Sec. 5.1.28 Clean earth and inert waste fill activity.
a. Each clean earth fill activity or inert waste fill activity not established and operated in conjunction with a
permitted use under section 30.4 of this chapter or established and operated in conjunction with an approved
site plan or subdivision are subject to the following requirements:
1. Each active fill area shall be shaped and sloped so that no undrained pockets or stagnant pools of water
are created to the maximum extent reasonably practicable as determined by the program authority. All
undrained pockets and stagnant pools of water resulting from drainage shall be treated as required by
the Virginia Department of Health to eliminate breeding places for mosquitoes and other insects. Slope
may not exceed 3:1. The height of fill may not exceed eight feet above natural grade.
No request to modify.
2. No fill area shall be located eitherwithin the flood hazard overlay district, except as authorized by section
30.3 of this chapter, or in any stream buffer area as defined by Chapter 17 of the Code of Albemarle or
on any hydric soils as identified by the United States Department of Agriculture.
Property includes area of flood hazard overlay. Property includes hydric soils (Soil classification 16 - Codorus
silt loam.) No request to modify.
3. Each fill area shall be reclaimed within seven days of completion of the fill activity, or such later time
authorized by the program authority for reclamation activities of a seasonal nature. Reclamation shall
include, but not be limited to, restoring the area so that it approximates natural contours; shaping and
sloping the area to satisfy the requirements of subsection (a)(1); and establishing a permanent vegetative
ground cover.
No request to modify.
4. Inert waste fill must be topped with clean earth fill to a minimum depth of two feet in order to allow for
permanent stabilization and reclamation; and establishing a permanent vegetative ground cover;
provided that the program authority may reduce the minimum depth of clean earth fill to one foot if the
area is unlikely to be redeveloped.
No request to modify.
5. The zoning administrator, or the program authority for those fill areas subject to subsection (b), may
require the owner to submit a reasonable performance bond with surety, cash escrow, letter of credit,
any combination thereof, or such other legal arrangement acceptable to the county attorney, to ensure
that measures could be taken by the county orthe program authority at the owner's expense should the
ownerfail, after notice is given to perform required reclamation work specified in the notice. The amount
of the bond or other surety shall be based on unit pricing for new public or private sector construction
in Albemarle County, Virginia, and a reasonable allowance for estimated administrative costs and
inflation which shall not exceed 25 percent of the estimated cost to initiate and complete the
reclamation of the borrow, fill or waste area, and to comply with all other terms and conditions of the
plan or narrative required by subsection (b). If reclamation work is required to be taken by the county or
the program authority upon the failure of the owner to do so, the county or the program authority may
collect the reasonable cost of the work directly from the owner, to the extent that the cost exceeds the
unexpended or unobligated amount of the surety. Within 60 days after the reclamation work is
completed and inspected and approved by the county engineer, the bond or other surety, or any
unexpended or unobligated portion thereof, shall be refunded to the owner.
No request to modify.
6. Fill activity (except foraccess) must be set back a minimum of 150 feet from any entrance corridor street.
Att P Sec 5.1.28 Clean Earth -Inert Waste breakdown.doa
SE202200068 Kindrick Farm -Clean Earth Fill
Page 1 of 4
Att. P Sec 5.1.28 Clean Earth -Inert Waste Breakdown
Project meets this requirement.
7. Fill activity (except for access) must be set back a minimum of 75 feet from all property lines in the Rural
Areas (RA), Village Residential (VR), Monticello Historic District (MHD), and residential zoning districts,
and from all public street rights of way. Access must be set back 50 feet from property lines and 100 feet
from dwellings on adjacent property. No setback is required if adjoining lots are under the same
ownership. The access to a fill activity is not subject to the setback from public street right of way.
Applicant has requested a modification of 50-foot setback from a property line and 100-foot setback from
dwellings on adjacent properties.
8. Fill activity must be set back a minimum of 50 feet from all non-residential property lines. No setback is
required if adjoining lots are under the same ownership.
No request to modify.
9. Minimum lot size for fill activity is five acres. Multiple parcels under the same ownership and with the
same zoning designation may be considered as a single lot for the purpose of achieving the minimum lot
size.
Project meets this requirement. Two parcels are involved. 32-1-155 acres. 32-2 — 77 acres.
10. No fill activity may occur within the drip line of any tree.
No request to modify.
11. The maximum area for fill activity on any parcel in existence on September 16, 2020 is two acres.
Determining area for fill activity includes all locations used, or designated to be used, for fill, vehicle
storage and vehicle maintenance but does not include area used for exclusively for access.
Applicant has requested a modification of 2 acre maximum per parcel.
12. Notwithstanding section 4.3 of this chapter, trees may be cut, provided a plan as required by subsection
(b) is submitted. However, no tree of 36 inches or greater in diameter may be cut.
No request to modify.
13. If a private street, shared driveway or access easement is used, the applicant must demonstrate that the
access is adequate for the proposed activity and that the applicant has the right to use the access. In
order for access to be deemed adequate, the owner must limit vehicles associated with the fill activity
to not more than 56,000 pounds. In addition, the access must meet the standards of section 4.6.6 of this
chapter and have a surface adequate to accommodate a vehicle weighing 56,000 pounds. The owner
may increase the weight of vehicles associated with the fill activity to a maximum of 80,000 pounds,
provided that the access meets the standards of section 4.6.6 of this chapter and has a surface adequate
to accommodate a vehicle weighing 80,000 pounds.
No request to modify.
14. No fill activity may occur until the Virginia Department of Transportation has approved the entrance onto
the highway.
Existing entrance. VDOT approval should be part of the clearance process.
15. Except for properties zoned Rural Areas (RA), Village Residential (VR) or Monticello Historic District
(MHD), tree canopy for area(s) disturbed by fill activity must be established and maintained in
compliance with section 32.7.9.8 of this chapter.
No request to modify. Property is zoned RA.
Att P Sec 5.1.28 Clean Earth -Inert Waste breakdown.doa
SE202200068 Kindrick Farm —Clean Earth Fill
Page 2 of 4
Att. P Sec 5.1.28 Clean Earth -Inert Waste Breakdown
b. Any fill activity with an aggregate area greater than 2,500 square feet requires a plan or narrative, subject to
the prior approval of the program authority, that satisfies the requirements of subsection (a) and the following
provisions:
No request to modify.
1. All materials shall be transported in compliance with section 13-301 of the Code of Albemarle. Before a
transporting vehicle leaves the parcel or parcels on which the fill area is located, it shall be cleaned so
that no materials outside of the vehicle's load -bed can be deposited on a public or private street.
No request to modify.
2. The fill area and the access roads thereto shall be treated or maintained to prevent dust or debris from
blowing or spreading onto adjacent properties or public streets.
No request to modify.
3. Fill activity shall be limited to the hours of 7:00 a.m. to 7:00 p.m., except in cases of a public emergency
as determined by the director of emergency services for the county.
APPLICANT MITIGATION OFFERRED FOR BOS CONSIDERATION: Applicant has requested a modification that
the fill activity be limited to 7:30 am to 6:00 pm with no operations on Sunday.
3. Fill activity shall be conducted in a safe manner that maintains lateral support, in order to minimize any
hazard to persons, physical damage to adjacent land and improvements, and damage to any public street
because of slides, sinking, or collapse.
No request to modify.
4. 4. Fill activity shall be conducted in a safe manner that maintains lateral support, in order to minimize
any hazard to persons, physical damage to adjacent land and improvements, and damage to any public
street because of slides, sinking, or collapse.
No request to modify.
5. The placement of fill shall be completed within one year of its commencement, except for reclamation
activities and any other activities associated with the final stabilization of the area. The program
authority may extend the date of completion upon the written request of the applicant, demonstrating
that factors beyond the control of the applicant prevented the completion within the one-year period.
The program authority may then extend the permit for a period of time that, in its sole discretion, is
determined adequate to complete the work.
APPLICANT MITIGATION OFFERRED FOR BOS CONSIDERATION: Applicant has requested a modification from
one year to five years.
6. In lieu of a plan or narrative, the program authority may accept a contractual agreement between the
Virginia Department of Transportation and its contractor for a public road project; provided that the
program authority determines that the agreement satisfies at least to an equivalent extent the
requirements and intent of this section.
No request to modify.
C. Inert waste fill activity is not permitted in the Rural Areas (RA), Village Residential (VR) or Monticello Historic
District (MHD) zoning districts without approval of a variation or exception as permitted in section 33.43 of
this chapter.
No request to modify.
d. The Board of Supervisors may approve a variation or exception from any requirement of this section.
Att P Sec 5.1.28 Clean Earth -Inert Waste breakdown.doa
SE202200068 Kindrick Farm —Clean Earth Fill
Page 3 of 4
Att. P Sec 5.1.28 Clean Earth -Inert Waste Breakdown
1. A variation or exception from any requirement of this section may be approved upon a finding that any
of the following factors are satisfied: (i) the proposed fill activity would further agricultural use of the
property; (ii) the variation or exception would allow for a more natural appearance of the site after the
fill activity has occurred; (iii) a reduction in setback from the entrance corridor is recommended by the
Architectural Review Board; (iv) the variation or exception is supported by the abutting owners impacted
by the variation or exception; (v) approval of any variation or exception is consistent with an approved
and valid initial or preliminary site plan or any other land use decision of the County; (vi) the proposed
fill activity will be of limited duration (less than 90 days) and involve not more than 10,000 cubic feet of
fill within any 12 months.
Request meets at least one of these. The BOS may grant a variation or exception
2. The agent will provide written notice by first class mail or by hand at least five days before the Board
hearing to the owner or owners, their agent or the occupant, of each parcel involved; to the owners,
their agent or the occupant, of all abutting property and property immediately across the street or road
from the property affected, including those parcels which lie in other localities of the Commonwealth;
and, if any portion of the affected property is within a planned unit development, then to such
incorporated property owners associations within the planned unit development that have members
owning property located within 2,000 feet of the affected property as may be required by the
commission or its agent.
Notice provided.
3. A party's actual notice of, or active participation in, the proceedings for which the written notice
provided by this section is required waives the right of that party to challenge the validity of the
proceeding due to failure of the party to receive the written notice required by this section.
Notice provided
(§ 5.1.28, 7-6-83; Ord. 01-18(6) , 10-3-01; Ord. 02-18(5) , 7-3-02; Ord. 20-18(3) , 9-16-20)
Att P Sec 5.1.28 Clean Earth -Inert Waste breakdown.doa
SE202200068 Kindrick Farm —Clean Earth Fill
Page 4 of 4