HomeMy WebLinkAboutSDP202200046 Review Comments Final Site Plan and Comps. 2023-02-21a$ County of Albemarle COMMUNITY DEVELOPMENT DEPARTMENT �tBGIN��' Project title: Project file number: Plan preparer: Owner or rep.: Plan received date: (Rev. 1) (Rev. 2) Date of comments: (Rev. 1) (Rev. 2) Plan Coordinator: Reviewer: Site Plan review Tjach Premier Circle — Final 401 McIntire Road, North Wing Charlottesville, VA 22902-4579 Telephone: 434-296-5832 WWW.ALBEMARLE.ORG Jonathan Showalter, PE [ ionathan.showalterk6mmons.com j 608 Preston Ave., Suite 200 / Charlottesville, VA 22903 Pha Premier Circle LLC / 682 Berkmar Cir., Charlottesville, VA 22901 smathoncd( yiedmonthousina.org 1 Aug 2022 11 Nov 2022 17 Jan 2023 31 Aug 2022 2 Dec 2022 21 Feb 2023 Andy Reitelbach John Anderson, PE Engineering has reviewed the final site plan and offers these review comments, which are ISP carryover comments. 1. General a. WPO202200013 approval is required prior to ESP approval. (FSP) Persists. Applicant response (letter, d. 7/21/22): `Acknowledged.' (Rev. 2) Persists. WPO plan review, 2/21/23, indicates only a few items remain: signatures on VAR10 registration statement and SWPPP, Wall A, B, labels, and Note re. Ex. SWM facility maintenance. b. An easement plat must be recorded prior to WPO plan approval: SWM facility /public drainage. (FSP) Persists. Applicant: `Acknowledged.' (Rev. 2) NA. Comment revised: An easement for SWM may be recorded with Premier Circle subdivision plat, SUB202200196 (review pending). c. A SWM facility maintenance agreement must be recorded prior to easement plat recordation. (FSP) Persists. Applicant: `Acknowledged.' (Rev. 2) Addressed. SWM Agreement recorded as Instrument #202300001156, 12/14/23. d. New i. Remove C3.0, C3.1, C3.2, C3.31 C6.0 from plans, include with WP0202200013. (Rev. 1) Not addressed. (Rev. 2) Partially addressed. As follow- uo:Remove C6.0 from ESP. 2. C2.2 a. Overall Demolition and C4.0 Overall Site Plan appear inconsistent in that nearly all existing hardscape requires partial /complete demolition to construct proposed improvements. Please revise demolition plan for consistency. (FSP) Addressed. Applicant: `Phase 1 demo plan has now replaced the overall demolition plan as the plans will be re -submitted as a final site plan submission.' b. Ensure that pre -developed site condition reflects discharge at parcel boundary that includes effect of existing SWM facility labeled to be abandoned. That is: pre -developed condition includes controlled storm runoff condition. (FSP) Withdrawn as FSP review comment, applicable to WPO. Applicant: `Labels for Phase 1 demo plan have been updated. SWM facility will remain unchanged through phase 1 and impervious area to SWM facility and on entire site will be reduced meeting stormwater requirements at discharge at the parcel boundary.' c. Identify existing SWM easement, if any. If easement exists, provide easement vacation plat. Ensure post -developed SWM provides requisite SWM control compared with a pre -developed Engineering Review Comments Page 2 of 5 condition that includes attenuating effect or treatment of storm runoff by existing SWM facility. (FSP) Withdrawn as FSP review comment, applicable to WPO plan review. Applicant: `After researching, no existing storm easement could be found for the existing stormwater management facility on site. Pre and Post conditions have been evaluated to ensure that the existing facility is still functioning as intended.' 3. C5.0: Provide, show, label SWM facility easement for proposed 125 LF detention system. See ACDSM Easement diagram, p. 15, for Min. width, which increases with detention system diameter and depth. (FSP) NA. Applicant: `The detention system is not required until Phase 2 of the site. An easement will be added for the future Phase 2 final site plan submission.' 4. C4.0 a. If development is phased, an approved WPO plan must correspond with all phases shown on the final site plan. A final site plan may not be approved that does not provide SWM control for any phase depicted. That is, a comprehensive SWM plan (WPO plan) is required prior to ESP approval. C4.0 indicates Phase 2 and Phase 3 potential locations of future building by others, but unless VSMP /WPO for Tjach Premier Circle accounts for approximate impervious area/s of future development, the ESP does nothing more than indicate potential locations, while deferring to a future date a WPO plan amendment or separate WPO required to construct potential buildings or establish impervious areas not previously accounted for. (FSP) NA, requirement stated at item 1_a., above. Applicant: `Comment Acknowledged. Per comments with County, Phase 1 precondition will be used for all future phase WPO preconditions. Each phase's post condition will have adequate SWM measures to meet regulations.' i. C4.1 (Phase 1 site layout) shows no underground detention. (FSP) Ret. item La., above. Applicant: `Underground detention for the site is not required until phase 2 of the project begins. Phase 1 removes a large portion of the site's existing impervious area and converts that area to grass reducing flow and meeting energy balance without detention for phase 1. Underground detention will be added in future phases when needed.' ii. C5.0 shows 125 LF of underground detention, an intentional level of SWM design detail, yet WPO202200013 design intent is unclear: 1. If UG detention is required for Phase 1, please revise ESP to clarify when UG detention is to be installed, and which phase or phases it is to treat (FSP) NA. Item La., above. (WPO plan approval required.) Applicant: `Underground detention is not required for phase 1 and will no longer be shown for phase 1 final site plan.' 2. Engineering recommends Tjach Premier Circle WPO provide comprehensive SWM quality /quantity control for all phases: Quality requirements may be met with letter of nutrient credit availability without purchasing credits until a Grading Permit is requested for a particular phase. Expense of credit purchase may be timed to development. A drawback of a less comprehensive WPO plan is that physical space may not be assigned to on -site detention or on -site water quantity control may prove problematic if not integrated into initial WPO plan design to account for reasonably anticipated final build -out imperviousness (i.e., walks, parking, patios, buildings, etc.). (FSP) Item La., above. Applicant: `An overall stormwater management plan will be submitted along with a stormwater management plan for phase 1. An updated narrative shall be provided in the calc book to help clarify quality and quantity for the site.' b. Engineering recommends early coordination with APCONEPCO re. potential location of phase 3 future building which may encroach within existing OHP easement. Recommend show existing APCONEPCO utility easement on Existing Conditions plan sheet. (FSP) Applicant: `Comment Acknowledged. The easement can be found on the existing condition sheet and will be further coordinated during the phase 3 final site plan.' c. Engineering cautions it is unclear this development may construct improvements within recorded access easement (Premier Circle). Instrument at deed bk.-pg. 797-242 was recorded May 2, 1984. Provide evidence of coordination, as needed, with access easement holder at bk.-pg. 797-242, or if Engineering Review Comments Page 3 of 5 this 1984 instrument benefits TMP 061 MO-00-00-00600. Engineering recommends FSP title sheet clarify access easement benefits development parcel. (FSP) Addressed. Applicant: `Letters have been sent to all property owners on the road and owners have no objection to the installation of sidewalk along Premier Circle.' d. Location of existing sanitary manhole in proposed sidewalk is questionable since sanitary MHs may be noxious or repellant, and separation from pedestrian facilities is typically recommended. Storm MHs /utility vaults do not pose equivalent concern, but sanitary sewer is a separate class. (FSP) Applicant: `Comment Acknowledged.' e. ISP proposes to replace existing 2 1 " RCP in certain locations with 18" DIA pipe. Provide calculations to support diminished pipe capacity (18" DIA has 73.5% capacity of 21" pipe). 18" DIA is more susceptible to obstruction than ex. 21" RCP. Engineering is unlikely to approve design that reduces existing storm conveyance given potential downstream effects, and comparable existing site to proposed full build -out impervious area, should all phases develop. (FSP) Addressed. Applicant: `Acknowledged. Pipe calcs shall be provided to ensure that smaller pipe is adequate for the site and can handle any future development on the site.' f. Label Premier Circle lane width at its narrowest at centerline stripe near U.S. 29 SBL. Ensure not less than 12' lane width in both directions along Premier Circle length wherever this site plan proposes improvements immediately adjacent to Premier Circle. 12' lane width does not appear to exist at all locations where project proposes improvements. (FSP) Addressed. Applicant: `Premier Circle Road widths have been added to the site plan. It has been ensured that all lane widths are 12' minimum or greater.' Also, please see item 41., below. g. Revise Premier Circle curbing to CG-6, as exists on opposite side of Premier Circle. CG-2 is not approved for Premier Circle. (FSP) Addressed. Applicant: `CG-6 has now been provided as required on premier circle.' New (FSP) (Rev. 1) Items h.-k. do not appear to be addressed, appear to persist. h. Entrance radii to parking at 1-Level Motel must meet VDOT Access Management Standards (Appendix F) low -volume commercial entrance Min, radii =25-ft. Please revise 10' R. (Rev. 2) Addressed. i. Dimension I -Level Motel entrance width (Min. =18' Appendix F, Access Mgmt. Std). (Rev. 2) Addressed. j. Inset detail label `portion of sidewalk and curb to be asphalt' is unclear. Clarify design intent with curb type label, and sidewalk /Premier Circle EP spot elevations (C5.0). (Rev. 2) Addressed. Asphalt material for ease of removal, later phase sidewalk to be concrete. k. Revise pavement striping to delineate 2-12' travel lane widths at NW end of striping. Lane width may exceed 12' at Int. Rt. 29, but CL striping should allocate lane space such that>12' w exists to either side of CL striping for its entire length. Avoid driver confusion that may occur if striped lane width <12' on Premier Circle, outbound /eastbound. (Rev. 2) Addressed. 5. C4.1 a. No portion of parking lots may be without curbing' 4 spaces along west edge of Phase 1, for example. (FSP) Persists. Engineerin defers efers to Planning. Applicant: `The 4 parking spaces along the western edge of phase 1 is a temporary condition. 1' gravel shoulder has been added to allow water to sheet flow off the asphalt to a proposed ditch. This will help save cost to the owners and developers and prevent them from having to remove new curb for future phases of development. Curb is proposed in the overall final buildout of the site and will be called out as necessary in future site plan phase 2 submissions.' (Rev. 1) May persist. If Planning Div. review coordinator does not object, comment will be withdrawn. (Rev. 2) Withdrawn. Planning does not object. b. Provide /label safety railing at retaining wall. (FSP) Addressed. c. Provide TWBW elevations for all retaining walls. (FSP) May persist. Please advise which sheet includes TWBW elevations. (Rev. 1) Addressed. d. Note: Retaining wall ht. >3' requires a building permit, retaining wall ht. >4' requires sealed retaining wall design (not generic typ. sections, Diamond Pro TM, for example). Submit sealed Engineering Review Comments Page 4 of 5 retaining wall plans for Engineering review prior to /as condition of ESP approval, (FSP) Applicant: `Comment acknowledged. The appropriate permits and wall plans shall be submitted for review once completed or ready to be obtained.' (Rev. 2) Addressed. Michael R Circeo, PE, design /seal d. 12/21/22 incl. at sheets CL2, CL3. Also, see item 10., below. e. While possible to construct proposed retaining wall south of Phase 1 Virginia Supportive Housing during site work phase, prior to building erection, once phase 1 building is constructed, any future maintenance /replacement of this wall necessitates off -site easement/s. Obtain temporary off -site construction easements to operate intermittently in the future during any period of routine or emergency retaining wall maintenance or replacement. (FSP) Applicant: `Comment acknowledged. A temporary off -site construction easement will be considered for construction and wall maintenance.' (Rev. 2) Persists. Applicant: `Comment acknowledged. A temporary off -site construction easement will be considered for construction and wall maintenance.' As follow-up: Please ensure that 15' permanent retaining wall construction and maintenance easement shown on C4.0 is recorded with Premier Circle Subdivision, SUB202200196. This easement is not shown on the most recent subdivision (plat) submittal. f. Recommend stop sign or stop bar at site exit/s. (FSP) Applicant: `Comment acknowledged.' 6. C5.0 a. Provide CG-6 wherever proposed grade concentrates runoff against curb, rather than CG-2. (FSP) Addressed. b. Provide VDOT LD-204 (stormwater inlet computations), LD-229 design tables (storm drain design computations). (FSP) Reviewed with WPO plan. Applicant: `The above calculations shall be provided in the calc book.' c. Provide pipe profiles. (FSP) Addressed. d. Provide spot elevations to ensure no nuisance ponding on parking surfaces. (FSP) Addressed. e. Avoid SAN — Storm conflict near contour label 475 NE of phase 1 building, near Premier Circle. Relocate one or the other to ensure adequate SAN-Storm separation. (FSP) Addressed. New (FSP) (Rev. 1) Items f, g, i, i. do not appear to be addressed, appear to persist. f. Indicate direction of flow in proposed and existing storm pipes. Flow in existing pipes is shown on C2.1, but should be included with Grading and Drainage Plan, as well. g. Label structure 142. (Rev. 2) Addressed. h. (On WPO plan) provide IP at Str. 142. (Rev. 1) Addressed w/ 11/9/22 VSMP /WPO plan, C3.3. i. Revise swale perpendicular to swale. Swale-swale connection (90-deg) is unstable at point of intersection. 90-deg. intersecting runoff may only occur at /in a structure (i.e., MH). Intersecting ditch flow requires 2-45' bends (or similar) to protect ditch walls. Label and provide ditch calculations for each ditch. Specify ditch lining. (Rev. 2) Addressed. Applicant response (Letter d. 1/1723): `The swale has been updated to not intersect at a 90-degree angle.' j. Include highlight CO.1 stone pipe /inlet elements with Phase 1 for integrity of pavement, curb, walks, etc, since these elements are required with Phase 1 and would require demo to install pipe /inlets, later. Utility marking, grading, etc, required with Phase 1 favors installation of DIs shown on CO.1 simultaneous with Phase 1 curb /entrance installation. (Rev. 2) Withdrawn. Applicant: `The existing pipe run along Premier Circle that leads to the existing BMP to the North of the site is fairly flat with a slope —0.3%. In order to install the proposed pipe under the entrance int this phase, the proposed pipes would either have to have the same slope, or the entire pipe to BMP would need to be replaced in order for the inverts to work.' [ Image removed with Rev. 2 comments.] 7. C5.1 a. Shows no storm detention: WPO202200013 for Tjach Premier Circle (under review) must provide SWM to meet SWM requirements for each phase. Only phases meeting SWM requirements may be approved with the FSP. WPO202200013 appears to provide comprehensive SWM control via 125 LF underground detention which appears required with Phase 1 development /Phase 1 building -parking, etc., but WPO is ambiguous. Concept of a Master Plan does not exist in state Engineering Review Comments Page 5 of 5 regulations per se (9VAC25-870-). Rather, proposed elements of development /site improvements are evaluated against requirements and SWM control provided to meet requirements for proposed improvements. WPO /ESP should clarify that SWM is provided for design elements shown on either plan. FSP title sheet should include reference to WPO202200013 (review pending). (FSP) Ref, item La., above. Applicant: `Underground detention for the site is not required until phase 2 of the project begins. Phase 1 removes a large portion of the site's existing impervious area and converts that area to grass reducing flow and meeting energy balance without detention for phase 1. Underground detention will be added in future phases when needed.' 8. L1.0 L3 0 a. Labels do not discriminate between phase 1, 2, 3, buildings, all are labeled proposed buildings, whereas other plan sheets indicate phase 2, 3, potential future building locations. Also related comments elsewhere. Revise `proposed building' labels for consistency across plan sheets. (FSP) Addressed. Applicant: `Labels have been updated on sheet Lt. I to differentiate between phases.' 9. New: C7.0 a. Pipe 121 i. Recommend increase pipe diameter to 8". (Rev. 1) Addressed. ii. VDOT Subdivision Street Design Guide, Appx B(1) Sec. 41.3.g. /Access Points: `Generally, distance between points of access in storm sewer trunk lines shall be limited based on pipe diameter,...' for 12" pipes, 50'. 8" pipe DIA would reasonably require a limit less than 50'. Provide at least one point of access to (revised) 8" DIA storm pipe # 121, 195.71' L. (Rev. 1) Not addressed. Provide at least one point of access to storm pipe 121. VDOT requires point of access every 50' for 12" storm pipe. (Rev. 2) Addressed. b. Recommend revise all 6" PVC pipe to 8" DIA for ease of maintenance, reliable performance, additional capacity during less frequent events (becoming more frequent), and leeway during construction (installation errors may have less impact). (Rev. 1) Addressed. c. Revise storm profile caption, Ditch Strm, consistent with structures /pipe depicted. (Rev. 1) Not addressed. (Rev. 2) Addressed. d. (Rev. 1) New: Restore pipes and structures in profiles deleted with 11/9/22 submittal; for example, pipes and structures upstream of Str. 110. Recommend revise all 6" PVC pipe to 8" DIA. (Rev. 2) Addressed. 10. New (Rev. 2) C4.0: Label Wall A Wall B, and provide ref. to retaining wall design details on CL2, CLI Please feel free to call if any questions: 434.296-5832 -x3069 Thank you I Anderson SDP202200046_Tjach premier circle_FSP_022123_rev2.doc