HomeMy WebLinkAboutWPO202200033 Bond Estimates 2023-03-17 (2)Project Name: VSMP Plan for LOT A-13 BUNDORA FARM
WPO file number: WPO2022-00033
TMIal 861
Date Estimate Completed: 03-08-2023, Odri Barefoot -Diaz
Siormwater Management Bond Estimate
ITEM ITEM
NUMBER _
1 Permanent Diversion or Ditch
Pipe
,Pipe, rap. chap (15 to Ce')
rip rap mcudad with E
mk far tletentian pond
for detention pond'.
diam
depth
height of dam alto it
height al" atface it
length of dam it
to wiMM1 ft
(area above transitil
0 sf
(total width of dam)
0ft
(height below transil
Oft
(area below tranatic
0 sf
(total fill volume)
O) cy
length of spillway
wid[M1 of spillway
-ft
ft
riM1eigM1t ft
s:� to melerto
barrel length
ft
barrel diameterin
E$-1,2
ft Length
NQ UNN ell f�T
Lellgtll:
$150.00 $6,300.00
15.1 ton $200.00 $3,013.50
cut at high side -f cut at lace f
length of cut
witl[M1 of cut
-ft
ft
(area below transmr
0 sf
(total width of cut)
0 ft
(depth below transit
0 ft
(area above tmnshi
osf
(total fill volume)
OD cy
(TOAL CY estimate
0 cy
(spillway stone tons
0tons
(riser unit price) $000
base plate orfdn
(barrel unit price) $0 00
barrel collars
hrubs
eedlige
nderdraln (LF)
lafllter sail mlx(CY)
from rack) anti vortex devices
lelntenanee access road (LF)
ip-rap, placed depth
ft length
width
(tons)
urwy and layout (pica per 0.1 or.) acres
audit
(per facility)
,(per dam)
WP02022r4)00W LOT X13 BUNDORA FMM SNM_BOM
ea $5,00 $1,400,00
_ft
0
$2,500,00
$2,500 OO
$00.00
$5.000.00
■ea
ea $500.00
$5
$2,500.00
ea $3,000.00
Wrap
$0,00
agent sum $40,006.00
cmlgngency $6,000.80
Total $44 010
36=23