Loading...
HomeMy WebLinkAboutWPO202200033 Bond Estimates 2023-03-17 (2)Project Name: VSMP Plan for LOT A-13 BUNDORA FARM WPO file number: WPO2022-00033 TMIal 861 Date Estimate Completed: 03-08-2023, Odri Barefoot -Diaz Siormwater Management Bond Estimate ITEM ITEM NUMBER _ 1 Permanent Diversion or Ditch Pipe ,Pipe, rap. chap (15 to Ce') rip rap mcudad with E mk far tletentian pond for detention pond'. diam depth height of dam alto it height al" atface it length of dam it to wiMM1 ft (area above transitil 0 sf (total width of dam) 0ft (height below transil Oft (area below tranatic 0 sf (total fill volume) O) cy length of spillway wid[M1 of spillway -ft ft riM1eigM1t ft s:� to melerto barrel length ft barrel diameterin E$-1,2 ft Length NQ UNN ell f�T Lellgtll: $150.00 $6,300.00 15.1 ton $200.00 $3,013.50 cut at high side -f cut at lace f length of cut witl[M1 of cut -ft ft (area below transmr 0 sf (total width of cut) 0 ft (depth below transit 0 ft (area above tmnshi osf (total fill volume) OD cy (TOAL CY estimate 0 cy (spillway stone tons 0tons (riser unit price) $000 base plate orfdn (barrel unit price) $0 00 barrel collars hrubs eedlige nderdraln (LF) lafllter sail mlx(CY) from rack) anti vortex devices lelntenanee access road (LF) ip-rap, placed depth ft length width (tons) urwy and layout (pica per 0.1 or.) acres audit (per facility) ,(per dam) WP02022r4)00W LOT X13 BUNDORA FMM SNM_BOM ea $5,00 $1,400,00 _ft 0 $2,500,00 $2,500 OO $00.00 $5.000.00 ■ea ea $500.00 $5 $2,500.00 ea $3,000.00 Wrap $0,00 agent sum $40,006.00 cmlgngency $6,000.80 Total $44 010 36=23