Loading...
HomeMy WebLinkAboutWPO202100063 Bond 2023-02-13Internal rse Only q3 Date Received: 2 I3 V Fee Pa1d:2Q 1.32 9 Rereived by: Intake: Forward to Program Administrator REQUEST TO ESTABLISH A BOND APPROVED PLAN # W M ZOZM) lC0 3 PROJECT NAME: (As listed on All parcels in the project, including any off -site work if easements are not provided, and current owners. Use a separate sheet if more owners are required. Owner and tax map information must be correct, and plans must be approved prior to bond estimates being prepared. TAXMAPs/PARCELS: GZ-1GA("F'3WNER'SNAME: 'fo..)nQ- p, - LLC SIGNATURE: date: 2 2p TAX MAPS / PARCELs: TAX MAPS / PARCELs: TAX MAPS / PARCELs: TAX MAPS / PARCELs: OWNER'S NAME SIGNATURE: OWNER'S NAME: SIGNATURE: OWNER'S NAME: SIGNATURE: OWNER'S NAME: SIGNATURE: date: date: NOTE: If ownership of the property is in the name of any type of legal entity or organization including, but not limited to the name of corporation, partnership, limited liability company, trust, association, etc., documents acceptable to the County must be submitted certifying that the person signing above has the authority to do so. The requested estimates are; (Fees include 4%Technology Fee) ❑ VESCP Erosion & Sediment Control per Water Protection Ordinance section 17-207; $0 fee 1 -VSMP Erosion and Sediment Control, Stormwater Management and Mitigation per Water Protection Ordinance section 17-208; $294.32 fee required ❑ Subdivision (roads, drainage, etc.) per Subdivision Ordinance section 14-435; & Water & Sewer per Subdivision Ordinance section 14-435; $307.84 fee required A bond estimate will be prepared by the plan reviewer. The estimate must be sent to the owner. Please provide contact information. EMAIL: � Cmrl-� OR REGULAR MAIL ADDRESS: 5 • P.= ��.�-t�s��l� t ✓ei III Revised 7/1/21