Loading...
HomeMy WebLinkAboutWPO202100063 Bond Estimates 2021-02-10 Engineer's Bond Estimate for WPO ( pill ? r4z. c eiNgs) Description Quantity Unit Price/Unit Cost Construction Construction Entrance 3 EA $ 5,000.00 $ 15,000.00 Construction Road Stabilization 1500 LF $ 15.00 $ 22,500.00 Perimeter E&S Super Silt Fence (SSF) 4425 LF $ 10.00 $ 44,250.00 Silt Fence 2100 LF $ 5.00 $ 10,500.00 Modified Outlet Protection 5 EA $ 2,000.00 $ 10,000.00 Temporary Seeding 22 Acre $ 2,500.00 $ 55,000.00 Totals $ 157,250.00