HomeMy WebLinkAboutWPO201000027 Preconstruction Form Erosion Control Plan 2010-05-05 Ai
_t�3+'
Erosion & Sediment Control
Preconstruction Conference Checklist
Name of Plan: �'VU-5 �-,ii f t('
Plan No.: 2010 -ciao z
Date: -- - 5JS) /3
1)Copies of approved plan given to: Owner or Authorized Agent 2 Contractor /
2) Have all the conditions been met? yes
3)Responsible Land Disturber: Be //?1$
Cert./Lic.No.: /' (W / Type: ./7L D
Address/Phone/Mobil Phone: q ? 6' —713(9( 4 J 9 79 -f ��Q ( %,1"
L 3 3 U Corvho.,, J/ Dr. S i,., yeld/ ( v,'//4' , t//4 2 2 90 /
4)Name of Prime Contractor: ✓PfJ L,xc A vii I
Name of Subcontractor:
5)Persons in Attendance:
Name Firm
/Y)rrrl /-10 1/ . 4,9 . (
00 he7 0-5 f' 1's5 c k�
6)Date Permit Issued: /5/20/CD
(7) Notification has been given that the owner/contactor is responsible for obtaining a
VSMP permit from DCR. DCR h as requested the County to check for the site posting.
Notes: f/'ocL CLfLLr 4 / )17L .^� e'14
5-151z io ,lamXj--6 ; 0 O D y 1/.&a ��
Rev: April 12,2010