Loading...
HomeMy WebLinkAboutWPO201100042 Stop Work Order 2011-07-06 ALA,, U ©=1• t fRGIN1P COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,Room 227 Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax (434) 972-4126 Aug 2,2013 Morlando Construction 92, 7108 2133 3937 4223 6480 c/o Mr. Dominic Morlando 8604 Cliff Cameron Drive, Suite 155 Charlotte,NC 28269 F-�_ / 3 /1,4A g.5 © '/ BAUMGARDNER,RICKEY LEE OR DONNA G 1252 STILL MEADOW AVE ,,y ,i — CHARLOTTESVILLE VA, 22901-6211 ' r" dA,i /51. d'a cc-/), Mr. Jonathan Burnham,Crown Motorcar Company,LLC, ,U )J631" ,645- t) " 2905 Premiere Pkw, Suite 300 Duluth, GA 30097 d4 ,z)v% e-/ 5 9609 RE: Crown BMW Retail Parts and Service/Plan #WP0201100042 Erosion Control Violation STOP WORK ORDER(2°d) - Certified Mail Gentlemen: Under§17-214 of the Albemarle County Code,you are hereby notified to immediately cease all land disturbing activities on the above referenced property(STOP WORK)with the exception of temporary seeding and mulching and/or work specifically authorized in writing by the County Erosion Control Officer,Kenny Thacker, or the County Engineer,Glenn Brooks. ' A sworn complaint has been made by the Albemarle County Erosion Control Officer,Kenny Thacker; This STOP WORK ORDER shall remain in place for seven (7)days from the date of receipt. if the required corrections stated below have not been made within seven(7) days,the County may elect to issue another Stop Work Order,and/or petition the Circuit Court for penalties and relief with regard to this violation. 1. Deficiency: Site construction has not taken place in a manner that will allow the existing approved erosion control plan to be adequate. Required Corrections: Submit a revised erosion and sediment control plan. This plan must match on-site conditions and meet all state and county minimum requirements. For any soils/materials leaving the site,the plan must reference a destination with an approved plan and permit, if you have questions regarding this action, please contact either Kenny Thacker or Glenn Brooks at 434- 296-5 8'32. • Page 2 of 2 Stop Work Order Crown BMW Sincerely, enn Thacker Glenn Brooks, P.E. Erosion Control Officer County Engineer Program Administrator geb/ Copy: Mark Graham,Albemarle County,Director of Community Development Charles A. Garcia,PE,PLS,LEED®AP Reading File n C7 o 0• p C r•' 1+ cro G p- ' • N d • < ■-t O co CD tJ O .p b E-' n co n nJ v o 0 0 E-' ,��; w '+' � w `° o ° w 0 n o w N.) co o rn O ru � d o• • ■ o . v � m ■ • • E cD te f'IRGI•1P COUNTY OF ALBEMARLE Department of Community Development 401 Mclntire Road,Room 227 Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax (434) 972-4126 July 25, 2013 Morlando Construction c/o Mr. Dominic Morlando 8604 Cliff Cameron Drive, Suite 155 Charlotte,NC 28269 RE: Crown BMW Retail Parts and Service/Plan#WPO201100042 Erosion Control Violation STOP WORK ORDER - Certified Mail 91 7108 2133 3937 4223 6435 Dear Dr. Morlando: Under §17-214 of the Albemarle County Code,you are hereby notified to immediately cease all land disturbing activities on the above referenced property(STOP WORK)with the exception of work to address the installation of erosion control measures, soil stabilization,and any necessary drainage corrections as approved by the County. A sworn complaint has been made by the Albemarle County Erosion Control Officer, Kenny Thacker;This STOP WORK ORDER shall remain in place for seven(7)days from the date of receipt. If satisfactory repairs have not been made within seven (7)days,the County may elect to issue another Stop Work Order, and/or petition the Circuit Court for penalties and relief with regard to this violation. 1. Deficiency: Site construction has not taken place in a manner that will allow the existing approved erosion control plan to be adequate. Required Corrections: Submit a revised erosion and sediment control plan. The Department also would like an on-site meeting with you,your engineer and Mr.Jonathan Burnham to address existing site condition until a new plan can be approved. We would like for this meeting to take place between July 8-11, 2013. 2. Deficiency: An off-site waste area has not been identified for material leaving the site. Required Corrections: For any material leaving the site, identify an off-site area which has an approved erosion and sediment control plan and grading permit, or provide an erosion and sediment control plan for the off-site waste area. If you have questions regarding this action, please contact either Kenny Thacker or Glenn Brooks at 434- 296-5832. Page 2 of 2 Stop Work Order Crown BMW Sincerely, envy Thacker Glenn Brooks, P.E. Erosion Control Officer County Engineer Program Administrator geb/ Copy: Mark Graham, Albemarle County, Director of Community Development Mr. Jonathan Burnham, Crown Motorcar Company, LLC, 2905 Premiere Pkw, Suite 300,Duluth, GA 30097 Reading File