AMENDED PROFFER STATEMENT
UNIVERSITY OF VIRGINIA FOUNDATION
NORTH FORK REZONING AMENDMENT
Date: February 17, 2023
ZMA-2021-00016 North Fork UVA Discovery Park
Tax Map Parcels — see list of parcel numbers, existing zoning designation, and proposed zoning
designation below:
Parcel
Owner
Existing Zoning
Designation
Proposed Zoning
Designation
Acres
03200000001800
University of Virginia Foundation
PD-IP
NMD
11.220
032000000018AO
University ofVirginia Foudation
PD-IP
NMD
9.501
032000000006R0(Portion)
UnKvrsity of Virginia Foundation
PD-IP
NMD
151.580
032000000006R0 Residue
University of Virginia Foundation
PD-IP
PD4P*
315.943
032000000022131
UniversityalVirginia Foundation
Hl**
PD4P
4.979
032000000022132
University of Virginia Foundation
R1
PD4P
1.897
032000000019130
Unhersity of Virginia Foundation
PD-IP
PD4P*
4.002
0320000000191-11
UnherslW of VirainiaFoundation
PD-IP
PD4P*
0.326
032000000019F1
Unhersity of Virginia Foundation
PD-IP
PD4P*
2.532
032000000019GO
Unhersity of Virginia Foundation
PD-IP
PD4P*
4.770
032000000019EO
Unhersity of Virginia Foundation
PD-IP
PD4P*
7.100
032000000019CO
Unhersity ofVirginia Foudation
PD-IP
PD4P*
4.863
032000000019FO
Uni%ersity of Virginia Foundation
PD-IP
PD4P*
6.024
032000000006A2
UniNersityalVirginia Foundation
PD-IP
PD4P*
7.110
032000000019J1
University ofVirginia Foundation
PD-IP
PD4P*
4.669
032000000019H0
Unrve ofVi
PD-IP
PDaP*
2.601
032000000019J0
:rbFoudation
Urine of Vl Iria Foundation
PD-IP
PD4P*
4.333
Total Acres:
543.450
Total NMD Acres:
172.301
*The Application Plan and Proffers are being amended for those parcels that are remaining PD-IP.
**The existing HI Property associated with ZMA 1987-007 is being amended to be rezoned to PD4P and remove existing
proffers.
All of the parcels listed above are part of ZMA 2021-016, and subject to these proffers (the
"Property").
Some of the parcels comprising the Property were originally rezoned as part of the original
rezoning of the University of Virginia Research Park to Planned Development -Industrial Park as
ZMA 95-04, which was amended by ZMA 1998-27. The zoning was further amended with
ZMA 2005-0003, which added additional parcels. Parcel 32-22B 1 was zoned Heavy Industrial
("HI") by ZMA 1989-07.
ZMA 95-04, ZMA 1998-27, ZMA 2005-003, and ZMA 1989-07, together with all applicable
application plans and proffer statements associated therewith, are collectively referred to herein
as the "Prior Zoning Actions."
This rezoning amendment application identified as "ZMA-2021-00016 North Fork UVA
Discovery Park" proposes to rezone some of the parcels subject to the prior Zoning Actions from
Planned Development -Industrial Park ("PD-IP") to Neighborhood Model District ("NMD"), to
rezone one parcel from R-1 Residential ("R-1") to PD-IP, to rezone one parcel from HI to PD-IP,
and to amend previously approved application plans and proffers associated with the Prior
Zoning Actions, each as listed in more detail on the table on page one (1) herein (the "Rezoning
Amendment"). This amended proffer statement associated with the Rezoning Amendment (this
"Amended Proffer Statement") modifies and supersedes all prior proffer statements, application
plans, exhibits, or other materials associated with the Prior Zoning Actions.
The development of the Property authorized by this Rezoning Amendment is referred to as the
"Project." The University of Virginia Foundation is the owner of the Property (the "Owner")
and the Applicant of this Rezoning Amendment (the "Applicant"). For purposes of this
Amended Proffer Statement, the terms Applicant and Owner are interchangeable.
The Applicant hereby voluntarily proffers that if the Albemarle County Board of Supervisors
acts to rezone the property subject to the Rezoning Amendment as requested, the Applicant shall
develop the Property in general accord with the following proffers pursuant to Sections 15.2-
2303 and 15.2-2303.4 of the Code of Virginia, 1950, as amended, and pursuant to Section 33.7
of the Albemarle County Zoning Ordinance. The Applicant specifically deems the following
proffers reasonable and appropriate, as conclusively evidenced by the signatures below. If the
Rezoning Amendment is denied, this Amended Proffer Statement shall immediately be null and
void and of no further force and effect.
1. Application Plan and Code of Development. The Property is depicted on the plans
entitled "North Fork ZMA Rezoning Application Plan" dated December 13, 2021, last revised
February 3, 2023, prepared by Timmons Group and LPDA (the "Application Plan"). Exhibit
to the Application Plan is a Code of Development that shall regulate the development of the
areas within the Project that are proposed to be zoned NMD (the "Code of Development"). The
Property will be developed in general accord with the essential elements of the Application Plan,
and in the areas zoned NMD, the Code of Development.
2. Maximum Non -Residential Area. The total maximum square footage of non-residential
uses developed within the Project shall not exceed three million, seven hundred thousand
(3,700,000) square feet gross floor area (the "Non -Residential Limit"). The Non -Residential
limit shall expressly exclude the following permitted uses:
a. Recycling centers
b. Structures included as amenities within Green Space or amenity areas (as shown on
the Application Plan or as regulated by the Code of Development) or any other
common area, or open space area, such as picnic shelters, trail head kiosks, and
restrooms.
c. Fire and emergency response stations(s)
d. Temporary construction uses
2
e. Storage buildings that are accessory to a permitted primary use (as distinguished from
uses defined in Section 3.1 of the Zoning Ordinance as
"Storage/Warehousing/Distribution/Transportation")
f. Utility infrastructure
g. Public Uses
h. Other uses that the Zoning Administrator determines to be similar in nature to those
listed herein.
3. Transportation Improvements. To accommodate the additional traffic estimated to be
generated by the Project, the Applicant will design and construct the following road
improvements, each as generally shown on Exhibit K to the Application Plan entitled "Proffered
Road Improvements:"
A. US Route 29 at Lewis & Clark Drive Intersection.
i). Second Eastbound Left Turn Lane. Prior to obtaining a certificate of occupancy for a
use within the Project that, based on a projected traffic count, would cause the
eastbound left turn volume (turning left from Lewis & Clark Drive to proceed north
on to Route 29) generated by the Project to exceed one hundred fifty (150) vehicles
during the PM peak hour, the Applicant shall install a second eastbound left turn lane.
ii). Second Northbound Left Turn Lane. Prior to obtaining a certificate of occupancy for a
use within the Project that, based on a projected traffic count, would cause the
northbound left turn volume generated by the Project making a northbound left turn
lane (turning left from Route 29 to proceed west onto Lewis & Clark Drive) to exceed
one hundred fifty (150) vehicles during the AM peak hour, the Applicant shall install
a second northbound left turn lane.
B. Lewis & Clark Drive. Prior to obtaining a certificate of occupancy for a use within the
Project that, based on a projected traffic count, would cause the projected number of
vehicle trips generated by the Project on Lewis & Clark Drive to exceed twelve thousand
(12,000) trips per day (or at such earlier time as the Applicant may elect in its discretion),
the Applicant shall widen the segment of Lewis & Clark Drive between Quail Run and
Airport Road to four (4) lanes.
C. Route 29 Northbound at Airport Road. The Owner's traffic impact analysis prepared by
Timmons Group dated December, 2021, last revised February 2023 (the "Traffic Study"),
concludes there is existing traffic congestion during the peak hours at the Route
29/Airport Road intersection, and that at full build out the Project is estimated to
contribute approximately eighteen percent (18%) of the total vehicle trips travelling
through the Route 29/Airport intersection during peak hours. To mitigate the Applicant's
proportionate contribution to the existing traffic congestion at the Route 29/Airport Road
intersection, the Applicant will design and construct the following road improvement:
i). Segment of Third Northbound Through Lane on Route 29. Prior to obtaining a
certificate of occupancy for a use that, based on a projected traffic count, would
3
cause the projected number of vehicle trips generated by the Project to exceed ten
thousand (10,000) vehicle trips per day, the Applicant shall install a segment of a
third northbound through -lane on US Route 29, beginning at the Route 29/Airport
Road intersection and extending north to the Airport Acres Road median crossover
(approximately one thousand (1,000) feet north). The estimated cost of this
improvement as of the date of this Amended Proffer Statement is Seven Hundred
Fifty Thousand Dollars ($750,000).
ii). Median U-Turn Intersection. Prior to obtaining a certificate of occupancy for a use
that, based on a projected traffic count, would cause the projected number of vehicle
trips generated by the Project to exceed twenty thousand (20,000) trips per day, the
Applicant will install a Median U-Turn (the "MUT") intersection at the US Route
29/Airport Road Intersection.
iii). Notwithstanding the provisions in paragraphs 3.C.(i) and (ii) herein, in the event that
alternative transportation improvements are identified to improve the US Route
29/Airport Road intersection other than those referenced in paragraphs 3.C.(i) and (ii)
herein, then prior to obtaining a certificate of occupancy for a use that, based on a
projected traffic count, would cause the projected number of vehicle trips generated
by the Project to exceed ten thousand (10,000) vehicle trips per day, then instead of
constructing the improvement described in paragraph 3.C(i), the Applicant will
contribute cash to the County Capital Improvement Program Fund to be applied
toward the cost of constructing such alternative improvements, in the amount equal to
eighteen percent (18%) of the cost of such alternative improvements, up to a
maximum of Seven Hundred Fifty Thousand Dollars ($750,000), which shall be paid
to the County prior to obtaining a certificate of occupancy for a use that, based on a
projected traffic count, would cause the projected number of vehicle trips generated
by the Project to exceed ten thousand (10,000) vehicle trips per day. Upon delivery of
such funds to the County, the Applicant shall have no further obligations pursuant to
paragraph 3.C.
All construction by the Applicant of offsite road improvements is expressly subject to the County
or the Virginia Department of Transportation ("VDOT") obtaining any required right-of-way (if
such right-of-way is not owned in fee simple by Applicant).
5. Buffer Adjacent to Dickerson Road. The one hundred fifty (150) foot buffer adjacent to
Dickerson Road and shown as "150' Buffer Area" on Exhibit C to the Application Plan, entitled
"NMD-PDIP Application Plan," may be reduced by up to fifty (50) feet if the dedication of right
of way is required for the widening of Dickerson Road by VDOT. In such instance, the
Applicant shall dedicate, without monetary consideration, the right of way within six (6) months
following the Applicant's receipt of the written request by the County (or within such extended
period as may be required to obtain final approval of any necessary subdivision plat or other
plan).
6. Recreational Areas, Trails, Green Space and Open Space.
0
A. Dabney Grove Recreation Area. In the area shown and labeled as "Dabney Grove Park
Parcel" on Exhibit E to the Application Plan entitled "Proposed and Existing NMD-PDIP
Parks & Rec Facilities" ("Exhibit E") (the "Dabney Grove Park Parcel"), the Applicant
shall construct an active amenity area containing a recreation field, parking lot, picnic
area, and restrooms (the "Dabney Grove Recreation Area") prior to obtaining a certificate
of occupancy for the two hundred and first (201') residential dwelling unit within the
Project. Once completed, the Applicant shall dedicate the Dabney Grove Recreation Area
to the County for public use.
B. Pedestrian Trails. The Applicant has previously conveyed to the County a Deed of
Dedication and Easement for the County to construct a public access trail and greenway
within the area shown as "Existing Greenway Easement along Rivanna River" on Exhibit
E (the "Rivanna River Greenway Trail"). As of the date of this Proffer Statement, the
Rivanna River Greenway Trail has not been constructed. The Applicant shall construct
the following improvements within the Project:
0. Trail Connecting Dabney Grove Park Parcel to a Greenway. The Applicant will
construct a pedestrian connection between the Dabney Grove Park Parcel and either the
Rivanna River Greenway Trail or the Jacob's Run Greenway Trail in at least one (1) of
the potential areas shown and labeled as "Potential Trail Connection" on Exhibit E (the
"Connection Trail"). The Connection Trail may be comprised of a Class B, Type 2 trail,
or a public sidewalk, or some combination thereof, and shall be made available for public
use via a public access easement. The Connection Trail shall be constructed prior to
obtaining a certificate of occupancy for the two hundred and first (201') residential
dwelling unit within the Project; provided, however, if the Rivanna River Greenway Trail
has not yet been constructed at such time, the Applicant shall commence construction of
the Connection Trail within three (3) months after the County notifies the Applicant in
writing that it has completed construction of the Rivanna River Greenway Trail, and shall
complete construction and dedication of the Connection Trail within twelve (12) months
following the commencement of construction.
ii). Public Pedestrian Trail within Jacob's Run Greenway. Subject to the terms and
conditions of an existing license with the U.S. Department of Forestry, the Applicant will
construct a Class B, Type 1 primitive trail (a "Primitive Trail") through the area shown
and labeled as "Jacob's Run Greenway and Primitive Trail" on Exhibit E, which trail
shall be dedicated to the County for public use (the "Jacob's Run Greenway Trail"). The
Jacob's Run Greenway Trail shall be completed and dedicated prior to obtaining a
certificate of occupancy for the two hundred and first (201s�) residential dwelling unit
within the Project; provided, however, if the Rivanna River Greenway Trail has not yet
been constructed at such time, the Applicant shall commence construction of the Jacob's
Run Greenway Trail within three (3) months after the County notifies the Applicant in
writing that it has completed construction of the Rivanna River Greenway Trail, and shall
complete construction and dedication of the Jacob's Run Greenway Trail within twelve
(12) months following the commencement of construction.
E
iii). Future Expansion of Rivanna River Greenway Trail Easement. The County has
determined that it may need to expand the boundary of the easement for the Rivanna
River Greenway Trail in limited locations to provide for an improved Rivanna River
Greenway Trail. Subject to review and approval of the design plans for such limited
expansions to confine that such expansions are consistent with conceptual sketches
shared with the Applicant as of the date of this Amended Proffer Statement, then within
six (6) months following the Applicant's receipt of a written request by the County (or
within such extended period as may be required to obtain final approval of any necessary
easement plat) the Applicant shall dedicate, without monetary consideration, a permanent
easement in such area(s).
iv). Easement for Future Shared -Use Path Along US Route 29. Within six (6) months
following the Applicant's receipt of a written request by the County (or within such
extended period as may be required to obtain final approval of any necessary easement
plat or similar plat) the Applicant shall dedicate, without monetary consideration, a
permanent easement of up to fifteen (15) feet along the Property's frontage on US Route
29, as necessary for the construction of a shared -use path along the Property's frontage
on US Route 29.
C. Trailhead Parking Area. The Applicant will provide a trailhead parking area to
accommodate approximately seven (7) vehicles in an area within the Property that
provides reasonably convenient public access to the Connection Trail trailhead, which
may be a portion of an existing parking lot (the "Trailhead Parking Area"). The Trailhead
Parking Area shall be completed generally at the same time as the Connection Trail.
D. NMD Amenity Areas. In the areas zoned NMD, the Code of Development shall regulate
the development of Amenity Areas.
E. Green Space and Open Space.
i). Total Area of Green Space and Open Space. The total area of green space and open
space over the entirety of the Project (areas zoned NMD and areas zoned PD-IP) will not
be less than two hundred (200) acres. The Dabney Grove Park Parcel, the Dabney Grove
Recreation Area, any land that is shown as green space or open space on the Application
Plan, and any land that is or has been dedicated to the County or to any other public
entity shall continue at all times to be counted as green space or open space (as
applicable) for purposes of this paragraph 6.E.
ii). Green Space in NMD Areas. The Code of Development shall regulate the green space
in the areas zoned NMD.
iii). Open Space in PDIP Areas. In addition to the improvements required within the
Dabney Grove Park Parcel and the Dabney Grove Recreation Area, the open space areas
within the areas zoned PDIP may include improvements such as, but not limited to
utilities, stormwater management facilities, graded and revegetated slopes of 25 percent
to 50 percent, pedestrian and bike trails, restrooms, trailhead parking areas (and other
0
trailhead improvements), amenity improvements, and similar structures determined by
the County to be appropriate for green space and/or open space areas, or as otherwise
permitted by applicable provisions of the County Code.
7. Historic Resources in Block D. Prior to demolition of any of the existing buildings located
within Blocks D-1 or D-2 (except for the Fire Rescue Station Parcel), the Applicant shall
document such buildings with photographs and drawings in coordination with the Albemarle
County Historic Preservation Committee.
8. Water Conservation. No single industrial or commercial user which proposes a use that will
require more than One Hundred Twenty -Five Thousand (125,000) gallons per day (average daily
consumption) of potable water shall be constructed without written confirmation from the
Albemarle County Service Authority prior to approval of a final site plan (or prior to issuance of
a building permit or final zoning clearance if a site plan is not required) that sufficient water
capacity exists to support such a user, or is expected to exist at the time of completion of
construction of any building(s) for such user. Such site plan approval, building permit, or zoning
clearance, as applicable, may include reasonable conditions related to water usage.
9. Miscellaneous.
A. Tracking Details on Site Plan. If requested by the County in connection with its review of
any site plan application within the Project, the Applicant shall include a summary chart of
total gross square footage of non-residential uses and number of residential dwelling units
completed within the Project to date, and/or trip generation estimates for such application,
to assist with monitoring compliance with this Amended Proffer Statement.
B. Dedication of Land or Easements. For any proffer in this Amended Proffer Statement
requiring the Applicant to dedicate land or easements to the County for public use, the
Applicant shall bear the costs of preparing any necessary subdivision plat, easement plat, or
related plat, and the cost to prepare the Deed or other instrument.
C. Right of County to Extend Deadlines. Any deadlines for completion of road improvements,
trails, or other improvements or obligations of the Applicant contained in this Amended
Proffer Statement may be extended by the County in its reasonable discretion as may be
required to obtain final approval of any necessary subdivision plat, site plan, easement plat,
road plan, or similar plan, or to accommodate unforeseen delays, supply chain disruptions,
contractor delays, and force majeure events such as, but not limited to, natural disasters,
quarantine, and pandemic without withholding issuance of any certificate of occupancy.
This Amended Proffer Statement shall run with the Property and each reference to the
"Applicant" or "Owner" within this Amended Proffer Statement shall include within its
meaning, and shall be binding upon, Applicant's and Owner's successor(s) in interest and/or the
developer(s) of the Property or any portion of the Property.
7
46651722.12
OWNER and APPLICANT:
UNIVERSITY OF VIRGINIA FOUNDATION
a Virginia non -stock corporation
Tim R. Rose, Chief Executive Officer
0