Loading...
HomeMy WebLinkAboutSP200400017 Action Letter Special Use Permit 2004-12-08 r of r tiiiril '� S�l® -• . v .. ��fRGINI� COUNTY OF ALBEMARLE Department of Community Development 401 Mclntire Road,Room 227 Charlottesville,Virginia 22902-4596 Phone(434)296-5823 Fax (434) 972-4126 January 4, 2004 Lori Meistrell P.O. Box 5207 Charlottesville, VA 22905 RE: SP-2004-00016. Forest Lakes North Swim and Tennis Club (Signs #23&94). AND SP-2004-00017, Forest Lakes South Swim and Tennis Club (Sign #18). Tax Map 46B3, Parcel B Dear Ms. Meistrell: On December 8, 2004, the Albemarle County Board of Supervisors took action on SP-2004- 00016 and SP-2004-00017 to allow all Forest Lakes Associates developments within the Forest Lakes North and Forest Lakes South neighborhoods to use the swim and tennis club amenities of either neighborhood in accordance with Sections 15.2.2.4 and 5.1.16 and Sections 20.4.2.1, 22.2.2.6, 18.2.2.4 and 5.1.2 of the Zoning Ordinance which allow for swim, golf, tennis and similar facilities on Tax Map 46B3, Parcel B in the Rivanna Magisterial zoning district. These special use permits were approved based on the following condition: 1. The use, as approved, shall be limited to the residents and guests of the following developments: Forest Lakes South, Springridge, Lanford Hills, Steeplechase, Amberfield, Cove Pointe, Edgewater, Gateway, Worthcrossing, Chelsea, Arbor Lake, Waterford, Watercrest, Copperknoll, Echo Ridge, Ridgefield, Poplar Ridge, Heather Glen, Whispering Woods, Timberwood, Timber Pointe, Autumn Woods. Any future residential developments contiguous to the developments listed, that are added to the Forest Lakes Community Association, may be permitted to use the facilities. The total number of additional dwelling units in future residential developments permitted to use the facilities shall not exceed one hundred twenty-five (125). Please be advised that although the Albemarle County Board of Supervisors took action on the projects noted above, no uses on the property as approved above may lawfully begin until all applicable approvals have been received and conditions have been met. This includes: • compliance with conditions of the SPECIAL USE PERMITS; and • approval of a ZONING COMPLIANCE CLEARANCE. In the event that the use, structure or activity for which these special use permits are issued is not commenced within twenty-four (24) months from the date of Board approval, it shall be deemed abandoned and the permit terminated. The term "commenced" means "construction of any structure necessary to the use of the permit." If you have questions or comments regarding the above-noted actions, please do not hesitate to contact Keith Lancaster at 296-5832 Sincerely, V. Wayne Cilinberg Director of Planning Planning Division Cc: Forest Lakes Associates File Amelia McCulley Bill Fritz Tex Weaver Chuck Proctor Keith Lancaster