Loading...
HomeMy WebLinkAboutWPO202200020 Plan - VSMP 2023-02-23VSMP SITE PLAN LEGEND EXISTING 311.5 x 311.5 TC x 311.5 TW x 311.5 BW x 3 J S -W O 0 GAS NEW 0 x m OHU ucu RMMM �O 1 W O 0 A DESCRIPTION BOUNDARIES BENCHMARK SITE PROPERTY LINE ADJACENT PROPERTY LINE BUILDING SETBACK PARKING SETBACK SITE TEXT PARKING COUNT TOPOGRAPHY INDEX CONTOUR INTERVAL CONTOUR SPOT ELEVATION TOP OF CURB ELEVATION TOP OF WALL ELEVATION BOTTOM OF WALL ELEVATION STREAM STREAM BUFFER 100 YEAR FLOODPLAIN BUILDING BUILDING RETAINING WALL STAIRS EDGE OF PAVEMENT ROAD CENTERLINE FRONT OF CURB BACK OF CURB CG-12 TRUNCATED DOME SIDEWALK BIKE PARKING HANDICAP ACCESSIBLE AISLE HANDICAP PARKING MATERIAL CONCRETE RIPRAP ASPHALT EC-2 MATTING EC-3 MATTING WETLAND TREELINE FENCE UTILITY UTILITY POLE GUY WIRE OVERHEAD UTILITY UNDERGROUND UTILITY STORM STORM MANHOLE DROP INLET STORM SEWER ROOF DRAIN SANITARY SANITARY MANHOLE SANITARY SEWER MAIN SANITARY SEWER LATERAL WATER WATER LINE WATER METER WATER METER VAULT FIRE HYDRANT FIRE DEPARTMENT CONNECTION GAS GAS LINE EASEMENTS CONSTRUCTION GRADING ACCESS SIGHT DISTANCE UTILITY STORMWATER FACILITY MAINTENANCE STORMWATER ACCESS DRAINAGE SANITARY WATERLINE GASLINE SOUTH PANTOPS DRIVE -PARCEL 20R OWNER/DEVELOPER Owner: South Pantops II Land trust Charles W Hurt Email: charlie@virginiaLandCompany.com Phone:464-979-2193 Shirley Fisher Trs Address: P.O BOX 8147 Charlottesville VA, 22906 ZONING R15 - Residential Flood Hazard Overlay, Steep Slopes - Managed, and Steep Slopes - Preserved MAGISTERIAL DISTRICT Rivanna VOTING DISTRICT Free Bridge SOURCE OF TITLE D.B.1069-499 D.B.2913-16 PLAT BENCHMARK Top of existing sanitary manhole along South Pantops Drive. Elevation 405.17 SOURCE OF BOUNDARY AND TOPOGRAPHY Topographic information for adjoining parcels provided by LIDAR data and Albemarle County GIS . Lidar Year: 2016 Boundary provided by: Field survey provided by Foresight Survey on August 02,2022 Topography provided by: Foresight Survey on August 02, 2022 FLOODZONE FEMA flood insurance rate map (community panel 51003c0289D), Effective date February 04, 2005 shows this property lines in the 100- year flood plain. DAM BREAK INUNDATION ZONE The parcel is within the State Dam Break Inundation Zone & Federal Dam Break Inundation Zone. GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL PLANS 1. The plan approving authority must be notified one week prior to the pre -construction conference, one week prior to the commencement of land disturbing activity, and one week prior to the final inspection. 2. All erosion and sediment control measures will be constructed and maintained according to minimum standards and specifications of the Virginia Erosion and Sediment Control Handbook and Virginia Regulations VR 625-02-00 Erosion and Sediment Control Regulations. 3. All erosion and sediment control measures are to be placed prior to or as the first step in clearing. 4. A co of the approved erosion and sediment control Ian shall be maintained on the site at all times. PY PP P 5. Prior to commencing land disturbing activities in areas other than indicated on these plans (including, but not limited to, off -site borrow or waste areas), the contractor shall submit a supplementary erosion control plan to the owner for review and approval by the plan approving authority. 6. The contractor is responsible for installation of any additional erosion control measures necessary to prevent erosion and sedimentation as determined by the plan approving authority. 7. All disturbed areas are to drain to approved sediment control measures at all times during land disturbing activities and during site development until final stabilization is achieved. 8. During dewatering operations, water will be pumped into an approved filtering device. 9. The contractor shall inspect all erosion control measures periodically and after each runoff producing rainfall event. Any necessary repairs or cleanup to maintain the effectiveness of the erosion control devices shall be made immediately. 10. All fill material to be taken from an approved, designated borrow area. 11. All waste materials shall be taken to an approved waste area. Earth fill shall be inert materials only, free of roots, stumps, wood, rubbish, and other debris. 12. Borrow or waste areas are to be reclaimed within 7 days of completion per Zoning Ordinance section 5.1.28. 13. All inert materials shall be transported in compliance with section 13-301 of the Code of Albemarle. 14. Borrow, fill or waste activity involving industrial -type power equipment shall be limited to the hours of 7:00am to 9:00pm. 15. Borrow, fill or waste activity shall be conducted in a safe manner that maintains lateral support, or order to minimize any hazard to persons, physical damage to adjacent land and improvements, and damage to any public street because o slides, sinking, or collapse. 16. The developer shall reserve the right to install, maintain, remove or convert to permanent stormwater management facilities where applicable all erosion control measures required by this plan regardless of the sale of any lot, unit, building or other portion of the property. 17. Temporary stabilization shall be temporary seeding and mulching. Seeding is to be at 75 Ibs/acre and in the months of P rY P rY 9 9 9 September to February t0 consist a 50/50 mix of Annual Ryegrass and Cereal Winter Rye, or in March and April to consist of Annual Rye, or May through August to consist of German Millet. Straw mulch is to be applied at 80lbs/100sf. Alternatives are subject to approved by the County erosion control inspector. 18. Permanent stabilization shall be lime and fertilizer, permanent seeding, and mulch. Agricultural grade limestone shall be applied at 90lbs/1000sf, incorporated into the top 4-6 inches of soil. Fertilizer shall be applied at 1000lbs/acre and consist of a 10-20-10 nutrient mix. Permanent seeding shall be applied at 180lbs/acre and consist of 95% Kentucky 31 or Tall Fescue and 0-5% Perennial Ryegrass or Kentucky Bluegrass. Straw mulch is to be applied at 80lbs/100sf. Alternatives are subject to approved by the County erosion control inspector. 19. Maintenance: All measures are to be inspected weekly and after each rainfall. Any damage or clogging to structural measures is to be repaired immediately. Silt traps are to be cleaned when 50% of the wet storage volume is filled with sediment. All seeded areas are to be reseeded when necessary to achieve a good stand of grass. Silt fence and diversion dykes which are collecting sediment to half their height must be cleaned and repaired immediately. 20. All temporary erosion and sediment control measures are to be removed within 30 days of final site stabilization, when measures are no longer needed, subject to approval by the County erosion control inspector. 21. This plan shall be void if the owner does not obtain a permit within 1 year of the date of approval. (Water Protection Ordinance section 17-204G.) 22. Permanent vegetation shall be installed On all denuded areas within nine (9) months after the date the land disturbing activity commenced. (Water Protection Ordinance section 17-207B) GENERAL WATER & SEWER NOTES 1. Work shall be subject to inspection by Albemarle County Service Authority inspectors. The Contractor will be responsible for notifying the proper service authority officials at the start of the work. 2. The location of existing utilities across the line of the proposed work are not necessarily shown on the plans and where shown, are only approximately correct. The contractors shall on his own initiative locate all underground lines and structures as necessary. 3. All materials and construction shall comply with the current edition of the general water and sewer construction specifications as adopted by the Albemarle County Service Authority. 4. Datum for all elevations shown in National Geodetic Survey. 5. The contractor shall be responsible for notifying "MISS UTILITY" (1-800-552-7001). 6. All water and sewer pipes shall have a minimum of 3.5 feet of cover measured from the top of pipe, over the centerline of pipe. This includes all fire hydrant lines, service laterals and water lines, etc. 7. All water and sewer appurtenances are to be located outside of roadside ditches. 8. Valves on deadend lines shall be rodded to provided adequate restraint for the valve during a future extension of the line. 9. Trees are not permitted in the ACSA easement. 10. The contractor shall be responsible to comply with the no -lead regulation regarding brass fittings effective January 4, 2014 (Senate Bill 3874 which amends the Safe Drinking Water Act). 11. All public water and sewer facilities shall be dedicated to the Albemarle County Service Authority. 12. Backflow prevention is required for all connections to the water main. EXISTING USE Vacant wooded lot Total Acres: 5.34 Ac PROPOSED USE Proposed units - Thirteen (13) Townhome Units , gross residential density : 2.62 DU/ACRES Maximum Disturbed Area: 1.20 (Acres) LAND USE SCHEDULE EXISTING AREA (SF) AREA (AC) BUILDING 0.0 0.00 0.00% PAVEMENT 2556.0 0.06 1.10% OPEN SPACE 230054.5 5.28 98.9% TOTAL 232610.5 5.34 100% PROPOSED AREA (SF) AREA % (AC) BUILDING 10374.0 0.24 4.50% PAVEMEN 14834.0 0.34 6.40% RETAINING WALL OPEN SPACE 207402.5 4.76 89.2% TOTAL 232610.5 5.34 100% SETBACK REQUIREMENTS Per Sec. 4.19 of Albemarle Zoning Ordinance, the applicable setbacks are as follows: Front = Minimum 5' Front right -of-way or edge of sidewalk if the sidewalk is outside of right-of-way Maximum 25' Front right- of way or edge of sidewalk if the sidewalk is outside of right -of way Building Separation = Minimum 10' (Unless the building shares a common wall) Side = Minimum 5' (Unless the building shares a Common wall) Rear = Minimum 20' RESERVOIR WATERSHED This site is within the Rivanna River watershed (020802040401). This site is not within a watershed of a public water supply. WATER & SANITARY SERVICES Site is served by Albemarle County Service Authority. GENERAL NOTES 1. The information and data shown or indicated with respect to the existing underground utilities at or contiguous to the site are based on information and data furnished to the owner and engineer by the owners of such underground facilities Or others. The owner or engineer shall not be responsible for the accuracy or completeness of such information or data. The contractor shall have full responsibility for confirming the accuracy of the data, for locating all underground utilities, for coordination of the work with owners of such underground utilities during construction, for the safety and protection thereof and repairing any damage thereto resulting from the work. All of these conditions shall be met at no additional cost to the owner. The contractor shall contact "Miss Utilities" of Virginia at 1-800-552-7001 prior to the start of work. 2. When working adjacent to existing structures, poles, etc., the contractor shall use whatever methods that are necessary to protect structures from damage. Replacement of damaged structures shall be at the contractor's expense. 3. The contractor shall be responsible for protecting all existing site structures from damage and coordinating work so that the owner can make necessary arrangements to modify/protect existing structures from damages. 4. The contractor shall be responsible for notifying all utility owners, adjacent land owners whose property may be impacted and the Virginia Department of Transportation prior to completing any off -site work. 5. Contractor shall notify and coordinate all work involving existing utilities with utility owners, at least 72 hours prior to the start of construction. 6. Contractor shall immediately report any discrepancies between existing conditions and contract documents to the owner and engineer. 7. Contractor shall submit for the approval of the owner submittals of all specified materials listed in the plans, to include shop drawings, manufacturer's specifications and laboratory reports. the owner's approval of submittals will be general and will not relieve the the contractor from the responsibility of adherence to the contract and for any error that may exist. 8. All bare areas shall be scarified, limed, fertilized, seeded and mulched. 9. All trees saplings,brush etc. shall be removed from within the right of way and the drainage easements. 9 Y 9 10. Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. 11. Retaining walls require separate building permits. 12. All water service lines, sanitary laterals, and sprinkler lines must be visually inspected by the Albemarle County Building Department from the main to the structure. 13.Building or structures built before January 1, 1985 must have an asbestos survey performed in order to apply for a permit. Asbestos removal permits are required is positive for such from Albemarle County and VDOLI. Contact VDOLI for additional requirements and permits for demolition projects. 14. Where the flood level rims of plumbing fixtures are below the elevation of the manhole cover of the next upstream manhole in the public sewer, the fixtures shall be protected by a backwater valve installed in the building drain, branch of the building drain, or horizontal branch serving such fixtures. Plumbing fixtures having flood level rims above the elevation of the manhole cover of the next upstream manhole in the public sewer shall not discharge through a backwater valve. GENERAL CONSTRUCTION NOTES 1. Prior to any construction within any existing right-of-way, including connection to any existing road, a permit shall be obtained from the Virginia Department of Transit (VDOT). This plan as drawn may not accurately reflect the requirements of the permit.Where any discrepancies occur the requirements of the permit shall govern. 2. All materials and construction methods shall conform to the current specifications and standards of VDOT unless otherwise noted. 3. Erosion and siltation control measures shall be provided in accordance with the approved erosion control plan and shall be installed prior to any clearing, grading or other construction. 4. All slopes and disturbed areas are to be fertilized, seeded and mulched. 5. The maximum allowable slope is 2:1 (horizontle:vertical). Where reasonably obtainable, lesser slopes of 3:1 or better are t0 be acheived. 6. Paved, rip -rap or stabilization amt lined ditch may be required when in the opinion of the County Engineer or designee it is deemed necessary in order to stabilize a drainage channel. 7. All traffic control signs shall conform with the Virginia Manual for Uniform Traffic Control Devices. 8. Unless othrewise noted all concrete pipe shall be reinforced concrete pipe - Class III. 9. All excavation for underground pipe installation must comply with OSHA Standards for the Construction Industry (29 CFR Part 1926). OFFSITE SUPPORT ACTIVITIES This project requires approximately 4,000 cubic yards of clean soil import for fill placement. This soil shall be soured from sites with an active VPDES Land Disturbance permit and must be listed on the SWPPP. TAX MAP 78, PARCEL 20R ALBEMARLE COUNTY, VIRGINIA WPO 2022-00020 VICINITY MAP SCALE: 1"=2000' Map provided by Google.com SHEETINDEX C1 COVER SHEET C2 EXISTING CONDITIONS C3 SITE LAYOUT C4 GRADING & UTILITY PLAN C5 ES&C NARRATIVE C6 EROSION AND SEDIMENT CONTROL PLAN PHASE 1 C7 EROSION AND SEDIMENT SHIMP CONTROL PLAN PHASE 2 C8 EROSION AND SEDIMENT ENGINEERING2 CONTROL DETAILS LAND PLANNING - PROJECT MANAGEMENT C9 SWM FACILITIES DETAILS C10 SWM QUALITY ANALYSIS 912 E. HIGH ST. 434,227.5140 AND DITCH DA MAP CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM C11 DRAINAGE AREA MAPS ,TH U SHIMP 11 N0.45183 A�V 2Is; 12-3 w� O NSF' r �SS1MrAl B� VSMP PLAN FOR SOUTH PANTOPS DRIVE PARCEL 20R ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2022.04.27 REVISION: 1.01.11.2023 VSMP Comments 2.02.21.2023 VSMP Comments FILE NO. COVER 22.002 C1 I ,I , \ ) /' /--- / /, / / / / / / / , / / /. , / / . / / / / / / / ,' / , - / / / ' / / / / ' , / I / , / / l I , I / - / t ��_ \ // / / // / / / / // / / / / / / / / / l / / / l I ( ( / / 1 \\ \\ /// /// /, / , -- - / // // / / / / / / / / / / / / / / / / / / l l / / l / \ \ i 1 \ / / / \ \ \ \ ` \ , / / / / / / /� // / I/ / /////// ///I�)// // ,// / / // \J 1 I \ �� J /,// --\\ / /I ///�� / ///i/�/i///I // /�) /////////////'�/ /�//i /�/ //'///�/i//////�/� i/� / �/ // i �l / i / i i i III \\ j �I I ` \ \ i/ j I/� / / / J) __i\ \I \\\ \\\ r J/,'r'/%/ice////� / // \ /I \ I // _-- r // / / / / / / / / / / / / / / I / \ \ / // / \ / I , / / //// / /////, /// // //I �/ // / / / / / / I \\I / __/ J / // ///// J // / / / / / / / / / / / . / / / / / / / / / / / I I' / / / / / \ / \ 1 ,`---- / / / / / / / / / / / / / / / / / / / / / / / / / I I ! \ / i / /--------/ / / / / / / / N _ - / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / , / / / / / / I I , /, - / // / J / l i _ / / l l / / / / / /r / / / , / 1 I I \ \ / / / I �- \ / / / / / l I l / / / 7 / / / / / / / / / / / / / / / / \ l 1 / / \ I ( I / / / ,' r�____�/ --� 1 / // /l ! (/ ' 11 ! l / I I / / / / / / / ///////% /// / // / ///// /// // // // / / / / l 1 { ` � \ I �+ Ill / / / \\\ \ I \\ ` / / / \ I I /! ( 1 I \ 1 1 III <) / //////% / / // // / / / / / / / ///// / // // / / / / I \\\ \ \ ♦ / / / i\`��_ /// // // / / - 1 / / / // / / / , , , / / i I i I \ \ / \ / i / / I\ \ - / / -- -\ ` \ ,11\--/ // // ////i/// //// / %/ / / // / i i / �1, , / // / \ \\ \ 1 -\ � \ J \ I 1 I 1 \ \ \ \ \ \ / / / / / / / / / / / / , / / ,/ < I I / I \I \ 1k l ` ' / /i /// / l \ \ \ / \ I \ // \ I , \ \ \ \ \ \ \ \ \. / / / / //,/ / // // / / / / l \ \ / ( / \\ / / / \ \ \ \ \ \ L \� \ ! /- I \ I , \ I I \ \ \ \ \ \ \ \ \`N1_ / / / / / / // / / / / / / // 1 � / / / / I / // // / i / / / / / / / ,/ / // // / // / \ \ 1 I / I I / / //I // // / \\ \ \\\\ \ \ \\ )\ \I I I-/ \\ -- `\� // //� \--- \\ \\ \ \\ \\ \ \\ \\ \ \ / / / / / / / /// % r / , - / / \\ \ \ I \ \ \ / / / / / / / / I // / , \ / I / // / // / \ \\ \ \ \ l \ -\- \� / , / - - \ \ \ \\ \\ \\NI -, / / / / / / // /� -_-_/' -`- _ \l \ I \ \ \ \ / / / / / I / / /// / / \ \\ \ - \ \ \ \\ \ \ \ \ � \ / / // /// /� / / /�f( f I-\ I I l l l I I l l / /ll// l///I \ \\ \ \\ \ \ \ \ r--- ' \ \ I / / - \ \ \ \ \ \ ', \ \ \ -\ l // / / / / / // / / / / / / / \ I \ TI'c / / 1 / / / \\ \ \ \ `� \ \ \ \ \\ \\ \ - \ / / / // / / / / / I / / I I / / / I 4\ \ \\ \ \\ \ \ I 1 11_ 1 \ \ \-\ ,/ � / - \ \\ \\-\-\ \ - - \ \ -\-- `/ / / / / / / / / / / / /� / / / / / / / 1 1 I \ \ I 1 / / / / / I I I I I l l I / l I I ! 1 I \ \ I , _ \ \ - \-/ / / // / / I \ I I l I / / \\ \ \\\ \`\ \ I I \ I \ -- \ ` -- \ `--\`\`- \ \ \\ -- \ -\- , / / / / // / / / / / / / / I / / 1 I / / / I / / �' / / / / / �\ . 1\ / / / / / , / / / / I \ , I I / / ( / \ \ \ \ L , \ \ - - �\ - \ - \ -\\ -./ / / / / / / / / / / / / / / / / I I \ / I 1 I I �/ / /// // / / / I I I 1 / I I l l I / / / I' I I I ( \ II \\ I \\\\\\\ I I\- \ I --`\\- I \// \\-\\ - \ - 11//////// / ,/// 111 / �\ 1 \ \_\ \ --`-`\`\ \\� - --- - / / / / / / / / / / / / / \ l // //\ / I / / / l \+ i l \ \\, \ \ \ \\ I \ A l / // / 1 I l l / / / , I I I 1 / l / 1- / I I I l \_ \ \ \ \ \ \ "!�\ -\-\ \- -\-l//l// ///// //// / / / l // 1 1 II / II ( / / / / III 111 + / III 1\\\II \\ \\ \ \ \� \\\ \ -\ N. \ -_ \\ Lam` \ \ - -- \``\------\ - \ - \--- / / / / / / / / // / / / , / / / / I \ / I I \ /' I I I l I I 1 / ♦ \ I 1 \ \ - \\\\ %lil \ \ \ ) ♦ \ �\\�\.> I �/ -\� --__//// //////, / / / / / III 1 I( // / I III 111% / , I\\ \\ \ ♦ '7 -\- I // / / / / I I/ I I I I I I I I I I 1 1 1 \ \ -- \ \ \ \ \ \ \\\\ \ l- `\ ` \ \-/I \ \ ♦♦ �\\\ - -\ `\ \`-`-`-` \-., ----I lj / / // / /,/ / '/ // / / // I 11l� / // I I I I I I , \ \ I I / \ \, -\ \\ ` / I - \ - - - / I I J / / \ \ \ \ \ \ \ \ \ I \ I, ` X �♦♦ \ �- N. I -- \ / / J / / ! I I f \ \ 1 \ I // 1 / 1 I I I I I I \ I I I I ' \ \ \ \ ` l \\\\\ \\\\\\ \ \ \_ k ♦ ♦ L: �1� T I I -1--\ -- \-\-- / // l IIII 1 I \ \ \ \ I I I /r' // \ \ \ \ 1 \ \�� \ \\ \ l__ - <�/ ♦ N34°40'44"E �^ --- \ - \l l i / I I I / �// 1 \ I I \ \ \ \-\ \\ \ \ \\ \ \\ \ \\ -� \\ \\-_- \ \ \ \\` ,;: `���` I 0' 1 \ ---- `- \ / / 1 I I \ \ \ \ / % I / 11 I / I l \ �- 1 r ✓ I 'I \ \ \ 11 I. \\ \\\\ \ \\ \\ \ \\ \\ -_-\ \ _ \ 00x-� 1.11 \\ L I -- - - / / / / I1 \ / / 1 I / / /�- I \ I 1 1 \\\ \ \\\\ \ \ \\ \ \\ \ \ \ �\ \- \ - \ I; \ --� - -- ` `` / l 1 ( / / ), / 1 / -/ v I I \ \\: \ \ \ \ I / \ - - I \ \\\\\\\ \\\\ \ \\ \ \ : � 1 I ♦ ^.1^ . I \ I -\- �`\\- \`////// I /I / / / , , ,/ / I I I I I 1 J II 1 \ \ \\\\ \ I 1 1 \ \ \ '\ \\ \ \ \\\ \ \ \ \ \\\-\ ` / - � � �` }' 4r. L \ \ \ / `---- I I/ / l / l / / / I I / I \ \ \ 1 \ \ / I \\\\\\\\1 1 I1 \\ `\-\` -\\� \ i' \ \ \ Lam , ,/ t \ \ \ -\ ``-`\- - \i / / I I / / , I I j \ \I ` w�) \ I \ \) \ \ \ \ \ ` /, \ \ - \\ R \ / / / / / / I I I I / / 1 I \ / / \\\\\\ I111 III\\\\�\ \\\\\\\ \ \ \ \\\� O -- \ / I I / / / / I /' / 1 1 �\\ \ \11 I1'' 4 \ `D M-BRf�A1FIRUfbA�li3iJ- - - \ f \ \ \ /" � � - \ \ - \ \ \ \ \\ I \ \ - ---' / I I I ! I / / ! ---- I I I I J I 1 I / / / / / \\ \ 1 \ .f \ / \ ` / / / / I II \ 00.\\ \ q0 C / - / / /,/ /// I i I I , I / \\\ I i \ I 1 1 1 / / / // i \ \ \\\\IIIII I \\ \ SQN��(DF-RA-'L - - ` �\- `\ \\ \\- \' \ - \\ �`� \ \ \� �a I < \ \ / / 1 \ \ I /� I 1 11 1 \\ 1 / // \\\ I \�� % �� / \ / > / \ / I I I \ / I I I 1 I I / / \ \\�O\\ l l \ \ - - \ - \♦ \\ - \-\ �f I \ \ - \ \ \ \ I \. I I \ \ l l 1 1 I , I 1 I / / \-\\\ \ \\\ ,I _ \ ,,�_-- -- \ \ \ \- r- \\ \ \\ \ \/� \ \ C \ \ j I \L I I \ \ \ / 1 1 ` I `\ `\\\\\\\�,\ ��; -_`\\ -, I \ - __ -� \ - \ r`MP 48-i5C9`- \ \ '�/ \ ... - \ \ \\ -^ Gq \ `V / ` , / l \ \ I j \ -`_ \ I I \ ' I I I I \I \ \\ I 1 I / // // .\ \�-,\�Q\\�.\ �_� - �'B�AL'Wf .,1ySVESTMENTS Ll\C - \--'ii'A% _� ,.-' /' - N \\ S \ \ \\ \\ R �e I \ - � l 1 - \\ I\I I I I I 1 _ \I /� I �' I, I I \ \ \ \\\\\- \ \ \ - \� `� f \ -- \ \\. \ \ O 1 I \ 1 `I 2 73-672 \ \ / �/- ` �@ \ \\ '�}r \ \ B W/ \ / / I I / I 1 1 >�» I 1 , I \ \ 1 \ / \ \\\\\\ \--�_-\\ - \ `� \ \ / //!- - \ d \ i \ \ ,� \\\\\ O$ 'i�¢ r // / / 11I / // i 1 1 11 \\ >• Yt \\ \ \\ `\II ! \ \ ---� \\ \ ♦ - \�ZQNED` HC \ -/ /, -_-' --_--_ \�\ \ \, \ ` \\` 7 'rMTS �F '/1I / / I I I ►>•lm,l• 1 1 I \ \ \\ \ \ \\ / t\\ 1 \ \ \�\\\\\�\�� _ - \\"\\� -� � \ \ ` \ � � --\\ \ \ /// I / �' _ \\\ \ \- \- \ I � \ \� MO `m �` / l l / l I I I I► I� -\ \\ 1 I \ \ \\ \-\ \ t \\\ . \� \\ - \. \ /// -\\\\\ - -ll C \ \ 7�\� \ ` . \ DISTURB N E\F �EA `�,_/ S T �I \ \ \ \ \\ \ L \ 1 \ \ \\ \ \ \ 1 \ \ : �/i 111 \\\---\`\\\`�� �` \\\ \\\\ \ \ \ \\ - \\- \ / -��\� \ \ \\/`\\.( `\�q \ °ce\\ �� �� '` , \ l ►'s / I II \ 1 \ \ \ \ I \ I \\ \\ I 1 \ 1 I j 1 \ \-\ \_-`\--\\\\ \\ -\� \ - \ - - - ---- / i- __ ,-------" \ \ \ \\\ \\ -� � \- \� 1 \ 1 \ \ \ \\ \ tf Oro / ', \- \ \ \ 1 I \ \ \ \ I // \ \ \ \\\ \ \ \ \\ - \ \ \\� \ \ `�\ \ - \ \ - - - --- / / i - - \ \ \{ \ � \b \�\� \ \ \\\ / % I /� \\ \ \\ f / / I I \ - \ \ 1 \ ./_ ) ) / \\ \ \\ \\ \ \ -\ - \ \ -- /\ `\ \ \y \ l I I / , /ice \ \\ \ \_ \\\ \ l -- \--\\\\\\' N\\--\`- - \ --_ _// - `bah \.\�X`\\�\ I`, �\ \ ,���� I /\ `\ \ \ \ \ , I I I 1 \\\ / // \\\\ \ __ \\\\\ \- \- \\\\\ \\- - - \a2, \ \ \ I \ / \ \ \ 1. -\\ \ - ` ,-�-- \- \`� �- �- ' fib, - i' // �,// � Y - �\�y� ��'� \\\\`\`\\\\\��1 \�� 47 \ �S \�k�0. � �'0 \ \\\\\\\\\\ ) I I \ 1 \\ \\ \\ \ \\ \I I \ \\ \\ `'\ I I / ^ \\ \ \ \� \\\\`\ \Pp \ \\ \- \ \ - \ \\\ \ \�°C // / / /- \-4 \ \�/ ` ` , � 5 \\\\ OLq ` \\\\\\\\\ 1\ \ \ I \ / \ \ \ \ \\ \ , 0, \\ \\\ \- \\ \ \\\\\ \ -\ I \ \ \ \ \ �'i-_- o // �, / / \ \\ - \\ \ \ b-11 \ \ RO � \ ♦ 1 \ \ \ \ \ \ /� \ \ \ I \\ \\ \\ \ 1 \ \ \ \ \ \ \ \ \ \\ \ / ` � \ \\ \ \ \ \. \\ \ \- \- \ \ \ \ \\ \ /O / / / \ \ F \ \ \ \ / \ ) \ _ \ , \ \ I 1 ` \ %"'. FR \ \ \\ \ \ \ \� \ \\\\\\� \`\••F---\ \` - / •�r \ \ r ;3 1 i1 1 I / \ b \ \ \\ - \ \ I - / I yG / �R , / \ \ \ \ \ \ \ \ \ \ \ I \ \ T \ \ - - \ \ \ \ - \ \ \ \ - - •/ / I I I S \ \ \ \ - \ \\-\ l \ \ \ \ \\ Q \` \ ♦r r F.. I I I 1 / 1 I I 1 I FM \ \ \ \ \ \ '� \ \ 1 \ - \ \ -_ , r I I I , 1 \ \_ \� J \`�\ \ \ \ \ ` \ - \ ram" / 1 I h' IC" I I 1 I I it I �I I \ 1 \/� \ 7 S \ \\\ \\ / I - - \ \ \ ,� 1 1 A V 0 - V v \ l A V A v �� \\� - L_ \ \ �\� \�,-\ \ \\\-` - --s-- �/ / 1 I \ 1 1 1 1 I 1 1 I I I 1 I , /, S I ' 1 I \ \ 1 \ J l h' �� �0�' --- \ \ `-�_ ___-- \ \ \\ ---- 1 ,lam v I I -\ \ ` ` ' \ \ - - \ \ \ \ \ \\\ \ \ \ . �. \ / / / I I 1 1 /11I I I / 1 1 1 T 1 1 111 II111I1 \ V'�2j, q \ \ \ \ \ ' `\ ` -\\ \\ ` \ \ \ %\ , '\ . \ \ \\ \ / / 7 \I �I I I I I I 1 1 I I I I \ I I 1 I I \ \ \ T ., TF -\ \\ \\\-\-\ \\ I \ `\ -\ \ I < - \- \\ \ \\---''�-_ -�� --� -\\ `\ \ -�- I I A 1 1 R\ 2 B \ \\ \\-\ \\ \ .\.\. \ \\ \\\ v \ / //. L \\ \ ' I I I I I I I I I i 1 1 '� .A \ \ \� 7 l \ \ \ \ \ \ \\`\- - \ \ -\ \ �� \ \\ \ \- \ - -__ / / / a I III I I I I IIIIII ' I �1 1� T, I \ \�\ \ 7 1 751 `\ \\\, \ \ -�� \ \ \ \ \ -\,>, \,I, \ �\'N -" �-- ', .//1.\1 1 �'Y / I I I I I I I I Iry� I11I 111E111 I �LLI I 1 , I \� \ O \ N \ \ \ \� \ \ 1 I - \ \ \ \ \\ / ( I 1 1 I II fi e�,lj II�� I \\ S O `m OSO -\ \ \ \ / I 1 1 i I \ `\`\\\ \ \ \`\ \- \ \ \ / I 1'\ I f I I \ - \ \ I I I \ \ \ , "� -\\ \\ \\ .l . \ . . .,. . I \ - _ f� , I ,� I I I l ! I I I I I I I I I 1 I , I I M \ \ \ L ` -` \ \ \ , \ - l I , , I \ r ` _N \ \ . \ \ \ \ \ \ / I I 1 I I 11 I II \ \ \ N. \ � , \ \ \ / / J . I I / / I I I 1 1 1 I 1 I \ \ \ `m \ T \ \ \ \ \ \ \ \ \ \ \ \ I \ \\ , \ h\\ \,, \ i / K i\�f f / I yy�� I 11 T"I I I I A I „ \ \ � // \ ` ` \ \ \ \ I I , 1 \. \ \ \ \ \ \ \ - /--- \ *, \ -A\ \.\ \ ^\.\\\�. _ -- //,/ . ) Il/ II II 1111 II4�'III IIIIIIII, j1I S ".1 IOI I I 1 Q ■ \ \ F_. �\ \A I. \ N. \\\ \ \ I I \\\ \ \ \ 1 \ \ ? \\ \�\ \ \ ` - - // �` / I / / / h I I I I D1 I I I 1 I IIII III I� T��, 1\\ i \ \ \ \ /� � '9r�/ \ -\ `-\ \ - , - \ 1 I \ \ \ - \ \ ) _ \ \ \.,_ h - \- ---__ ///////- 1 I / I I 1 I I wII I fi- i I \ \ \ \ \ \ %p I \ A - - \ \ \ - \ \\ 11 ( \\\\ - \\ \ 11 /' q T \ \ \ \ \ \.1 \ l,p,`\.\�\\•,\l / / L \.✓ I I I11 1 1 ,1 1 ll I 1, 1I ,,y I \\\ \ \ \ \ \ \\ J %�„ 00 �'C- \\ \ \ \ - - \ \ \) \ \\\ \ - \ \ \ \\. \ I \1 \ -. \ \ \ - / / r, " .I 1 I, I 1 I I I I 1 I , 1 1 wI IoI 1 I \ \I \ \ \ \ \ \ \ \ \ \ \\ Fg \ N O� \- -\ -`` ` -- \ ___- �\� III \ \ \ \ ` ' P. \ \ \ `--�/ I I J I I I \ \ \ \ \ - ti O \ • \ • ` - \ \ \ / \ . .� A •` _\, .-.\. \ J I I �1 �\ 1/.I .110 I I I I 1 1 1 w II , II 1 o_I I 1 I 1 I I fi I\ \. \ \ \ \ \ \ \\ 20, 00. \. \�e \ ` \ \\ - \ \ ♦ \ / - \ \ -\ \ 1 I \ \. - \ --// I \ I I I I I I \ \ \ \ \\ \ \ \\ - `\ \ \ \-\\- I `� \ \\ -\ \ I I 11 // \ . .\ lI I I /. .\ \ I I Q' , 1 , I I 1 1 \ \ \ \ \ \ \ \ \ \ \ \ \ / `\ \ \ \ \ \ \ \ � / \ \ \ \ \ l l 1 / /. \.� \ \. \ 1, \ / II .� .� �, 11 1.1 I I I, I I, I , II 111 I\I 1 \ \ \ 6 \ \ \ \ ` \ -- -\ \ \\ \ - ` \ \ \ \ \ \ w* - \ \-, I ( \ I I I \ I \ \ \ \ \ \ \ \ \ - 1 / \ \\ ld: \ \ \ \ \ \ %vIII,If \� \\\\ . . . . 'rT _/ S ., 1 \ \ I4 \ I.I 1 1 I \ , ( I 1 , 1 I \\\\\\\\\\\` \ \ \ \ \ \ \ \\ \\ -\ \ /�T \- \\ \\\\ \ \ \ \ \ �I \\ `\ \ ` \ \ -\ \ / V A\ A A V A A V A A A V l, A \ V A V A\ k \ F-' 1� V v \ v v v - \ V A \ \ 7FS v F-I' V A A A '� - A -- - 1 vv / Ij1V v v v v Avvvv /§ sg v v v '�+,, - v \'S v v - - -- v I \ - -v v L - - v v % v v v / \ y y Vv v�. 11 A N\ V A V A A A V A \ V A V A A \ \\ \ V A 'ti7 A A A vv A - vv A A A 3 , vv -.y�, A v A vV % /' -v A A `� AL- - - ._I v- v _ A A V A A \ V A AA v A v\ vV `v v A v v `vvv v\ / `NIN"� - -v - -v \ \ R € U �L RE -o \ \ \ \ \ j \ % - \ \ \ \\ \\\ \ \� �R\ \\\ \\\ \ \\® \ \ I \ \ \ \ \- V-- \ \ \ \ \ \ \ \ \ \ \ \ \ ` / \ -\\\\\ - - \ �\ - ,I \ / / s?I' \ .\ \ , \ \ \ \ \ \ \ \ \ \ - \ zb,�\ \� \ - \ \ \ \ \ 1 �\ \� - \ \ \ \ - - \ \�\ . \, IQ�. \ \. �\. .\. \\\�,\\\\\\\\ \\ \ \ \\ \ \\\\\\\\�a.\\ `\ \ \\\ \ /,\, \\ - A111141\ \ \ N. \ \ \ % - 1 - \ 5 \ \ \ \ \ \ \ \ . \ \ \ \ \ -- - -- \ \. \ \ \ \\ \ \ \ \\\ \\ \ \ \ � - w, \ \ \ \ \ \ n \ \ \\ \ \ \ J� // � � \ tix 7/ x \' N \, \ . \. . . `l. \ \� \ \ \ ` \ � \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ v.\ 'i. \ \ \ \\ ♦� \ `�� � \ \ \ \ \ \ \ 1 O \ h \ \ \ \ , \ \ \ \ , \ / ,-\\ B. O \.- \ \ I .L. I. 1 \ \ \ \\ \ \\ \ \ \ \ \ \ \\\\ \�\ `\ � \ - �, \\ �\ \ \+\\ \ \ \ \ \ \ CC `a /(\ \ \ \ \ \ \ \ \ \ \ - ----� V 7 v V A A A `qA A V A v v v a - V ♦ v -i I v Q,q. vA vv- v A 1 1' 1 I. V v v v v v \vv vv v v - v- �- ♦..N, v V A V A S,e, �6 v v v v v V v A - --) �,__ / - y - vv Avvv> Vv vv vAv vvv v vvvvf ` L`oZ v v .A`qS v v v A v z4 10 � % v�3 v - /_ J /$„ / -A-vA v A v v vv v N. v v v \���'"� �v - -- TM > -` �r v ` 0' - v v y v \ vvv v II I/- \vvv v v v v _ q� I\�v .-, n vv AvvvvvA vvvv v A P NT��.I Ail Raw --A vv vv v7sv�� \• N. V /O v v v v -- \ / ����/�/�� pp � y v \ v v 1 -v, A / A A VA\ ♦A C'S V'\ V ` v v v v v -A'`'mil`- v A- v 9 v A A A \ \\ \ L. \ \ \ \ \\ \ \, \ \ � \, " 6 IeLLES W H \` � 7 \ \ - \ \ \ \ o �� OC \ \ \ \ \ \ \ - /-- --`'\ \I l I --�_\\ �� . . . . Z`% ` \ FISHER TR \ ��\\ \ \\ \ A ( ^^�7 `\``\ \\ \ - \ \� \\- \ \ \ \\ \ - 2\j \ \ \% \ \ \ \ \ \. IF \ \ \ \ \--\ \ \ / � \,- \ \ - `/L� N \ •\ .x \ \ \ \ ZAAE2 \R- I Jib --- \ \ \ \ \ \ \ ��/� \ \% \ \ \\\\ ? \ \ _ I VD / \\ \\ � \\X\\ \.,vk-.,. I,� \ ` \ \ \ N. \\�\\ � • \\, \\\\\\\\\\\ \\` \� \ \ - ♦ -�-\ - - -\ \\ �\ \ \\ \\\\ \\y \ \ \'\ \\ \ \ p \ �\ 'o'i' '�'\ '�� \\ \ \ \ \ t\ \ r \ \\ \ ' / \\ \.\. �/♦-� \ o \ \ \\\ \ ♦ I, I- / I \ \ \`l\I FO `11 \ . . . . 1 \ .-\.`\ .- \\ \ \\, \ \ \ � \\\-`--- -\ `\ �� ---- -\--\ - ` \\ \ I I \ \ 1 , / c�F, r �\ \ \ \\ \ 1, \ \ \ I I I I / \\ \ i\% \ \ \ \ \ \ \ - - \ \ \ / /v VAR WIDT SIGHT`\ \ \ \ \- O \\ 1 \ \ - \ \ \ l\ \ ( \ \\ - \ V \ \\ \ \ \ \ -F \ \ \ \ \ \- `I,,--,- - - �� \ \ 1 \ 1 '\ i DISTAN ASEM T \ \\ - \ 4 \\ \\\ \-���� _ _ N. \ \ \\ G \- \\ l ^ \ \ \ \ \ \ \ '�TF \ . \ , RU' \ \ \ \ 29 \ \ \ - \� \ \ , \ \ \ C` __ _ \ r i V v - - - - - - - A A - v ', ,y, A A I l / ( \ A I v A 1 Av O Av�A( �) Ft yAyvv t . ., y A v Av v♦\ v v� \ �y` - -A - - � A -� vvv\� - y '4' ' / -I \ - \\ \ -, J \\ \\ - \ �\ \ \ \ \ \ \ \ \ \ \ \ \ - \ - - -�-- \ \ \ \ \ \ \ \ y q \ \ \ \ \ / , - \\ \ \ ♦ \, \ \ \ ♦ \ \ \ \ \ \ \ \ - \ - - --\ - \ \ \ \ \- q SA \ \\\ - \ - \- I I I 1 \ \ \ , / \ - I \ \ \\ \\ \ N \ N , \ 1 I \\\ RIV`R \ \ - \\' .\ \ \ \ \♦ \ -"�\ \ 1\ - --�-- \\\ \\ \ l \ \ -\ \ \ \ - Y \ \ \ \ \ Q - \ - - -`\ \ - - \ \ \\ \ \ \ 11 I S it / 1- ,� \ -\ \- \ \ \ \ \-- -1 . - 1 \ \ y - \ L. - - v\ \ \\ \\ \ \ \ \ \ \ \ I 1 a//Y \ ---- - 1 1 1 \ I \_ 'I, � \k- \\ I I I I N, -_ _7 - �L�______________ " ,\\ �\\\\\\\ � \ \ I I 1 / / \ \ 1 ( I- \ ♦ \\ 1 t. a\` \ \ \ \ \ \ \)I J 1 / ,till 1111 I 1 I I 1 / \\1 I \ \ \ \ II /\ \� - '� ■ / ,/ /// / / / 111 I 1 I 1 \ - \ \ I \ \ Z �. \- \ \ .\ / /�// / / / / / / I I III I I I 1 \1 r I , - \ \ \ \- l ( \ I \\\\ v' \ \ .I 9Z�\-7 ,.) J // r / / ,/ / /// / I I I I I :..\ 1� - \\ \ \ \ \\ \ \ 1 \- \ >S."O !\ \� \ \\\ OF11 �fC / / / ///' / / /i// / i//i//i////J I I 1 I I I I \ \I'l1 \\ `\ \ \ ` \\\ ` \ I \ - I\\. �S: \\\\\ l \ �Eti1,- �f* l l / �/ / / / / / I I I 1 I I, ;, TMP 78-20Q , \ \ -\�J I \ \ )All \ \ \\ \ ( \- l I / // `f`',.t�t( t /♦ / I �°�, / / / // / / / / / / I I I '"`- SOUTH PANTOPS LIMITED \ \ \ I \ I \ \ \\ � \ /\ \ \ ` ..S,I \ \ \ \ ( F�2 ( I I `'Y I I I l l / , / I 1 1/ I F \--BARSN�RSHIP I \ \ `\ -\ \ \ \ \ \ r- \ / `_ `\ \ \. \\ \ \\.-) \ \ ` \' �\ I I I l / / / l I l l I I ( I ` I \ \ \ \ \ \ / \ I \ \ .\ \ \j \ \ \\\\\ . - \. \\ I \ I I 1 ! I v Icy`" `J " I / I I / / ( ! / l / / / I / ry I ? , I . \ l \ \ \ ` \\ \ / \/ I \ 1 \ \ \ `' , \• - \, \ \. , I 1 1 I . I I I I I I I I I / 1 1 0? / ( , \ \ \ \ \ \ \ \ \ \ \ ♦\ I i I F \ - 1 -1 `\ \\ \ �� ,\ \ \.\- \ \•\ \. I 1 1 I I 1 I 1 I I I I I I I I I' l I l l l I I 1 TF / ,_ \ \\ ` \` \\\\ '\ , -\\\\\ l \\\\ \� \\ .I \\ I I I I I 1 I 1 , 11 / //--\ 'I I \ \\ 1 - �\ \ \ \ \ \ \ *) \ \ \ I I 1 1 1 I 1 1 \ \ I I I 1 I I / / I 1 I ,* \ \\ \\ \ \ \\\\ \ \\ \ 4\- / I \ , I\ \ \t- , . ♦\ ,,\ \ \ \ \ \ \ \ \ \ \ 1 1 1 I \ l \ \ \ \ \ 1 I I I l I I ( , III 1\\'1\ I \ \ \ \ \\,-- I %l \ ( \. \ \ \ \ \ \ \ \ \ \ \ I 1 I I 11 III I \ \ tP \ - _ - � - 11 I 1 � \ I \-)\\\�\\l \ I\ \. \\ \\ `��\. \\ .\ \\. \\ \\ M �\ \\\\�\ \ \ \ \ \ \ \\ \\ \ \ \ \\ \\ I I I 1, � 1 I I I I I 1 I,111I I , I IL \\ \ \ \\ - \ /_ \N\ \ \/ I I I I I 1 \\\\\-- \ \ \ 1. \. \ \ 1 \ \ \ \ \ \ \ \ \ \ \ \ \ , I I I 1 I 10\ I / r \ \ \--/ I I L - \\- \ I - \ \ \ \ \ \ \ \ I I I \ O\ / L \ - - - - \ \-\ . . \ \\ \ \. ,� .. \ \ \ \ \ \ \ \ \ \ \ \ 1 1 I I I 1 1 I \ 11 \ \ \ \ / ` I- 11 , � \ \\ \\ \ \ , O ` \� \\ \\ \ \\ \ \ \ \ \ \ \ \I \ \I \ I I I I I 1 I I \I,\11 I \ \ 7\ ----__----__----- -- \\ \ \ - O \ \ \ \ \ s \ \\\\-\ \\ \ `O \ \ \ \ ♦ \ \ \ \ \ \ I I I 11111 \ \ - I \ \ \\ \ 1 .- \ \ . /i \ \ \ \ D REAK I UND.A 0�1 I 1 1 I I \ \ -- -__ \ \ \ \ \ \ \ \ \ \ I 1111111 1 1 \ \ \ \ \ , C 1/ \ \\\\\\\, i \ ` �\,\ \-- 9� \ \-\ \\\ \\ \\ \ \ \ \ \\ \, 1 \ YOIN nED RPL) I I I r 1 11 I I f II III \ \ \ \ £ \- `-�-`_- \, \\\��\\ f , ♦ \ \ \ \ \ \ \�\ \ \ \ \ \ \ , 1 1 I I I I 1 I 1 1 1 I I I II 11111 , \ \ \ , I \ \; \ �� \ \ II ` \ . \ , I` - \ \ \ �\ \\� \ \ \ \\ \ \ 1 1 , I I 1 1 11 1 1 I I A 1111 \ M \- \, \` `\ '� , I\ 71 %r\\ 1I1.1 . `\� \\\;, \\\\ \\ \ 1 1\I I I I I , I 1 11 1 1 1 111 11 I I NIII \ 23B `\ \ I I �\ \\���\`-- \ I \\ \\ \ \ 1 11\ , I I I 11 I I, I I I 1 I A1111 \ I \\ \ s / \ , I \ \ .\ I 1 \ Q\, \1I I 111I I I 1 I I,II I1 I I 1111111 \ \ \ \ ,- \ / ll ( \ \\\ I ♦ \ \ 11 L1. ` `� \\ \`�\\\\\\ III 11' 1 1 1 I 1 I 1 1 I 1 I I I 1 \ I 111 \ ` \ -_ \__-- r \ t `-/ \\ 1\\. \ \ \\ \ -` ' 1\\ \\`\ \ 11 \ ' \ 1 11 1' 11I I 1 1 1 1 1 I I I 11j \ f - _ \ -\ \ \\ \;\\ \ ; ; \\�:;. \, - \ 1,\ \\\�\ \\ \ \\\,\ \ 1 \ \ \ l 1 \ I, II 1 1 I \, I 'I 1\ I 1 I 11 I I ' �j I;[II 1\ \\ \\\ \\ \ -� - \�-- \ \ .\\ \ I �, ♦'. / I L1 \` \\\ ` \\\\ \ \ \ \ \ 1 I I I I 1 1 1 I 11 I ' 111n1 r \ \ , -I `. \ \v0 1 1 \ / 1 `. I\ \\\,\1 \ \\ I 1 1 I I I I I 1 I I I I III , p11111 1\ I \\ \ \ \ \ \ . I / 1 \ ,\ \ \\ \\ \\ \ \ I I l 1 I 1 \ ------/ I\\\\\\ A\ \\.\)\ i, /. I 1111II\ \\\\\ \ \ \ \dd II II I I I i I I 1 \ t \ s \ \\ g8 \\ 6 I \ \ \ 1,1 1 I I I I I I II 11 1/ I I 1 11�11 -, \I \ \ 1 \ \\\ ) 10 0♦ \ \ 1 I 1 I1, 1\\ I I I I I I II \ ; 11 III \ \ \ 1 \\ \\` I ��3� \ \ \, I. ` I � l I\1\\\ �11,\\I II II II II I, 1,1'1 \, 11111 , II 1 i I i i 11 I � I ii I Ill I - \\ /\ \ `- K" _ --\ \.\`\\`'' s� % ca` \ \`\\, '\ 1\ \\1\ \ \ \ \11\ \ \ 1 I I I I I I I I I 1 � 1111 11 >' r \\ 1 ) \ g `-- - ; - -,\\� �\'\ �, � \\ \\� It \\ \\ \ \� � \ \\ I\\\ \\ \ \ \ \ \ \,'1 1\'\ \ \, \I \\ 11 1 I, 111 II III I 1 I \I lS i i � 11 \ ■ \ _ I , \ \\ \\ L \ O 1 \ \ 1 \- `\ \ \ \ \ \\ \ \ \ I 1 1 \ \ , \ \ 1 I \ , 1 \ \ \ I I I I I I . I 111 ) 1 \, \ \ \\ \\\\\ -I ;. '\V I �/ I `I \\\\�\\;\\\�\ \\A\� �\\,\ \ \I\I,\I\\`\\'\I'\1\, 1\1\ \, 11, \, `1 1 11\�Y'I, III l I 'I ► I I Ill, ` M \\\ \\\ '\I �\\���\'t_l �`. +,,P �11,/- I\ \\\\\\\\;\;;\\\; \II\,\,I,;111'11, 1, 111\, `, \, I,\'I \,'1 '1 \I,Ii II II 1I ;; '� Ill' \ M ,J 1\,AAAV AI �� `� '� Vvv , , 1\1AI\,1AAI \,111111, 1�111VIll II \,11VI,1'I 'I I I I I I I I I A /, ;1j1,'I `\ l/ \_-/ V Vv V I ♦. c-`3 -v�vV I A I 1 II111,I I1'1 I1 \,A1A\\\\\\ 11 I, 11 111 1 1 Ill I I I A°I 1 I IIII( \ rI I \\ \\\\-- c \`\\1'I /\\ � III111 II 11I II11II\,II II II III II i I'1 II 1I II III I I 1 1 I1[I- fir^ (`/'l\\__ N I/---\\\\\\\ \` _ ,\\\\\III I \ ; I II'111'lll Ill II II IIII, II 11111�IIII II I 1 I II11111I 1 1 I IIII\ \ / ■ 40 0 40 80 120 I I I I IA v V I I 11 I I 11 1,1 111 I I 1 1 I I 1 1 II I 1V I I 1I 11111 I' \I 1 1\\\\I / '\ ', `\ \ \I \I I % \) \I,\ 111\ A I, �I I ', II II II 1 11 1, 1 1 1`I 1 1 1 1, 1 1 1111 �I I I I I III II I , \ I\ '\ I I I II \ \, I l , / M \\ \, \\'(�l \, N \, I,'111. )) % ` 'I I, 111111, jII',1!I A�11,\1\\II 1, I'II III I ! II II I,'I\,\I\,\,\I 11 I ;k�IIi � 1 Scale: 1 "=40' LEGEND: IF IRON FOUND IS IRON SET MATCH LINE SOIL TYPE BOUNDARY (NOTE: ALL SOILS HSG 8) COUNTY GIS PRESERVED SLOPES SHIMP ENGINEERING LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM u SHIMP z No. 45183 2121123 4� O �rslONAL ti' �� VSMP PLAN FOR SOUTH PANTOPS DRIVE PARCEL 20R ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2022.04.27 REVISION: 1. 01.11.2023 VSMP Comments 2. 02.21.2023 VSMP Comments FILE NO. EX. CONDITIONS 22.002 C 2 kUT4T STORM STIR STATE ROUTE 1140 SOUTH -PA-N--TOPS-DRIVE F+ R LIMTSO DISTURBANCEI01IMPLOD LOD mr LOD � LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD" LOD � LODLOD LOD 6' PLANTING STRIP 6�'P PLANTING STRIP CONC. SIDEWALK 20' SANITARY SEWER EASEMENTD.B 841-521 EX.TREELINE /4T 0 �WEX. SSMH .SSMH C NCRETE bITCH 5' FRONT MA STORM STIR \ \ _ STATE RR�U ROAD CL PANTOP QRIVE ��\ \ \ DOGHOUSE I \ \ \ \ \ \ \ \ \ \LIMITS 0� \ \\TOP=411-313 6.40 I DIS RBANCE \ \ \ \ \ \ \\ 10=411.00 PLOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD L0D — LOD N34'40'44" 6 PL NTING\STRIP \ 6 PLANTING STRIP\ I.) \ e2 O C. 'SIDE WFiLK' d: yid +,i t+ .�4= �t.tih:+. � ti�i'. `v•."P°,+�. �t°�"`Wy i'+,� n.� ' S it A�Ft'.1... \ 5°19'12"E 219.27 T �O 111111111111111111 LOD LOD LOD LOp CONCRETE _ 160 1 LOD L "h EW TREELIN S34'4H'4 — _-- i 400— 400=.ii MH / ALLIFT NSVESTMENT S LLC %. — _ — — — — — — — — -� O1r-�-!• -�-� — _ i — — r • ,w. .'.;i� \ �,0 \ \ \� D.B 2673-672 ZONED: HC� a\ \ — _ ' ! — — — — — — — — — — _� — — — — — — �� �— — — — — ;,`r,,,., CO CRET \ \ _ — — — -- — -- V -- \ DT,�H pN, IFa r x �- — — — — — EX.TREEt1N \ — — — _ \ 25'\FRONT\Iv1AXIMl7fy1 SETBACK R _ 9S' FRnNIT KAn YInAI in.f r/ nPV ro�hiv6 �c — — — — — — — — — - — — — —•Ian' \ . \ / STORM STIR 424 STATE ROUTE 1\ 40 SOUTH — — —- - DOGHOUSE — I� PANTOPS DR \ \ DI-3B \ _ — — \ \ I \ \ \TOP=416.40 \ CG-6 \ \ \ \ CG-6 \ \ —AD CL \ \ 10=411.00 \ (TYP.) NEW RAVVE ENT— _ \ — — - � LOD � LOD LOD � LOD � LOD LOD � LOD LOD LOD � LOD � LOD � LODE LOD � LOD � LOD � � � LOD LOD � LOD � LOD � LOD � LOD � LOD f LOD � LOD � LOD � LOD � LOD LOD � LOD M� Aff_ - \ I.- \ ao n \ 5' ONT MINIMIIM7 \ _ LOD CLOD—L �LOD _ LOD _ TREELINE--- _ _ i`SEWER-E-ASEMENTD.B 841=52-1 — — 4. —P — EX.TREE-tN — — 4 — — — — _ — — — � L\ Al i \TREKLINE, \ -VARIABLE WIDTH SIGHT DISTANCE EASEMENT DB 2913 PG 15� SHED SHIMP ENGINEERING LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM O' �sslONAL VSMP PLAN FOR SOUTH PANTOPS DRIVE PARCEL 20R ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2022.04.27 REVISION: 1. 01.11.2023 VSMP Comments 2.02.21.2023 VSMP Comments FILE NO. 22.002 GRADING & UTILITY PLAN Scale: C4_ 1"=20' PROJECT DESCRIPTION, GENERAL NOTES, EROSION & SEDIMENT CONTROL NOTES, AND SEQUENCE OF CONSTRUCTION 1992 TYPICAL ORIENTATION OF TREA TMENT - 1 (SOIL STABILIZATION BLANKET) c MIm WHERE THERE S A OEM AT THE TOP OF THE SLOPE, BRING THE MATERIAE MR THE BERM AND ANCHOR R BEHIND THE emu. ON SH&Lgy SLCPES, STRIPS OF NETTING PROTLCRJE EONLRNIGS MAY BE APPLIED ACROSS THE SLOPE. E"ik21- WOMEN ffllu �I II-.° li I� n_I.11911 �Lu�l �OII-ncTrn=n-B=E=Ti 11=1l 11= ON UM SLOPES. APPLY PROTEOIFK 07MRWC PAFMLLn TO THE DIRECTION OF ROW AND A4CHOR SECURELY, BRING LNTERML BOMB TO A LEMEL AREA 9EFURE A - uNoENAV 11E INS ATTiIt TURN THE ENO UNDER 4' Aga) STARE AT 12' NTENYALS. ,. Ir source: Adapted from Ludlow Products Brochure IN DITCHES, APPLY PROTECTIVE QO RIND PARAELEL TO THE DIRECTION Of ROM. USE p WK SLOTS AS REQUIRED. AWID JOINING MI N TIE CENTER OF o1E DITCH IF AT ALL P HLE. Plate 3.36-1 )SOIL STABILIZATION BLANKET C5 Not To Scale ' 2 ) CLEAR WATER DIVERSION (CID C5 Not To Scale Coronacted Soil 3 DIVERSION DIKE DD C5 NOT TO SCALE UNDERGROUND DETENTION MAINTENANCE NOTES: 1. INSPECT THE DETENTION SYSTEM TWICE PER YEAR, IN SUMMER, AND WINTER. CLEAN OUT DEBRIS AS NEEDED; 2. INSPECT WEIR PLATE ORIFICES AND TRASH RACKS, ANNUALLY. FIX ANY CLOGS OR REPLACE TRASH RACKS AS NEEDED. 3. INSPECT GENERAL SYSTEM DEBRIS ACCUMULATION ONCE EVERY 2 YEARS. IF DEBRIS OR SEDIMENT IS NOTICED, CLEAN OUT THE SYSTEM WITH A VAC TRUCK USING ACCESS RISERS. REMOVAL OF TEMPORARY PRACTICES FOR ALL TEMPORARY PRACTICES LISTED ABOVE, THE CONTRACTOR SHALL REMOVE ANY TEMPORARY MEASURES SUCH AS DIVERSIONS OR SILT FENCE WITHIN 30 DAYS OF FINAL SITE STABILIZATION. THIS REQUIREMENT MAY BE MODIFIED BY THE EROSION AND SEDIMENT CONTROL INSPECTOR. PROJECT DESCRIPTION THIS SITE IS A WOODED LOT OFF ROUTE S PANTOPS DRIVE IN ALBEMARLE COUNTY BEING DEVELOPED INTO A 13 UNITS TOWN HOUSE DEVELOPMENT THE TOTAL AREA OF DISTURBANCE IS 1.20 ACRES. THE PROJECT INVOLVES THE FOLLOWING WORK ACTIVITIES: 1. THE CONTRACTOR SHALL OBTAIN ALL LOCAL AND STATE EROSION AND SEDIMENT PERMITTING REQUIREMENTS AND MAINTAIN ALL EROSION AND SEDIMENT CONTROLS IN ACCORDANCE WITH THE PERMIT REQUIREMENTS. 2. INSTALLATION OF PERMANENT EROSION AND SEDIMENT CONTROL MEASURES AS SHOWN ON THE PLAN AND DETAILS. 3. GRADING AND PLACEMENT OF FILL SHALL BE IN GENERAL ACCORDANCE WITH THE PLAN. 4. ESTABLISHMENT OF PERMANENT STABILIZATION OF ALL DISTURBED AREAS. ADJACENT PROPERTIES THIS PROPERTY IS BORDERED ON THE SOUTH-WEST BY RIVANNA RIVER AND UNDEVELOPED LAND, AND NORTH-EAST BY S PANTOPS DRIVE. OFFSITE AREAS SOIL MAY NEED TO BE IMPORTED FROM THE SITE FROM SITES WHICH SHALL HAVE EROSION CONTROL PERMITS. SOILS THE SITE CONTAINS THE FOLLOWING SOIL TYPES: 13E - CATOCTIN SILT LOAM, 25 TO 45, VERY STONY, HSG B 23B - YADKIN CLAY LOAM, 7 TO 15 PERCENT SLOPES, HSG B 71B - RABUN CLAY LOAM, 2 TO 7 PERCENT SLOPES, HSG B 71D - RABUN CLAY LOAM, 15 TO 75 PERCENT SLOPES, HSG B 71E - RABUN CLAY LOAM, 25 TO 45 PERCENT SLOPES, HSG B 88 - UDORTHENTS, LOAMY, 2 TO 25 PERCENT SLOPES W - WATER CRITICAL AREAS THE CRITICAL AREA ON THE SITE IS THE EXISTING CHANNEL WITHIN THE SITE AND COUNTY GIS PRESERVED SLOPE. CONTRACTOR TO USE EXTRA CAUTION TO PREVENT SEDIMENT FROM ENTERING THIS CHANNEL. EROSION & SEDIMENT CONTROLS 1. SAFETY FENCE: A PROTECTIVE BARRIER INSTALLED TO PROHIBIT UNDESIRABLE USE OF AN EROSION CONTROL MEASURE. STD. AND SPEC. 3.01. 2. CONSTRUCTION ENTRANCE: INSTALL AND MAINTAIN A CONSTRUCTION ENTRANCE, AS NECESSARY, THAT MEETS THE REQUIREMENTS OF STD. AND SPEC. 3.02 AND CONFORMS WITH THE REQUIREMENTS OF THE EROSION & SEDIMENT CONTROL PLAN. 3. SILT FENCE: INSTALL AND MAINTAIN SILT FENCE THAT MEETS THE REQUIREMENTS OF STD. AND SPEC. 3.05. THIS SILT FENCE SHALL BE INSTALLED AS SHOWN ON THE EROSION & SEDIMENT CONTROL PLAN AND ACCOMPANYING DETAILS FOR THE PURPOSE OF INTERCEPTING SILT -LADEN RUNOFF BEFORE IT IS DISCHARGED FROM THE SITE. THE SILT FENCE SHALL BE INSPECTED AND MAINTAINED TO ENSURE CONTINUED PERFORMANCE. 4. TEMPORARY SEEDING: TEMPORARY SEEDING SHALL BE APPLIED TO ALL DENUDED AREAS WITHIN SEVEN (7) DAYS TO DENUDED AREAS THAT MAY OR MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT (UNDISTURBED) FOR LONGER THAN 30 DAYS. TEMPORARY SEEDING SHALL BE APPLIED IN CONFORMANCE WITH STD. AND SPEC. 3.31. 5. PERMANENT SEEDING: PERMANENT SEEDING SHALL BE APPLIED TO AREAS DELINEATED ON THESE PLANS WITHIN SEVEN (7) DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. PERMANENT SEEDING STABILIZES DISTURBED AREAS AND ENHANCES THE BEAUTY OF THE SITE. 6. MULCHING: APPLICATION OF PLANT RESIDUES OR OTHER SUITABLE MATERIALS TO THE SOIL SURFACE TO PREVENT EROSION AND FOSTER THE GROWTH OF VEGETATION. ORGANIC MULCHES (STRAW) HAVE BEEN FOUND TO BE THE MOST EFFECTIVE. 7. DUST CONTROL: CONDUCT DUST CONTROL OPERATIONS NECESSARY TO MET THE REQUIREMENTS OF STD. & SPEC. 3.39 AS REQUIRED TO CONTROL SURFACE AND AIRBORNE MOVEMENT OF DUST. 8. OUTLET PROTECTION: RIP -RAP SHALL BE PROVIDED AT THE OUTFALL OF CONVEYANCE CHANNELS, CULVERTS, AND STORM SEWERS IN CONFORMANCE WITH STD. AND SPEC. 3.18. OUTLET PROTECTION SHALL BE INSTALLED WITH ACCOMPANYING STORM SEWERS AND SHALL BE INSPECTED AFTER EACH RAINFALL EVENT AND REPAIRED IF NECESSARY. ANT SEDIMENT BUILD UP SHALL BE REMOVED. 9. TEMPORARY DIVERSION DIKE DD - 3.09 A TEMPORARY DIVERSION DIKE SHALL BE USED TO BOTH DIVERT STORM RUNOFF FROM UPSLOPE DRAINAGE AREAS AWAY FROM UNPROTECTED DISTURBED AREAS TO A STABILIZED OUTLET AND TO DIVERT SEDIMENT -LADEN RUNOFF FROM A DISTURBED AREA TO A SEDIMENT -TRAPPING FACILITY. LOCATION AND DETAILS ARE SHOWN ON THE PLANS 10. TEMPORARY SEDIMENT TRAP ST - 3.13 A SMALL PONDING AREA, FORMED BY CONSTRUCTING AN EARTHEN EMBANKMENT WITH A STONE OUTLET ACROSS A DRAINAGE SWALE, TO DETAIN SEDIMENT -LADEN RUNOFF FROM SMALL DISTURBED AREAS FOR ENOUGH TIME TO ALLOW MOST OF THE SUSPENDED SOLIDS TO SETTLE OUT. MAXIMUM EFFECTIVE LIFE IS 18 MONTHS. STD. AND SPEC. 3.13. PERMANENT STABILIZATION AND SEQUENCE OF CONSTRUCTION THE FOLLOWING ARE THE PROPOSED MANAGEMENT STRATEGIES AND DETAILED SEQUENCE OF CONSTRUCTION: PHASE 1 1. INSTALL CONSTRUCTION ENTRANCE OFF S PANTOPS DR AS SHOWN ON C6. TRUCKS SHALL BE CLEANED PRIOR TO LEAVING SITE CONSTRUCTION ACTIVITY ENTRANCE LOCATION : (38.028942,-78.451065) 2. INSTALL SEDIMENT TRAP AS SHOWN ON THIS PHASE AND ITS DIVERSION 3. INSTALL SILT FENCE AND PERIMETER CONTROLS. 4. INSTALL TEMPORARY MEASURES SUCH AS DIVERSION AND CLEAN WATER DIVERSION 5. THE CONTRACTOR SHALL REMOVE THE DIVERSIONS AND SILT FENCE OF FINAL SITE STABILIZATION. PHASE 2 STAGE 1: 1. CONTACT THE ENGINEER AND ALBEMARLE COUNTY FOR INSPECTION AND APPROVAL OF ALL E&S CONTROL MEASURES. 2. UPON APPROVAL OF ALL E&S CONTROL MEASURES, BEING CLEARING THE SITE, INSTALL RETAINING WALL, SILT FENCE AND STOCKPILE MASS GRADING. 3.MAINTAIN ALL E&S CONTROL MEASURES AND APPLY TEMPORARY SEEDING AND DUST CONTROL AS NEEDED. STAGE 2: 1. INSTALL NEW SANITARY MAINS. 2. BEGIN INSTALLATION OF NEW WATERLINE AND STORM STRUCTURES (Al-A5) AND OTHERS. A. STRUCTURE A3 IS TO BE INSTALLED PARTIALLY. BOTTOM OF DETENTION PIPE IS 380.00' PER PROFILE ON SHEET C9 ( DETAIL 1). B. DO NOT INSTALL THE WEIR WALL FOR THIS DETENTION PIPE UNTIL SYSTEM IN PLACE AND THE GRADING IN THAT ARE CLOSE TO FINAL GRADE. 3. MAINTAIN PERIMETER CONTROLS AS MASS GRADING PROCEEDS. 4. AS PARKING AREAS ARE BROUGHT TO FINAL GRADE, MAINTAIN CONSTRUCTION ROAD STABILIZATION. 5. AS THE REMAINING SITE AREA IS BROUGHT TO GRADE, APPLY MULCHING, TEMPORARY SEEDING AND PERMANENT SEEDING AS SHOWN IN THE DRAWING. NOTE: SEDIMENT TRAP CAN BE REMOVED BEFORE CONSTRUCTION OF LOTS 1 THROUGH LOT 5 .BUT THIS REQUIRES STABILIZATION OF REMAINDER OF PROJECT. STAGE 3: 1. INSTALL SILT FENCE WHERE NEEDED FOR ANY FINAL PERIMETER GRADING (PRIMARILY FOR THE PRESERVED SLOPE AREA) 3. DURING HOUSE CONSTRUCTION, AREAS THAT ARE NOT BEING DISTURBED MUST REMAIN STABILIZED. INSTALL SILT FENCE PROTECTION FOR LOTS UNDER CONSTRUCTION. FINAL 1. MAINTAIN CONTROLS UNTIL SITE STABILIZATION AND COUNTY INSPECTOR HAS APPROVED CONTROL REMOVAL. 2. WHEN SITE HAS REACHED STABILIZATION, REMOVE PERIMETER CONTROLS. CONSTRUCTION MUST BE REMOVED OUT BY CONTRACTOR. CONSTRUCTION MAINTENANCE THE FOLLOWING CONSTRUCTION MAINTENANCE PRACTICES SHALL BE FOLLOWED AT THE SITE. 1. ALL E&S CONTROL MEASURES WILL BE CHECKED DAILY AND AFTER EACH SIGNIFICANT RAIN EVENT. ALL DEFICIENCIES IDENTIFIED DURING THESE INSPECTIONS SHALL BE CORRECTED AS SOON AS PRACTICABLE. 2. THE SILT FENCE BARRIER SHALL BE REGULARLY CHECKED FOR UNDERMINING, DETERIORATION OR SIGNIFICANT EROSION. SEDIMENT SHALL BE REMOVED AFTER EACH STORM EVENT AND WHEN THE LEVEL OF SEDIMENT DEPOSITION REACHES HALF THE HEIGHT OF THE CONTROL. 3. THE CONTRACTOR IS RESPONSIBLE FOR ADHERING TO ALL MAINTENANCE REQUIREMENTS SET FORTH IN THE CURRENT EDITION OF THE VIRGINIA SEDIMENT AND EROSION CONTROL MANUAL, OTHER APPLICABLE COMMONWEALTH OF VIRGINIA REGULATIONS AND THE PROJECT SPECIFICATIONS. 4. ALL SEEDED AREAS WILL BE REGULARLY CHECKED TO ENSURE THAT A GOOD STAND OF GRASS IS MAINTAINED. 5. AREAS WITH RIP -RAP SHOULD BE REGULARLY INSPECTED TO DETERMINE IF HIGH FLOWS HAVE DAMAGED THESE CONTROLS OR CAUSED EXCESSIVE SEDIMENT DEPOSITION. ALL AREAS SHALL BE MAINTAINED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS E&S CONTROL PLAN. ENVIRONMENTAL CONTROLS 1. CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL ENVIRONMENTAL CONTROL MEASURES SO AS TO COMPLY WITH LOCAL ORDINANCES, STATE AND FEDERAL LAWS AND REGULATIONS APPLICABLE TO WATER POLLUTION IN WATERS OF THE STATE AND IN INTERSTATE WATERS. 2. CONTRACTOR SHALL MINIMIZE THE POTENTIAL FOR AIR POLLUTION BY THE USE OF EMISSION CONTROL EQUIPMENT ON CONTRACTOR OPERATED EQUIPMENT, SHUT -DOWN OF MOTORIZED EQUIPMENT WHEN NOT IN USE, AND ACTIVELY CONTROLLING DUST EMISSIONS THROUGHOUT THE PROJECT. EROSION & SEDIMENT CONTROL PERMITTING CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL LOCAL AND STATE EROSION AND SEDIMENT CONTROL PERMITS AND MAINTAINING ALL EROSION AND SEDIMENT CONTROLS IN ACCORDANCE WITH THE PERMIT REQUIREMENTS. GENERAL NOTES 1. THE INFORMATION AND DATA SHOWN OR INDICATED WITH RESPECT TO THE EXISTING UNDERGROUND UTILITIES AT OR CONTIGUOUS TO THE SITE ARE BASED ON INFORMATION AND DATA FURNISHED TO THE OWNER AND ENGINEER BY THE OWNERS OF SUCH UNDERGROUND FACILITIES OR OTHERS. THE OWNER OR ENGINEER SHALL NOT BE RESPONSIBLE FOR THE ACCURACY OR COMPLETENESS OF SUCH INFORMATION OR DATA. THE CONTRACTOR SHALL HAVE FULL RESPONSIBILITY FOR CONFIRMING THE ACCURACY OF THE DATA, FOR LOCATING ALL UNDERGROUND UTILITIES, FOR COORDINATION OF THE WORK WITH OWNERS OF SUCH UNDERGROUND UTILITIES DURING CONSTRUCTION, FOR THE SAFETY AND PROTECTION THEREOF AND REPAIRING ANY DAMAGE THERETO RESULTING FROM THE WORK. ALL OF THESE CONDITIONS SHALL BE MET AT NO ADDITIONAL COST TO THE OWNER. THE CONTRACTOR SHALL CONTACT "MISS UTILITIES" OF VIRGINIA AT 1-800-552-7001 PRIOR TO THE START OF WORK. 2. WHEN WORKING ADJACENT TO EXISTING STRUCTURES, POLES, UTILITIES, ETC., THE CONTRACTOR SHALL USE WHATEVER METHODS THAT ARE NECESSARY TO PROTECT STRUCTURES FROM DAMAGE. ANY DAMAGE CAUSED BY THE CONTRACTOR OR ITS SUBCONTRACTORS SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY TO REPAIR OR REPLACE. THIS EXPENSE IS THE CONTRACTOR'S RESPONSIBILITY. 3. REPLACEMENT OR REPAIR OF DAMAGED STRUCTURES SHALL BE AT THE CONTRACTOR'S EXPENSE. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL EXISTING SITE STRUCTURES FROM DAMAGE AND COORDINATING WORK SO THAT THE OWNER CAN MAKE NECESSARY ARRANGEMENTS TO MODIFY/PROTECT EXISTING STRUCTURES FROM DAMAGES. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING ALL UTILITY OWNERS, ADJACENT LAND OWNERS WHOSE PROPERTY MAY BE IMPACTED AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION PRIOR TO COMPLETING ANY OFF -SITE WORK. 6. CONTRACTOR SHALL NOTIFY AND COORDINATE ALL WORK INVOLVING EXISTING UTILITIES WITH UTILITY OWNERS, AT LEAST 72 HOURS PRIOR TO THE START OF CONSTRUCTION. 7. ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION MUST COMPLY WITH OSHA STANDARDS FOR THE CONSTRUCTION INDUSTRY 29 CFR PART 1926). 8. THE CONTRACTOR SHALL VERIFY THE LOCATIONS OF ALL BOUNDARIES, BUILDINGS, VEGETATION, AND OTHER PERTINENT SITE ELEMENTS. CONTRACTOR SHALL IMMEDIATELY REPORT ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND CONTRACT DOCUMENTS TO THE OWNER AND ENGINEER. 9. CONTRACTOR SHALL SUBMIT FOR THE APPROVAL OF THE OWNER SUBMITTALS OF ALL SPECIFIED MATERIALS LISTED IN THE PLANS, TO INCLUDE SHOP DRAWINGS, MANUFACTURER'S SPECIFICATIONS AND LABORATORY REPORTS. THE OWNER'S APPROVAL OF SUBMITTALS WILL BE GENERAL AND WILL NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY OF ADHERENCE TO THE CONTRACT AND FOR ANY ERROR THAT MAY EXIST. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS, INSPECTIONS, BONDS, AND OTHER RELATED ITEMS IN ACCORDANCE WITH LOCAL AND STATE POLICY. STORMWATER MANAGEMENT NOTES WATER QUALITY (BMP): 1. PER THE NEW VRRM SPREADSHEET, NO FURTHER TOTAL PHOSPHOROUS TREATMENT IS REQUIRED. 2. WATER QUALITY WILL BE PROVIDED WITH DEDICATION OF 3.24 ACRES LAND INTO A SWM FOREST/OPEN SPACE EASEMENT. WATER QUANTITY THE RUNOFF FROM THIS DEVELOPMENT IS RELEASED INTO THE MANMADE CHANNEL IN COMPLIANCE WITH QUANTITY REGULATION DETAILED IN 9VAC25-870-66-B(3)A (CHANNEL PROTECTION) AND 9VAC25-870-66-C(3).0 (FLOOD PROTECTION): SWIM QUANTITY IS SATISFIED BY ANALYZING CONCENTRATED RUNOFF FROM THE DEVELOPMENT AT THE SITE OUTFALL AT THE SOUTHWEST CORNER OF THE DEVELOPMENT PROPERTY. 9VAC25-870-66-B(3)A REQUIRES THAT CONCENTRATED RUNOFF FROM DEVELOPMENT AT THE SITE OUTFALL MEET THE ENERGY BALANCE EQUATION. TO ACHIEVE THIS, CONCENTRATED RUNOFF FROM THE LIMITS OF DISTURBANCE AREA WILL BE ROUTED TO AN UNDERGROUND DETENTION FACILITY AND THEN TO THE SITE OUTFALL. WHEN THE ENERGY BALANCE EQUATION IS BEING USED TO DETERMINE THE ALLOWABLE DISCHARGE, THE IMPROVEMENT FACTOR WOULD NEED ONLY BE APPLIED TO THE 'SITE" AS PER THE REGULATORY LANGUAGE OF 9VAC25-870.66.B.3 IN THIS CASE, THE APPLICATION OF ENERGY BALANCE TO THE DISCHARGE FROM THE SITE WOULD BE CALCULATED AS FOLLOWS: RVEPre. site RV, Pre, Offsite Q1 Post C Q3 P""te (1 F) t Q1 Pre of (site RVivosr, sits RVipost,Offstte Tablet : Energy Balaoc a Equation Summary QIPRSI(111aIA1I...d)(cIS) Ql Pos[(.%I1Adflmvd)(CA) OUTFALL 1.85 1 1.77 NOTE: 0.10 ACRES (THE RELATIVELY FLAT AREA ABOVE THE DETENTION PIPE) WILL SHEET FLOW INTO THE ONSITE WOODS WITH NO DOWNSTREAM IMPACT. THIS AREA IS IDENTIFIABLE ON PLANS AND IN THE FIELD AS AN EXISTING FLAT "BENCH" ON THE SLOPES THERE. THE SURFACE OF THIS AREA IS MOSTLY COMPACTED SOIL WITHOUT UNDERGROWTH DUE TO HUMAN ACTIVITY. WHEN THIS AREA IS REGRADED AND STABILIZED, WE EXPECT LESS RUNOFF VOLUME FROM THIS "BENCH". FOR THESE REASONS, RUNOFF FROM THIS 0.10-ACRE AREA COMPLIES WITH 9VAC25-870-66-D. CHANNEL PROTECTION: CONCENTRATED RUNOFF FLOWING THRU THE SITE SHALL BE ROUTED VIA NEW STORM DRAINS INTO THE NATURAL CHANNEL WHICH WILL RELEASE RUNOFF AT RATES WHICH COMPLY WITH THE ENERGY BALANCE EQUATION 9VAC25-870-66-B(3)A. FLOOD PROTECTION: TO MEET FLOOD PROTECTION REQUIREMENTS POST -DEVELOPMENT RUN-OFF WILL BE DISCHARGED INTO A CHANNEL WHICH IS LOCATED IN A MAPPED FLOODPLAIN. THUS, THIS IS THE LIMITS OF ANALYSIS AND NO FURTHER ANALYSIS IS REQUIRED. CONCENTRATED RUNOFF RELEASE TO THE OUTFALL IS CONTAINED WITHIN ADEQUATE MANMADE CHANNEL. REF LD-268 DITCH DESIGN ANALYSIS. THIS IS COMPLIANT 9VAC25-870-66-C(3). C MINIMUM STANDARDS (MS) All applicable Virginia Erosion and Sediment Control Regulations and Minimum Standards shall be adhered to during all phases of construction. These include, but are not limited to the following: 1. STABILIZATION OF DENUDED AREAS: Permanent or temporary soil stabilization shall be applied to bare areas within seven days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade, but will remain dormant or undisturbed for longer than 30 days. Permanent stabilization shall be applied at areas that are to be left dormant for more than 1 year. 2. STABILIZATION OF SOIL STOCKPILES: During construction of the project, soil stockpiles shall be stabilized or protected with sediment trapping measures. The applicant is responsible for temporary protection and permanent stabilization of all soil stockpiles on site as well as soil intentionally transported from the project site. 3.PERMANENT VEGETATIVE COVER A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieve that, in the opinion of the county Inspector, is uniform and mature enough to survive to inhibit erosion. 4. TIMING & STABILIZATION OF SILT TRAPPING MEASURES: Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be constructed as a first step in any land disturbing activity and shall be made functional before upslope land disturbance takes place. 5.STABILIZATION OF EARTHEN STRUCTURES: Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after installation. 6. SEDIMENT TRAPS AND BASINS: A sediment basin shall control surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to three acres. The sediment basin shall be designed and constructed to accommodate the anticipated sediment loading for the land disturbing activity. The outfoll device or system device shall take into account the total drainage area flowing through the disturbed area to be served by the basin. 7. CUT AND FILL SLOPES: Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is corrected. & CONCENTRATED RUN-OFF DOWN CUT OR FILL SLOPES: Concentrated runoff shall not flow down cut or fill slopes unless contained within an adequate temporary or permanent channel, flume, or slope drain structure. 9. WATER SEEPS FROM A SLOPE FACE: Whenever water seeps from a slope face, adequate drainage or other protection shall be provided. 10. STORM SEWER INLET PROTECTION: All storm sewer inlets that are made operable during construction shall be protected so that sediment -laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. Y 9 11. STABILIZATION OF OUTLETS: Before newly constructed stormwater conveyance channels are made operational, adequate outlet protection and any required temporary or permanent channel lining shall be installed in both the conveyance channel and receiving channel. 12. WORK IN LIVE WATERCOURSES: When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control sediment transport and stabilize the work area to the greatest extent possible during construction. Nonerodible material shall be used for the construction of causeways and cofferdams. Earthen fill may be used for these structures if armored by nonerodible cover materials. 13. CROSSING A LIVE WATERCOURSE: When a live watercourse must be crossed by construction vehicles more than twice in any six month period, a temporary stream crossing constructed of nonerodible materials shall be provided. 14. APPLICABLE REGULATIONS: All applicable federal, state and local regulations pertaining to working in or crossing live watercourses shall be met. 15. STABILIZATION OF BED AND BANKS The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is completed. 16. UNDERGROUND UTILITIES: Underground utilities shall be installed in accordance with the following standards in addition to other criteria: a.No more than 500 linear feet of trench may be opened at one time. b.Excovoted material shall be placed on the uphill side of trenches c.Effluent for dewatering operations shall be filtered or passed through approved sediment trapping device, or both, and discharged in a manner that does not adversely affect flowing streams or offsite property. d.Material used for bockfilling trenches shall be properly compacted in order to minimize erosion and promote stabilization. e.Restabilization shall be accomplished in accordance with these regulations. f. Applicable safety regulations shall be complied with. 17. CONSTRUCTION ACCESS ROUTES: Where construction vehicle access routes intersect paved public roads, provisions shall be made to minimize the transport of sediment by vehicular tracking onto paved surfaces. Where sediment is transported on to a public road surface, the road shall be cleaned thoroughly at the end of each day. Sediment shall be removed by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to individual lots as well as to larger land disturbing activities. 18.TEMPORARY E&S CONTROL MEASURE REMOVAL: All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after temporary measures are no longer needed, unless otherwise authorized by the local program authority. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sediment. 19.ADEQUACY OF RECEIVING CHANNELS: Properties and waterways downstream from the development site shall be protected from sediment deposition, erosion and damage, due to increases in volume, velocity and peak flow rates of stormwater runoff for the stated frequency storm of 24-hour duration. SHIMP ENGINEERING2 LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM 711 U STO N0.45 183 A 2121 1 23 4r O /jJj 4�S1n,,TAI VSMP PLAN FOR SOUTH PANTOPS DRIVE PARCEL 20R ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2022.04.27 REVISION: 1. 01.11.2023 VSMP Comments 2.02.21.2023 VSMP Comments FILE NO. ES&C NARRATIVE 22.002 C5 SOIL EROSION & SEDIMENT CONTROL SYMBOLS SYMBOL NO. TITLE KEY STORM STR \ SATE ROUTE 114�0 SOUTH / I PANTOPS IVE — I ROAD cL \ \ \ \ \ \\ \\ \ITS OF t4DIStMRBANC E \\ \ \ \ ^ -PLCID � LDD uw � LOD � LOD LOD LOD LOD LOD lm LOD LOD" LOD LOD LOD u \ I N / x x x \ \ \ \ \ i > x x x x x \ CONCRETE x x x —\ 4•—�_\ EW TREELIN_ — — — — — — — — — TMP 78-15C9 / BALLIF INSVESTMENTS LLD ;M im jma D.8 2673-67200 00�ZONED: HC �� wL - _ _ 00 00 a �PRES-EVED SLOPE — — — — ----�_—_ --- w --� .,.• .r' C CRET \ \ 00� fto —\ \ !��- w. ---- \ \ — / i 380'— —_ �-� \ — — —. \ 25'\FRONT' 25' FRONT M. XIMUj T/BBACK FRDWYR�� — — — — — — — —, — — — — — — — — — \.\ STORM STR \ _ _ ROAD CLO ITS \ \ \ D148ANC� V A\ ■ LOD LOD LOD LOD LOD LOD LOD OD LOD LOD \ LOD LOD" LOD � LOD LOD L \ \ \ EX. GUARD RAIL (DEMO) X X X [DRAWN TO SCALE] [DRAWN TO SCALE] LOD LOD LOD 3.02 CONSTRUCTION ENTRANCE CE 3.03 CONSTRUCTION ROAD STABILIZATION CRS 3.05 SILT FENCE SF 3.10 SAFETY FENCE SAF 3.13 TEMPORARY SEDIMENT TRAP ST 3.09 TEMPORARY DIVERSION DIKE DD 3.09 CLEAN WATER DIVERSION �W 3.13 TEMPORARY SEDIMENT TRAP ST TOTAL LIMITS OF DISTURBANCE: 1.20 Acres SEDIMENT TRAP DRAINAGE AREA — — — — — — o \ — STATE ROUTE \140 SOUTH \��\ PANTOPS \ ROAD CL\— OD �E]EOp LOD ss \ LOD LOD D LOD LOD LOD LOD L � \ ` LOD LOD mw� L LOD \ LOD A J \ \ DE . EXEC LOD UNEW LOD nw� LOD LOD _ \ Drainage Sediment _ — — Trap 0.83 Acres EX. ARID RAIL (DEMO) — \ \ 160 51 — ` 1 � \ S52°30'00"E 90.00' \ \ Cod - 2 [JEW TREELINE — — _ \ x _ — — \ \ 2288 26 00 \ 0' \ \ \ _ �'� — - - — — S34°40'45" \ _ _ \ N34'40'46"E\ o 2�A° 20.0� 20.00' 20.00' 20.00' 3 2T0.00' �t 2 4 C I _20.00, — — — — — — — — — — — — -i— — — — — 3 C5 \1 \ 12R 74' EMO CG— 34- -----------------_ _ _ :;:v.. 7R\.00 \2.00' 20.00' \—\\— \ \� AND ASPH T IF I _-------I— ------ a��-�-MM �XIoH�-I i \ —-- o0 OM no M \ \ \ f 29 _ V �� \ �DTTHE\\ \Ap \\\\ �\ J \ \ \\ \\ --- \co 'CO- - EX.TREZYN — \\ \ \ \ ^ N ca\ \ m x I 1 _ \ °� O \ t O1 II _ ` \ �\ \ \ o m a6 \ n1 \ `O \ +x I --o —� --- \\ \\ \\ \ \ \ \\ \� r �\ v STAGI G AND � Wi ----------- —bo 0.\ --- \-- AREA 00 4 \ \ \ \ R7 _ — — — STOCKPI E I 00 \ 00 \� - -4� \ LI yC.�'� \ \ \ --- ----- — -- — zLao \ \ \ \ — — — \ \� x �x x — — x LOD may® SHED �\ 4EI� LENGTH= 4 98 FT \ \10 408NE — — _ o 406 L \ �' \ o. \\ \\\ \ 202 ow ----� \ \ \ \ \ \ �_ ±02.5= 402 =_-- 20.3 ^ �oD\ ►h 4005- _ -- —�- —� C \TREXLIN� \ \\ \ \ \ , ` lap�� \ III400 LOD \ — — — — — \ / _ LOD )n Of IV , T' \� 4400La44o= \\\\ \ QmN /: � UNDIS ED AREA p\ h E\ c LOD% \ La-M 77 an 4uu .. \ — \— — — ------ \ ,BOO \ ` �'� �y�------- -- — — — —PRESERVED SLOPE LOD----\ x \ ''. \ \ \ Ex.ssM 8 _ — — — \ EX.WAL \ fNLET EX.SSMHNEW COD TREELINEno �LODLOD —_—--_---- ` \ \\ \ \ \ \ \ DIDAkft LOD �M LOD LOD too _ ss0. \ \ \\ --- -----_ \ \\ SSMH \`�� LOT 14 ---- — \ \ \ \ \ \ \� \ — — — — LOD 00 �fvtul 7j8-22��REk� �34-AC \ \ IF \ \� \ \ PRES VE SLOPE \ \ \ \ \ —�— \ ��R OWNER- SOl7TH PANIDPS� AND TRU — \ \ P\ \ \ \ \� \ LOy►LOD — ��� _ — — OPEN SP_ACF-:-4.33 -AC oD-ram 2HARLES W Hk1RT \ \ --- _�liIR�EY F�ER�S ---- \ \ \ \ \ \ \ \ \ \ \� — L — _ — — AREA LOT 1 T iRt� TOT 13: 0 60 AC \ \ \ \ \ \ \ 1 i"�'r 1'\ \\ \ \ \♦ \ \ \ \\ s \ \\ \ \\ \ \ \ \ �� — _ --- -- _ L-0��: 3.41 ACC\\\— � \_--- ���=AREAor o�5.34 ACRES----P1RESERVED�OPE— 20 0 20 40 60 SHIMP ENGINEERING2 LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM VSMP PLAN FOR SOUTH PANTOPS DRIVE PARCEL 20R ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2022.04.27 REVISION: 1. 01.11.2023 VSMP Comments 2.02.21.2023 VSMP Comments FILE NO. 22.002 EROSION AND SEDIMENT CONTROL PLAN PHASE 1 Scale: C 6 1 "=20' STORM STR \ � 0 // , ) / I \ I STATE ROUTE_114 SOUTH _ / _ I ROAD CL I / �/ PANTOPS DRIVE I\ \ \ \ \ \ \ \ \ IMITS OF \ \ \ \ \ \ DIARBANCE \ \ \ \ OUiPLOD LOD LOD LOD Lao Mmilkm LOD LOD LOD LOD LOD LOD LOD LOD LOD Lao \ \ T Y \ \ \ %PD , 6' PLANTING� STRIP \ \ 6' PLANTING STRIP\ !`1 \' it d`''W�A 1 yy 1 nl 1 54 X . I 4 !y� 1 . •., "_- -x... %X _ i — .,CONCRETE . x L EW TREELIN Q / L — — — — — _ / BALLIF INSVESTMENTS LLC we — — -� — — — — — — — — — SANITARY-S€-WER-E-AS — D.B 2673-672 _ — — —20' _ EMENTD.B 841=52fi — _ — — .sw*•it.�" ZONED' HC — „,,,., _•%,•i .. h 000000 a ^f _ I _ --- — --- _ — _ _ C CRET ` —\ x �- — — — — — — Q — EX.TREELtN ---- --_-- — .." _ I w / / / / 380'' — •,;.:u \ \ 5'\FRC � � 25' FRONT M XIMUNt T�CK FIR -15 — — — — — � 'i'' "' \ NOTE: LOW MAINTENANCE GROUND COVER: SOUTHEAST NATIVE GRASS SEED MIX (AMERICAN MEADOWS INC.) FOR SLOPES STEEPER THAN 3:1 GRADE, MIX THE FOLLOWING SEEDS AT 30 LBS/ACRE EACH, ALONG WITH EC-2 MATTING: VIRGINIA WILDRYE (ELYMUS VIRGINICUS), LITTLE BLUESTEM GRASS (SCHIZACHYRIUM SCOPARIUM), PURPLETOP (TRIDENS FLAVUS), BROOMSEDGE (ANDROPOGON VIRGINICUS), AND INDIAN GRASS (SORGHASTRUM NUTANS). -P SERVED-S♦GPE--: �— --- -- \ \ NOTE: AMREOHESEDIMENT TRAP X— Y I I IrMH A2 \ \ \ SHALL BE GRADEDANDSTABILIZEDWITHMULCH OR STORM STIR \ ROAD CL ��IMITS OF DOGHDOUS DIS\ RBANCE \TOP=416.40 \ 10=411.00 ��PLOD � LOD � LOD � LOD � LOD � LOD � LOD � LOD �LOD � LOD � LOD LOD � LOD� LOD � LOD LOD � LOL1�� ��{Op_ Y SOIL EROSION & SEDIMENT CONTROL SYMBOLS SYMBOL N0. TITLE KEY X —X —X [DRAWN TO SCALE] TS PS DC LOD LOD LOD 3.02 CONSTRUCTION ENTRANCE CE 3.03 CONSTRUCTION ROAD STABILIZATION CRS 3.05 SILT FENCE SF 3.10 SAFETY FENCE SAF 3.13 TEMPORARY SEDIMENT TRAP ST 3.09 TEMPORARY DIVERSION DIKE DD 3.09 CLEAN WATER DIVERSION �W 3.18 OUTLET PROTECTION OP 3.31 TEMPORARY SEEDING TS 3.32 PERMANENT SEEDING PS 3.35 MULCH MU 3.39 DUST CONTROL DC TOTAL LIMITS OF DISTURBANCE: 1.20 Acres SEDIMENT TRAP DRAINAGE AREA CONSTRUCTION STONE PRIOR TO REMOVAL OF THE SEDIMENT I TRAP. CONTACT COUNTY INSPECTORS FOR VERIFICATION OF STABILIZATION PRIOR TO REMOVAL OF TRAP. — — — - — — — — — — — — — — — — — — — _ _ — EX.SSMH o \ \4 211 _ STATE ROUTE 1140 \SOUTH Sf 6 I\ PANTOPS DRIVES \ _ SA C8 CG-6 \\ �- \ ROAD CL \ \ C5 �T6 � — LOD LOD LOD � LOD LOD � LOD LOD � LO L � YPNEW RAVEMENT \ LOD R LOD � L LOD LOD LOD enuft LOD \ \ , 6' PLAN NG STRIP L Lop % % v x- % % r, ..r .. — 160 51 _ T LLFR9NT v ------ ' _ (Op 2 ��LNEW TREELINE —— L \ S �/ `Lpp _ _ — — — — — — \ 01 `_ lOp 4007 _ ['� _ — — _ — — — — — — — — — I — — R 2 �i R D R D ' - _ ` [ DL D T*l --- -- — 2 _� RD D RD — — — — — — — -�- \ aq \ _ 24 BR SIN p 20.00' 20.00' = 1 R '---a. R7� _ — — — — — — — — — — — ` i RD RD R 20.00'—_ — — — — — �, \ D yhS' D D R _ Z�A'SIN ------ -- _ i __ -_20.00' � \ R - R 9 �'IF� �7-�-� ��a»XSMH _ .:.�.•,r'..� � \ \ k 2 ..'-"". O\ �OWNHOU E �' \ 20.00' 1 o 0 4 B,�SIN _ _ 20.00 \ 20.00' o LOT 7 c6 \ _ _ — .�.;;:,.;%'<` \ E, \ \ \(TYP \ \ \ 00 LOT 6 \ M LOT 8 0 \ —� _ — — — :mat;:. \ \ \ \ \ \ — \ \ LOT 9, M \ ,.�'':,i,, CONCRETE\ \ \ \ \ LOT 10 0 \ DTT H \ \Ap \ \ b — - — — — \ LOT 11 ro\ —�_----------_ --- o \ n LOI12 LOT13 -_�— EX.TRPFM _ :g:.y, >. \ �. \ O� \ \ AO \ c�\ LOT 1 \ 00 00 \ — 380'— — — �P — — — _ ,: ?•. \ \ \ \ \ \ \ n \ LOT 2 LOT 3 LOT 4 M LOT 5 \ }5 \ �•n bb _ } 04 55 - — — — — — — — — — — — — 1 — — — — — — — — — — — — -- .;.R I TOP=387.20 } — 18.01 z — — — — — — ., \ L 11=378.00 \ \ \ 5 \6�\ 1 — - — _ — �i \ \ ° $ 370'— z — — — — — LOD ic �14\ � - \ I 0=374.0 \ \ 1 \ 18.0' $ I N — — _ N \ \ 'v —� — — — \ \ \ \ \ ss \ LENGTH= FT 410` m — — — — — — — — ----�--- ---- Al \ \ I \ \ \ �\ �\ \ 4P8 _ o1I \ N \ \ /--------_---- o-- -- \ VB:. DBE Lob 2 ti ! NEW \ \ A°o• \ M 4 6 Qa g z _ — L !y TREE, �\ J r �� �` \ \ a ------- — ,/ \\ \5_= 40204 — — �v -- �0 — — NEW PAVEMENT\TR E LI N --- — \ \ \� \ \ ` DI-2 — — \ b! R 38�g oD `\ \ \ \ \� \� — 84 gF�uLe� RL R_° �� - �_— ....NEW k- - %�0. _ — \� TREELINE — — — `p T r -----_ q.w• \ \ \ \\ \ \ \ \ \�\ \\ \\ \�9 \! `\ \\ �� -- —....; —--------------- ` ` O\I— — — — \ v E 5,r NCR�TE\ \ \ \ \ \ \ \\ \ \ O' 8� ; \ --- L� \ 3 0 \ \ + \ \ \ \ L LOD Lao Lao ! Lao 2 — < \ 0 _ \ \ \ _ _ \\\IT \\\\\\\ \\ \\\ \\ \\\\�►\>\1�38\C. \ ��1�\�\ !�b \ g\ -- ------�.- . --- C8----------- ---- 400>�_ I \ �� \ '" �� \ \ \ \ \ \ \ \ \ \ \ \ \4VEIf,2 RFA`jE \ AO�io\ :\ \\ \10' SEGMENTAr-BLOCK — — •` _ — — — — — — — — — \ \ \ \ \ \ . \ RCTAINING WALLan — — — — — — — — — — — — — — — — — _ ki 0 \ w ---------------- LOD \ • \ EX.SSM H — �� �-�� \�------------------ ---� �— --- __ .W EXAL \ / \ PIPE A4 PRESERVED SLOPE EX.SSMH w \ \ \ \ \ — — — — — — _ / \ \ \ \ \ \ z \ \ \ \ \ \ \ L� top TREELINE 39�s�� — — \— �I \ \ \ \ \ \,\ 30" ACGESS3-R� \ `L_, — \ Lev=3�a.ao c�60' i�LOD ��LOD�..L L°D�----------—_-------�_ �\ �\ ` LOD � LOD LOD � LOD SL \ I • I I I l \ \ \ \ \ \ \ \ \ \ \ \ �\ \ \ \ �\ -- — — —TX 7820R O-- — ---- ----- �\ \\ \ \ o• I I I / — \ \ \ \ ♦ \ \ \ \ \ \ \ \ \ \ \ \ \ \ may' \ \� \ \ = ��� �, .,� LcA ER: SOUTH PANTOPS I II L-AN TRUST --- _ \ \\ CHARLEY W HURT SHIRLEY�HIE� I3R fRS �� �3so'------_ \�\\\ IF LaIll ___ --- D.B 2913�5i1 \ \ \ \ \ \ \ \ \�__ —_ 30 ACL€SSRISE — LOD RISE -- _--- Z \ \ \ PRESE&ED SLOPE\ \ \ �s \ \ \ \ \ \ \� _ tEv— iR8.0o _ _ _ — — \ \ \ \ \ \ \ \ \ == — --- �E� ES �_----_� 4 ACR 0-0 va 00 00 ___--------- _-- _ D'— 20 0 20 40 60 bcoie: 1 "=20 SHIMP ENGINEERING2 LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM '��p�I TH O � v . SfflN4r a No. 45183 � 2123�. 0 rSI01VAI. ENV VSMP PLAN FOR SOUTH PANTOPS DRIVE PARCEL 20R ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2022.04.27 REVISION: 1. 01.11.2023 VSMP Comments 2.02.21.2023 VSMP Comments FILE NO. 22.002 EROSION AND SEDIMENT CONTROL PLAN PHASE 2 C7 STONE 70' MIN. CONSTRUCTION ACCESS 3" SM-2A ASPHALT TOP COURSE EXISTING 277 PAVEMENT 6" MIN. 21A AGGREGATE BASE PROFILE STONE 70' MIN. CONSTRUCTION ASPHALT PAVED ACCESS -- A WASHRACK FEXISTING 2% 2% PAVEMEN j 1 2% ' 2' MIN.* *MUST EXTEND FULL WIDTH POSITIVE DRAINAGE OF INGRESS AND EGRESS TO SEDIMENT OPERATION TRAPPING DEVICE PLAN 12' MIN. POSITIVE DRAINAGE 27 TO SEDIMENT TRAPPING DEVICE FILTER CLOTHS _-- SECTION A -A A ntittitman water tap of 1 itch must be ntstalled with a ntininumi 1 inch ballcock shutoff valve supplying a wash hose with a diameter of 1.5 itches for adequate constant pressure. Rash water umst be carried away front the entrance to an approved settlittg area to remove Sediment. All sednttent shall be prevented from entering storm drains, clitches or watercourses. PAVED WASH RACK NO SC.- I -1)PAVED CONSTRUCTION ENTRANCE (CV) C$ Not To Scale Sediment Trap Design Data No. A B C Ho(ft) H (ft.) Z (ft.) W(ft) DA Wet Vol. D1 WetVol. Dry Vol. D2 Dry Vol. (Acs.) (Req.) (ft.) (Prov.) (Req.) (ft.) (Prov.) 1 400.5 402.5 404.0 4.0 5.0 3.5 4.5 0.83 55.6 2.0 55.7 55.61 1.5 59.0 ORIGINAL GROUND ELEV. Area 2 DRY STORAGE D2 67 CU, YD./AC E Area 1 WET STORAG 67 CU. YD./AC E � W=Z+I 1'I (EXCAVATED) 1/ FILTER CLOTH ORIGINAL GROUND EL=C ELEV. "SEE PLATE 3.13-1 COARSE AGGREGATE " CLASS I RIPRAP CROSS SECTION OF OUTLET ® CLASS I RIPRAP LENGTH (IN FEET) = 6 " DA (IN ACRES) �_ DIVERSION DIKE � A�COARSE AGGREGATE EXAll FILTER CLOTH **COARSE AGGREGATE SHALL BE VDOT #3, #357 OR #5 OUTLET (PERSPECTIVE VIEW) IM 3.13 MINIMUM TOP WIDTH (W) REQUIRED FOR SEDIMENT TRAP EMBANKMENTS ACCORDING TO HEIGHT OF EMBANKMENT (FEET) It Ho ------ __--- 1.5 0.5 20 2.0 1.0 2:0 1.5 1.5 25 so 2n 15 3.5 2_5 3.0 "o 4.0 10 3.0 ENfAWiFD IMA SouI Va. DSWC P1ase 3.13-1 CONSTRUCTION OF A SILT FENCE (WITH WIRE S UPPOR T) 1. SET POSTS AND EXCAVATE A 4"X4" 2. STAPLE WIRE FENCING TO THE POSTS. TRENCH UPSLOPE ALONG THE LINE OF POSTS. w 3. ATTACH THE FILTER FABRIC TO THE WIRE FENCE AND EXTEND IT INTO THE TRENCH. 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. EXTENSION OF FABRIC AND WIRE INTO THE TRENCH. 2 )SILT FENCE (SF) W. WIRE SUPPORT C$ Not To Scale C PERSPECTIVE VIEW PLASTIC FENCE SOURCE: CONWED PLASTICS VDOT ROAD AND BRIDGE STANDARDS VA. DSWC r �1 PERSPECTIVE VIEW METAL FENCE PLATE. 3.1-1 1992 3.35 Source: Va. DSWC TABLE 3.35-A TABLE 3.35-A ORGANIC MULCH MATERIALS AND APPLICATION RATES 3 MULCHING MU C$ Not To Scale TABLE 3.31-C TEMPORARY SEEDING PLANT MATERIALS, SEEDING RATES, AND DAMS N N cow SEEDING RATE NORTHa SOUTHb PLANT all 5Il 8/15 2/IS s/1 9/1 CHARACTERISTICS SPECIES A. 1000 fly m to to to 1.4/3o 8/15 un ontoo vn 11ns OATS 3 bu. (up to 100 Ibs.. 2 Ibs. X - - % - - Use spsive vasiaiea (e.8�. Noble). (Avw HIa not Iese 0150 16eJ RYE° 2 W. (W to 110 Ibs., 2.5 It.. X - X X - X Um for late tall aedings, winter (Swale cereal not lass Ditto SO Ibs.) cover. Tolmtee cold and low moievve. GERMAN MILLET 50 Its, appmx. 1 lb. - X - - X - W.. eenuel. Dies et f rst (Sefuia iWiul troal. Mey be eddW to smmar mixes. ANNUAL RYEGRASS` 6016a. 1'h Ibs. % - X % - X May be Wdd in mixa. Will ({gJlMlp multi-Flomml mow w[ of mwl sNMs. WEEPING 15 Ibs. 5'h X - - X - Warm-xemn perevniel. May LOVEGRASS bush. Tolerates hot, dry slopes fEnemstia ..IA mil acid, infertile soils. My be added to mixes. KOREAN 25 Ibs. approx. 1'h % X - X X - Werm sr*son umud legume. LESPEDEZA` Ibs. Tolen[ea acid soils. May be f�a a is iwlacul addm to mixes. • Northam Piedmont and Mountain region. See Plates 3.22-1 and 3.22-2. b Southern Piedmont and Coastal Plain. e May be used as a cover crop with spring seeding. d May be used as a cover crop with fall seeding. X May be planted between these dates. May nosy be planted between these dates. - 'ITEMP01 C$ Not To Scale TABLE 3.39-A ADHESIVES USED FOR DUST CONTROL Water Application Dilution Type of Rate Adhesive (Adhesive: Water) Nozzle Gallons/Acre Anionic Asphalt Emulsion Latex Emulsion Resin in Water Acrylic Emulsion (Non -Traffic) Acrylic Emulsion (Traffic) PIPE OUTLET CONDITIONS 3do (MIN.) IPE OUTLET TO WELL IEFINED CHANNEL 1` ` ° D zrp -� d SECTION A -A FILTER CLOTH KEY IN 6'-9"; RECOMMENDED FOR ENTIRE PERIL NOTES: 1. APRON LINING MAY BE RIPRAP, GROUTED REPRAP, GABION BASKET, OR CONCRETE. 2. La IS THE LENGTH OF THE RINRAP APRON AS CALCULATED USING PLATES 3.18-3 AND 3,18-4. 3. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER, BUT NOT LESS THAN 6 INCHES. Q10 (cfs) La (ft) Do 3Do d5o depth Outlet (ft) (ft) (in) (in) Condition Al (OP) 8.03 10.0 1.25 3.75 6 18,00 Channel OUTLET PROTECTION TABLE (OP Not To Scale PERMANENT SEEDING SPECIFICATIONS February 16 through April 30: Kentucky 31 Fescue - 128 Ibs/acre; Red Top Grass - 2 Ibs/acre; Annual Rye - 20 Ibs/acre. May 1 through August 15: Kentucky 31 Fescue - 128 Ibs/acre; Red Top Grass - 2 Ibs/acre; Foxtail Millet - 20 Ibs/acre. August 16 through October 31: Kentucky 31 Fescue - 128 Ibs/acre; Red Top Grass - 2 Ibs/acre; Annual Rye - 20 Ibs/acre. November 1 through February 15: Kentucky 31 Fescue - 128 Ibs/acre; Red Top Grass - 2 Ibs/acre; Winter Rye - 20 Ibs/acre. MULCHING SPECIFICATIONS: Straw or hay at a rate of 2 tons/acre. Must be anchored. Spread with mulch blower or by hand. LIME AND FERTILIZER SPECIFICATIONS: Lime and fertilizer needs should be determined by soil tests. Soil tests may be preformed by the Cooperative Extension Service Soil Testing Laboratory at VPI&SU, or by a reputable commercial laboratory. Information concerning the State Soil Testing Laboratory is available from CITY Extension Agents. Under unusual conditions where it is not possible to obtain a soil test, the following soil amendments will be applied: For Permanent Seeding: Seeded areas shall be limed at a rate of 2 tons per acre, and fertilized at a rate of 1,000 Ibs. per acre of 10-20-10 (10 lbs. per 1,000 square feet) or equivalent. For Temporary Seeding: Seeded areas shall be limed at a rate of 2 tons per acre, and fertilized at a rate of 600 Ibs. per acre of 10-20-10 (10 lbs. per 1,000 square feet) or equivalent. LOW MAINTENANCE GROUND COVER: SOUTHEAST NATIVE GRASS SEED MIX (AMERICAN MEADOWS INC.) For slopes steeper than 3:1 grade, Mix the following seeds at 30 Ibs/acre each, along with EC-2 Matting: Virginia Wildrye (Elymus virginicus), Little Bluestem Grass (Schizachyrium scoporium), Purpletop (Tridens flovus), Broomsedge (Andropogon virginicus), and Indian Grass (Sorghostrum nutans). 9 PERMANENT SEEDING (PS C $ Not To Scale .,A 3,000 PSI CONCRETE 4" - VDOT #21A 0 0O0O0O0O0O�O� BASESTONE `COMPACTED SUBGRADE 7:1 Coarse Spray 1,200 MIN. CBR=6.0 TO BE FIELD VERIFIED 12.5:1 Fine Spray 235 1 o TYPICAL SIDEWALK SECTION 4:1 Fine Spray 300 C 8 Not To Scale 7:1 Coarse Spray 3.5:1 Coarse Spray $ DUST CONTROL DC C$ Not To Scale 450 350 • �%I%I%I%I%I%I%I%I%I%l • • . r • • SHIMP ENGINEERING2 LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM ,TH U SHIIv1P 11 N0.45 183 A 2Is 12-3 �`fS1nArA1 8��1-' VSMP PLAN FOR SOUTH PANTOPS DRIVE PARCEL 20R ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2022.04.27 REVISION: 1. 01.11.2023 VSMP Comments 2.02.21.2023 VSMP Comments FILE NO. ES&C DETAILS 22.002 5 )TEMPORARY SEDIMENT TRAP C 8 Not To Scale 6 SAFTY FENCE SAF C$ Not To Scale 11 C 8 Not To Scale SEEDING RATE NORTHa SOUTHb PLANT all 5Il 8/15 2/IS s/1 9/1 CHARACTERISTICS SPECIES A. 1000 fly m to to to 1.4/3o 8/15 un ontoo vn 11ns OATS 3 bu. (up to 100 Ibs.. 2 Ibs. X - - % - - Use spsive vasiaiea (e.8�. Noble). (Avw HIa not Iese 0150 16eJ RYE° 2 W. (W to 110 Ibs., 2.5 It.. X - X X - X Um for late tall aedings, winter (Swale cereal not lass Ditto SO Ibs.) cover. Tolmtee cold and low moievve. GERMAN MILLET 50 Its, appmx. 1 lb. - X - - X - W.. eenuel. Dies et f rst (Sefuia iWiul troal. Mey be eddW to smmar mixes. ANNUAL RYEGRASS` 6016a. 1'h Ibs. % - X % - X May be Wdd in mixa. Will ({gJlMlp multi-Flomml mow w[ of mwl sNMs. WEEPING 15 Ibs. 5'h X - - X - Warm-xemn perevniel. May LOVEGRASS bush. Tolerates hot, dry slopes fEnemstia ..IA mil acid, infertile soils. My be added to mixes. KOREAN 25 Ibs. approx. 1'h % X - X X - Werm sr*son umud legume. LESPEDEZA` Ibs. Tolen[ea acid soils. May be f�a a is iwlacul addm to mixes. • Northam Piedmont and Mountain region. See Plates 3.22-1 and 3.22-2. b Southern Piedmont and Coastal Plain. e May be used as a cover crop with spring seeding. d May be used as a cover crop with fall seeding. X May be planted between these dates. May nosy be planted between these dates. - 'ITEMP01 C$ Not To Scale TABLE 3.39-A ADHESIVES USED FOR DUST CONTROL Water Application Dilution Type of Rate Adhesive (Adhesive: Water) Nozzle Gallons/Acre Anionic Asphalt Emulsion Latex Emulsion Resin in Water Acrylic Emulsion (Non -Traffic) Acrylic Emulsion (Traffic) PIPE OUTLET CONDITIONS 3do (MIN.) IPE OUTLET TO WELL IEFINED CHANNEL 1` ` ° D zrp -� d SECTION A -A FILTER CLOTH KEY IN 6'-9"; RECOMMENDED FOR ENTIRE PERIL NOTES: 1. APRON LINING MAY BE RIPRAP, GROUTED REPRAP, GABION BASKET, OR CONCRETE. 2. La IS THE LENGTH OF THE RINRAP APRON AS CALCULATED USING PLATES 3.18-3 AND 3,18-4. 3. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER, BUT NOT LESS THAN 6 INCHES. Q10 (cfs) La (ft) Do 3Do d5o depth Outlet (ft) (ft) (in) (in) Condition Al (OP) 8.03 10.0 1.25 3.75 6 18,00 Channel OUTLET PROTECTION TABLE (OP Not To Scale PERMANENT SEEDING SPECIFICATIONS February 16 through April 30: Kentucky 31 Fescue - 128 Ibs/acre; Red Top Grass - 2 Ibs/acre; Annual Rye - 20 Ibs/acre. May 1 through August 15: Kentucky 31 Fescue - 128 Ibs/acre; Red Top Grass - 2 Ibs/acre; Foxtail Millet - 20 Ibs/acre. August 16 through October 31: Kentucky 31 Fescue - 128 Ibs/acre; Red Top Grass - 2 Ibs/acre; Annual Rye - 20 Ibs/acre. November 1 through February 15: Kentucky 31 Fescue - 128 Ibs/acre; Red Top Grass - 2 Ibs/acre; Winter Rye - 20 Ibs/acre. MULCHING SPECIFICATIONS: Straw or hay at a rate of 2 tons/acre. Must be anchored. Spread with mulch blower or by hand. LIME AND FERTILIZER SPECIFICATIONS: Lime and fertilizer needs should be determined by soil tests. Soil tests may be preformed by the Cooperative Extension Service Soil Testing Laboratory at VPI&SU, or by a reputable commercial laboratory. Information concerning the State Soil Testing Laboratory is available from CITY Extension Agents. Under unusual conditions where it is not possible to obtain a soil test, the following soil amendments will be applied: For Permanent Seeding: Seeded areas shall be limed at a rate of 2 tons per acre, and fertilized at a rate of 1,000 Ibs. per acre of 10-20-10 (10 lbs. per 1,000 square feet) or equivalent. For Temporary Seeding: Seeded areas shall be limed at a rate of 2 tons per acre, and fertilized at a rate of 600 Ibs. per acre of 10-20-10 (10 lbs. per 1,000 square feet) or equivalent. LOW MAINTENANCE GROUND COVER: SOUTHEAST NATIVE GRASS SEED MIX (AMERICAN MEADOWS INC.) For slopes steeper than 3:1 grade, Mix the following seeds at 30 Ibs/acre each, along with EC-2 Matting: Virginia Wildrye (Elymus virginicus), Little Bluestem Grass (Schizachyrium scoporium), Purpletop (Tridens flovus), Broomsedge (Andropogon virginicus), and Indian Grass (Sorghostrum nutans). 9 PERMANENT SEEDING (PS C $ Not To Scale .,A 3,000 PSI CONCRETE 4" - VDOT #21A 0 0O0O0O0O0O�O� BASESTONE `COMPACTED SUBGRADE 7:1 Coarse Spray 1,200 MIN. CBR=6.0 TO BE FIELD VERIFIED 12.5:1 Fine Spray 235 1 o TYPICAL SIDEWALK SECTION 4:1 Fine Spray 300 C 8 Not To Scale 7:1 Coarse Spray 3.5:1 Coarse Spray $ DUST CONTROL DC C$ Not To Scale 450 350 • �%I%I%I%I%I%I%I%I%I%l • • . r • • SHIMP ENGINEERING2 LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM ,TH U SHIIv1P 11 N0.45 183 A 2Is 12-3 �`fS1nArA1 8��1-' VSMP PLAN FOR SOUTH PANTOPS DRIVE PARCEL 20R ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2022.04.27 REVISION: 1. 01.11.2023 VSMP Comments 2.02.21.2023 VSMP Comments FILE NO. ES&C DETAILS 22.002 5 )TEMPORARY SEDIMENT TRAP C 8 Not To Scale 6 SAFTY FENCE SAF C$ Not To Scale 11 C 8 Not To Scale 'ITEMP01 C$ Not To Scale TABLE 3.39-A ADHESIVES USED FOR DUST CONTROL Water Application Dilution Type of Rate Adhesive (Adhesive: Water) Nozzle Gallons/Acre Anionic Asphalt Emulsion Latex Emulsion Resin in Water Acrylic Emulsion (Non -Traffic) Acrylic Emulsion (Traffic) PIPE OUTLET CONDITIONS 3do (MIN.) IPE OUTLET TO WELL IEFINED CHANNEL 1` ` ° D zrp -� d SECTION A -A FILTER CLOTH KEY IN 6'-9"; RECOMMENDED FOR ENTIRE PERIL NOTES: 1. APRON LINING MAY BE RIPRAP, GROUTED REPRAP, GABION BASKET, OR CONCRETE. 2. La IS THE LENGTH OF THE RINRAP APRON AS CALCULATED USING PLATES 3.18-3 AND 3,18-4. 3. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER, BUT NOT LESS THAN 6 INCHES. Q10 (cfs) La (ft) Do 3Do d5o depth Outlet (ft) (ft) (in) (in) Condition Al (OP) 8.03 10.0 1.25 3.75 6 18,00 Channel OUTLET PROTECTION TABLE (OP Not To Scale PERMANENT SEEDING SPECIFICATIONS February 16 through April 30: Kentucky 31 Fescue - 128 Ibs/acre; Red Top Grass - 2 Ibs/acre; Annual Rye - 20 Ibs/acre. May 1 through August 15: Kentucky 31 Fescue - 128 Ibs/acre; Red Top Grass - 2 Ibs/acre; Foxtail Millet - 20 Ibs/acre. August 16 through October 31: Kentucky 31 Fescue - 128 Ibs/acre; Red Top Grass - 2 Ibs/acre; Annual Rye - 20 Ibs/acre. November 1 through February 15: Kentucky 31 Fescue - 128 Ibs/acre; Red Top Grass - 2 Ibs/acre; Winter Rye - 20 Ibs/acre. MULCHING SPECIFICATIONS: Straw or hay at a rate of 2 tons/acre. Must be anchored. Spread with mulch blower or by hand. LIME AND FERTILIZER SPECIFICATIONS: Lime and fertilizer needs should be determined by soil tests. Soil tests may be preformed by the Cooperative Extension Service Soil Testing Laboratory at VPI&SU, or by a reputable commercial laboratory. Information concerning the State Soil Testing Laboratory is available from CITY Extension Agents. Under unusual conditions where it is not possible to obtain a soil test, the following soil amendments will be applied: For Permanent Seeding: Seeded areas shall be limed at a rate of 2 tons per acre, and fertilized at a rate of 1,000 Ibs. per acre of 10-20-10 (10 lbs. per 1,000 square feet) or equivalent. For Temporary Seeding: Seeded areas shall be limed at a rate of 2 tons per acre, and fertilized at a rate of 600 Ibs. per acre of 10-20-10 (10 lbs. per 1,000 square feet) or equivalent. LOW MAINTENANCE GROUND COVER: SOUTHEAST NATIVE GRASS SEED MIX (AMERICAN MEADOWS INC.) For slopes steeper than 3:1 grade, Mix the following seeds at 30 Ibs/acre each, along with EC-2 Matting: Virginia Wildrye (Elymus virginicus), Little Bluestem Grass (Schizachyrium scoporium), Purpletop (Tridens flovus), Broomsedge (Andropogon virginicus), and Indian Grass (Sorghostrum nutans). 9 PERMANENT SEEDING (PS C $ Not To Scale .,A 3,000 PSI CONCRETE 4" - VDOT #21A 0 0O0O0O0O0O�O� BASESTONE `COMPACTED SUBGRADE 7:1 Coarse Spray 1,200 MIN. CBR=6.0 TO BE FIELD VERIFIED 12.5:1 Fine Spray 235 1 o TYPICAL SIDEWALK SECTION 4:1 Fine Spray 300 C 8 Not To Scale 7:1 Coarse Spray 3.5:1 Coarse Spray $ DUST CONTROL DC C$ Not To Scale 450 350 • �%I%I%I%I%I%I%I%I%I%l • • . r • • SHIMP ENGINEERING2 LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM ,TH U SHIIv1P 11 N0.45 183 A 2Is 12-3 �`fS1nArA1 8��1-' VSMP PLAN FOR SOUTH PANTOPS DRIVE PARCEL 20R ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2022.04.27 REVISION: 1. 01.11.2023 VSMP Comments 2.02.21.2023 VSMP Comments FILE NO. ES&C DETAILS 22.002 5 )TEMPORARY SEDIMENT TRAP C 8 Not To Scale 6 SAFTY FENCE SAF C$ Not To Scale 11 C 8 Not To Scale OUTLET PROTECTION TABLE (OP Not To Scale PERMANENT SEEDING SPECIFICATIONS February 16 through April 30: Kentucky 31 Fescue - 128 Ibs/acre; Red Top Grass - 2 Ibs/acre; Annual Rye - 20 Ibs/acre. May 1 through August 15: Kentucky 31 Fescue - 128 Ibs/acre; Red Top Grass - 2 Ibs/acre; Foxtail Millet - 20 Ibs/acre. August 16 through October 31: Kentucky 31 Fescue - 128 Ibs/acre; Red Top Grass - 2 Ibs/acre; Annual Rye - 20 Ibs/acre. November 1 through February 15: Kentucky 31 Fescue - 128 Ibs/acre; Red Top Grass - 2 Ibs/acre; Winter Rye - 20 Ibs/acre. MULCHING SPECIFICATIONS: Straw or hay at a rate of 2 tons/acre. Must be anchored. Spread with mulch blower or by hand. LIME AND FERTILIZER SPECIFICATIONS: Lime and fertilizer needs should be determined by soil tests. Soil tests may be preformed by the Cooperative Extension Service Soil Testing Laboratory at VPI&SU, or by a reputable commercial laboratory. Information concerning the State Soil Testing Laboratory is available from CITY Extension Agents. Under unusual conditions where it is not possible to obtain a soil test, the following soil amendments will be applied: For Permanent Seeding: Seeded areas shall be limed at a rate of 2 tons per acre, and fertilized at a rate of 1,000 Ibs. per acre of 10-20-10 (10 lbs. per 1,000 square feet) or equivalent. For Temporary Seeding: Seeded areas shall be limed at a rate of 2 tons per acre, and fertilized at a rate of 600 Ibs. per acre of 10-20-10 (10 lbs. per 1,000 square feet) or equivalent. LOW MAINTENANCE GROUND COVER: SOUTHEAST NATIVE GRASS SEED MIX (AMERICAN MEADOWS INC.) For slopes steeper than 3:1 grade, Mix the following seeds at 30 Ibs/acre each, along with EC-2 Matting: Virginia Wildrye (Elymus virginicus), Little Bluestem Grass (Schizachyrium scoporium), Purpletop (Tridens flovus), Broomsedge (Andropogon virginicus), and Indian Grass (Sorghostrum nutans). 9 PERMANENT SEEDING (PS C $ Not To Scale .,A 3,000 PSI CONCRETE 4" - VDOT #21A 0 0O0O0O0O0O�O� BASESTONE `COMPACTED SUBGRADE 7:1 Coarse Spray 1,200 MIN. CBR=6.0 TO BE FIELD VERIFIED 12.5:1 Fine Spray 235 1 o TYPICAL SIDEWALK SECTION 4:1 Fine Spray 300 C 8 Not To Scale 7:1 Coarse Spray 3.5:1 Coarse Spray $ DUST CONTROL DC C$ Not To Scale 450 350 • �%I%I%I%I%I%I%I%I%I%l • • . r • • SHIMP ENGINEERING2 LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM ,TH U SHIIv1P 11 N0.45 183 A 2Is 12-3 �`fS1nArA1 8��1-' VSMP PLAN FOR SOUTH PANTOPS DRIVE PARCEL 20R ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2022.04.27 REVISION: 1. 01.11.2023 VSMP Comments 2.02.21.2023 VSMP Comments FILE NO. ES&C DETAILS 22.002 5 )TEMPORARY SEDIMENT TRAP C 8 Not To Scale 6 SAFTY FENCE SAF C$ Not To Scale 11 C 8 Not To Scale EARTH FILL NOTES ar At 401lDine, e . M.VA Nonh 2NO2wing County of Albemarle caa Talepho VA *2%-4579 •7 ?elephant 4142965832 COMMUNITY DEVELOPMENT DEPARTMENT WWW.ALBEMARLE.ORG 4 Construction Record Drawings (As -built) and Required Documents for VSMP The following is a list of doclunents and infetmation required on construction record drawings for stormwaler facilities (reference Water Protection Ordinance 17422). It is preferable that The construction record drawing be prepared by someone orher than the designer. Please do nor provide design drawings as construcrion record drawings_ Fee 5353.be (fee includes the 4% Technology Fee). Record (as -built) drasvine reguiremenls: 1) A signed and dated professional seal of the preparing engineer or surveyor. 2) The name and address of the firm and individual preparing the drawings on the tide sheet- 3) Include "as -built drawing" or "record drawing" on the title sheet. 4) Show the constructed location of all items associated with each facility, and the inspection records to verify proper dimensions, materials and installation. The items include, but are not limited to the following: a) Updated Location with geo-coordinates (nodhingleasting) of all facilities. b) Verified Drainage Area maps for the drainage area treated, and for drainage to the facilities. c) Current physical and topographic survey for all earthen structures. Ponds should include a survey of the pond bottom. Surveys should verify pond volumes are per design. Corrections may be required for deviations from the design. d) Plants, location and type. e) Plans and profiles for all cuhverts, Pipes, Risers, Weirs and Drainage Structures — Display the installed type of drainage structures, culvert/pipe size, weirs, materials, inlets or end treatment(s), inlet and outlet protection, alignment and invert elevations compared to design. f) Ditch Lines — Display the constructed location of all ditch lines and channels, includingtypical sections and linings. g) Cuardrail, fences or other safety provisions — Display the constructed location of all safety provisions; fences, guardrail, including the type, length and applied end treatments, comparedto design. h) Access roads — show location of access roads, surface treatment, drainage, etc, as applicable. i) Easements — Show all platted easements with deed book references labeled. Facilities and drainage must be within platted casements. Provide copies of rccordcd documents. Additional Documentation Reauired with the As -built Submittal: 5) Material layers— biofilter media stone layers, sand layers, keyways and cores must be verified i s to material types and depths. Provide inspection reports, boring or test pit reports and materials certifications. Biofilter media must be an approved state mix. 6) Inspection Records and photographs for pipe trenches and bedding, including undetdrains and filter fabric. 7) Video Pipe Inspection for any pipes which are not viewable without the need to enter a confined space. 9) Computations — For significant deviations from design, provide sealed computations verifyingthat the as -built condition is equivalent or exceeds design requirements. 9) Compaction reports are required verifying fill compaction in dams. 10) Manufacturer(s) certifications) for proprietary BMP's certifying. proper installation and functioning. 415 410 405 400 395 390 385 380 375 CONSTRUCTION RECORD DRAWING (AS —BUILT NO SCALE � s PROFILE A4— A5 C9 SCALE:1=30 415 410 405 400 395 390 385 380 375 0�70 1. Material - Fill material should be taken from an approved, designated borrow area. It should be free of roots, stumps, wood, rubbish, stones greater than 6 inches, and frozen or other objectionable materials. Fill material for the center of the embankment and the cutoff trench should conform to Unified Soil Classification GC, SC, or CL. Consideration may be given to the use of other materials in the embankment based on the recommendations of a geotechnical engineer supervises the design and construction. 2. Placement - Areas on which fill is to be placed should be scarified before its placement. Fill material should be placed in layers a maximum of 8 inches thick (before compaction), which should be continuous over the entire length of the fill. The most permeable borrow material should be placed in the downstream portions of the embankment. The principal spillway must be installed concurrently with fill placement and not excavated into the embankment. 3. Compaction - Fill material should be compacted with appropriate compaction equipment such as a sheepsfoot, rubber —tired or vibratory roller. The number of required passes by the compaction equipment over the fill material may vary with soil conditions. Fill material should contain sufficient moisture such that the required degree of compaction will be obtained with the equipment used. The minimum required density is 95% of maximum dry density with a moisture content within 2% of the optimum, unless otherwise specified by the engineer. Each layer of the fill should be compacted as necessary to obtain minimum density and the engineer should certify, at the time of construction, that each fill layer meets the minimum density requirement. All compaction is to be determined by either Standard Proctor Test (ASTM D698) or the Modified Proctor Test (ASTM D1557) as directed by the geotechnical engineer based on site and soil conditions and the size and type of structure being built. 4. Cutoff Trench - The cutoff trench should be excavated into impervious material along or parallel to the centerline of the embankment as shown on the plans. The equipment used for excavation should govern the bottom width of the trench, with the minimum width being 4 The depth should be at least 4 feet below existing grade or as shown on the plans. The side slopes of the trench should be 1H:1V or flatter. The backfill should be compacted with construction equipment, rollers, or hand tampers to assure maximum density and minimum permeability. 5. Top Soil - The surface layer of compacted fill should be scarified prior to placement of at least 6 inches of topsoil. The topsoil shall be stabilized with in accordance with the Virginia Erosion and Sediment Control Handbook, latest edition. 11/07Ou 94i" .... ..M .'mi". Ptasttc HMV TRASH RACK sauTIONS New Trash Rack 1" Holes 30% Opening Area 00000 000000 0°0°0° 12" 0000000 000000 000000 O O 0 6" Typ. Front Section 0O 0 12" 000 00000 000000 1— 6"-4 (A) Bottom Rack Side Section 3 ) ORIFICE TRASH RACK DETAIL C9 J NO SCALE 425 420 415 410 405 400 3%+70 10+00 B1 B2 Iw MMM $A 425 420 415 410 405 400 10+5:p5 7 PROFILE B1— B2 C Q SCALE: 1':30" 5. 400 395 390 385 380 375 370 365 360 3 Al (A 2) (A 3) 0 w O x Z a iv � [n (S EXISTING GRADE 30" ACCESS ELEV=3 M _ E DETAIL �E ) o 20 LF - ® 5.107 L 200 FT CMP DETENTION PIPE 6' DIAMETER II rPIPE A4 IN IY 15 HDPE) zoo.o' - ON BOTTOM STONE =379.0D 12- y 57 STONE BEDDING ONWOVEN AP IN MFILTER FABRIC, 39 1 " 0 M O O 't O 0 0 W — co ----------------- > >> >> Z Z Z Z Z GO U9+50 10+00 WEIR ELE=385.00' DIM=6'X6' ORIFICE — — — — — — — — ELE=383.00' NO TRASH RACK -- INV ELE=380.00------- 2" ORIFICE J / (A) BOTTOM TRASH aery 4 WEIR DETAIL C9 NO SCALE 395 390 385 380 10- 375 10+50 11+00 11+50 12+00 PROFILE PIPE Al TO DETENTION SYSTEM PROFILE Scale: 1=30 MH FRAME & COVER PREMANUFACTURED RISER STUB 1 I I I I I � WELD LADDER TO ACCESS RISER. CONTINUE LADDER DOWN TO 8' CMP DETENTION INVERT 30" CMP RISER 6' CMP DETENTION 5 ACCESS RISER DETAIL C9 NO SCALE LL o RISER 0,00' EXISTING GRADE 30" ACCESS ELEV=3 LLJ O 12' # 57 STONE COVER 0 CO 100-YR ELE=385.72' ----J2 250 0 TOP PIPE=386.00 10-YR ELE=385.19' 00, 200 FT CMP DETENTION PIPE 1-YR ELE=382.83' 72" CMP _____.NWEIR PLATE HEIGHT=5.0' TOP PIPE=380.00 0 12 57 STONE BEDDING Lf� -50 11 +00 114 Cn 8 ) DETENTION SYSTEM PROFILE C9 Scale-.1=10 12+50 400 395 390 385 380 375 370 365 35660 13+CP 5 NOTES 1. DETENTION SYSTEM SLOPE 0.00% SHIMP ENGINEERIN 32 LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM ,TH U . SHIMP No. 45183 AV 212112.3 0 VSMP PLAN FOR SOUTH PANTOPS DRIVE PARCEL 20R ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2022.04.27 REVISION: 1. 01.11.2023 VSMP Comments 2.02.21.2023 VSMP Comments 50 FILE NO. 22.002 SWM FACILITIES DETAILS C9 SOUTH PANTOPS DRIVE - PARCEL 20R Modified LD-268 Roadside and Median Ditch Design Form Dosing Storm Side Slope Min. Max n=0.015 Concrete 0.04 Ditch C A CA Tot I - tin 12 110 0-1in 02 010 :1 L :1 R Slope Slope Allowable Velocity 2-yr 10-yr Matting Type Freeboard Channel Designed Depth SF AC INCR ACC Ft/Ft Ft/Ft 'Velocity "'Depth 'Velocity "Depth 1 0.47 88370 2.03 0.95 0.95 5.0 1.0 5.17 6.81 0.95 6.12 11.81 3 3 0.23 0.34 2Q0 17.36 0.35 17.67 0.48 EC-3 TYPE II 1132 0.80 'Velocity calculations performed using maximum slope for this application -Depth calculations performed using minimum slope for this application "' 02 & 010 Mow from hydroCAD Structure channel DA 1 1,D-268 DITCH DESIGN - C 10 Not To Scale SOUTH PANTOPS DRIVE - PARCEL 20R LD-204 Storm\ ter Inlet Computations Inlets on Grade Only Sag Inlets Only y o m U L a z v x `s o seso « ii se u ed c sad a a t m r x S S U a z 1 s a CY 15 F G e a a z d 1 2 3 5 6 8 9 10 11 12 13 14 15 1 16 17 18 19 20 21 22 23 24 (ft) (ac) (in/hr) (cfs) (cfs) (d3) (l1 (1) 1 (ft) (ft) (d's) (cfs) (11) (ft) (f0 A DI-2 8' 0.40 0.87 0.35 4.00 1.40 0.000 1.40 0.015 0.020 0.054 0.083 0.18 - - 8.97 6.5 2.28 0.000 2.28 0.25 12.28 2 )LD-204 INLET COMPUTATIONS C10 J Not To Scale SOUTH PANTOPS DRIVE - PARCEL 20R LD-229 STORM DRAIN DESIGN COMPUTATIONS From To Catch. Runoff Inc Accum ToC Total Total Up Dr. Pipe Inv Pipe Pipe Velocity Flowtime Pout Point Area Coef AC AC Intensity Flow(cfs) invert Invert Length Slope Diameter Capacity Inc (ac) (min) (in/hr) El II (ft) % (in) (cfs) (ft/s) (min) 1 2 3 4 5 6 7 8 9* 10 11 12 13 14 15 16 17 A5 A4 0.40 0.87 035 0.35 5.00 5.17 1.81 391.00 383.00 55.2 14.49% 15 26.64 12.39 0.02 *A3 A2 0.35 5.02 5.16 8.03 380.00 378.00 39.2 1 5.10% 15 25.70 12.85 0.02 *A2 Al 0.35 5.02 5.16 8.05 374.00 370.03 32.3 1 12.29% 1 15 39.89 17.67 0.01 Flow from hydroCAD Q10-Year LEGEND �� VRRM IMPERVIOUS VRRM TURF 71 VRRM WOODS SWM FOREST / OPEN SPACE POST-DEV DA MEADOW I r - x Ia OU _ l PR LOPE � \ (. :0 4 :1 160 22,tiI 80 3 )LD-229 STORM DRAIN DESIGN C10 Not To Scale NEW VRRM as DRAINAGE MAP SOUTH PANTOPS DRIVE PARCEL 20R REVISION DATE: FEBRUARY 16, 2023 - , WOOD ---- - SWM FOREST/ OPEN SPACE TO BE DEDICATED 3.24 ACRES ------ ._a. as -. �" �� r t�7B,�-AR£1,EL3OR RIVANNA RIVER 5 NEW VRRM MAP C 10 Not To Scale TOTAL LIMITS OF DISTURBANCE 1.20 ACRES LEGEND POST-DEV DA WOODS POST-DEVDATURF o® POST-DEV DA IMPERVIOUS POST-DEV DA MEADOW LIMITS OF DISTURBANCE POST -DITCH DA TOTAL -� POST -INLET DA TOTAL y ; L /max as loll I ` OUTFALL \ ` �\ FileI 50 0 50 100 150 ALE 11 SCGIe: 1 "=50' STORMWATER MANAGEMENT NARRATIVE: WATER QUALITY: DITCH & INLET DRAINAGE MAP SOUTH PANTOPS DRIVE PARCEL 20R DATE: 10 JANUARY 2023 4 CHANNEL DA MAP - C 10 Not To Scale 1. PER THE NEW VRRM SPREADSHEET, NO FURTHER TOTAL PHOSPHOROUS TREATMENT IS REQUIRED. 2. WATER QUALITY WILL BE PROVIDED WITH DEDICATION OF 3.24 ACRES LAND INTO A SWM FOREST/OPEN SPACE EASEMENT. 3., CONCENTRATED RUNOFF RELEASE TO THE OUTFALL IS CONTAINED WITHIN ADEQUATE MANMADE CHANNEL. Ref LID 268 DITCH DESIGN ANALYSIS. QFQ Wrylnla R..ffRcduRxon Method New QeMpospenr Coapple. 5drepCibM - Versbn 3.0 C: 30118MP Standards and Specifications 030130raa BMPSbMards andspeeMeanons pojM W:M: 1 spuds Pappas ores Parcel t0a dads input ftlx 0n: I 3/al/Z023 wmMm values EVP0e:91 sP+dl'roamatxa =3DrpftWshspers [Yosatlentel% irte Information Project (Treatment Volume and Loads) rdl6Wnts noel Pa nfall rrcaal 43 T2a .11 -a, antes, 3.W , rvs1T>I EMCImyY) 0.3fi u Na Len ITN)EMC myy 1.efi 1, Ioae)e/acre/scl OA1 -mmcron.-, 0.90 3.24 0.34 a.m.Me'a sa.asrM Aside 1 pmY. ctaY. OSIr 0.in iU.03 n04 U.03 Mrmgdiut 0.30 0.23 0.35 InpnNous(m % 0.95 0.R 0.95 0.95 raWopenspaxcwerWcl 3.:4 Trtapnem Volume pafix9 lac,. xl TrsaTvm Volumalcuak retlt rP Luaa00/yrl vn TN loaaxx 3x lomrmamnd llL P. osas Onl WelgMed RvlMan 0.03 ,",and, n% Mana6ed Tud lanml 0.3a Welland as Dull p.lo %MenssWT.d 8% order (point 0.62 M(ImpmNwe) 0.95 %Ftp..bl. ]59{ 6Pe Rlu: 0.ID 9Ie O.Y N NEIT W AT-PPAki SPREADSHEET C 10 J Not To Scale 00n000r O� 0 Sf1IMPENGNNEERNNG, P,Cr FA7dNCFNNG-LVlVMffiW -MOAU uAM02010161" " elu lmury aM.e m : i aa.aa M.mN. "� SHIMP ENGINEERING LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM 711 U . SHIMP 7,No. 45183 12112.3 0 1631SiiAI 10;4� VSMP PLAN FOR SOUTH PANTOPS DRIVE PARCEL 20R ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2022.04.27 REVISION: 1. 01.11.2023 VSMP Comments 2.02.21.2023 VSMP Comments FILE NO. 22.002 WATER QUALITY ANALYSIS AND DITCH DA MAP C10 STORMWATER MANAGEMENT NARRATIVE: PREDEV DRAINAGE MAP SOUTH PANTOPS DRIVE PARCEL 20R REVISION DATE: 16 FEBRUARY 2023 -_--------------- toot ■ ■ ■ ■ •. PREDEV DRAINAGE MAP SOUTH PANTOPS DRIVE PARCEL 20R REVISION DATE: 16 FEBRUARY 2023 NOTE: AREA SHEET FLOW IS NOT SUBJECT TO ANALYSIS FOR CONCENTRATION RUN—ON. AS THERE IS NOT DOWNSTREAM IMPACT FOR INCREASED VOLUMES OF SHEET FLOW RUNOFF. �88. LEGEND 0 PRE-DEV DA WOODS PRE-DEVDA TURF ® PRE-DEV DA IMPERVIOUS 1 PRE DA MAP C 11 Not To Scale (POST DA, 2.62 AC 0 ,t 23B HSG: B r x TURF x 0 SHIMPENGINEENNG, P.C. >iNcn�INc-LLYDMAN>7i1G-rxa�cr Mayar,�vr WATER FLOW DIRECTIONAL ARROW w LIMITS OF DISTURBANCE ■■■■ PRE-DEVDA TOTAL AREA ACRES -" TOTAL LIMITS OF DISTURBANCE�;� 1.20 ACRES I I \•^`. SHEET FLOW -43E— �� `•� OUTFALL �� �. �, '�AREA= 0.10 AC --- .---------- —,---,� y 7 '.»--�-- �� _-�- " G: B � PRESERVED __. - -,'-- I ­ SLOPE .�.,..✓"'�- .1+ — \ _ -------- --- ;_� �- LEGEND 13E- ii POST-DEV DA WOODS I' HSGf-� �n _- _ ___ - - — - — _ . _ - POST-DEVDA TURF 100 0 100 200 300 POST-DEV DA IMPERVIOUS EL SCALE: 1 "=100' POST-DEV DA MEADOW 2 POST DA MAP C11 Not To Scale SHIMPENGINEERING, P.C. EIVOREERING-LIM1F/AV0V-FR01&^fM9NAG810ff 7 B f 236 \ HBO: B e WATER FLOW DIRECTIONAL ARROW — — LIMITS OF DISTURBANCE ■■■■ POST-DEVDA TOTAL DA DETENTION PIPE WATER QUANTITY THE RUNOFF FROM THIS DEVELOPMENT IS RELEASED INTO THE MANMADE CHANNEL IN COMPLIANCE WITH QUANTITY REGULATION DETAILED IN 9VAC25-870-66—B(3)A (CHANNEL PROTECTION) AND 9VAC25-870-66—C(3).0 (FLOOD PROTECTION): SWIM QUANTITY IS SATISFIED BY ANALYZING CONCENTRATED RUNOFF FROM THE DEVELOPMENT AT THE SITE OUTFALL AT THE SOUTHWEST CORNER OF THE DEVELOPMENT PROPERTY. 9VAC25-870-66—B(3)A REQUIRES THAT CONCENTRATED RUNOFF FROM DEVELOPMENT AT THE SITE OUTFALL MEET THE ENERGY BALANCE EQUATION. TO ACHIEVE THIS, CONCENTRATED RUNOFF FROM THE LIMITS OF DISTURBANCE AREA WILL BE ROUTED TO AN UNDERGROUND DETENTION FACILITY AND THEN TO THE SITE OUTFALL. WHEN THE ENERGY BALANCE EQUATION IS BEING USED TO DETERMINE THE ALLOWABLE DISCHARGE, THE IMPROVEMENT FACTOR WOULD NEED ONLY BE APPLIED TO THE "SITE" AS PER THE REGULATORY LANGUAGE OF 9VAC25-870.66.B.3 IN THIS CASE, THE APPLICATION OF ENERGY BALANCE TO THE DISCHARGE FROM THE SITE WOULD BE CALCULATED AS FOLLOWS: RVIPre, site RVIPre, offsite Q3 Post � Ql Presite �l F� + Q3 Pre,offsite RVipost, site RVipost,offsfta Table I : Energy Balau Ce Equahuu Summary Q11'w(NI..Allowed)(Cfs) Q1Post(_N1ax Achieled)(Cfs) JOUTFALLI 1.85 1.77 NOTE: 0.10 ACRES (THE RELATIVELY FLAT AREA ABOVE THE DETENTION PIPE) WILL SHEET FLOW INTO THE ONSITE WOODS WITH NO DOWNSTREAM IMPACT. THIS AREA IS IDENTIFIABLE ON PLANS AND IN THE FIELD AS AN EXISTING FLAT "BENCH" ON THE SLOPES THERE. THE SURFACE OF THIS AREA IS MOSTLY COMPACTED SOIL WITHOUT UNDERGROWTH DUE TO HUMAN ACTIVITY. WHEN THIS AREA IS REGRADED AND STABILIZED, WE EXPECT LESS RUNOFF VOLUME FROM THIS "BENCH". FOR THESE REASONS, RUNOFF FROM THIS 0.10—ACRE AREA COMPLIES WITH 9VAC25-870-66—D. CHANNEL PROTECTION: CONCENTRATED RUNOFF FLOWING THRU THE SITE SHALL BE ROUTED VIA NEW STORM DRAINS INTO THE NATURAL CHANNEL WHICH WILL RELEASE RUNOFF AT RATES WHICH COMPLY WITH THE ENERGY BALANCE EQUATION 9VAC25-870-66—B(3)A. FLOOD PROTECTION: TO MEET FLOOD PROTECTION REQUIREMENTS POST —DEVELOPMENT RUN—OFF WILL BE DISCHARGED INTO A CHANNEL WHICH IS LOCATED IN A MAPPED FLOODPLAIN. THUS, THIS IS THE LIMITS OF ANALYSIS AND NO FURTHER ANALYSIS IS REQUIRED. CONCENTRATED RUNOFF RELEASE TO THE OUTFALL IS CONTAINED WITHIN ADEQUATE MANMADE CHANNEL. REF LD-268 DITCH DESIGN ANALYSIS. THIS IS COMPLIANT 9VAC25-870-66—C(3).0 South Pantops Drive Parcel -20R (is 2S Pre_Ons"te /re—Offsite 2L OUTFALL Subcat Reach on Link Drainage Diagram for Pre Dev NEW LOD Prepared by (enter your company name here), Printed 2/20/2023 HydroCADS 9.10 s1n 07054 02010 HydroCAD Software Solutions LLC (is \ Post_Onsite Date MANAGED South Pantops Drive Parcel - 20R 2S Post—Offsh 3 Managed 3S Po _Onsite 5P UN NAGED 6L OUTFALL Subcat Reach 0, Rk UNMANAGED SHIMP ENGINEERING LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM ,TH U SHIMP Ip N0.45183 A 2121 l23 wk' 0 �`S'S1nArA1 B� VSMP PLAN FOR SOUTH PANTOPS DRIVE PARCEL 20R ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2022.04.27 REVISION: 1. 01.11.2023 VSMP Comments 2.02.21.2023 VSMP Comments FILE NO. DRAINAGE MAPS 22.002 C11