HomeMy WebLinkAboutWPO202200042 Review Comments WPO VSMP 2023-03-02John Anderson
From: John Anderson
Sent: Thursday, March 2, 2023 9:49 AM
To: Jim Taggart; David James
Cc: Emily Cox; chris.schooley@greenwoodhomes.com; Elizabeth Wassman; Alexander Flint
Subject: WPO202200042 - tree removal only: RE: Belvedere Block 10 Timber
Hi, Jim, I hope this helps.
Item 6.b. is of particular importance; the remainder is relatively straight -forward.
For WPO202200042 Belvedere Phase 3 block 10 tree removal only plan approval:
[ possible roles for Alexander, Liz —thank you all. j
1. SWM quantity calculations: Pls. provide analysis similar to that provided with RGA Dunlora Village Phase 1 tree
removal -only plan, WPO202100063, sheet 5 of plan —Alexander may lend support (image, below).
2. Provide SWPPP using county template similar to SWPPP provided for RGA Dunlom Village Phase 1 tree
removal -only plan, approved 2/23/23 —Liz may be able to help with this.
3. Sheet 5 VRRM.xIs lists 26.08 Ac. post-dev land use; sheet 3, Note 15 lists 19.22 Ac. —these values should be
identical.
4. Sheet 5: Provide brief narrative that explains mechanism /timing of recordation of forest -open space easement,
whether it occurs with a phase 3 block 10 final subdivision plat, for example. Note: If Belvedere Long Holdings,
LLC proposes to record FOS Easement with a final subdivision plat (i.e., subdivision not yet recorded), then
Albemarle may accept FOS Area (Ac.) as offsetting phosphorus reduction requirement (future blk. 10 subdivision
plat), (this tree removal -only plan includes an Exhibit of Areas to be dedicated as FOS Easement, with future
final subdivision plat. Also, item 6.b., below.
5. Sheet 3
a. Pls. revise `limits of clearing' label to `limits of tree clearing'.
b. Delete label that reads: `Apply mulch, 50' wide ground cover upslope of all tree protection.'
c. Provide prominent labels (consistent with WPO202300009 / Biscuit Run tree removal), on the plan:
i. Wood chip mulch & temporary seeding shall be installed on all areas within limits of clearing.
ii. Tree Clearing only! Mulch all areas within the limits of clearing.
d. List Area of limits of clearing, with revised label at item 5.a. above — Acreage to match VRRM.xIs.
e. Note 12: Delete word `state'.
f Note 2: Replace `recommends' with `requires'.
g. New Note: Silt fence is not required as a preliminary perimeter ESC control measure, unless requested by
County ESC inspector.
h. New Note: Tree protection is required as a preliminary perimeter ESC control - land clearing delineation
measure.
i. Revise limits of tree clearing to eliminate tree removal across ZMA conservation or ZMA preservation
areas, else indicate magisterial or legislative source of permissible tree cutting across ZMA conservation
or preservation areas. Ref. sheet 2.
j. Revise limits of tree clearing to eliminate tree removal across Albemarle County preserved steep slopes,
else indicate magisterial or legislative source of permissible tree cutting across preserved steep slopes;
default =impermissible.
k. Revisit VRRM.xIs and Note 15 as a final check, once limits of tree clearing revised to eliminate preserved
steep slopes, or ZMA preservation or conservation areas.
6. Sheet 1
a. Stormwater Management Compliance Narrative is somewhat confusing:
i. Ref. made to 2-phase construction, yet this is phase 3 block 10 plan; pls. clarify whether phase 3
is tree clearing, or a constructive phase of development, with improvements to be reviewed
/approved later.
ii. Ref in first paragraph to sheet flow appears to be a reference to effect of tree -clearing; please
state this explicitly since this is a tree removal only plan.
iii. 9VAC25-870-66.D. Requirements:
1. Provide sentence that references analysis provided on sheet 5 of plan (item 1. above).
2. Revise third line to read `... that releases less flow than that of the pre -developed
condition ... '
b. Plat at DB 5277 PG 305 is Titled `Plat Showing Vegetative Preservation Easements across TMP's 61-
160, 62-2A1, 62-2C, 62A3-1 & 62-2B.' This is not identical with platted Forest -Open Space Easement
and does not include notes specifically required of SWM FOS Easement and does not appear to associate
with deed of dedication of SWM easement. Please clarify, or furnish nutrient credits sufficient to meet
phosphorus reduction requirements for ? Ac. tree removal. It is unlikely we will be able to quickly apply
vegetative preservation easement at DB 5277 PG 315 +, which is accompanied by Declaration of
Restrictive Covenants. Trying to derive SWM utility or compliance based on this instrument and plat will
take time. Also, it may simply not work. Why, for example, were vegetative easements established, was
it for SWM? Clarification may help, but we do not have sufficient information at this point to accept that
vegetative easements across these TMPs will be useful, in this instance.
c. Erosion and Sediment Control Narrative
i. Paragraph 1: Eliminate reference to Silt Fence.
ii. Paragraph 2: third line, insert word `surface' between `paved' and 'of'.
iii. Paragraph 3: At end of first sentence, add a comma, then `if requested and within 24-hr of request
of County ESC Inspector.'
SWM Calc., example, WP0202100063
9VAC25-870-66.D, THERE SHALL BE NO NET INCREASE IN RUNOFF VOLUME. BELOW IS TH
THIS PHASE, RESULTING FROM THE CLEARING OF TREES. ALL TREE STUMPS SHALL BE 1
=E, AND MULCH UTILIZED AS GROUND COVER FOR ALL AREAS WHERE THE CANOPY THE
OVER ALL RUNOFF SHALL EXIT THE SITE AS SHEETFLOW; GRADING OR CHANNELIZATF
ZMWATER IS PROHIBITED. SEE HYDROLOGIC ANALYSIS BELOW.
PRE-POST-OUTFALLS Type1124-hr 1-yrRainfall=2.97"
Prepared by HP Inc. Printed 2/22/2023
HydroCAD® 10.10-6a sin 08126 ® 2020 HydioCAD Software Solutions LLC
Summary for Subcatchment 31IS: Pre -Developed Clearing Area
Runoff = 5.21 cfs @ 12.12 his, Volume= 0.587 af, Depth> 0.32"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 his, dt= 0.01 his
Type II 24-hr 1-yr Rainfall=2.97"
22.000 60 Woods/grass comb., Good, HSG B, gravel road
22.000 100.00% Pervious Area
To Length
Description
rr�
PRE-POST-OUTFALLS
Prepared by HP Inc.
HydroCADO 10.10-6a s1n 08126 ® 2
Summary for Subcal
Runoff = 3.00 cfs @ 12.
Runoff by SCS TR-20 method, UH=
Type II 24-hr 1-yr Rainfall=2.97"
Area (so) CN Description
22.000 56 Brush, Good
22.000 100.00% Per
To Length Slope Velocit
(min) (feet) (fVR) (ft/sec
8.0
3 Type II 24-hr
1-yr Rainfall=2.9i
Runoff Area=22.1
Y Runoff Volume=l
Runoff Depth>0.:
Tc=8.0 min
CN=56
Labels from WP0202300009 (Biscuit Run): include on sheet 3 WP0202200042, Belvedere, blk. 10.
3
iE OF Ex
A\/
WOOD CHIP MULCH & TEMPOI
SEEDING SHALL'13E INSTALLED I
AREAS WITHIN OMITS OF'GLEF
TREE,CLEARING ONL`Y,!
MULCH ALL AREAS WITHIN
THE LIMITS OF CLEARING.'.
1\
;C EDGE,OF EXISTING
WoDDLAN0,TO REMAIN.
Thanks for your help with this!
best, J. Anderson
John E. Anderson, PE I Civil Engineer 11
Department of Community Development I County of Albemarle, Virginia
401 McIntire Road I Charlottesville, VA 22902
434.296.5832 ext. 3069
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, March 1, 2023 2:11 PM
To: John Anderson <janderson2@albemarle.org>; David James <djames2@albemarle.org>
Cc: Emily Cox <ecox2@albemarle.org>; chris.schooley@greenwoodhomes.com; Elizabeth Wassman
<EWassman@roudabush.com>
Subject: RE: Belvedere Block 10 Timber
Thanks John. I do understand that there are many items competing for that 01APR slot. I appreciate whatever you can
do.
5!
The 870-66.1) is the sheet flow quantity matter. The water quality is handled on this version by the 6.9 ac of Forest open
space easement already preserved and recorded. We'll obviously add to that with more measures and purchases with
the full-buildout VSMP.
Thank you.
Jim Taggart, P.E.
Vice President, Engineering
For RGA
From: John Anderson <landerson2@albemarle.org>
Sent: Wednesday, March 1, 2023 1:49 PM
To: Jim Taggart <JTaggart@roudabush.com>; David James <d!ames2@albemarle.org>
Cc: Emily Cox <ecox2@albemarle.org>; chris.schoolev@greenwoodhomes.com; Elizabeth Wassman
<EWassman@roudabush.com>
Subject: RE: Belvedere Block 10 Timber
Jim
We'll do our best, same Apr1 deadline is driving other items... we'll give it our best. I hope to glance at this, tomorrow,
and then speak with David. Perhaps he and I can team to turn it around quickly —thanks, Jim
[ do you need /has blk. 10 acquired /accounted for nutrient credits /w. quality side of things? —assume 9VAC25-870-
66.D. on the quantity side...? SWPPP submitted? Thanks ]
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, March 1, 2023 10:21 AM
To: John Anderson <landerson2@albemarle.org>; David James <diames2@albemarle.org>
Cc: Emily Cox <ecox2@albemarle.org>; chris.schoolev@greenwoodhomes.com; Elizabeth Wassman
<EWassman@roudabush.com>
Subject: RE: Belvedere Block 10 Timber
Thanks John, and best of luck to David!
Yes, this is for the 01APR deadline however, it's important to realize that is the deadline to have all the clearing finished.
We have several weeks of work to complete after the plan is approved and before the deadline.
Is there any way we could expedite this in light of the deadline and the availability of the contractor? We patterned this
submittal after the Dunlora plan recently approved, so hopefully we have all the components required for approval.
Thank you.
Jim Taggart, P.E.
Vice President, Engineering
For RGA
From: John Anderson <janderson2@albemarle.org>
Sent: Wednesday, March 1, 2023 10:15 AM
To: Jim Taggart <JTaggart@roudabush.com>; David James <diames2@albemarle.org>
Cc: Emily Cox <ecox2@albemarle.org>
Subject: RE: Belvedere Block 10 Timber
Hi, Jim,
David is off today, and sits for the PE exam tomorrow. This is his, so I can't say. We should be able to provide an update
Friday. I realize this is not immediately helpful, but it is where we are.
This is to meet the Apr-1 deadline, right?
Again, David should be available to discuss Friday —we'll do our best, thanks for your patience.
J. Anderson
From: Jim Taggart <JTaggart@roudabush.com>
Sent: Wednesday, March 1, 2023 10:10 AM
To: John Anderson <landerson2@albemarle.org>; David James <diames2@albemarle.org>
Subject: FW: Belvedere Block 10 Timber
Good Morning John and David,
Not sure who to ask. We submitted a clearing plan for Belvedere BLK10 last week. We have word that we might have a
clearing crew available. Could one of you help me discern the status please?
Thank you.
Jim Taggart, P.E.
Vice President, Engineering
For RGA
From: chris.schoolev@greenwoodhomes.com <chris.schoolev@greenwoodhomes.com>
Sent: Wednesday, March 1, 2023 10:06 AM
To: Elizabeth Wassman <EWassman@roudabush.com>; Jim Taggart <JTaggart@roudabush.com>
Cc:'Genevieve Verlaak'<genevieve.verlaak@greenwoodhomes.com>; kent@greenwoodhomes.com
Subject: Belvedere Block 10 Timber
Liz and Jim --- I heard from Contour today that their clearing team was available starting immediately to timber but
would be busy with a big Amazon site later in the month.
What's the status on our VSMP approval?
Will this need to be bonded?
Thanks.
Chris
Chris Schooley
Director of Real Estate Planning
Greenwood Homes
Chris.SchoolevCDGreenwoodHomes. com 1434.989.9752
Greenwood homes. com