HomeMy WebLinkAboutWPO202200009 Application WPO VSMP 2023-02-15Revised 07/1/21; 7/26/2021; 4/26/2022
B. All Fees [Code §17-208]
For new or modified plans: Total acres proposed to bedisturbed .
Acres to be Disturbed
Fee Due with this
Application
Transfer or
Modification Fee
Total Fee = (Application Fee + 4% Technology Surcharge)
Single Family Dwelling only
Less than 1 acre
$171.60
($165 + $6.60)
$23.92
($23 + $0.92)
Single Family Dwelling only
1 and less than 5 acres
$171.60
($165 + $6.60)
$236.08
($227 + $9.08)
Less than 1 acre $171.60
($165 + $6.60)
$20.80
($20 + $0.80)
1 and less than 5 acres $1,591.20
($1,530 + $61.20)
$236.08
($227 + $9.08)
5 and less than 10 acres $2,004.08
($1,927 + $77.08)
$294.32
($283 + $11.32)
10 and less than 50 acres $2,652.00
($2,550 + $102)
$353.60
($340 + $13.60)
50 and less than 100 acres $3,596.32
($3,458 + $138.32)
$530.40
($510 + $20.40)
100 acres or more $5,657.60
($5,440 + $217.60)
$824.72
($793 + $31.72)
C. Amendments to an approved plan. Fee = $236.08 per review ($227 fee + $9.08 technology surcharge)
D. Registration Statement on the official DEQ form.
E. Erosion and Sediment Control Plan satisfying the requirements of Code §17-402.
F. Stormwater Management Plan satisfying the requirements of Code §17-403.
G. Pollution Prevention Plan satisfying the requirements of Code §17-404.
H. Stormwater Pollution Prevention Plan satisfying the requirements of Code §17-405.
I. Mitigation Plan satisfying the requirements of Code §17-406 for any proposed disturbance of
stream buffers. $176.80 ($170 fee + $6.80 technology surcharge)
J. Requested Variations or Exceptions as provided in Code §17-407 and §17-408.$176.80 ($170 fee + $6.80
technology surcharge)
Provide 2 copies of all plans and any supporting documents or submit all documents online. Professional
seals must have original signatures.
Additional information if not provided on plans and documents:
Name of a Contact Person for correspondence (usually the plan preparer, consultant, or agent):
Name (Print):
Address:
City: State: Zip:
Daytime Phone: ( ) E-mail:
*When applications and plans are reviewed, but not approved, and a response to comments is not received within 6
signatures will not be considered valid. Active permits are subject to annual maintenance fees [§ 17-208].
Fee Amount $ Date Paid By who? Receipt # Ck# By:
WPO #FOR OFFICE USE ONLY
434