Loading...
HomeMy WebLinkAboutSDP202000063 Correspondence 2023-03-14 (6)SHIMP ENGINEERING, P.C. Design Focused Engineering March 14, 2023 John Wilson, PE Area Land Use Charlottesville Residency VA Department of Transportation RE: Response Letter #2 for SDP202000063 HTC Area C Townhomes - VDOT Dear John, Thank you for your review of the Final Site Plan for HTC Area C Townhomes. This letter contains responses to VDOT comments dated April 19, 2022.Our responses are as follows: 1. CG-12 handicap ramps will need to be redesigned to direct pedestrians across entrances and not into the travelway. No mid -block crossing has been warranted. Noted, now, new CG-12 ramps are shown at the Block H Berkmar Dr Entrance, which direct pedestrians across the site entrance, and not diagonally across Berkmar. 2. Existing bike ramp on Timberwood Blvd. should be corrected to match the other bike ramps in this development. Noted, linework updated to address this. Per site visit, these do match the other ramps in this development, the previous tinework shown was not very clear and has now been corrected. 3. VDOT will not maintain the decorative CG-9D entrance on Lockwood Drive. Noted, a note has been added to C6 which states this. 4. Please remove trees within 30 of intersections per B(1)-44 RDM. Trees within 30' of intersections have now been removed (this was resolved with now - approved Road Plans). 5. Please remove the parking spaces within the sight triangles. CG-3 Islands should be extended to address clear line of sight for sight triangle. This Block III Entrance qualities as a low -volume commercial entrance. Due to this, only stopping sight distance is required (155' for the 25 mph road with less than 2% grade). The islands cover the sight triangle for the stopping sight distance. 6. Please clarify the sight triangles are shown per VDOT RDM. Sight lines location of eye do not appear to be per RDM F-40 Intersection Sight Distance detail and table 2-5 and RDM B(1)19 Sight Distance. Eye location will be a minimum 14.5 feet from the edge of travel lane. Sight distance triangles have now been clarified. The eye locations are 14.5' behind the edge of travel lane, this is now dimensioned. (no revision to Block II intersection sight distance tines. Block HI entrance requires stopping sight distance, so the sight triangles there have changed). 912 E. High Sr. Charlottesville, VA 22902 1434.227.5140 1 shimp-engineering.com 7. Existing manhole HI appears to be in the proposed R/W and under proposed sidewalk. Manhole Hl should be relocated from under the sidewalk area. The manhole rim has been rotated so that it is located in the grass beside the sidewalk. We will keep the base in the current location due to the existing position of the storm pipe stub. I can't identify any practical way to move the base location without needing an offsite grading easement on the neighboring property. 8. Landscaping plants and trees adjacent to the sight distance triangle will need to be maintained in area between 2 and 7 feet above ground as a clear zone to preserve sight lines and accommodate pedestrians. Notes added to the landscaping plan Sheet C1l/C12, and to sight distance plan Sheet C15. If you have any questions or concerns about these revisions, please feel free to contact me at keane@shimp-en ing eering corn or by phone at 434-299-9842. Regards, Keane Rucker Shimp Engineering, P.C. 912 E. High St.. Charlottesville, VA 22902 1434.227.51401 shlmp-engineenrig.rom