HomeMy WebLinkAboutCLE202300027 Application 2023-03-09J K
PROJECT
NORTH
TN CONSTRUCTION PLAN
SCALE: 1/4"=T-0"
LEGEND
EXISTING PARTITION TO REMAIN <4 PARTITION TYPE
O NEW INTERIOR PARTITION TYPE
F1071 ROOM NUMBER
�, P EXISTING DOOR TO REMAIN
IIIIIIIIIL�///I 01 DOOR NUMBER
REUSED NEW BUILDING STANDARD DOOR FEC NEW FIRE CABINET AND FIRE EXTINGUISHER
�ry
I PARTITION NOTES I
GENERAL:
- SEE ADDITIONAL PARTITION NOTES ON SHEET G005.
- ALL INTERIOR PARTITIONS SHALL BE TAPED SMOOTH AND SANDED TO RECEIVE PAINT.
- CONTROL JOINTS TO BE EMPLOYED IN LONG EXPANSIONS OF PENETRATIONS AT 30' INTERVALS FROM FLOOR TO CEILING.
CONTRACTOR TO REFER TO ASTM C840: THE STANDARD SPECIFICATION FOR APPLICATION AND FINISHING OF GYPSUM BOARD.
- CONTRACTOR TO WRAP COLUMNS TIGHT WITH DRYWALL.
- PROVIDE FIRE -RATED WOOD OR METAL BLOCKING FOR ALL WALL HUNG UNITS INCLUDING GRAB BARS, TOILET PARTITIONS,
CASEWORK, AND SHELVING.
- VERIFY STUD GAUGES WITH MANUFACTURES SPAN LIMITS.
- ALL CEILING HEIGHT PARTITIONS TO RECEIVE "L" BEAD AT CEILING.
- ALL FULL HEIGHT PARTITIONS TO RECEIVE CONTINUOUS SEALANT AT GAP BETWEEN GYPSUM BOARD AND STRUCTURE ABOVE.
4
CONSTRUCTION NOTES
GENERAL:
- SEE GENERAL PARTITION, INSULATION, AND CONSTRUCTION NOTES ON SHEET G005 IN ADDITION TO THE NOTES BELOW.
SPECIFIC:
C01 PROVIDE SUPPORT BLOCKING IN WALLS FOR NEW CASEWORK AND TOILET ACCESSORIES AS SHOWN ON PLAN. COORDINATE
EXACT LOCATION WITH TENANT AND EQUIPMENT VENDOR AS NEEDED.
FC072 PROVIDE FIRE EXTINGUISHER CABINET - LARSON CAMEO SERIES OR EQUAL, CLEAR BUBBLE, FINISH: ALUMINUM, ROUGH OPENING 25"H X 10
1/2"W X 1 1/4"D. DEVICE HANDLE TO BE MOUNTED AT 48" MAX TO MEET ADA.
CO3 PROVIDE MOISTURE RESISTANT GYPSUM BOARD IN ALL RESTROOMS.
C04 REPAIR WALL AS REQUIRED PER NEW WORK.
C05 PREPARE RESTROOM FLOOR FOR TILE, CLEAN, PATCH SMALL CRACKS, LEVEL AS REQUIRED, SEAL CONCRETE SO NOT TO WICK MOISTURE
INTO GROUT AND INSTALL UNCOUPLING OR ANTI -FRACTURE MEMBRANE. TILE WORK PER ANSI A137.1:2022 AMERICAN NATIONAL
STANDARDS SPECIFICATIONS FOR CERAMIC TILE.
C06 CONTRACTOR TO COORDINATE ACCESS INTO HYPERBARIC ROOM FOR INSTALLATION OF MACHINE AT 90 DEGREE TURN.
C07 STUB UP PLUMBING IN WALL DURING THIS PHASE FOR NEXT PHASE.
C08 BUILD WALL AS A TEMPORARY WALL UNTIL EQUIPMENT IS SIZED.
C09 ADD EXTRA INSULATION IN THIS WALL SO NOT TO HEAR THE WASHER/ DRYER NOISE.
C10 HYPERBARIC ROOM 126 MUST BE TOTALLY CLEAN AND DUST FREE BEFORE INSTALLATION OF THE EQUIPMENT.
C11 PROVIDE SPECIAL BLOCKING AND FRAMING PER MANUFACTURER'S SPEC FOR WALL MOUNTED TOILET.
PLUMBING NOTES
5 GENERAL:
- PLUMBING TO BE DESIGN/ BUILD.
- SEE GENERAL PLUMBING NOTES ON SHEET G005 IN ADDITION TO THE NOTES BELOW.
- TEST WATER TO ENSURE IT WILL NOT CAUSE A BURN TO PATIENT.
- THERE SHOULD BE NO ANCHOR POINTS ON SINKS OR FAUCETS OR OTHER BATHROOM ACCESSORIES.
- ALL PLUMBING SYSTEMS SHALL BE DESIGNED AND INSTALLED IN ACCORDANCE WITH THE INTERNATIONAL PLUMBING CODE,
- WATER PRESSURE AT THE FIXTURE SHALL BE REGULATED.
- PLUMBING CLEANOUTS TO BE LOCATED IN WALLS OR IN STORAGE ROOM FLOORS. PROVIDE LOCATION PLAN TO DESIGNER FOR APPROVAL.
- SINKS ARE TO BE OF A NON -ABSORPTIVE AND ACID -RESISTANT MATERIAL. SINKS SHALL HAVE WELL -FITTED AND SEALED BASINS TO PREVENT
WATER LEAKS ONTO OR INTO CABINETRY AND WALL SPACES.
- CLINICAL SINKS SHALL HAVE AN INTEGRAL TRAP WHEREIN THE UPPER PORTION OF THE WATER TRAP PROVIDES A VISIBLE SEAL.
- TEMPERED WATER SHALL BE DELIVERED FROM ALL PUBLIC HAND WASHING FACILITIES THROUGH AN APPROVED WATER TEMPERATURE LIMITING
DEVICE THAT CONFORMS TO ASSE 1070 PER SECTION 416.5 OF THE VPC.
- ALL PLUMBING FIXTURES ARE TO HAVE A BALL VALVE TO SHUT OFF.
- CONTRACTOR TO COORDINATE REQUIRED POWER FOR FAUCET AND TOILET, AS WELL AS MIRROR AND AUTO HAND DRYER IN RESTROOM.
SPECIFIC:
PL01 INSTALL TENANT PROVIDED TWO (2) ELECTRIC STACKABLE WASHER/DRYER. PROVIDE REQUIRED COLD AND HOT WATER
CONNECTION, AND REQUIRED DRAIN FOR WASHER AND ELECTRICAL OUTLET REQUIRED FOR DRYER AND WASHER.
PL02 CONTRACTOR TO RECESS THERMOSTATIC MIXING VALVE INTO WALL WITH AN ACCESS PANEL HIDDEN FROM VIEW UNDER THE SINK.
6
MECHANICAL NOTES
MECHANICAL CONTRACTOR TO READ HYPERBARIC USER GUIDE BEFORE PROCEDING WITH WORK IN ROOM 126.
SPECIFIC:
FMO71 HYPERBARIC ROOM TO HAVE 8 +P AIR EXCHANGES, HUMIDITY TO BE 30%-75%.
M02 CONTRACTOR TO ADD ADDITIONAL AIR AND OR AIR EXCHANGES TO WASHER DRYER ROOM TO KEEP HEAT AND HUMIDITY DOWN.
z
W
Q
W
r)
U
ozi
O
LLJ
V1
0^
u HENR4TENSER
No. 2576
02.13.2023
RCHiTF,�.�
�4AwAb�-
CD
N
r
LLJ
D
Z
LL I
CD
uJ
Y
N
O
Jz<
�0>
^
'^
Z
0�
LLJ
J
<
LL
Q�
LIJ
LL
LLJ
>
v0
O
_U
LL
LL
LLJ
w
LLJ
�
LLJ
-J
LU
J
w
_
SHEET TITLE
DEMOLITION PLAN /
CONSTRUCTION PLAN
JOB NUMBER: 22-053.00
DRAWN BY CHECKED BY
DK CID
REVISION
DATE
02/13/2023
FILE NAME
22-053_Al 11.dwg
SHEET NUMBER
Al 12