Loading...
HomeMy WebLinkAboutWPO202300019 Plan - Stormwater 2023-03-21LLU N 'HIEVENHON PLAN KEY 1301. A"MI PROTECTION RAIN GAGE CONCRETE WASHOUT AND CEMENT WASTE STRUCTURE Q CONSTRUCMON STUCCO. PAINTING. AN Q ANING nDEWATERING C ERArMs OEAA7R1MATERIUVDRY ANO STORAGE ® MATERIAL N$E DURING BUILDING PROCESS ® sCUD WASTE QSANITARY WASTE � LANDSCAPING !'O) Y C ERAnCN$ © WASH WATERS VEHICLE AND IS_'Cl EQUIPMENT WASHINSHING G O SWPPG MAILBO% DN UE EueuNc AND EL STORAGE \ \\ \ \ \\ 1 r \ \ \\\\\\\ \ \\`� � \ \\\\\\ \ \\\ ` U WI — \ IN I \ \\ \\ �I \\\ \ —_— \\\ \ \N\\ \\\\ \ \ \ \ ®{�'/� I J \ ` \ I I\ / r I I 1 zaxm No 1 \. I I SOIL EROSION S SEDIMENT CONTROL SYMBOLS SYMBOL NO. TITLE KEY 50 0 Scale: 1"=50' 3.02 CONSTRUCTION ENTRANCE PCE 3.05 SILT FENCE SF 3.03 CONSTRUCTION ROAD STABILIZATION CRS 3.07 INLET PROTECTION IP 3.31 TEMPORARY SEEDING TS 3.32 PERMANENT SEEDING PS 3.35 MULCH MO 3.39 DUST CONTROL DC LIMITS OF DISTURBANCE 50 100 150 0 - -------------- i • i/ MF AOIW-�W'Ctr6 F � / Fifth Street Landing Self Storage POLL UTIONPREVENTIONPLAAT NOTE: CONTRACTOR CAN RELOCATE POLLUTION PREVENTION F ITEMS, BUT MUST MARK UP DRAWINGS WITH UPDATED LOCATION. LIMITS OF DISTURBANCE TO BE FIELD MARKED WITH WHITE FLAGS OR WHITE PAINT IMPORTS MUST BE NOTED IN THE SWPPP GRADING LOG. CONTRACTOR SHALL MARK .l *� LOCATION OF COVERED DUMPSTERS AND BUILDING MATERIALS (INCLUDING PAINT AND SOLVENTS) WITHIN THE LIMITS OF A DISTURBANCE AS NEEDED. r'r---' ALL POLLUTANTS SHALL BE "J PREVENTED FROM ENTERING STORM DRAINS. + / / / TDTAL DA TO SILT 1.Y3 AC CEFENCER DA PITCHES FROM CENTER SITE / .. 1 OES A ANO DNOT IXCEED 0.25 AC Fpi l' ANY 100 IS SEGMENT OF SF 5 ocmN FT,N 9D } -T. J / ' r / GE % lEDTED I � 1 / �• I r' ESTIMATED FUEL TANK: 200 GAL=27 CF LAY PVC IMPERMEABLE LINER ON TOP SUPPORTED BY HAY BALES TO CREATE CONTAINMENT. MAX CONTAINMENT DEPTH=1.5'. BASE FOOTPRINT: 4'x8'=32SF. AT 0.9' HEIGHT OF FUEL STORAGE, BASE STORAGE VOLUME= 29 CF. 1.1 x 10—YR RAIN DEPTH=1.1 x5.6"=0.51' FINAL FUEL CONTAINMENT SIZE: