HomeMy WebLinkAboutSUB202200180 Checklist - Project Closeout (Administrative) 2023-03-23 SUBDIVISION/SITE PLAN
FILE CLOSEOUT / IMAGING CENTER INSTRUCTIONS
C
IST
Please complete this form within 30 days of finaction,l o lace in folder and forward to and status label. CDA will forward to the Imaging Center for digital closeout. CDA FOR QC
SDr1 ## �7 Zo�/f0 PROJECT TITLE ( i ' , -- ,--P"--(
FULL NAME OF LEAD REVIEWER CAx'kP FINAL ACTION DATE: G1 /
/ f/?�
ou View - --- — -- -- -
Application,Page 2 Data Ente d
lEt‘aff Report,Ground Water Assessment,or other documents placed in"Docs&Pies"
Hardco
py—File Folder Closeout: All items listed should be placed in project folder,in reverse — -
chronological order(latest on top).
Please check each item included in this folder. To indicate that an item is not applicable to this file,place an"N/A"
next to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to provide
clarity to the file,please indicate that item on the"Other" lines provided.
Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the
document; or,if the document is already in digital format,can be saved to LaserFiche. Please provide the digital
location(path/name)of the document in the space provided.
ril Engineering Folder Information/documentation
,_,_, 0 Scan ❑ Saved location
Ld"Application(signature copy)
❑ S• can [Saved location �- L //Iz..d---L/
Public Notification records/Abutting Owner correspondence
,�� 0 Scan ❑ Saved location
tJ Applicant Correspondence(t,o../�fro}}, memos/emails)
❑ S• can ❑aved location
L Complete set of printed Review C ents
❑ Scan aved location c,i,_-A
Approved ,lan/plat(signed,or stamped"Approved"with )
Planner/Engineer name
is Scan El Saved location , . �6 � �C /.//
ig'Action Letter(Administrative Approval) / J1'1-c lj uc�. _�,,, 4- �/C
❑ Scan ❑ Saved location
pi White Envelope-PC/BOS Meeting Package-Staff Report(include plan/plat presented,PC/BOS Action Lett
❑ S• can 0 Saved location er)
Ea"Ground Water Assessments'
❑ Scan aSraved location ' ,
IG Other(Please explain-i.e. Studies) �~
❑ Scan ❑ Saved location
/1.' Other(Please explain-i.e. Studies)
❑ Scan ❑ Saved location
t the planner's discretion,copies of unapproved plans/plats may be placed in the file if it is referenced
the
Pstaff report or minutes and lends clarity to the review at a later date. If such plans are included, they should be
clearly marked as unapproved and contain a note clarifying why it was included.
0 S• can ❑ Saved location
Additional Information on this`project: _ 1 -- ---—=-------__-- --
Additional Planning Commission Minutes-may be obtained online or by contacting PC Recording Secretary
• Board of Supervisor Minutes-may be obtained online or by contacting the Clerk of BOS
• Construction Documents-will be added to this folder after completion of project. Prior to completion,
____ - documents may be obtained by contacting the County Engineer.
NOTES: SDP/SUB project folders will be accepted by the Imaging Center when the following items are complete:
1) Checklist is completed and Included in folder;
2) Folder has a typed status label(same font&label color as project label)placed under the project label to
reflect current project status and date;
3) Documents are Acco-fastened(except plats/plans),and in chronological order(latest documents on top);
4) Documents are sufficiently identified as to which need to be scanned or saved to LaserFiche.
If the above items are not complete,Imaging Center staff will circle the incomplete item and return folder to the Chief of
Planning for corrective action.
Issued 2/7/2008,Revised 4/1/2008,Revised 7/1/2009,Revised 2/9/2010,Revised 10-29-2012