Loading...
HomeMy WebLinkAboutZMA202000012 Review Comments Zoning Map Amendment 2023-03-24County of Albemarle o � � i, Community Development Department Memorandum To: Kelsey Schlein, kelsey@shimp-engineering.com Date: March 24, 2023 Re: ZMA202000012 Montclair Zoning Map Amendment - Review Comment Letter Ms. Schlein: Cameron Langille Principal Planner, Planning bla n¢i I le@al bemarl e.orx tel: 434-296-5832 ext. 3432 Staff has reviewed your revised submittal for the zoning map amendment, ZMA202000012 Montclair Zoning Map Amendment (ZMA). We have a few remaining comments which we believe should be addressed before we can recommend favorably on your ZMA request. We would be glad to meet with you to discuss these issues. Our comments are provided below: General Comments: 1. Please revise the narrative so that the section on impacts to public schools identifies Crozet Elementary School as the elementary school that would serve this development. Code of Development: 1. See attached comments from Stacy Pethia regarding affordable housing. On page 11 of the COD, please revise the language as requested. 2. See comment #1a in the "Application Plan" section below. If necessary, Table D will need to be revised so that additional greenspace is provided to mee the minimum 20%. Table C will need to be revised so that it states an accurate acreage and unit figures in Block 2. Application Plan: 1. Since the ZMA has been revised to only include rezoning a portion of TMP 56E-2, please provide further information on how the applicant determined the acreage of that parcel that would be rezoned. Has the applicant conducted a metes & bounds survey of the proposed zoning district line to verify that the 2.8 acres can accommodate the improvements and other features that would be built within that portion of the NMD? a. Tables C and D of the COD identify Block 2 as 2.7 acres, but the Application Plan states that 2.8 acres of TMP 56E-2 is being rezoned. Please verify and revise either the COD or the Application Plan as necessary so a consistent acreage figure is stated. Please revise the acreage label for Block 2 on Sheet 1(if necessary). 2. The application should provide the proposed shared use path along the entire frontage of TMP 56E-2 along Route 240 as shown on previous iterations of the Application Plan. 3. Please see attached Engineering Division comments. Please revise the plan to show the intermittent stream and WPO buffer through Block 2 and north of Block 2. 4. Since Public Road C crosses the stream mentioned in the previous comment, mitigation measures will be needed. The applicant should consult with the Engineering Division regarding the specific mitigation techniques that need to be shown on the ZMA. 5. Please see attached Fire Rescue comments. Fire Rescue staff have asked that several notes be added to the plan (comments #2-4). Proffers: 1. No proffers have been submitted at this time. If a proffer statement is included on a future submittal, additional comments may be forthcoming. WWW.ALBEMARLE.ORG 401 McIntire Road, Suite 228 1 Charlottesville, VA 22902-4596 Department of Community Development - Zoning Division Rebecca Ragsdale, rragsdale@albemarle.org - No objection. Department of Community Development - Planning Division - Architectural Review Board (ARB) No objection, see attached from Margaret Maliszewski, mmaliszewski(0)albemarle.org. Department of Community Development - Engineering Division Requested changes, see attached comments from Frank Pohl, foohlC@albemarle.org. Housing Office See attached comments from Stacy Pethia, spethia@albemarle.org Department of Fire & Rescue Requested changes, see attached comments from Howard Lagomarsino, hlagomarsino@@albemarle.org. VDOT No objection, see attached comments from John Wilson, iohn.c.wilson@@vdot.virginia.gov. ACSA See attached recommendations from Richard Nelson, rnelson@@serviceauthoritv.org. Resubmittal There is a $1,538.16 fee for each subsequent resubmittal after the first resubmittal. Additional notification fees will not be required unless a deferral takes place and adjoining owners need to be notified of a new date. If you choose to resubmit, please include a completed copy of the ZMA resubmittal form attached to this letter. Feel free to contact me if you wish to meet or need additional information. My email address is blangille@albemarle.org. Sincerely, 1 ',A Cameron Langille Principal Planner Planning Division, Department of Community Development WWW.ALBEMARLE.ORG 401 McIntire Road, Suite 228 1 Charlottesville, VA 22902-4596 Review Comments for ZMA202000012 Project Name: WHITE GATE VILLAGE - DIGITAL Date Completed: Friday, February I 2023 DepartmenUDivision/Agency: Review Status: Reviewer: Margaret Maliszewski CDD ARB No Objection Page: 1� County of Albemarle Printed On: 33/17/2023 Review Comments for ZMA202000012 Project Name: WHITE GATE VILLAGE - DIGITAL Date Completed: Friday, February I 2023 DepartmenUDivision/Agency: Review Status: Reviewer: Frank Pohl CDD Enaineerina Requested Changes Page: 1 County of Albemarle Printed On: 33/17/20 33 Review Comments for ZMA202000012 Project Name: WHITE GATE VILLAGE - DIGITAL Date Completed: Tuesday, February 07, 2023 Department/DivisiordAgency: Review Status: Reviewer: Stacy Pethia ] Housino Department Requested Changes See Delow Tor my comments. Code of Develop page 11 For -Sale Affordable Dwelling Units • Replace sentence, 'All purchasers of the affordable units shall be approved by the Albemarle County Community Development Department or its designee ("Community Development")', with 'All purchasers of the affordable units shall be approved by the Albemarle County Office of Housing'. • The current maximum affordable sales price for Albemarle County 65% of Virginia Housing's maximum sales price/loan limit for their first-time homebuyer program loans. For -Rent Affordable Dwelling Units • RENTAL RATES: housing affordability is based on GROSS rent. Maximum rents for affordable units must include an allowance for tenant provided utilities. Suggest the changing the first sentence to: The gross rent (unit rent plus tenant provided utilities) for each rental housing unit which shall qualify as an Affordable Dwelling Unit (" For -Rent Affordable Dwelling Unit") shall not exceed HUD' s affordability standard of thirty percent ( 30%) of the income of a household making eighty percent ( 80%) of the area median income ( as determined by HUD from time to time).' • Delete the third sentence in the paragraph. • In last sentence, replace 'VHDA' with 'Virginia Housing'. Page: 1 County of Albemarle Printed On: 33/17/20 33 Review Comments for ZMA202000012 Project Name: WHITE GATE VILLAGE - DIGITAL Date Completed Thursday, February 16, 2023 Departme l/Division/Agency Review Status: Reviewer: Howard Lagomarsino Fire Rescue Requested Changes Please note in the narrative the potential impact on public safety of the development Though not necessary to address at this stage of submission, to help in planning future steps for this project, here are some points of concern for ACFR at future review steps of projects, especially at the site plan phase (Please acknowledge understanding of the potential need to meet these requirements): 1) The concept plan illustrates roads that fall below the requirements to be considered a fire apparatus access road. Not all roads are necessary to fullol the fire apparatus access road requirements for all buildings, but any road that is necessary to fullfil the fire apparatus access road requirements must meet the following criteria: a) To accommodate emergency/fire vehicle access, emergency vehicle access roads)/route(s) are required and arranged SO that they provide access to within 150 feet (45 720 mm) of all portions of the facility and/or all portions of the exterior wells of the first story of the buildings as measured by an approved route around the exterior of the buildings or facility from the road. b) An emergency/fire vehicle access mad/route needs to provide an unobstructed travel way width of 20 fL if buildings/stmcthres are under 30 feet tall and 26 ft. if buildings/structures are over 30 feet tall. No Parking- Fire Lane or markings are required as appropropuate to prevent parked vehicles from encroaching the required travel way width. c) An emergency/fire vehicle access mad/route needs to provide a suitable surface to sustain the weight of emergency apparatus weighing up to 75,0001bs. in all weather conditions. d) Emergency/fire vehicle access roads need to be clear of overhead obstructions at 13 It 6 in. and below e) To accommodate fire apparatus, turn radii serving fire apparatus access roads generally require a minimum of 25 ft. based on the largest piece of fire apparatus expected to respond. f) To ensure that parking does not obstruct the emergency apparatus fravel way as described above, any parking must be designed to and/or No Parking - Fire Lane signs or markings are required to maintain the required unobstructed travel MY widths. g) Any dead-end longer than 150 ft requires an approved turn around for emergency apparatus. h) It is desired the road grade does not exceed 10 W 2) Provide a note on the plans of the required ISO fire calculation for the buildings_ 3) Indicate on the plan the latest ACSW flow test to ensure adequate fire flow per calculation in comment # 2. 4) Provide the locations of fire hydrants as determined by calculations in # 2, with spacing in accordance with the required fire lbw calculation (This starts at 500 feet and arranged so that no building is more than 250 feet from a hydrant, but the distances am further reduced as the required fire flow increases). 5) In areas without buildings, then hydrant spacing is required every 1000 ft to accommodate transportation emergencies. 6) If not within the ACSW service area, provide a note identifying location of closest water source suitable for emergency/fire apparatus operations 7) Fire suppression, fire alerting systems and other building design features, such as exits, interior finishes, building access etc., are the purview of the building official and required as directed by Mat office_ 8) If fire suppression systems or standpipes are installed the FDC must face the road, on address side and Mere needs to be hydrant within 100 ft. of the FDC, arranged so that when hydrant and FDC are in use for emergency operations, hose does not obstruct travel way. The threads for the appliances (FDC, etc) must conform to C & O standard. 9) During construction, the following fire prevention steps am required, so please note them on the plan: a) Smoking shall be prohibited in areas where smoking makes conditions such as to make smoking a hazard and these areas shall be designated with no smoking signs per Virginia Statewide Fire Prevention Code. Page I County of Albemarle Primed On: 03/17/2023 not obstruct trawl way. The threads for the appliances (FDC, etc) must conform to C & O standard. 9) During construction, the following fire prevention steps are required, so please note them on the plan_ a) Smoking shall be prohibited in areas where smoking makes conditions such as to make smoking a hazard and these areas shall be designated with no smoking signs per Virginia Statewide Fire Prevention Code. b) Areas where smoking can occur, shall haw appropriate receptacles for discarded smoking materials per Virginia Statewide Fire Prevention Code_ c) Per the Virginia Statewide Fire Prevention Code, vehicular access for firefighting shall be provided at all construction and demolition sites, provide access to within 100 ft. of temporary or permanent fire department connections, and have no overhead wiring or other overhead obstructions lower than 13 ft. 6 inches; this access may be via permanent or temporary road, but shall be capable of supporting fire apparatus in all weather conditions- d) Contractor shall ensure the street numbers are always plainly visible from the frontage street during construction per the Virginia Statewide Fire Code. e) An approved water supply for firefighting operations shall be in piece and available as soon as combustible materials arrive on site f) Waste and combustible debris shall be removed from the building at the end of each day and disposed of in accordance with the Virginia Statewide Fire Code. g) Fire extinguishers shall be provided, with not less than one approved fire extinguisher at each stairwell, on all floor levels where combustible materials have accumulated, in every storage and construction shed and in areas of special, hazards, such as where flammable and combustible liquids are stored or used, in accordance with the Virginia Statewide Fire Code. h) Operations involving the use of cuting and welling shall comply with the Virginia Statewide Fire Prevention Code and shall require a permit from the Albemarle County Pine Marshal's Office. Page. County of Albemarle Printed On: 03/1712g23 COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION Stephen C. Brich, P.E. 1401 East Broad Street (804) 7862701 Commissioner Richmond, Virginia 23219 Fax: (804) 7862940 February 17, 2023 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Cameron Langille Re: ZMA-2020-00012 — Montclair Review# 4 Dear Mr. Langille: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section has reviewed the White Gate Village ZMA, dated December 19, 2022 as submitted by Shimp Engineering, and find them generally acceptable: A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the VDOT Charlottesville Residency Land Use Section at (434) 422-9399 for information pertaining to this process. If you have further questions, please contact John Wilson at 434-422-9782. Sincerely, John C. Wilson, P.E. Assistant Resident Engineer Land Use VDOT - Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING ALBEMARLE COUNTY COMMUNITY DEVELOPMENT— Information from Service Providers To be filled out by ACSA for ZMA's and SP's 1) Is this site in the jurisdictional area for water and/or sewer? Water to existing structures. 2) What is the distance to the closest water and sewer line, if in the jurisdictional area? On site. 3) Are there water pressure issues which may affect the proposed use as shown on plan? Water pressures in the area are high. A pressure reducing valve (PRV) will be required for each unit where pressures are greater than 80 psi. 4) Are there major upgrades needed to the water distribution or sewer collection system of which the applicant and staff should be aware? N/A 5) Are there other service provision issues such as the need for grinder pumps? N/A 6) Which issues should be resolved at the SP/ZMA stage and which issues can be resolved at the site plan/plat stage? One of the parcels is currently in the ACSA Jurisdictional Area for water to existing structures. The County is to determine when an ACSAIA amendment should be reviewed. 7) If the project is a large water user, what long term impacts or implications do you forsee? 8) Additional comments? RWSA sewer capacity certification will be required. Resubmittal of information for �$��°F"`8 Zoning Map Amendment t ��RG/NyP PROJECT NUMBER THAT HAS BEEN ASSIGNED: Owner/Applicant Must Read and Sign I hereby certify that the information provided with this resubmittal is what has been requested from staff Signature of Owner, Contract Purchaser Print Name FEES that may apply: Date Daytime phone number of Signatory Resubmittal fees for original Zoning Map Amendment fee of $2,958 ❑ First resubmission FREE ❑ Each additional resubmission (TO BE PAID WHEN THE RESUBMISSION IS MADE TO INTAKE STAFF) $1,479 ❑ 4% Technology surcharge $59.16 TOTAL ZONING MAP AMENDMENT RESUBMISSION FEE $1 538.16 Resubmittal fees for original Zoning Map Amendment fee of $4,141 ❑ First resubmission FREE ❑ Each additional resubmission (TO BE PAID WHEN THE RESUBMISSION IS MADE TO INTAKE STAFF) $2,070 ❑ 4% Technology surcharge $82.80 TOTAL ZONING MAP AMENDMENT RESUBMISSION FEE $2,152.80 To be Daid after staff review for Dublic notice: Most applications for a Zoning Map Amendment require at least one public hearing by the Planning Commission and one public hearing by the Board of Supervisors. Virginia State Code requires that notice for public hearings be made by publishing a legal advertisement in the newspaper and by mailing letters to adjacent property owners. Therefore, at least two fees for public notice are required before a Zoning Map Amendment may be heard by the Board of Supervisors. The total fee for public notice will be provided to the applicant after the final cost is determined and must be paid before the application is heard by a public body. ➢ Preparing and mailing or delivering up to fifty (50) notices $237 + actual cost of first-class postage ➢ Preparing and mailing or delivering each notice after fifty (50) $1.19 for each additional notice + actual cost of first-class postage ➢ Legal advertisement (published twice in the newspaper for each public hearing) Actual cost (averages between $150 and $250 FOR OFFICE USE ONLY Fee Amowt $ Date Paid By who9 Receipt Ck# By: Community Development Department 401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296-5832 Fax: (434) 972-4126 Revised 7/1/2021 Page 1 of 1