Loading...
HomeMy WebLinkAboutWPO202200032 Bond Estimates 2023-03-03Project Name: Berkmar Self Storage WPO - 2022- 00032 WPO file number: WP02022-00032 TMP(s): 04500-00-00-11200 ; 04500-00-00-112EO Date Estimate Completed: 313123 Erosion & Sediment Control Plan Bond Estimate Item Item No. Unit Unit Cost Cost Number installed r stabloation (TS, PS, MU) 5.6 acres $5,001 $27,350.00 z sift fence (SF) 1484.0 ft $5.00 $7,420.00 3 safety fence (SAF) 50.0 ft S5.00 $250.00 4 tree protection (TP) 1323.0 ft $5.00 $6,615.00 4 diversion (DD, FD, RWD) 370.0 ft $13.00 $4,810.00 5 temporary slope drain (rSD) pipe length 0 ft pipe diameter 0 in $0.00 $0.00 6 Sediment Traps 7 earthwork for trap/basin - ST� 8 height of dam at toeoft fl cut at high sideOft ft 9 9 9 height of fill at faceft cut at face ft 10 length of damft length of cut ft 11 top width width of cut lz (area above transition; 6.5 sf (area below transition) 160 sf 13 (total width of dam) 4 If (total width of cut) 54 ft 14 (height below transitioi 1 If (depth below transition) 3 ft 15 (area below transition) 1 sf (area above transition) 72 sf 16 28.9 cy (total cut volume) 1374.8 cy 17 length of spillway -fl (TOAL CV estimate) 1384 cy $13.00 $17,992.00 i8 width of spillway ft (spillway stone tons) 10.8 tons $50.00 $540.00 19 zu earthwork for trap/basin - ST2 zl height of dam at toe oftfl cut at high side oftft zz height of fill at faceft cut t at face 23 length of damft length of cut ft 24 top width width of cut 25 (area above transition; 16.875 sf (area below transition) 540 sf 26 (total width of dam) 6.5 If (total width of cut) 132 ft 27 (height below transitioi 1 If (depth below transition) 7 ft 28 (area below transition) 2.25 sf (area above transition) 413 sf 29 (total fill volume) 49.6 cy (total cut volume) 2682.5 cy 30 length of spillway -fl (TOAL CV estimate) 26M cy $13.00 $35,087.00 31 width of spillway ft (spillway stone tons) 15.6 to- $50.00 $780.00 32 33 sift fence inlet protection(IP) $101 $2,100.00 34 stone inlet protection (IP) $200.00 $600.00 35 outlet protection (OP) length oftfl width 9.5 ft $.00 $.00 36 outlet protection (OPIt) length width 8 ft 1 $720720.00 $720720.00 37 channel (SCC, matted) length Itwidth 0 ft 0 $0.00 38 check dam depth in channel channel width 0 ft 0 $0.00 $0.00 39 construction entrance (CE) 0 $2,500.00 $0.00 40 wash rack -ea y $2,000.00 $2,000.00 3/3/2023 Erosion & Sediment Control Plan Bond Estimate Item Item Number 41 paved construction entrance ( x 1 ) 42 dp-rap, placed depth 43 junder SWM bond width 44 45 survey and layout (price per 0.1 mi.) acres 46 mobilization -fl length (tons) - traps and basins WP0202200032_ESC-bond-estim_eerkmar Self Storage_030323.xlsx No. Unit Unit Cost Cost (installed) $3500.00 $3,500.00 -ea ft 0 tons $60.00 $0.00 - $3,735.00 $2,500.00 cost sum $116,612.00 contingency $11,651.20 Total $128,170 3/3/2023