Loading...
HomeMy WebLinkAboutWPO202300019 Plan - VSMP 2023-03-21VSMP PLAN FOR LEGEND EXISTING NEW DESCRIPTION BOUNDARIES BENCHMARK SITE PROPERTY LINE - - - - ADJACENT PROPERTY LINE �r BUILDING SETBACK PARKING SETBACK SITE TEXT 0 1 u PARKING COUNT TOPOGRAPHY INDEX CONTOUR INTERVAL CONTOUR 311.5 x x1 W SPOT ELEVATION 311.5 TC x X1- TOP OF CURB ELEVATION 311.5 TW x x - TOP OF WALL ELEVATION 311.5 B W x x BOTTOM OF WALL ELEVATION - ....... - STREAM STREAM BUFFER 100 YEAR FLOODPLAIN BUILDING BUILDING RETAINING WALL STAIRS EDGE OF PAVEMENT ROAD CENTERLINE FRONT OF CURB BACK OF CURB CG-12 TRUNCATED DOME SIDEWALK BIKE PARKING HANDICAP ACCESSIBLE AISLE !1� HANDICAP PARKING l� MATERIAL CONCRETE RIPRAP ....................................... -------------------- - ASPHALT EC-2 MATTING EC-3 MATTING 0 WETLAND TREELINE X X FENCE UTILITY UTILITY POLE CD m GUY WIRE OHu OHu OVERHEAD UTILITY ucu UGu UNDERGROUND UTILITY STORM STORM MANHOLE q q DROP INLET STORM SEWER ....... ROOF DRAIN SANITARY SANITARY MANHOLE SANITARY SEWER MAIN S S SANITARY SEWER LATERAL WATER W W WATER LINE Q 0 WATER METER 0 o WATER METER VAULT FIRE HYDRANT A A FIRE DEPARTMENT CONNECTION GAS GAS GAS GAS LINE EASEMENTS CONSTRUCTION GRADING ACCESS SIGHT DISTANCE UTILITY STORMWATER FACILITY MAINTENANCE STORMWATER ACCESS DRAINAGE SANITARY WATERLINE GASLINE NOTE: 1. THE SIZE OF THE SYMBOLS MAY VARY FROM WHAT IS SHOWN. 15TH STREET LANDING SELF -STORAGE OWNER FTV Investments LLC 943 Glenwood Station Lane, Suite 101 Charlottesville, VA 22901 DEVELOPER Centennial American Properties 935 South Main Street, Suite 201 Greenville, SC 29601 PLAN PREPARATION Shimp Engineering, P.C. 912 East High Street Charlottesville, VA 22902 (434)227-5140 ZONING Planned Development Shopping Center, Entrance Corridor (Overlay) ZMA2020-00009 (amendment to ZMA88-16) approved on December 2, 2020, amending the allowable square footage for the subject property to a maximum of 110,000 square feet. MAGISTERIAL DISTRICT Rivanna SOURCE OF TITLE DB 1169 PG 347 SOURCE OF BOUNDARY AND TOPOGRAPHY Boundary & topographic survey provided by Meridian Planning Group LLC Boundary & topographic survey are NOT in State Plane Coordinates FLOODZONE According to FEMA Flood Insurance Rate Map, effective date February 4, 2005 (Community Panel 51003CO269D), this property is located within a Zone AE 100-year floodplain subject to LOMR 08-03-1390P effective date 8/8/2008. This development is outside of the limits of the floodway and the stream buffers for Moore's Creek and Biscuit Run. RESERVOIR WATERSHED This site is within the Moore's Creek Watershed. WATER & SANITARY SERVICES Site is served by ACSA public water and sewer. GENERAL CONSTRUCTION NOTES 1. Prior to any construction within any existing right-of-way, including connection to any existing road, a permit shall be obtained from the Virginia Department of Transit (VDOT). This plan as drawn may not accurately reflect the requirements of the permit.Where any discrepancies occur the requirements of the permit shall govern. 2. All materials and construction methods shall conform to the current specifications and standards of VDOT unless otherwise noted. 3. Erosion and siltation control measures shall be provided in accordance with the approved erosion control plan and shall be installed prior to any clearing, grading or other construction. 4. All slopes and disturbed areas are to be fertilized, seeded and mulched. 5. The maximum allowable slope is 2:1 (horizontal:vertical). Where reasonably obtainable, lesser slopes of 3:1 or better are to be acheived. 6. Paved, rip -rap or stabilization mat lined ditch may be required when in the opinion of the County Engineer or designee it is deemed necessary in order to stabilize a drainage channel. 7. All traffic control signs shall conform with the Virginia Manual for Uniform Traffic Control Devices. 8. Unless otherwise noted all concrete pipe shall be reinforced concrete pipe - Class III. 9. All excavation for underground pipe installation must comply with OSHA Standards for the Construction Industry (29 CFR Part 1926). GENERAL WATER & SEWER NOTES 1. Work shall be subject to inspection by Albemarle County Service Authority inspectors. The Contractor will be responsible for notifying the proper service authority officials at the start of the work. 2. The location of existing utilities across the line of the proposed work are not necessarily shown on the plans and where shown, are only approximately correct. The contractors shall on his own initiative locate all underground lines and structures as necessary. 3. All materials and construction shall comply with the current edition of hegeneral water and sewer construction specifications s as adopted by the Albemarle County Service Authority. 4. Datum for all elevations shown in National Geodetic Survey. 5. The contractor shall be responsible for notifying "MISS UTILITY" (1-800-552-7001). 6. All water and sewer pipes shall have a minimum of 3.5 feet of cover measured from the top of pipe, over the centerline of pipe. This includes all fire hydrant lines, service laterals and water lines, etc. 7. All water and sewer appurtenances are to be located outside of roadside ditches. 8. Valves on deadend lines shall be rodded to provided adequate restraint for the valve during a future extension of the line. 9. Trees are not permitted in the ACSA easement. 10. The contractor shall be responsible to comply with the no -lead regulation regarding brass fittings effective January 4, 2014 (Senate Bill 3874 which amends the Safe Drinking Water Act). 11. All public water and sewer facilities shall be dedicated to the Albemarle County Service Authority. 12. Backflow prevention is required for all connections to the water main. EXISTING USE Vacant, managed turf PROPOSED USE Self -Service Storage Facility LAND USE SCHEDULE EXISTING Area % Building 0 SF 0.0% Pavement 5,770 SF 57.1% Sidewalk 0 SF 0.0% Open Space 143,641 SF 96.1 % Total= 149,411 SF (3.43 ac.) PROPOSED Area % Building 35,227 SF 23.6% Pavement 36,248 SF 24.3% Sidewalk 4,737 SF 3.2% Open Space 73,199 SF 48.9% Total= 149,411 SF (3.43 ac.) Limits of Disturbance = 1.28 ac GENERAL NOTES 1. The information and data shown or indicated with respect to the existing underground utilities at or contiguous to the site are based on information and data furnished to the owner and engineer by the owners of such underground facilities or others. The owner or engineer shall not be responsible for the accuracy or completeness of such information or data. The contractor shall have full responsibility for confirming the accuracy of the data, for locating all underground utilities, for coordination of the work with owners of such underground utilities during construction, for the safety and protection thereof and repairing any damage thereto resulting from the work. All of these conditions shall be met at no additional cost to the owner. The contractor shall contact "Miss Utilities" of Virginia at 1-800-552-7001 prior to the start of work. 2. When working adjacent to existing structures, poles, etc., the contractor shall use whatever methods that are necessary to protect structures from damage. Replacement of damaged structures shall be at the contractor's expense. 3. The contractor shall be responsible for protecting all existing site structures from damage and coordinating work so that the owner can make necessary arrangements to modify/protect existing structures from damages. 4. The contractor shall be responsible for notifying all utility owners adjacent land owners whose roe may be impacted P fY 9 tY 1 property rtY Y P and the Virginia Department of Transportation prior to completing any off -site work. 5. Contractor shall notify and coordinate all work involving existing utilities with utility owners, at least 72 hours prior to the start of construction. 6. Contractor shall immediately report any discrepancies between existing conditions and contract documents to the owner and engineer. 7. Contractor shall submit for the approval of the owner submittals of all specified materials listed in the plans, to include shop drawings, manufacturer's specifications and laboratory reports. the owner's approval of submittals will be general and will not relieve the the contractor from the responsibility of adherence to the contract and for any error that may exist. 8. All bare areas shall be scarified, limed, fertilized, seeded and mulched. 9. All trees, saplings, brush, etc. shall be removed from within the right of way and the drainage easements. 10. Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. 11.Retaining walls require separate building permits. 12. All water, sewer, and fire lines require NEW inspection and testing procedures. ACSA performs any testing and inspections of the public sewer and water main(s). The Albemarle County Building Inspections Department (ACBID) does a visual inspection and witnesses the testing of the building drain, water service pipe, and the sprinkler lead-in connection. The developer/contractor is responsible to retain a Special Inspector as outlined in the updated Albemarle County Policy for Site Utilities to perform the visual inspection and testing of all utilities not covered by ACSA or ACBID. This includes building sewers, water, and fire line branches between the main and the meter(s)/building(s). The Special Inspector's report must be submitted and approved by the Albemarle County Engineering Department prior to a Certificate of Occupancy being issued. 13. Accessible parking spaces, access aisles, and accessible route shall be installed in accordance with ICC ANSI At 17.1-09. 14. Where the flood level rims of plumbing fixtures are below the elevation of the manhole cover of the next upstream manhole in the public sewer, the fixtures shall be protected by a backwater valve installed in the building drain, branch of the building drain or horizontal branch serving such fixtures. Plumbing fixtures having flood level rims above the elevation of the manhole cover of the next upstream manhole in the public sewer shall not discharge through a backwater valve." 15. All roof drains shall discharge in a manner not to cause a public nuisance and not over sidewalks. 16.Buildings or structures built before January 1, 1985 must have an asbestos survey performed in order to apply for a demolition permit. Asbestos removal permits are required if positive for such from Albemarle County and VDOLI. Contact VDOLI for their additional requirements and permits for demolition projects and 540-562-3580x131. County File Number Pending TAX MAP 76, PARCEL 55A ALBEMARLE COUNTY, VIRGINIA VICINITY MAPSCALE:1°=1000' FRY'S SPRING; 7gn 0",snd /5th Street Alamo Drafthouse Cinema Charlottesville T SITE ;mans 5M S% S CREEK OAK HILL SHEETINDEX C1 COVER C2 EXISTING CONDITIONS C3 SITE PLAN C4 GRADING & UTILITY PLAN C5 STORM PROFILES C6 UTILITY PROFILES C7 EROSION & SEDIMENT CONTROL NARRATIVE C8 EROSION & SEDIMENT CONTROL PLAN PH 1 C9 EROSION & SEDIMENT CONTROL PLAN PH 2 C10 EROSION & SEDIMENT CONTROL DETAILS C11 STORMWATER PLAN & DRAINAGE AREA MAPS C12 STORMWATER PLAN & DRAINAGE AREA MAPS WILLOUGHBY IMAGE PROVIDED BY GOOGLE MAPS SHIMP ENGINEERING � LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM 0 A Lj No.45183 Z; LS `S_ f01YAL re, VSMP PLAN FOR 5TH STREET LANDING SELF -STORAGE ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2023.03.14 REVISION: FILE NO. COVER 21.020 C1 RESIDUE OF ( I r T TMP V 600- 0 INVESTMENTS F DB 4278 PG 243 / \ / / T'I'&•• / DB 1835 PG 742 EX. STIR. 16 SDMH ® \ RIM: 385.70 \/ 15" RCP INV IN: 378.70 1�"MCP INV OUT: 378.80 oopc �/ \ ( \ i \ \\\`— �- — i // —// ,1> EX/IUMPSTER )PADLOT 1 A PORTION OF TMP 07600-00-00-055A/ / 0.656 AC. FH ------\ SSMH�\\\ \ \\` \\�k, \ TOPL389.35' \ \ \ \ \ \ /� WV SOIL TYPE 7 \ / // 20' PRIVATE DPI GE EASEMENT \ — \ 8" PVC INV=382.&5' \ \ \ \ \ \ 1 \ WV 3 ®�—WMx2 USG B — h DB SQ�13 G 259 /\w / & / WV w / CO V \ WV \ / CO -----\\ SOPH390.90• F�Te�\rq/rF, l //^1 \ \ \ \ \ \ \ 8" PVC INV=383.60' Opp/ NFRO l / \ / \ \ \ \ \ EX. BOUNDARY TO BE VACATEDN OF\ PORTION OF BOUNDARY TO BE VA ATED-� ' 15 LF OF ESE. I'S" RC TBR / EX. SDMH TBIR TOP NOT SET , INO ACCES/ BW=385.30 / \ \ y PORTION OF 20' AND VARIABLE WIDhI / /✓- \ PORTION OF 0/ PRIVATE ACSA WATERLINE EASEMENT I / / ACSA SE EASEMENT DB 5013 PG 259 / / / \ SHIMP DB 13 PG 259 l / / TO BE VACATED / \ T BE VACATED 1/ Pk=3899. ;O — J/ / / E N G I N E E R I N G LAND PLANNING - PROJECT MANAGEMENT LOT I TMP 076M1-00-00-00100 912 E. HIGH ST. 434.227.5140 A PORTIO OF FTV INVESTMENTS LLC CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM TMP 0760016C00-OSSA -I DEED BOOK 4278 PAGE 243 / \ ' ZONED: LI -'\ TMP 07600-00-00-055CO I / I EX. 15" PVC TBR - MORRIS CREEK YACHT CLUB INC / TOP=391.14' / Tw=3eFl4o \\ C/O THE Yi1711 PA424 COMPANIES \ I\ / INV=382.04�3 ' \ ewas.3z DEEDBOOK// T$ \ ZONED: HG EX. SDMH TBR \ / \ \ TOP NOT SET O Z \ \ NO ACCESS / J ):IIN>P TW=389.38 L No. 45183 / \ I � EX. SDMH TBR \ 15- fVC INV=382.70' / I 20' P AIEORTIDRAON OFSEMENTp DB 5013 PG ✓/ / I //� / / TO -BE VAC / �\� / I I I r - , SOIL TYPE 22C3 / / /� / BW_3854a / / _ / \ ) I / VSMP PLAN FOR use B / X/ , ,' ` ' / / j _I 5TH STREET LANDING TW=389.51 40( BW=385.49 // / SELF -STORAGE / / / \ / / `�'90 \ / \ /J I \\ J / / (� ALBEMARLE COUNTY, VIRGINIA SUBMISSION: SOIL TYPE 95usc B/D / 'A (� J 2023.03.14 TW=3a9.59 / / / ` \I JI I f / / / REVISION: BW=385.56 100, EX. 15" PVC TBR % \ / / / / TOP=389.35' % / / / / / I "-"/ INV=382.55' BW-385.61 / FILE N0. 21.020 I \ /% // / EXISTING CONDITIONS / /I / , I BW=384.74 TW=389.67 TW= _389.72 BW=385.67 / BW=385.66 BW=385.67 '3 TW=389.67 BW=385 BW=385.69 TW=389.73 / ^ L noun iNUNN Now*Noun _ / // / / \ / \ s01L rY 7s\ j 20 / / 0 20 J / 40 /60 USG B C2 RESIDUE OF \ T,Q TMP 07600-00-00-055A .�•1s �. FTV INVESTMENTS LLC\ ST'�: . DB 4278 PG 243 '�' ��&•• DB 1835 PG 742 E T A / VARIABLE WIDTH PRIVATE INGRESS/EGRESS ACCESS / \ EASEMENT \ / DB 4984 PG 535 \ / EX. STIR. 16 SDMH RIM: 3.70 15" RCP INV IN: 37878.70 \. 18" RCP INV OUT: 378.80 / \ \ VARIABLE WIDTH PRIVATE INGRESS/EGRESS ACCESS EASEMENT / \ \ \ \ DB 5013 PG 259 / EX. DUMPSTER PAD / \ / LOT 1 A PORTION TMP 07600-00-00-055A 20' ACSA 0.65E AC. SEWER EASEMENT / DB 5013 PG 259 , \\ FH SSMH \ TOP=389.35' \\ � WV 20' PRIVATE DRAT GE EASEMENT 8" PVC INV=382.65' \ \ \ '°W ® ,WMx2 \ in yyV i � DB 5013 G 259 VARIABLE WIDTH PUBLIC INGRESS/EGRESS ACCESS \ I\ WV w\ \ ` CO \ �N EASEMENT DB 4984 PG 535 EW J" CORP ST 20' AND VARIABLE WIDTH }. DB 4987 PG 105 �N 20' ACSA WV ACSA WATERLINE EASEMENT WA INE EMENT 4 ,.� �FW g•. DB 5013 PG 259 VARIABLE WIDTH PRIVATE INGRESS/EGRESS ACCESS EASEMENT DB 4984 PG 535 k, 8 co SSMH F'rTF AO T TOP=390.9 'v\ girF \ EW N W GV 8" PVC INV=383.6 �F 4/ F 0 NEe n . 2 TER/. I 4 SEMENT 2 776,5 15" LF Fr�R a HOPE � <o Z I NEW FHA NEW DI-3 ?3,5 1g• HDp AO NEW FDC .. P _ NEW M 1 6.00' TW=389.52 BW=385.30 119.2 a °- SHIMP 45 TW=389.50 ENGINEERING2. 5.30 LANDPLANNING - PROJECT MANAGEMENT NEW DI A3 - < LOT 2 TMP 076M1-00-00-00100 912 E. HIGH ST. 434.227.5140 RD 54 CF 6•• A PORTION OF FTV INVESTMENTS LLC CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM `R0 h' PE- ROOF TMP 076001E AC.0-055A DEED BOO 4278ZONED:LPAGE 243 Ro pAl-°_. Q 2 TMP 07600-00-00-055CO " iq MORRIS CREEK YACHT CLUB INC Tw=369.40 C/O THE OLYMPIA COMPANIES BW=385.32 DEED BOOK 1711 PAGE 424 / e° o ZONED: HC . p 200 U F� aP / TW=389.38 L No. 45183 a f BW=385.33 A �i I �(2� oz 209.27" NEW DI-3B TW=389.49 CO BUILDING r Bw=385.40 VSMP PLAN FOR �� 4 FLOORS 5TH STREET O Up � 26,180 SF/FLOOR BO ,,o 0 7 FIFE 391.00 LANDING e BW=38549 SELF -STORAGE / o ALBEMARLE COUNTY, VIRGINIA / SUBMISSION: 2023.03.14 TW=389.59 REVISION: BW=385.5E \ SOez 149.27' co � 4 v TW=389.57 BW=385.61 FILE NO. 21.020 SITE & UTILITY PLAN TW=389.4 TW=389.67 BW=384.74 TW=389.67 TW=389.72 BW=385.67 BW=385.66 BW=385.67 TW=389.73 TW=389.67 BW=385.69 BW=385.69 TW=389.73 BW=385.69 ,K 20 0 20 40 60 Scale: 1"=20' C3 RESIDUE OF \ / J TMP 07600-00-00-055A FTV INVESTMENTS LLC DB 4278 PG 243 '�'&•• DB 1835 PG 742 \ Sr Z �\/ \ \\ \� 1\ \ VARIABLE WIDTH PRIVATE ��GRESS\/EGRESS ACCESS EASE ENT DB 4984/ PG 535— //// EX. STIR. 16 SDMH ® \ I 15" RCP INV IN: 3778.70 ( \ / \. I / \ � _ / � � / I \ V\ 1�"MCP INV OUT: 378.80 � —VARIABLE WIDTH PRIVATE GRESS/EGRESS / - -' — — _ / / � / \ \ \ \ ACCESS EASEM�NT — — — — — — / / / — / / DB 5013 PG 59 / — / / / / I 1 ` / / / / / / / / / / EXUMPSTER )PAD \\\\ / — I LOT 1 / A PORTION TMP 07600-00-00-055A \ \ 20' ACSA \ \ \ \ \ \ \ 0.656 AC. SEWER-FA-SLEMENT DB 5013 PO\259 SSMH 11PL3�9.35' 20' PRIVATE 8" PVC INV=382.&.5\ DB . ® \ \ VARIABLE WIDTH PU\B�IC INGRESS/EGRESS AC ESS CO \ / \ EASEM T \ \ \ �� \\\ 20' AND VARIABLE WIDTH \ \ DB 4984 PG \ \ \ \ I \� \ \ \ DB 4987 PG 105 \ \ \ \ \ \ V \ DBS50 3ATPRGL1259EA5'ENIENT / /I �iZv VARIABLE WIDTH PRLVATE INGRESS/EGRESS ACCESS 6eSENT, I DB 4984 R� 55��33�\ \ /CO p v v \ V V A VAA V a. v w SSMH TOP=390.9 S�TFN�Tq/r4. _ I v \ \ \ \ \ V A \ � 8" PVC INV=383.6 EASEMENT 259 V \ V A 4 SEMENT 2 90 <o 89 6.00' oo ° BW=385.30 7Pk=389.50 LOT 2 1� TMP 076M1-00-00-00100 o Ro 90 A PORTION OF \ FTV INVESTMENTS LLC \ \ I 90 l l Ro TMP 07600-00-00-055A \ -I DEED BOOK 4278 PAGE 243 \ \ Ro 1.116 AC. \ ZONED: LI SHIMP ENGINEERING2. LAND PLANNING - PROJECT MANAGEMENT \ 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM TMP 07600-00-00-055C0 \ MORRIS CREEK YACHT CLUB INC / _ / Tw=3eRl4o \\ C/O THE Yi1711 PA424 COMPANI ES \ I\ i / &° \ ew85.32 DEEDBOOK \ ZONED: HC 20.0 / J TW=389.38 \BW=385.33 �o \ / 0) 209.27• / TW=389.49 io U �45183 ):.myfP 9 L No, � � 1, �I�2�� O 1116 SfUIYAL BUILDING 9000 h� BW=3B5.40 / _ / VSMP PLAN FOR ✓ — �- 1 / / / / / me 4 FLOORS I[L / \ , � / / / \ 26,180 SF/FLOOR 90 \ / / / - \ \ ' �,' 1 5TH STREET \ I FFE 391.00— \/J I LANDING I / TW=389.51 BW=385.49 `, / SELF -STORAGE / I `�90 a / \ / l I / �' \1 r j j/ �� \ ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 'A I -J/ 2023.03.14 TW=389.59 /\I JI I / / / REVISION: / BW=385.56 86 / ! 149.27 BW=385.61 FILE NO. Ir vv ! �/ /'/// �/ �I 11 l _ �- II I/ I I �� ✓/ //i // 21.020 TW=389.4 TW=389.67 GRADING PLAN / BW=384.74 BW=385.66 BW=385.67 BW=385.69 TW=389.67 BW=385.67 J BW=385.69 20 / / 0 20 J 40 /60 / A3 A0 BO 420 420 420 420 415 415 415 415 410 410 410 410 it] N 405 a, 405 405 405 400 N 400 400 V) 400 PROPOSED GRADE ,EXISTING GRADE 395 GRADE 395 395 395 390 390 390 390 385 385 385L= 140 U 385 N 380 380 380 380 o- 375 — 375 375 375 z 370 370 370 > 370 z- 365 365 365 365 36� 50 10+00 10+50 11+00 11+50 12+00 12+5° 360 360 STORM PROFILE A3 TO ROOFDRAIN 35aSD '°+°° '0+50 "+°° "+50 12+05 C5 SCALE: 1"=20' HORIZONTAL, 1"=10' VERTICAL 4 STORM PROFILE AO—BO 420 BO 420 C5 SCALE: 1"=20' HORIZONTAL, 1"=10' VERTICAL 415 415 410 410 LS 405 0 405 400 V) 400 395 L_U GIRAULL EXISTING GRADE 395 SHIMP 390 390 ENGINEERING2. LANDPLANNING - PROJECT MANAGEMENT 385 385 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM m 00 380 380 M p).0 � Z_ 375 375 z z T8 370 370 3695 50 10+00 10+50 1 1 +00 1 1 +50 12+003g 5 L N-.45183 1, �I2 2 STORM PROFILE BO TO ROOFDRAIN ==ss C5 SCALE: 1"=20' HORIZONTAL, 1"=10' VERTICAL ti 420 420 VSMP PLAN FOR 415 415 5TH STREET 410 410 LANDING SELF -STORAGE 405 405 ALBEMARLE COUNTY, VIRGINIA 400 40o SUBMISSION: /EXISTING GRADE 2023.03.14 395 395 REVISION: 390 390 385 385 380 380 375 375 FILE NO. 21.020 370 aff 370 365 OU5 STORM PROFILES 3 STORM PROFILE AO—A3 C5 SCALE: 1"=20' HORIZONTAL, 1"=10' VERTICAL C5_1 AO Al A2 A3 M � K N W W W o � m� � ¢ � n - IM � N 3 O � �Z wo- Z .> W Z J � Z > - woz M of W - zzZ- - - Q 50 10+00 10+50 11+00 11+50 12+00 12+50 13+ 0 n7 3 SAN. 0 � o � N LAT. 5 � J M M a w _ d a = rn I- x � 3 w 50 10+00 10+50 11+ 420 420 415 415 410 410 405 AUL 405 400 400 EXISTING G 395 z z 395 39 390 385 385 380 380 37 375 370 370 36�5 C165 SANITARY LATERAL PROFILE C6 SCALE: 1"=20' HORIZONTAL, 1"=10' VERTICAL 420 420 415 415 410 410 405 405 ;�PROPOSED GRADE 400 400 FX15TING GRADE 395 395 SHIMP 390 390 ENGINEERING2. LANDPLANNING - PROJECT MANAGEMENT 380 380 385 385 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM 375 375 370 370 TH 36g5 50 10+00 10+50 11+ 5 0 c fiIIV>P �+ U L N-.45183 2 WATER SERVICE LINE PROFILE A �123 C6 SCALE: 1"=20' HORIZONTAL, 1"=10' VERTICAL t�.o A �� y�IYAL 420 420 415 415 VSMP PLAN FOR ,/PROPOSED GRADE 410 410 5TH STREET 405 loz 405 LANDING SELF -STORAGE 400 400 ALBEMARLE COUNTY, VIRGINIA 395 395 SUBMISSION: 2023.03.14 390 Ar 390 REVISION: 385 385 380 380 w co 00 J M 375 375 o¢ - U Q W 370 "' 0 0 _ 370 ow FILE N0. Of wx o z 21.020 3695 50 10+00 10+50 1 1 +00 1 1 +50 5 UTILITY PROFILES 3 FIRE LINE PROFILE C6 SCALE: 1"=20' HORIZONTAL, 1`10' VERTICAL C6_1 �� F � � 8 DIP w o J � J � � H � 3 - � w w x z 3 ws 420 420 415 415 410 410 405 AUL 405 400 400 EXISTING G 395 z z 395 39 390 385 385 380 380 37 375 370 370 36�5 C165 SANITARY LATERAL PROFILE C6 SCALE: 1"=20' HORIZONTAL, 1"=10' VERTICAL 420 420 415 415 410 410 405 405 ;�PROPOSED GRADE 400 400 FX15TING GRADE 395 395 SHIMP 390 390 ENGINEERING2. LANDPLANNING - PROJECT MANAGEMENT 380 380 385 385 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM 375 375 370 370 TH 36g5 50 10+00 10+50 11+ 5 0 c fiIIV>P �+ U L N-.45183 2 WATER SERVICE LINE PROFILE A �123 C6 SCALE: 1"=20' HORIZONTAL, 1"=10' VERTICAL t�.o A �� y�IYAL 420 420 415 415 VSMP PLAN FOR ,/PROPOSED GRADE 410 410 5TH STREET 405 loz 405 LANDING SELF -STORAGE 400 400 ALBEMARLE COUNTY, VIRGINIA 395 395 SUBMISSION: 2023.03.14 390 Ar 390 REVISION: 385 385 380 380 w co 00 J M 375 375 o¢ - U Q W 370 "' 0 0 _ 370 ow FILE N0. Of wx o z 21.020 3695 50 10+00 10+50 1 1 +00 1 1 +50 5 UTILITY PROFILES 3 FIRE LINE PROFILE C6 SCALE: 1"=20' HORIZONTAL, 1`10' VERTICAL C6_1 �� F � � 8 DIP w o J � J � � H � 3 - � w w x z 3 ws PROJECT DESCRIPTION, GENERAL NOTES, EROSION & SEDIMENT CONTROL NOTES, AND SEQUENCE OF CONSTRUCTION PROJECT DESCRIPTION THE PURPOSE OF THIS PROJECT IS TO BUILD A SELF-SERVICE STORAGE FACILITY. THE TOTAL AREA OF DISTURBANCE IS 1.28 ACRES. THE PROJECT INVOLVES THE FOLLOWING WORK ACTIVITIES: 1. THE CONTRACTOR SHALL COMPLY WITH ALL LOCAL AND STATE EROSION & SEDIMENT CONTROL PERMITTING REQUIREMENTS AND MAINTAIN ALL EROSION & SEDIMENT CONTROLS IN ACCORDANCE WITH THE PERMIT REQUIREMENTS. 2. INSTALLATION OF TEMPORARY AND PERMANENT EROSION AND SEDIMENT CONTROL MEASURES AS SHOWN ON THE PLAN AND DETAILS. 3. GRADING AND PLACEMENT OF FILL SHALL BE IN GENERAL ACCORDANCE WITH THE PLAN. 4. ESTABLISHMENT OF PERMANENT STABILIZATION OF ALL DISTURBED AREAS.. 5. CONSTRUCTION OF DRIVEWAY, SIDEWALKS, AND BUILDING PADS AS SHOWN ON THE SITE PLAN. EXISTING SITE CONDITIONS THE SITE IS A UNDEVELOPED LOT WITH TURF AREAS AND A RETAINING WALL CONSTRUCTED AS PART OF A COMMON PLAN OF DEVELOPMENT. ADJACENT PROPERTIES THE SITE IS BOUNDED TO THE NORTH BY MOORES CREEK, TO THE SOUTH BY ROUTE 64, TO THE EAST BY BISCUIT RUN, AND TO THE WEST BY A HOLIDAY INN. OFF -SITE AREAS ANY OFFSITE ACTIVITIES WILL BE FROM SITES WITH APPROVED EROSION CONTROL PLANS. NO OFFSITE DISTURBANCE ANTICIPATED. OFFSITE DISPOSAL OF SPOILS MAY BE REQUIRED. SOILS THIS SITE CONTAINS THE FOLLOWING SOIL TYPES BASED ON NRCS SOIL MAPS FOR ALBEMARLE COUNTY VIRGINIA: CULPEPER CLAY LOAM, USG B DAN RIVER LOAM, USG B HATBORO SILT LOAM, USG B/D CRITICAL EROSION AREAS N/A RESPONSIBLE LAND DISTURBER: TBD EROSION & SEDIMENT CONTROLS UNLESS OTHERWISE INDICATED, ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO THE MINIMUM STANDARDS AND SPECIFICATIONS AS SET FORTH IN THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, LATEST EDITION. THE MINIMUM STANDARDS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL REGULATIONS SHALL BE ADHERED TO UNLESS OTHERWISE WAIVED OR APPROVED BY VARIANCE. CONSTRUCTION ENTRANCE (PCE) - 3.02 INSTALL AND MAINTAIN A CONSTRUCTION ENTRANCE, AS NECESSARY, THAT MEETS THE REQUIREMENTS OF STD. AND SPEC. 3.02 AND CONFORMS WITH THE REQUIREMENTS OF THE EROSION & SEDIMENT CONTROL PLAN. CONSTRUCTION ROAD STABILIZATION (CRS) - 3.03 TEMPORARY STABILIZATION WITH STONE OF ACCESS ROADS, SUBDIVISION STREETS, PARKING AREAS, AND OTHER TRAFFIC AREAS IMMEDIATELY AFTER GRADING TO REDUCE EROSION CAUSED BY VEHICLES DURING WET WEATHER, AND TO PREVENT HAVING TO REGRADE PERMANENT ROADBEDS BETWEEN INITIAL GRADING AND FINAL STABILIZATION. STD. AND SPEC. 3.03. SILT FENCE (SF) - 3.05 SILT FENCING WILL BE INSTALLED AS A FIRST STEP IN CONSTRUCTION ACTIVITIES. LOCATION AND DETAILS ARE SHOWN ON THE PLANS. INLET PROTECTION (IP) - 3.07 INLET PROTECTION MEASURES AROUND THE NEW INLETS SHALL BE PROVIDED IN ACCORDANCE WITH STD. AND SPEC 3.07. SILT FENCE OR TEMPORARY STONE APPLICATIONS SHALL BE APPLIED AS APPROPRIATE FOR CURRENT GRADE CONDITIONS. PERMANENT STABILIZATION TEMPORARY SEEDING (TS) - 3.31 TEMPORARY SEEDING SHALL BE APPLIED TO ALL DENUDED AREAS WITHIN SEVEN (7) DAYS TO DENUDED AREAS THAT MAY OR MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT (UNDISTURBED) FOR LONGER THAN 14 DAYS. TEMPORARY SEEDING SHALL BE APPLIED IN CONFORMANCE WITH STD AND SPEC. 3.31. PERMANENT SEEDING (PS) - 3.32 ALL DITCHES AND ADJACENT AREAS WITHIN 15 FT OF THE EDGE OF THE DITCHES SHALL BE SEEDED IN CONFORMANCE WITH STD. AND SPEC. 3.32. PERMANENT SEEDING SHALL BE APPLIED TO AREAS DELINEATED ON THESE PLANS WITHIN SEVEN (7) DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. PERMANENT SEEDING STABILIZES DISTURBED AREAS AND ENHANCES THE BEAUTY OF THE SITE. MULCHING (MU) - 3.35 APPLICATION OF PLANT RESIDUES OR OTHER SUITABLE MATERIALS TO THE SOIL SURFACE TO PREVENT EROSION AND FOSTER THE GROWTH OF VEGETATION. ORGANIC MULCHES (STRAW) HAVE BEEN FOUND TO BE THE MOST EFFECTIVE. GENERAL NOTES 1. THE INFORMATION AND DATA SHOWN OR INDICATED WITH RESPECT TO THE EXISTING UNDERGROUND UTILITIES AT OR CONTIGUOUS TO THE SITE ARE BASED ON INFORMATION AND DATA FURNISHED TO THE OWNER AND ENGINEER BY THE OWNERS OF SUCH UNDERGROUND FACILITIES OR OTHERS. THE OWNER OR ENGINEER SHALL NOT BE RESPONSIBLE FOR THE ACCURACY OR COMPLETENESS OF SUCH INFORMATION OR DATA. THE CONTRACTOR SHALL HAVE FULL RESPONSIBILITY FOR CONFIRMING THE ACCURACY OF THE DATA, FOR LOCATING ALL UNDERGROUND UTILITIES, FOR COORDINATION OF THE WORK WITH OWNERS OF SUCH UNDERGROUND UTILITIES DURING CONSTRUCTION, FOR THE SAFETY AND PROTECTION THEREOF AND REPAIRING ANY DAMAGE THERETO RESULTING FROM THE WORK. ALL OF THESE CONDITIONS SHALL BE MET AT NO ADDITIONAL COST TO THE OWNER. THE CONTRACTOR SHALL CONTACT "MISS UTILITIES" OF VIRGINIA AT 1-800-552-7001 PRIOR TO THE START OF WORK. 2. WHEN WORKING ADJACENT TO EXISTING STRUCTURES, POLES, ETC., THE CONTRACTOR SHALL USE WHATEVER METHODS THAT ARE NECESSARY TO PROTECT STRUCTURES FROM DAMAGE. REPLACEMENT OF DAMAGED STRUCTURES SHALL BE AT THE CONTRACTOR'S EXPENSE. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL EXISTING SITE STRUCTURES FROM DAMAGE AND COORDINATING WORK SO THAT THE OWNER CAN MAKE NECESSARY ARRANGEMENTS TO MODIFY/PROTECT EXISTING STRUCTURES FROM DAMAGES. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING ALL UTILITY OWNERS, ADJACENT LAND OWNERS WHOSE PROPERTY MAY BE IMPACTED AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION PRIOR TO COMPLETING ANY OFF -SITE WORK. 5. CONTRACTOR SHALL NOTIFY AND COORDINATE ALL WORK INVOLVING EXISTING UTILITIES WITH UTILITY OWNERS, AT LEAST 72 HOURS PRIOR TO THE START OF CONSTRUCTION. 6. CONTRACTOR SHALL IMMEDIATELY REPORT ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND CONTRACT DOCUMENTS TO THE OWNER AND ENGINEER. 8. CONTRACTOR SHALL ADJUST ALL APPURTENANCES AS REQUIRED TO MATCH NEW GRADES. THE EXACT LOCATION OF APPURTENANCES SHALL BE COORDINATED WITH THE OWNER. 9. CONTRACTOR SHALL SUBMIT FOR THE APPROVAL OF THE OWNER SUBMITTALS OF ALL SPECIFIED MATERIALS LISTED IN THE PLANS, TO INCLUDE SHOP DRAWINGS, MANUFACTURER'S SPECIFICATIONS AND LABORATORY REPORTS. THE OWNER'S APPROVAL OF SUBMITTALS WILL BE GENERAL AND WILL NOT RELIEVE THE THE CONTRACTOR FROM THE RESPONSIBILITY OF ADHERENCE TO THE CONTRACT AND FOR ANY ERROR THAT MAY EXIST. EROSION & SEDIMENT CONTROL NOTES: 1. ALL VEGETATIVE AND STRUCTURAL EROSION & SEDIMENT CONTROL (E&S) PRACTICES WILL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE MINIMUM SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATION 9VAC25-840-40. 2. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO COMMENCEMENT OF LAND DISTURBING ACTIVITY AND ONE WEEK PRIOR TO FINAL INSPECTION. THIS REQUIREMENT CAN BE WAIVED AT THE DISCRETION OF THE PLAN APPROVING AUTHORITY. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. 4.A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ONSITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING BUT NOT LIMITED TO, OF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTRY EROSION AND SEDIMENT CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN REVIEWING AUTHORTY. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN REVIEWING AUTHORITY. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABALIZATION IS ACHEIVED. 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. 9.THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALY AND AFTER EACH RUN-OFF PRODUCING STORM EVENT. ANY NECESSARY REPARIS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 10. INSTALL AND MAINTAIN CONSTRUCTION ENTRANCES FOR ENTIRE PROJECT AT ALL LOCATIONS WHERE VEHICLES ENTER/LEAVE THE WORK AREA AND WHERE SOIL IS STOCKPILED. 11. MAINTAIN ALL EROSION AND SEDIMENT CONTROL UNTIL THE COMPLETION OF FINAL STABILIZATION. UNLESS OTHERWISE NOTED ON THE PLANS REMOVE ALL EROSION & SEDIMENT CONTROLS FOLLOWING THE ESTABLISHMENT OF A PERMANENT VEGETATIVE COVER AND COMPLETION OF FINAL STABILIZATION. EROSION & SEDIMENT CONTROL PERMITTING 1. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL LOCAL AND STATE EROSION AND SEDIMENT CONTROL PERMITS AND MAINTAINING ALL EROSION AND SEDIMENT CONTROLS IN ACCORDANCE WITH THE PERMIT REQUIREMENTS. . •;uF2_ I V2T afflTAIrkyl SWIM QUANTITY: THIS DEVELOPMENT IS SUBJECT TO THE APPROVED STORMWATER MANAGEMENT PLAN 5TH STREET COMMERCIAL DEVELOPMENT VSMP PLAN DATED 05/03/2017 AND DESIGNED BY COLLINS ENGINEERING. SINCE THE IMPERVIOUS AREA IS INCREASING BY 0.10 AC IN THIS DEVELOPMENT, THE FLOW RATE WAS RECALCULATED AND THE OUTFALL CHANNEL WAS ANALYZED TO ENSURE IT REMAINS NON -EROSIVE DURING THE 2-YR STORM PER 9VAC25-870-66.B.1.o AND THAT THE 10-YR STORM IS CONTAINED PER 9VAC25-870-66.C.2.a.. SWIM QUALITY: STORMWATER QUALITY COMPLIES WITH 9VAC25-870-65 THROUGH THE PURCHASE OF NUTRIENT CREDITS AND DEDICATION OF OPEN SPACE PER THE APPROVED STORMWATER MANAGEMENT. AN ADDITIONAL 0.18 LBS/YR OF PHOSPHOROUS REMOVAL IS REQUIRED DUE TO THE INCREASE IN IMPERVIOUS AREA. THIS WILL BE ACHIEVED BY PURCHASING NUTRIENT CREDITS. MANAGEMENT STRATEGY AND SEQUENCE OF CONSTRUCTION THE FOLLOWING ARE THE PROPOSED MANAGEMENT STRATEGIES AND DETAILED SEQUENCE OF CONSTRUCTION. REQUIRED PERMITS MUST BE IN -HAND BEFORE WORK BEGINS: PHASE 1 1. INSTALL CONSTRUCTION ENTRANCE. TRUCKS SHALL BE CLEANED PRIOR TO LEAVING THE SITE. 2. INSTALL PERIMETER WIRE -SUPPORTED SILT FENCE AS SHOWN. 3. REMOVE EXISTING STORM STRUCTURES. 4. INSTALL CONSTRUCTION ROAD STABILIZATION STONE WITHIN LIMITS OF DISTURBANCE. 5. CONTACT THE ENGINEER AND ALBEMARLE COUNTY FOR INSPECTION AND APPROVAL OF ALL E&S CONTROL MEASURES. 6. UPON APPROVAL OF E&S CONTROL MEASURES, BEGIN WHOLESALE CLEARING, AND GRADING. PHASE 2 1. AS STORM STRUCTURES ARE INSTALLED, PROVIDE INLET AND OUTLET PROTECTION. 2. BEGIN GRADING FOR ROAD, PAVED AREAS, AND BUILDING. 3. BRING AREAS TO GRADE AND STABILIZE SLOPES ALONG ROAD SHOULDERS. 4. APPLY TEMPORARY SEEDING, MULCHING, AND PERMANENT SEEDING AS AREAS ARE STABLILZED. 5. ONCE ALL AREAS ARE STABILIZED, CONTACT ALBEMARLE COUNTY FOR INSPECTION PRIOR TO REMOVAL OF PERIMETER CONTROLS. CONSTRUCTION MAINTENANCE THE FOLLOWING CONSTRUCTION MAINTENANCE PRACTICES SHALL BE FOLLOWED AT THE SITE. 1. ALL E&S CONTROL MEASURES WILL BE CHECKED DAILY AND AFTER EACH SIGNIFICANT RAIN EVENT. ALL DEFICIENCIES IDENTIFIED DURING THESE INSPECTIONS SHALL BE CORRECTED AS SOON AS PRACTICABLE. 2. THE SILT FENCE BARRIER SHALL BE REGULARLY CHECKED FOR UNDERMINING, DETERIORATION OR SIGNIFICANT EROSION. SEDIMENT SHALL BE REMOVED AFTER EACH STORM EVENT AND WHEN THE LEVEL OF SEDIMENT DEPOSITION REACHES HALF THE HEIGHT OF THE CONTROL. 3. THE CONTRACTOR IS RESPONSIBLE FOR ADHERING TO ALL MAINTENANCE REQUIREMENTS SET FORTH IN THE CURRENT EDITION OF THE VIRGINIA SEDIMENT AND EROSION CONTROL MANUAL, OTHER APPLICABLE COMMONWEALTH OF VIRGINIA REGULATIONS AND THE PROJECT SPECIFICATIONS. 4. ALL SEEDED AREAS WILL BE REGULARLY CHECKED TO ENSURE THAT A GOOD STAND OF GRASS IS MAINTAINED. 5. ALL AREAS SHALL BE MAINTAINED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS E&S CONTROL PLAN. ENVIRONMENTAL CONTROLS 1. CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL ENVIRONMENTAL CONTROL MEASURES SO AS TO COMPLY WITH LOCAL ORDINANCES, STATE AND FEDERAL LAWS AND REGULATIONS APPLICABLE TO WATER POLLUTION IN WATERS OF THE STATE AND IN INTERSTATE WATERS. 2. CONTRACTOR SHALL MINIMIZE THE POTENTIAL FOR AIR POLLUTION BY THE USE OF EMISSION CONTROL EQUIPMENT ON CONTRACTOR OPERATED EQUIPMENT, SHUT -DOWN OF MOTORIZED EQUIPMENT WHEN NOT IN USE, AND ACTIVELY CONTROLLING DUST EMISSIONS THROUGHOUT THE PROJECT. 3. ANY WASTE DISCOVERED DURING THE PROJECT SHALL NOT BE MOVED WITH OUT PRIOR AUTHORIZATION OF THE OWNER AND BE DIRECT -LOADED INTO COVERED ROLL -OFF CONTAINERS FOR TEMPORARY STORAGE PRIOR TO DISPOSAL IN A PERMITTED LANDFILL. MINIMUM STANDARDS (MS) All applicable Virginia Erosion and Sediment Control Regulations and Minimum Standards shall be adhered to during all phases of construction. These include, but are not limited to the following: 1. STABLIZATION OF DENUDED AREAS: Permanent or temporary soil stabilization shall be applied to bare areas within seven days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade, but will remain dormant or undisturbed for longer than 7 days. Permanent stabilization shall be applied at areas that are to be left dormant for more than 1 year. 2. STABILIZATION OF SOIL STOCKPILES: During construction of the project, soil stockpiles shall be stabilized or protected with sediment trapping measures. The applicant is responsible for temporary protection and permanent stabilization of all soil stockpiles on site as well as soil intentionally transported from the project site. 3. PERMANENT VEGETATIVE COVER A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieve that, in the opinion of the city Inspector, is uniform and mature enough to survive to inhibit erosion. 4. TIMING & STABILIZATION OF SILT TRAPPING MEASURES: Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be constructed as a first step in any land disturbing activity and shall be made functional before upslope land disturbance takes place. 5. STABILIZATION OF EARTHEN STRUCTURES: Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after installation. 6. SEDIMENT TRAPS AND BASINS: A sediment basin shall control surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to three acres. The sediment basin shall be designed and constructed to accommodate the anticipated sediment loading for the land disturbing activity. The outfoll device or system device shall take into account the total drainage area flowing through the disturbed area to be served by the basin. 7. CUT AND FILL SLOPES: Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is corrected. & CONCENTRATED RUN-OFF DOWN CUT OR FILL SLOPES: Concentrated runoff shall not flow down cut or fill slopes unless contained within an adequate temporary or permanent channel, flume, or slope drain structure. 9.WATER SEEPS FROM A SLOPE FACE: Whenever water seeps from a slope face, adequate drainage or other protection shall be provided. 10. STORM SEWER INLET PROTECTION: All storm sewer inlets that are made operable during construction shall be protected so that sediment -laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. 11. STABILIZATION OF OUTLETS: Before newly constructed stormwater conveyance channels are made operational, adequate outlet protection and any required temporary or permanent channel lining shall be installed in both the conveyance channel and receiving channel. 12. WORK IN LIVE WATERCOURSES: When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control sediment transport and stabilize the work area to the greatest extent possible during construction. Nonerodible material shall be used for the construction of causeways and cofferdams. Earthen fill may be used for these structures if armored by nonerodible cover materials. 13.CROSSING A LIVE WATERCOURSE: When a live watercourse must be crossed by construction vehicles more than twice in any six month period, a temporary stream crossing constructed of nonerodible materials shall be provided. 14. APPLICABLE REGULATIONS: All applicable federal, state and local regulations pertaining to working in or crossing live watercourses shall be met. 15.STABILIZATION OF BED AND BANKS The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is completed. 16.UNDERGROUND UTILITIES: Underground utilities shall be installed in accordance with the following standards in addition to other criteria: a.No more than 500 linear feet of trench may be opened at one time b.Excavated material shall be placed on the uphill side of trenches c.Effluent for dewatering operations shall be filtered or passed through approved sediment trapping device, or both, and discharged in a manner that does not adversely affect flowing streams or offsite property. d.Material used for bockfilling trenches shall be properly compacted in order to minimize erosion and promote stabilization. e.Restabilization shall be accomplished in accordance with these regulations. f. Applicable safety regulations shall be complied with. 17.CONSTRUCTION ACCESS ROUTES: Where construction vehicle access routes intersect paved public roads, provisions shall be made to minimize the transport of sediment by vehicular tracking onto paved surfaces. Where sediment is transported on to a public road surface, the road shall be cleaned thoroughly at the end of each day. Sediment shall be removed by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to individual lots as well as to larger land disturbing activities. 18.TEMPORARY E&S CONTROL MEASURE REMOVAL: All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after temporary measures are no longer needed, unless otherwise authorized by the local program authority. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sediment. 19. ADEQUACY OF RECEIVING CHANNELS: Properties and waterways downstream from the development site shall be protected from sediment deposition, erosion and damage, due to increases in volume, velocity and peak flow rates of stormwater runoff for the stated frequency storm of 24-hour duration. SHIMP ENGINEERING2. LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM io L No.45183 � .16 1, � O `Zis� SfUIYAL VSMP PLAN FOR 5TH STREET LANDING SELF -STORAGE ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2023.03.14 REVISION: FILE NO. 21.020 EROSION & SEDIMENT CONTROL NARRATIVE C7 ( I _ \ / \ EX. S R. RIM: 6385 MO / I/� /I \/I \` 1 / V 1� I�CPPINV OUT: 378.80 00 EX /11UMPSTER IPAD� r LOT 1 / A PORTION TMP 07 0 0.656 AC. -OSSA FH / \ / / \ TOPL3439.35' ///� wV / /oe .� 8" PVC INV=382.>55' --W \ \ \ \ \ \ 1 \ wus V 3 ®oMx2 SOILT PB 7 \ I ' / \ h \\ \ \ \ \ \\ CO wv U \ wv PCE \SF / 20' PRIVATE DR'AI GE EASEMENT DB 5I13 G 259 I/ ---SSMH° 9o.9o' -383.60' v V� \ \ \ \ \EX. BOUND RY OF BE VACATED F \ IMITS OF STURBANCE = 1. AC I \ SOIL EROSION & SEDIMENT CONTROL SYMBOLS SYMBOL N0. TITLE KEY 3.02 CONSTRUCTION ENTRANCE PC -X X X X - 3.05 SILT FENCE SF 3.03 CONSTRUCTION ROAD STABILIZATION CRS 3.07 INLET PROTECTION IP TS 3.31 TEMPORARY SEEDING TS 3.32 PERMANENT SEEDING PS �7 3.35 MULCH MU 3.39 DUST CONTROL DC - - ��- - - LIMITS OF DISTURBANCE SEQUENCE OF CONSTRUCTION PHASE 1 1. INSTALL CONSTRUCTION ENTRANCE. TRUCKS SHALL BE CLEANED PRIOR TO LEAVING THE SITE. 2. INSTALL PERIMETER WIRE -SUPPORTED SILT FENCE AS SHOWN. 3. REMOVE EXISTING STORM STRUCTURES. 4. INSTALL CONSTRUCTION ROAD STABILIZATION STONE WITHIN LIMITS OF DISTURBANCE. 5.CONTACT THE ENGINEER AND ALBEMARLE COUNTY FOR INSPECTION AND APPROVAL OF ALL E&S CONTROL MEASURES. 6. UPON APPROVAL OF E&S CONTROL MEASURES, BEGIN WHOLESALE CLEARING, AND GRADING. N OTE: SINCE THIS DEVELOPMENT IS APPROXIMATELY AT GRADE, PERMITER WIRE -SUPPORTED SILT FENCE AND CONSTRUCTION ROAD STABILIZATION STONE WILL PROVIDE SUFFICIENT EROSION & SEDIMENT CONTROL. PER VESH 3.03, EXISTING GRADE DOES NOT EXCEED A SLOPE OF 4%. PER VESCH 3.05 CONDITION 2, THE SIZE OF THE DRAINAGE AREA DOES NOT EXCEED 0.25 AC FOR ANY 100 FOOT SEGMENT OF SILT FENCE. - - PORTIO BOUNDARY TO BE VA ATED� 15 LF OF EX.'115" RC TBR / EX. SDMH TBR TOP NOT SET NO ACCES BW=385.30 / y PORTION OF 20' AND VARIABLE WIDPOR I PP// ) \ / ' PACSAO SE F APRIVATESEMENT / y DBS50 3APGL1NE 259EASEMENT / \\ 1 I I DB PG 259 T TO BE VACATED VACATED LOT 2 TMP 076M1-00-00-00100 A PORTIOy OF \ k FTV INVESTMENTS LLC \ \ I TMP 0760016 AC 0-055A DEED BOOK 4278 PAGE 243 / \ ZONED: LI TMP 07600-00-00-055CO I / I , EX. 15" PVC TBR \ MORRIS CREEK YACHT CLUB INC / TOP=391.14' TW=385_40 \ C/O THE OLYMPIA COMPANIES ` I i / I INV=382.04' / }/ \ BW-385.32 /� \ DEED BOOK 1711 PAGE 424 \ / \\ ZONED: HC I\� \\ I /�✓// �' / J\> / \�� EX. SDMH TBR TOP NOT SET \ \ NO ACCESS SHIMP ENGINEERING2. LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM io �f'IIV�~i EX. SDMH TBR �', �� L No. 41 TOP=387.20'7 / TO AL DA TO SILT FENCE = \ n 15" fVC INV=382.70' p� / AC PORTION OF \ /DA PITCHES FROM CENTER OF SI1E- . / 0 20' P ATE DRAINAGE gSEMENT / AND DOES NOT EXCEED 0.25 AC FOR �� DB - 13 9 S } / TO BE VAC = 4D / \ I I / ANY 100 LF SEGMENT OF SF r } TW=389.49 � �� / } r � solL TYPE 22C3 / / / /� � / Q BW=385.40 /,--✓- -'11 USG B / / S /�VSMP PLAN FOR W= 8549 // // � /J � / � // /� 5TH STREET + 390\ // ' / \, ,� i / LANDING ---_- I ,/ / - - / SOIL TYPE95 cRs / }� t/I % / /_ II//�_� - SELF -STORAGE USG B/D / ALBEMARLE COUNTY, VIRGINIA BW=385.56 / SUBMISSION: 2023.03.14 EX. 15" PVC TBR REVISION: TOP-389.35' J I // / ( INV=382.55' 00, 810 LF OF PERIMTER WIRE SUPPORTED SILT FENCE / ew=3sssi / I FILE NO. TW=389.4 TW=389.67 / / / / J J ` /I I BW=384.74 TW=389.73 7 BW=385.67 /1\J/ 21.020 BW=385.66 TW=389.6.BW=385.69 BW=385.69 TW=389.73 BW=385.69 / \ L � i / // Z// / // I / \ / �� TY 76\ //// / / // �� / // // EROSION & SEDIMENT _ r'// /���� �/= _\ - USG CONTROL PLAN PH 1 --Nmw ..m��a / zo o /z -4o-- f1 / VV ///S ale: 1"=20' / / Z VARIABLE WIDTH PRIVATE GRESS\/EGREIS ACOi SS EASE j \\y\/ DB 4984/ P6 535 EX. STR. 16 SDMH RIM: 3.70 \ \ 1��CP5„PINV IN: 78 INVOUT: 378.80 \\ \ ( \ \\ \ \ Y - VARI BLE WIDTH PRIVATE \I GRESS/�RESS � - - -- - \ / � � / / / � / � / \/ J ACCESS EASEM NT - _ _ - - - DB 5013 \ \ \ \ \I \ I EX. /1)UMPSTER PAD , X I LOT 1 A PORTION OF / TMP 07600-00-00-055A / 20' ACSA \ \ \ \ \ \ \ -- 0.656 AC. SEWER--EAF,,EMENT DB 5013 PC,,259SSMH FH TOPL3439.35' \ \ \ \\ \\, /` WV 8" PVC INV=382.155' \ \\\\\ 1 \. WV /W/\ 3 ®o--WMx2 \ VARIABLE WIDTH PUB�C INGRESS/EGRESS \FESS \\ \ \ \ I\ WV 1,y\ i , ` ® \ \ EASEM T \ \ \ \ \ \ \\ �/~W 3E.. CORP ST 20' AND VARIABLE WIDTH \ \ DB 4984 PG 535 \ \ \ \ � bp' ACSA WV ACSA WATERLINE EA ENT \ DB 4987 PG 105 \ \ \ \ \ INE EMENT - 4 W �f1.� PCE S DB 5013 PG 259 \ \ VARIABLE WIDTH PR4MATE INGRESS/EGRESS ACCESS EAS EMK N DB 4@84 F+3�\ \ \ \ B,fCO i Pop . SSMH k i, F-I'TF D T TOP=390.9 v v \ \ V A v EW N W GV 8" PVC INV=383.6 s NEW °0 2 \ TERq/ TER 4 SEMENT \ \ \ \\ /. N ,° 2 116.5 LF 15" HOPE \ I <e NEW FHA NE DI_ Z F �/ PIS, A NEW FDC 8 �\ �W 6.00' I / TW=389.52 \ \ \ I \ � I // BW=385.30 \ � 1 \ I / /NEW DI 1 \A3 i IP LOT 2 Om Ro 54 CF 6-A PORTION OF \ 90 �Ro H P O116 AC. TMP 0760O-O55A / 20' PRIVATE DRAI DB 5¢93 I/ / EASEMENT 259 IMITS OF STURBAKE = 1:P8 AC / I / r / TMP 076M1-00-00-00100 FTV INVESTMENTS LLC DEED BOOK 4278 PAGE 243 ZONED: LI SOIL EROSION & SEDIMENT CONTROL SYMBOLS SYMBOL N0. TITLE KEY 3.02 CONSTRUCTION ENTRANCE PCE -X -X -X -X - 3.05 SILT FENCE SF 3.03 CONSTRUCTION ROAD STABILIZATION CRS ® 3.07 INLET PROTECTION IP TS 3.31 TEMPORARY SEEDING TS 3.32 PERMANENT SEEDING PS 3.35 MULCH MU 3.39 DUST CONTROL DC - - - - - - LIMITS OF DISTURBANCE SEQUENCE OF CONSTRUCTION PHASE 2 1. AS STORM STRUCTURES ARE INSTALLED, PROVIDE INLET AND OUTLET PROTECTION. 2. BEGIN GRADING FOR ROAD, PAVED AREAS, AND BUILDING. 3. BRING AREAS TO GRADE AND STABILIZE SLOPES ALONG ROAD SHOULDERS. 4. APPLY TEMPORARY SEEDING, MULCHING, AND PERMANENT SEEDING AS AREAS ARE STABLILZED. 5. ONCE ALL AREAS ARE STABILIZED, CONTACT ALBEMARLE COUNTY FOR INSPECTION PRIOR TO REMOVAL OF PERIMETER CONTROLS. TMP 07600-00-00-055C0 \ MORRIS CREEK YACHT CLUB INC \ C/O THE OLYMPIA COMPANIES ` I ! / �` \ TW-A85.32 \ DEED BOOK 1711 PAGE 424 \ I , / J A^ - o ew 85.32 / \ ZONED: HC I V / \ \ `/ ✓ / J 20.0 / r ABW-385.33 \ SHIMP ENGINEERING2. LANDPLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM io / A \ o� inr L No. 4 209.2T \ NE -3B } �Tw=389.49 J / / J \ \ // I I I `�•�OIYAL NBUILDING r BW=385.46 4 FLOORS / ,� SD/ \ 26,180 SF/FLOOR lJP 4 FFE 391.00 a905 B� . T VSMP PLAN FOR �+ I / \ / / / / ` � } ✓ ` � / / � / / 1 / � / � I � � a : ° / TW=389.51 / 3W=385.49 / / \ _ 5TH STREET ° ° / IV / i _ �\i i \\ /�r LANDING SELF -STORAGE r _ \ JI I ALBEMARLE COUNTY, VIRGINIA T-39.56W I SUBMISSION: / r/ \ aQ� , �I //\- I 2023.03.14 149.2T /i I REVISION: 4 / / i / I / BW=385.61 FILE NO. L-389.4 TW=389.67 k / - �/ BW=384.74 TW=389.67 TW=389.72 BW=385.67 I / / / / / 21.020 BW=385.66 BW=385.67 TW=389.73 TW-389.67 BW=385.69 BW=385.69 TW=389.73/l EROSION & SEDIMENT CONTROL PLAN PH 2 %Aww%Apmm NEW- c 9 ///S ale: 1"=20' / / TABLE 3.32-D SITE SPECIFIC SEEDING MIXTURES FOR PIEDMONT AREA Total Lbs. Per Acre Minimum Care Lawn - Commercial or Residential 175-200 lbs. - Kentucky 31 or Turf -Type Tall Fescue 95-100% - Improved Perennial Ryegrass 0-5% - Kentucky Bluegrass 0-5% High -Maintenance Lawn 200-2501bs. - Kentucky 31 or Turf -Type Tall Fescue 100% General Slope (3:1 or less) - Kentucky 31 Fescue 128 lbs. - Red Top Grass 2 lbs. - Seasonal Nurse Crop * 20 lbs. 150 lbs. Low -Maintenance Slope (Steeper than 3:1) - Kentucky 31 Fescue 108 lbs. - Red Top Grass 2 lbs. - Seasonal Nurse Crop * 20 lbs. - Crownvetch * * 20 lbs. 150 lbs. * Use seasonal nurse crop in accordance with seeding dates as stated below: February 16th through April ...................... Annual Rye May 1st through August 15th ..................... Foxtail Millet August 16th through October ...................... Annual Rye November through February 15th ................... Winter Rye ** Substitute Sericea lespedeza for Crownvetch east of Farmville, Va. (May through September use hulled Sericea, all other periods, use unhulled Sericea). If Flatpea is used in lieu of Crownvetch, increase rate to 30 lbs./acre. All legume seed must be properly inoculated. Weeping Lovegrass may be added to any slope or low -maintenance mix during warmer seeding periods; add 10-20 lbs./acre in mixes. 1 PERMANENT SEEDING PS C 10 Not To Scale TABLE 3.31-B ACCEPTABLE TEMPORARY SEEDING PLANT MATERIALS -QUICK REFERENCE FOR ALL REGIONS* Rate Planting Dates Species (lbs./acre) Sept. 1 - Feb. 15 50150 Mix of Annual Ryegrass (Lolium multi-florum) & 50- 100 Cereal (Winter) Rye (Secale cereale) Feb. 16 - Apr. 30 Annual Ryegrass 60 - 100 (Lolium multi-florum) May 1 - Aug 31 German Millet 50 (Setaria italica) 2::)TEMPORARY SEEDING (TS C1 Q Not To Scale TABLE 3.39-A ADHESIVES USED FOR DUST CONTROL Water Application Dilution Type of Rate Adhesive (Adhesive: Water) Nozzle Gallons/Acre Anionic Asphalt Emulsion 7:1 Coarse Spray 1,200 Latex Emulsion 12.5:1 Fine Spray 235 Resin in Water 4:1 Fine Spray 300 Acrylic Emulsion (Non -Traffic) 7:1 Coarse Spray 450 Acrylic Emulsion (Traffic) 3.5:1 Coarse Spray 350 3 DUST CONTROL DC C1 0 Not To Scale ORGANIC MULCH MATERIALS AND APPLICATION RATES RATES: MULCHES: NOTES: Per Acre Per 1000 sq. ft. Straw or Hay 12 - 2 tons 70 - 90 lbs. Free from weeds and coarse (Minimum 2 matter. Must be anchored. tons for Spread with mulch blower or winter cover) by hand. Fiber Mulch Minimum 35 lbs. Do not use as mulch for 1500 lbs. winter cover or during hot, dry periods.* Apply as slurry. Corn Stalks 4 - 6 tons 185 - 275 lbs. Cut or shredded in 4-6" lengths. Air-dried. Do not use in fine turf aeras. Apply with mulch blower or by hand. Wood Chips 4 - 6 tons 185 - 275 lbs. Free of coarse matter. Air- dried. Treat with 12 lbs nitrogen per ton. Do not use in fine turf areas. Apply with mulch blower, chip handler, or by hand. Bark Chips 50 - 70 cu. 1-2 cu. yds. Free of coarse matter. Air - or yds. dried. Do not use in fine Shredded turf areas. Apply with Bark mulch blower, chip handler, or by hand. * When fiber mulch is the only available mulch during periods when straw should be used, apply at a minimum rate of 2000 lbs./ac. or 45 lbs./1000 sq. ft. 4 MULCHING MU C1 � Not To Scale GRAVEL CURB INLET SEDIMENT FIL TER GRAVEL FILTER*� �__1 RUNOFF WATER 69911JISIiw11 CONCRETE GUTTER SPECIFIC APPLICATION THIS METHOD OF INLET PROTECTION IS APPLICABLE AT CURB INLETS WHERE PONDING IN FRONT OF THE STRUCTURE IS NOT LIKELY TO CAUSE INCONVENIENCE OR DAMAGE TO ADJACENT STRUCTURES AND UNPROTECTED AREAS. * GRAVEL SHALL BE VDOT #3, #357 OR 5 COARSE AGGREGATE SOURCE: VA. DSWC 6 C1 Not To Scale PLATE 3.07-6 CONSTRUCTION OF A SILT FENCE (WITH WIRE S UPPOR T) 1. SET POSTS AND EXCAVATE A 4"X4" 2. STAPLE WIRE FENCING TO THE POSTS. TRENCH UPSLOPE ALONG THE LINE OF POSTS. 3. ATTACH THE FILTER FABRIC TO THE WIRE FENCE AND EXTEND IT INTO THE TRENCH 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. —1 EXTENSION OF FABRIC AND WIRE INTO THE TRENCH. SOURCE: Adapted from Installation of Straw and Fabric Filter Barriers for Sediment Control, PLATE. 3.05-1 Sherwood & Iyant 5 SILT FENCE SF C1 Q Not To Scale Paved construction entrance for crosinn control nlans SIO`L 70' MIN.— CONSTRUCTION ACCESS --3" SM-2A A_HALT TOP / COURSE EXISTING % r ?� PAVEMENT MIN, 21A AGGREGATE BASE PROFILE STONE 70' MIN. CCNSIRUCIION ASPHALT PAVED ACCESS— A WASHRACK -=XISiT N =. 2% 2%pVFvl ^ 12% 12' MIN,* t—POSITIVE DRAINAGE *MUST EXTEND FULL WIDTH TO SEDIMENT OF INGRESS AND EGRESS OPERATION TRAPPING DEVICE PLAN 12' MIN. SITIVE DRAINAGE SEDIMENT 4PPING DEVICE FILTGa CLC— IJ SECTION A —A A mininiurn water tap of 1 inch must be installed with a mininmmn 1 inch ballcock shutoff valve supplying a wash hose with a diameter of L 5 inches for adequate constant pressure. Wash water unlst be carried away from the entrance to an approved settlhng area to remove sediment. All sedintennt shall be prevented from entering stoma drains, ditches or watercourses. PAVED WASH RACK NO I AVED CONSTRUCTION ENTRANCE (PCE) Not To Scale SHIMP ENGINEERING2. LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM io �� � L No.45183 � � 1, �I�2�� 0 `�� S�otvAL VSMP PLAN FOR 5TH STREET LANDING SELF -STORAGE ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2023.03.14 REVISION: FILE NO. 21.020 EROSION & SEDIMENT CONTROL DETAILS Q 01 POST -DEVELOPMENT NOTES: too'STr?CAM fi11f:F'T.R f�®'. Pi).�J� �I�LOiliT'l�A�' SCA>.E'1"=50' a. THEGP.ADINGSHOWNREPRESENTSTHEPROPOSE_D F'2r1M tV0(i', tiR.FEK CONTOURS ASSOCIATED WITH THIS VSMP PLAN. FROM APPROVED z. THE PROPOSED DRAINAGE DIVIDES, BOTH IN LEVEL OF q ' •� IMPERVIOUSNESS AND SIZE, REPRESENT THE FULL PLAN W P O 2 O 16 O O O 8 2 ;- :� � �. air _ BUILDOUTOFTHIS PROJECT. THE STORMWATER QUANTITY •. " � y ,� SEE'CHANNELADEQUACT AND DUALITY TREATMENT PROPOSED WITH THIS PLAN PLAN' ON THIS SHEET, & REFLECT THIS FULL BUILDOUT, CALCULATIONS PACKET 3. A FINAL SITE PLAN IS REQUIRED FOR THE CONSTRUCTION �,��j Dr)A' -� - '- FOR CHAPIIVELADEOUAf_Y OF THE PLAN CONCEPTUALLY SHOWN BELOW. AT THE TIMOF THE FINAL E VERIFIED FOR TEPLAN'REVIEW TE PLAN WILL BE€N€RALS MPLrANHLYITtfT# IS MAP LAN. ® J \0K ( !��' r � -.100 YEAR F7_oODPLAIN, �' - :`!. _ � ,'�? � I NIjING FINAL FI.ACF.MF:N I or n! I , r1R C(fi ETION c : "Y" i.-yt,/ f■ '�N' 1 -r0' 'vIITI! Al1Ual, LINE FERMI MQf. ;; (.REEK, MIIIGATION'.1.11�1F:. 1 v �)"'• P. A; SHOWN ON `;P 2001 000f)3: ,,..� AND APPROVEO BY THE '-;�'� �+♦, • -� r, v'• - �°,- t AlJitMARIF COUNTY FJ0 j Ab 1 \ ' \ - s(e y � fir. �\ � lllll�M�Ilr�r�rr�gh���' ; 1F J 0 O ! F ft ft °Y / ��t .�,� - l 1 $, 7• / ! @ °moo C .. 00 f0I�` 0100 POSED UPGRADE Tl GSTORM ;'EWER. t�'.. / ''' '' ✓ ® / ® 1 v rd ♦ , 47 0ROPOSFJ?,B8T EXISTING FEMA A% - ! /t. ! ♦ / . ; r , A�MANAGEPQ6td1"PRACTIfF_OF 7 FL00 F ARN ! �' i/ FQK4 t&OPEN SPAC€ /_// - / r, ,/ 6AS%NIENT5. SEF THIS SHEET , r r FOR FUi I DEPICTION OF ESM'r. HOLIDAY INN 4Wi Cr J X �. ) ............. ... 4% (d Cf d •/ d f.A ,IIMc .FEIMA ! . I.IJJODWAY Post -Development DA A &. B Impervious Area Summady iJ (For Final Buiklout Water Cluartti Cak:ulatiords a [Con uildings 27500sf crete Skfewalks & DulilpsterPad 6,7.z5sferviousPavers4,700far king Lot Asphalt&Curb 66,470 sf f Total = 104,835 sr CN FOR WPO 201600082 Forest/Open Space -_ undisturbed, protected forest/open space or reforested land Managed Turf -- disturbed, graded for yards or other turf to be mowed/managed Impervious Cover ° r a°. ,.....e a :•a r; :. a o°m a-, J r °, r. 1OO' STREAM BUFFER FROM BISCUIT RU --- _ PROPOSED GREENWAY EASEMENT AREA 'NO _ DISTURBANCE AREA, BASED ON SP 2007-0006: ` - - -- A Soils 8 Soils C Soils D Soils a (acres) 0.00 30 0100 55 0.00 70 0.00 77 CN a (acres) 0.00 39 0.84 G1 0,00 74 0.00 80 CN a (acres) 0,00 1 98 2.41 98 0.00, 98 0.00_ 98 CN CN(D.A. CI - 88 Total Area (acres): 3.25 Runoff Reduction STORMWATER COMPLIANCE WITH APPROVED COMMON PLAN OF DEVELOPMENT THIS DEVELOPMENT IS PART OF THE 5TH STREET COMMERCIAL DEVELOPMENT VSMP PLAN, WPO 201600082, DATED 5/3/17 AND APPROVED ON 9/1/17. PER THE STORMWATER NARRATIVE IN THE APPROVED VSMP PLAN, THIS SITE IS COMPLIANT WITH IIC STORMWATER REGULATIONS AND MEETS CHANNEL PROTECTION REQUIREMENTS SET FORTH IN 9VAC25-870-66.B.1.a AND B.4.a AND FLOOD PROTECTION REQUIREMENTS SET FORTH IN 9VAC25-870-66.C.2.a AND C.3.a. THIS DEVELOPMENT IS WITHIN DRAINAGE AREAS A&B AS SHOWN IN THE APPROVED PLAN, WHICH IS DESIGNED FOR A POST -DEVELOPMENT CN OF 88.3 AND A TOTAL IMPERVIOUS AREA OF 2.41 AC. THE APPROVED MINOR SITE PLAN AMENDMENT IN SDP201900045 INCREASED THE TOTAL IMPERVIOUS AREA TO 1.62 AC WHICH LEAVES 0.79 AC OF IMPERVIOUS SURFACE FOR THIS DEVELOPMENT. THE 5TH STREET LANDING SELF STORAGE DEVELOPMENT PROPOSES A TOTAL IMPERVIOUS AREA OF 0.89 AC. PER THE STORMWATER CALCULATIONS, THE SITE IS STILL COMPLIANT WITH THE ABOVE REFERENCED CHANNEL PROTECTION AND FLOOD PROTECTION REQUIREMENTS THE APPROVED STORMWATER PLAN ROUTS ALL RUNOFF THROUGH STORM STRUCTURES TO AN ARMORED SPILLWAY THAT DISCHARGES INTO MOORE'S CREEK. PER THE DRAINAGE AREA MAP INCLUDED ON SHEET C10, ALL IMPERVIOUS SURFACES ARE ROUTED TO STORM STRUCTURES WHICH CONNECT TO AN EXISTING STRUCTURE AND DISCHARGES AT THE DESIGNED LOCATION. ^`• �\ 1 ,,. 10 kIA HTY■N!1 ie 11dIA r L✓F8 ILDI 392E A & I 1 fi r ' r! d1\ I R� ♦ � ; /// / / 1 DRAINAGE AREAS FOR SDP 201900045 -50 SCALE: 1" = 50' FROM APPROVED PLAN SDP201900045 / / , '♦ 1 1 ' 9 awr CN FOR SDP 201900045 A Soils B soils C Soils Forest/Open Space -- undisturbed, protected forest/open space or reforested land Area (acres) 0,00 30 0.00 'r5 b,00 /0 CN Managed Turf -- disturbed, graded for yards or other turf to be mowed/managed Area acres 0.00 39 L,613 61 0,00 74 CN Impervious Cover Area (acres) Q:00 98 1.62 98 0.00 98 CN 1-year storm 2-year storm 10-year storm RVDeveloPed (Watershed -inch) with no Runoff Reduction"'� 1,22 1./1 3:30 RVDeveloPed (watershed -inch) with Runoff Reduction* 1.22 1. 11 d.30 Adjusted CN* 79 /9 79 \N� PHASE 2 MANAGED TURF D Soils Total Area (acres): 3.2.r3 0.00 Runoff Reduction 71 Volume ft' : 0 0:00 sa o.00 98 CNIDA_.e 79 SHIMP ENGINEERING2. LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM io HRVIP [ L N—..4.f5183 Q� OA A �` SkAVAy VSMP PLAN FOR 5TH STREET LANDING SELF -STORAGE ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2023.03.14 REVISION: FILE NO. 21.020 STORMWATER PLAN & DRAINAGE AREA MAPS C 11 Ixv vxOmwnunon xeeu['Iwn memo. xewuemopmem ci U2011 BMP 3tancaN, And SAe MaAda- OW13 Draft BMP 3petB 1- prop. Name' 1 $LIT Street Landing RH 3t.raga Date: 1/30/2023 B.wg.e,y. sPedfxmr.m n,r. Site Information Project (Treatment Volume and Loads) TP Load rmRlOwn spa my.r Laval 0 w Wg0MIM(ka-0 Add %FORWd P% M.rymTurfmyarl�l O.w WapMtl M(Nfl Aw %ManyMTul 0% ImpvNOwf rlc®I 0.10 MllmpeM e) A95 %Imwn'lia 100% sre urea laau) a10 stets ..9 ow am A1B a1B RuroIICeBMOYMa1RB1 llblb 0r cub 1 ow. ,oreu/olmslta OA2 OA3 0.00 0.05 e. 0.a5 0.ID 0.22 019 C erv�ousf.vtt Imp5 A9 ATi 0.95 0.95 nee alum. rpoe OOYlaa hl m rentVnI, (,,bi,fW) 3as TP loatl lib/yr) 0.33 TN leatl Bb/yr 1.55 Site Results (Water Quality Compliance) Area checks DAA DAB D.A.0 DA0 U.AE ARUCHECK F0REa1r/0KNSPM(x) 0.00 0.00 ODO 0.00 0.00 OK. IMPERVIOUS COVER (ac) 0'00 0.00 0.00 Oa0 0.00 OK. IMPERVIOUS COVER TREATED Jac) 0.00 0.00 0.00 0.00 0.00 ON. WIVAGEDTURFARFA(a) OM 0,00 DDO D.oD 0.00 OK. MANAGEDIDRFAREAINEATED (a) 000 000 000 000 Coo OK AREA OEM OK. OK. OK. OK. OK. Site Treatment Volume(R3) 345 Runoff Reduction Volume and TP By Drainage Area D.A A D.A B O.A C O.A O D.A. E TOTAL ' MINOFF REDUCTION VOLUME ACNIEV*jib/ TO LORD AVNLARIE FOR REMOVAL 0.00 0.00 0.00 0.00 0.00 RLOMREOAIwNACHIEVED 0.00 000 0.DO 0.00 0.00V LOAD REMAINING 0.00 000 0.00 0.00 0.00 NTTROGENIOADREDUCTIONACHIM0 0.00 0.00 0.00 0.w 0.00Total Phosph NNAL FOST-0FVEIOPMENTT lOAO (Ib/yt/ D.21 1P TOAD REDUCTION REQUIRED Ib/yr) 0.18 TPLOM REWCTgN ACHIEVED (Ib/W DOW 1? LOAD REMONING (1b/yrl: 0.22 RENMNINGTP LOAD REDUCTION REWIRED (Ib/yr): 0.18 Total Nitrogen (For Information Purposes) POSE -DEVELOPMENT LOAD (Ib/ W I 1.33 NrMoGENMDRE000110NACNIEVED (Ib/W am REMAINING POSr-0EVEEOPMFNTNIrRIXiFN LOAD Pb/W)1 1.33 rt)'ir-Ot VlV7MNl NV1ti / V -�-� In"IrKa xfs n tivamh ivwFprLAu [ ryNl l%F1 MSUCIA1R111MIM MS YSMP RlA4 00 MEIVIOAM TH1 P%U*1T, RETPF.SEM hIM 4»INllrl � /Hn 1%I.ircn. the ntI1MNA1laOWNTrfP , AND r/NAV MAIMltt f4NIPt SED VrtH tNISLUH - i . �•' IIEft ECT IM"AL OU{DOV'. .rl,'p�` I APNN •11FE�A►R►Frlllrr/fLEt7[1M rprstRUr1NrN Of iHEN Ndi(1f/U1.1UAllySHfAYpal40NP. A11tA IY (It rm1 WAAL SiT\P(AV'lmvowlwk PANIVAt K MPIrLF]RCrRNmmco M•1*kuwmiTm%"PJ"AlL 4,rt'„`��`�I-aC�•, 1� r�:1.• r �,J S aiaal}aa{aII11IIRg{a{gA{a/• � I• y ``+ n/ _Ia4M1n ee, \ I' I r rNl ,4, - REVISED DA A & B �a 101 AL AREA = 3.35 AC IMPFRVIOUS AREA - 2-51 AC � y r JF� FNgY1J4 gS.Arl TrI C r DRSiialfl rfYA-� J,'(• r_ % AH IQD TE TLOODfLAN� / .. , ga IQIWyIIh 41, IS �••• 1 - R1M Deu!NIprRMa W A 11 a hIRrNMsIIe Fwa llLsaaty � �J (for fRvl eJWgg WMRrOrlll!v C%R tNlilm) �.. .( �/., (-onfrrrti Sidewalk a llumpsr-r Pad 4,Itsv -4'- - - h+aw.A P►%"1 AIM if If . l Nlr lul Ay1uR 61 .,E. GIL410 sf - - lowl •• IMAM Et - OF 0 -�' r[ �S7.OEI�COPMfM rlu'r••ey ICFCf'// r• PLMMWh♦.'.fFiClra i•�� �/ fA1,ttAAf10N•eeKlrti 10a L:IArata i AfAT)IMC V B Ito TEAR F1r/ODFLAaf• •wi.r A*r LlmfA. PLA(FutN 1 -e'er OF r'NJ rise ODIIl'triNri ` nF-)rate :; t ( b PROPOSED f / BUILDING LAYOUT tT ;r l f ♦ r t t ( I A t0D' 1,1*..AV &WEP FRUd U'ACUT P11o110 iO UTANWAV LAL%D UT AR£A I'NO DrSYLPOARM AKA. &ASEII (IN IF 900T- 3.1IWr.8A5E➢ (IN SP T00T 1:A_Y� STORMWATER MANAGEMENT NARRATIVE I I i1 /r I I• j� intA nt1D0a'n• I ADDITIONAL IMPERVIOUS AREA = 0.10 AC THIS DEVELOPMENT PROPOSES AN ADDITIONAL 0.10 AC OF IMPERVIOUS AREA TO DA A & B. CALCULATIONS WERE PERFORMED WHICH DEMONSTRATE THAT THE EXISTING CHANNEL, CONSTRUCTED BASED ON THE APPROVED STORMWATER PLAN IN WP0201600082, IS NONEROSIVE DURING THE 2-YR STORM, REMAINING COMPLIANT WITH CHANNEL PROTECTION REQUIREMENTS IN 9VAC25-870-66.B.1.A AND BA.a. ADDITIONALLY, THE EXISTING CHANNEL REMAINS COMPLIANT WITH FLOOD PROTECTION REQUIREMENTS IN 9VAC25-870-66.C.2.a AND C.3.a. THE 10-YR DESIGN STORM IS CONTAINED WITHIN THE CHANNEL. WATER QUALITY FOR THE ADDITIONAL IMPERVIOUS AREA IS PROVIDED THROUGH THE PURCHASE OF NUTRIENT CREDITS. THE 0.10 AC INCREASE REQUIRES 0.18 LB/YR OF TP LOAD REMOVAL. SHIMP ENGINEERING2. LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM vJtl �SHIMP � r�c/N 45183 At a``ss a VSMP PLAN FOR 5TH STREET LANDING SELF -STORAGE ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2023.03.14 REVISION: FILE NO. 21.020 STORMWATER PLAN & DRAINAGE AREA MAPS C11