboutZMA202100016 Review Comments Zoning Map Amendment 2022-12-16I N f f Roads WE S 100 Year Floodplain 0 -"�� •. s a1.GGGGGa •f_ I • - Floodway I% 100-YearNo Floodplairo; Floodplain Water Bodies \ ..., Streams - Buildings ACPR recommends a greenway easement area in this general vicinity Floodway in lieu of the proposed proffered dedication of the entire 21-acres ( p p p ), Parcels in order to enable the on -site completion of a loop trail connecting the planned trails along Jacobs Run and North Fork Rivanna River Greenway Easements , (prior to the planned future off -site extension of the Jacobs Run Existing Easement � greenway trail to Chris Greene Lake Park) 100-Year / L�(�llll�l� Floodplain I / Floodplain• -s No Floodway I // A bike-ped bridge across Jacobs Run would be a i necessary component of the planned I proffered o " greenway trails along the North Fork Rivanna River j and Jacobs Run. As such, a greenway easement would be necessary on both sides of Jacobs Run in order to accommodate a trail and bike-ped bridge. Any such bike-ped bridge 100-Year should be sited to minimize environmental impacts, minimize cost of construction and maintenance, and Floodplain - maximize flood resiliency. Floodway More specifically, any such bridge across Jacobs Run � � � � � i would ideally be sited in a location that requires no grading or land disturbance within the floodway and no structures within the floodway. No such appropriate =, span site across Jacobs Run is possible within the ' existing greenway easement along the river. ice/ i ACPR cons dee that larger greenway easement areas would be ecessary somewhere in these general areas 100-Year alon a middle or lower portion of Jacobs Run, to be Floodplain able to successfully design, permit, construct, and s maintain a greenway trail and bike-ped bridge. e ('as assessed by ACPR, based on / The existing 100' greenway easement (measured from the center multiple site visits and GIs analysis) of the North Fork Rivanna River) includes multiple "pinch points" Floodway and "gaps" where it will be difficult or infeasible to design, permit, 0 150 300 600 construct, and maintain a sustainable greenway trail. Feet 1:2,000 / ' ►� r