HomeMy WebLinkAboutWPO201400068 Bond WPO VSMP 2014-12-17 Internal 1, MI
hate Itecei.ed: "' Fee Paid _ t 1ti Y j'j cij _ ,
Received by: I
Intake: Fornard t Management Anahst
.:411
a > .. -
�RGIZ�P�
CX.f1A.;>4u4
C*0
REQUEST TO ESTABLISH A BOND _
APPROVED PLAN # WPO 2014 - 00068
PROJECT NAME: Farmington South Side Improvements VSMP Plan
(As listed on the approved plan)
All parcels in the project. including any off-site work if easements are not provided, and current owners. Use a
separate sheet if more owners are required. Owner and tax map information must be correct,and plans must be
approved prior to bond estimates being prepared.
TMP 60E- (2) -1 f Shei a Tate, FCC President
TAX MAPS/PARCELs: OWNER'S N
SIGNATURE: I/ date:/a ' / /
TAX MAPs/PARCELs: OWNER'S NAME:
SIGNATURE: date:
TAX MAPs/PARCELs: OWNER'S NAME:
SIGNATURE: date:
TAX MAPs/PARCELs: OWNER'S NAME:
SIGNATURE: date:
TAX MAPs/PARCELs: OWNER'S NAME:
SIGNATURE: date:
NOTE: If oN‘nership of the property is in the name of any type of legal entity or organization
including, but not limited to the name of corporation, partnership, limited liability company,
trust, association, etc., documents acceptable to the Connt. must be submitted certifying that
the person signing above has the authority to do so.
The requested estimates are;
❑ VESCP Erosion& Sediment Control per Water Protection Ordinance section 17-207: SO fee
VSMP Erosion and Sediment Control,Stormwater Management and Mitigation per Water
Protection Ordinance section 17-208;S250 fee required
❑ Subdivision(roads,drainage,etc.)per Subdivision Ordinance section 14-435;
& Water& Sewer per Subdivision Ordinance section 14-435; $250 fee required
A bond estimate will be prepared by the plan reviewer. The estimate must be sent to the owner. Please provide
contact information.
EMAIL: state22901@gmail .com
OR REGULAR MAIL ADDRESS:
a f1 .2a4,64 (S�
Revisedtil20t2414 ��,,A�J�' /1J