Loading...
HomeMy WebLinkAboutWPO202200027 Bond Estimates 2023-03-10Project Name: Towneplace Inn and Suites WPO file number: WP02022-00027 TMP(s): 78-9D (07800-00-00-009D0) Date Estimate Completed: 2/21/23; ckk by 1A, 031023 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed 1 Blanket Matting' 7300 sf $0.56 $4,088.00 2 stablization (PS, TS) 2.3 acres $5,000.00 $11,500.00 3 silt fence (SF) 840.0 ft $5.00 $4,200.00 4 safety fence (SAF) 1319.0 ft $5.00 $6,595.00 5 diversion (DID, FD, RWD) 1005 ft S13.00 $13,065.00 6 temporary slope drain (TSD) pipe length 0 ft pipe diameter 0 in $0.00 $0.00 7 earthwork for trap #1 8 height of dam at toe 3 ft cut at high side 1.5 ft 9 height of fill at face 5 ft cut at face 2.5 ft 10 length of dam 178 ft length of cut 103 ft 11 lop width 3 ft width of cut 17 ft 12 (area above transition, 65 sf (area below transitic 55 sf 13 (total width of dam) 6 ft (total width of cut) 25 ft 14 (height below transitio -2 ft (depth below transit -1 ft 15 (area below transition) -10 sf (area above transitic -13.5 sf 16 (total fill volume) 362.6 cy (total fill volume) 158.3 cy 17 length of spillway 0 ft (TOAL CY estimate; 415 cy $13.00 $5,395.00 18 width of spillway 0 ft (spillway stone tons: 0 tons $50.00 $0.00 19 earthwork for trap #2 20 structures for basin 21 riser height 2.5ft 22 riser diameter 18 in (riser unit price) $40.00 $100.00 23 barrel length 33 ft base plate or fdn 0 $200.00 $0.00 24 barrel diameter 24 in (barrel unit price) $50.00 $1,650.00 25 barrel collars 0 $200.00 $0.00 26 baffle length 0 ft $50.00 $0.00 27 silt fence inlet protection (IP) $0.00 28 stone inlet protection (IP) 20 $200.00 $4,000.00 29 outlet protection (OP) length 0 ft width 0 ft 0 $0.00 $0.00 30 channel (SCC, matted) length 0 ft width 0 ft $0.00 31 check dam depth in channel 0 ft channel width 0 ft 0 $0.00 $0.00 32 construction entrance (CE) 1 $2,500.00 $2,500.00 33 wash rack 1 $2,000.00 $2,000.00 34 paved construction entrance 1 $3,500.00 $3,500.00 35 rip -rap, placed depth 0 ft length 0.0 ft 36 width 0.0 (tons) 0 tons S60.00 $0.00 3/10/2023 Project Name: Towneplace Inn and Suites WPO file number: WP02022-00027 TMP(s): 78-913 (07800-00-00-009D0) Date Estimate Completed: 2/21/23; �hkby JA,031023 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed 37 38 survey and layout (price per 0.1 mi.) acres 1 traps and basins 0 $500.00 39 mobilization $2,500.00 40 stream crossing (computed independently) $0.00 cost sum $61,593.00 contingency $6,159.30 WP0202200027_ESC_SWM_bond 022123_bchicockFja_031023.xlsx Total $67,760 3/10/2023 Project Name: Towneplace Inn and Suites WPO file number: WPO2022-00027 TMP(s): 78-9D (07800-00-00-009D0) Date Estimate Completed: 2/21/23; a,kbytw,031023 Stormwater Management Bond Estimate Item Item No. Unit Unit Cost Cost Number installed 1 permanent diversion or ditch 0 ft $13.00 $0.00 2 standard manhole frame lop (not inlet) 3 ea $500.00 $1,500.00 3 drop inlet or grate 5 ea $3,500.00 $17,500.00 4 manhole structure (per ft. rise) 58 ft $450.00 $26,100.00 5 pipe: hdpe 8.0 in d ft $0.00 6 12.0 in d ft $40. $0.00 7 15.0 in d ft $50.0 $0.00 8 18.0 in d 269.0 ft $80.0 $21,520.00 9 21.0 in d ft $100.0 $0.00 10 24.0 in d ft $110.00 $0.00 11 30.0 in d ft $120.00 $0.00 12 pipe: pvc 12.0 in d ft $25.00 $0.00 13 24.0 in d ft $0.00 14 pipe, rcp, cmp (15 to 48") 24.0 in d 0 0 ft $50.00 $0.00 15 aggregate base or drainage stone in d ft L ft W 0.0 ton $35.00 $0.00 16 trees 0 ea $275.00 $0.00 17 shrubs 0 ea $50.00 $0.00 18 seedlings 0 ea $5.00 $0.00 19 underdrain (LF) 0 ft $5.00 $0.00 20 biofller soil mix (CY) 0 cy $45.00 $0.00 21 trash rack/ anti vortex devices 0 ft $1,500.00 $0.00 22 maintenance access road (LF) 0 ft $50.00 $0.00 27 survey and layout (price per 0.1 mi.) acres basins 0 $0.00 28 mobilization $2,500.00 29 as -built drawings (per facility) ea $2,000.00 $0.00 30 materials testing (per facility) ea $2,000.00 $0.00 31 compaction testing (per dam) ea $3,000.00 $0.00 cost sum $69,120.00 contingency $6,912.00 WP0202200027_ESC_SWM_ bond _022123_bchirodd-ja_031023.xlsx Total $76,040 3/1012023 Project Name: Towneplace Inn and Suites WPO file number: WPO2022-00027 TMP(s): 78-913 (07800-00-00-009D0) Date Estimate Completed: 2/21/23; chk by )A, 031023 Stormwater Management Bond Estimate Item Item Number No. Unit Unit Cost Cost (installed) 3/10/2023