Loading...
HomeMy WebLinkAboutWPO202200033 Bond 2023-03-17Internal Use only Date Received: Fee Paid: Received by: Intake: Forward to Program Administrator REQUEST TO ESTABLISH A BOND APPROVED PLAN 4WP02022-00033 PROJECT NAME: LOT A-13 BUNDORAN FARM (As listed on the approved plan) All parcels in the project, including any off -site work if easements are not provided, and current owners. Use a separate sheet if more owners are required. Owner and tax map information must be correct, and plans must be approved prior to bond estimates being prepared. TAX MAPs / PARCELs: 86-48-A-13R OWNER'S NAME: Paul Thompson SIGNATURE: date: 3/7/2023 TAX MAPs / PARCELs: 86-48-A-13R OWNER'S NAME: ]Deepti Basal SIGNATURE: DSae��e date: 3/7/2023 TAX MAPS / PARCELs: OWNER'S NAME: SIGNATURE: date: TAX MAPs / PARCELs: OWNER'S NAME: SIGNATURE: date: TAX MAPS / PARCELs: OWNER'S NAME: SIGNATURE: date: NOTE: If ownership of the property is in the name of any type of legal entity or organization including, but not limited to the name of corporation, partnership, limited liability company, trust, association, etc., documents acceptable to the County must be submitted certifying that the person signing above has the authority to do so. The requested estimates are; (Fees include 4% Technology Fee) la VESCP Erosion & Sediment Control per Water Protection Ordinance section 17-207, $0 fee la VSMP Erosion and Sediment Control, Stormwater Management and Mitigation per Water Protection Ordinance section 17-208; $294.32 fee required ❑ Subdivision (roads, drainage, etc.) per Subdivision Ordinance section 14-435, & Water & Sewer per Subdivision Ordinance section 14-435; $307.84 fee required A bond estimate will be prepared by the plan reviewer. The estimate must be sent to the owner. Please provide contact information. EMAIL: Enoch@snyderdesignbuil.com OR REGULAR MAIL ADDRESS: C: keane@shimp-engineering.com Revised 7/1/21