Loading...
HomeMy WebLinkAboutARB202300018 Correspondence 2023-03-13R C H I T E C T$ To Date Project Subject Dear Margaret, memo Margaret Maliszewski Albemarle County Department of Community Development March 13, 2023 ARB-2023-18: Hickory Hope Apartments A (Southwood Block 12) by Piedmont Housing Alliance Response to ARB202318 Action Letter Condition 1 Thank you for your help guiding Southwood Hickory Hope Apartments through the Architectural Review Board process. Please accept the letter from Piedmont Housing Alliance below as a formal response to the Board's condition of approval #1 in the Architectural Review Board's Action Letter dated March 8, 2023. Piedmont Housing Alliance ("PHA") is in receipt of the Charlottesville Architectural Review Board ("ARB") formal determination in ARB-2023-18: Hickory Hope Apartments (Southwood Block 12) (the "Project"). We are pleased that the Board unanimously approved the request, pending staff administrative approval of certain conditions, including that PHA, "Consider revising the design of Building A to establish more of a "front" facing the EC street." In order to properly consider this possible redesign, PHA sought estimates for additional brick and associated labor costs to extend the corner brick change of the building farther around the Old Lynchburg Road facing portion of the building. We have received the contractor's estimate, which, though not tremendously large, does result in significant increased overall expense for the Project. In addition to the contractor's estimated increased cost for materials and labor, we must consider our architectural firm's expense to update contract sets/plans/documents already approved by Virginia Housing plus our Low -Income Housing Tax Credit ("LIHTC") consultant's expense for adding the costs to the development budget. Every added expense adds up quickly and financing the project is quite expensive to begin with, as well as quite complicated. In addition, PHA just learned from Virginia Housing ("VH") that they are imposing a $220,000 "standby fee" for the loan commitments. And that is on top of significant tax-exempt bond finance fees that have negatively impacted our credit pricing and overall budget. The development budget is set and under consideration by lenders, VH and investors. At this stage, we must protect the contingency line as much as possible. In sum, although making the change suggested by one of the board members carries a relatively small price tag in and of itself, when PHA considers the totality of associated necessary costs, the change becomes untenable. At this stage of the Project, with construction set to begin very soon, PHA cannot afford any additional costs or delays aside from what we already know is coming from VH and construction cost escalations. It is essential to Project integrity and success that PHA move forward with review of current building designs without added expense of any further design and budget changes. If you have any questions or would like to see more documentation, please contact Whitney McDermott. Thank you, From Whitney McDermott, AIA wmcdermott@brw-architects.com CC: Michael Eaton, Ernecia Coles, Bruce Wardell