HomeMy WebLinkAboutARB202300032 Plan - Submittal (First) 2023-04-04BMW OF CHARLOTTESVILLE
APPLICATION FOR A CERTIFICATE OF APPROPRIATENESS
APRIL 03 2023
V 112 fourth street NE
Charlottesville, VA 22902
2 434 971 7160
a info@brw-architects.com
0 https://brw-architects.com
EXTERIOR RENOVATION
J
i
`M.
map k4lw-
-�-�� ta': rim •� a• � r-_aa�-.
..�Ae.
jk
_ Cf
. Ak
\_ vplb
/V ` ti - � � O t•��
3**
01
RICHMOND ROAD
J 1 9M
o �
� 0 03 -
I z
J w
r I i I c�
SITE CONTEXT DIAGRAM
02 VIRGINIA NATIONAL BANK
mmllmwwww*� 1A
03 OLD AUDI & PORSCHE
01 WAWA GAS STATION
OA GUADALAJARA RESTAURANT
CONTEXT - ELEMENTS OF ENTRY CORRIDOR
BMW OF CHARLOTTESVILLE
APPLICATION FOR A CERTIFICATE OF APPROPIATENESS
APRIL 03 2023
Il
FLOW BMW CHARLOTTESVILLE: SHOWROOM AND SERVICE BUILDING
EXTERIOR PARAPET RENOVATIONS AND BUILDING COLOR CHANGE
The exterior renovation of both the showroom building and the vehicle service building
for the BMW dealership at 1295 and 1289 Richmond Road will involve minor changes
to the configuration of the exterior of the building.
The application proposes to change the color of portions of both buildings from the
existing dated tans and browns to an updated off-white color more in keeping with other
existing white buildings along the Entrance Corridor. Other portions of the building's
exterior finish sidings will remain as is. The submitted application for a Certificate of
Appropriateness outlines these changes while articulating the elements of the property
which will remain unchanged.
Site Plan
This application proposes no changes to the existing site plan, layout, materials, landscape
planting or lighting configurations throughout the site.
Existing Buildings
Changes to the existing buildings are limited to:
• Minor changes to the configuration of the building parapets on the north facing
facade on both the showroom building and the vehicle service building.
• A small horizontal canopy over the main doors of the showroom building and
main display window will be added.
• New white color for the existing synthetic stucco on both buildings facades.
• Painted existing brick to match the white color of the new synthetic stucco.
The major portions of the buildings which remain unchanged are:
• Existing windows on all facades.
• Existing doors at building entrances.
• Configuration of sidewalks associated with both buildings.
• Configuration of facades on east, west and south of both buildings.
• Existing corrugated metal siding to reamin as is.
The most significant modification to the configuration of the building will be to eliminate
the dated curved parapets on both buildings and create new horizontal parapets which
will unify the overall exterior building design and provide a more typically horizontal
profile for the top of the facade. The color change to both buildings will be the most
significant impact on the property.
Context
The relationship of these buildings to the surrounding context along the Entrance Corridor
will be unchanged.
Compatibility with the character of the Entrance Corridor
The revised horizontal parapet will provide for more compatibility with existing buildings
along the Entrance Corridor. The dated curved parapets which will be eliminated were
an anomaly along the corridor. The new white color will also be more compatible with
existing white buildings along the corridorwhich include the new Volkswagen Dealership,
the Atlantic Bank Building, and the UVA Community Credit Union.
Site Development
Unchanged
Landscaping
Unchanged
Compatibility with Significant Historic Sites:
Structure Design
9. Building forms and features will replace the existing post-modern non -historic
curved parapet with a horizontal parapet consistent with numerous other
buildings in the surrounding entrance corridor context.
10.Unchanged.
11. Unchanged.
12. New horizontal parapet, existing tan brick to be painted historic white,
existing stucco color to be changed to historic white.
13. Unchanged.
14. Unchanged.
15. BMW is using the existing buildings within the Entrance Corridor making
minor modifications to improve the building design to be more consistent with
the surrounding context rather than develop typical BMW Trademark buildings.
16.Window glass will be unchanged.
Accessory Structures and Equipment
Changes to the parapet will increase the screening provided by the existing parapet.
Existing Mechanical Equipment will be unchanged.
Lighting
Existing exterior and landscape lighting will remain unchanged. There will be 6 new
recessed LED can lights on the underside of the new canopy at the main entrance to the
showroom.
Signs
Sign applications will be submitted separately and will meet Albemarle County ARB sign
guidelines.
Landscaping
All landscaping will remain unchanged.
Site Development and Layout:
Site Development Pattern
All site development patterns will remain unchanged.
Site Grading
All site grading will remain unchanged.
PROJECT NARRATIVE
BMW OF CHARLOTTESVILLE
APPLICATION FOR A CERTIFICATE OF APPROPIATENESS
APRIL 03 2023
5
RICHMOND RD
IU-12 �[OM061►Imj10ll]
BMW SERVICE
kRAPET
1295 RICHMOND ROAD
BMW SHOWROOM
scale : V-0" = 1 /64"
SITE DIAGRAM
BMW OF CHARLOTTESVILLE
APPLICATION FOR A CERTIFICATE OF APPROPIATENESS
APRIL 03 2023
9
BMW EXISTING SHOWROOM
BMW EXISTING SERVICE BUILDING
FP
EXISTING FRONT PERSPECTIVES
BMW OF CHARLOTTESVILLE
APPLICATION FOR A CERTIFICATE OF APPROPIATENESS
APRIL 03 2023
7
VIEW Ol
VIEW 02
EXISTING CONTEXT
BMW OF CHARLOTTESVILLE
APPLICATION FOR A CERTIFICATE OF APPROPIATENESS
APRIL 03 2023
EXTERIOR FINISH MATERIALS:
1. EXTERIOR INSULATION FINISH SYSTEM
- COLOR TO MATCH RAL-9010 PURE
WHITE. FINISH AS SCHEDULE
2. EXTERIOR PAINT - RAL-9010 PURE WHITE
(BRICK)
3. EXISTING STOREFRONT
4. FINISH TO REMAIN
5. NEW SIGNAGE TO BE SUBMITTED
SEPARETLY
6. EXISTING OVERHEAD DOOR
EXISTING
Roof Top
25'- 4" Ft
Level 01
0'-00"
Roof Top
25'- 4" Ft
Level 01
0'-00"
scale: 1 / 16" = V-0"
MAIN ELEVATION - SHOWROOM
BMW OF CHARLOTTESVILLE
APPLICATION FOR A CERTIFICATE OF APPROPIATENESS
APRIL 03 2023
9
EXTERIOR FINISH MATERIALS:
1. EXTERIOR INSULATION FINISH SYSTEM
- COLOR TO MATCH RAL-9010 PURE
WHITE. FINISH AS SCHEDULE
2. EXTERIOR PAINT - RAL-9010 PURE WHITE
(BRICK)
3. EXISTING STOREFRONT
4. FINISH TO REMAIN
5. N.A.
6. EXISTING OVERHEAD DOOR
FilmirWAR11
�m
ME
Roof Top
25'- 4" Ft
177117711 Level 01
1717117171 0'-00"
EXISTING
PROPOSED
Level 01
-14'-6"
Roof Top
25'- 4" Ft
Level 01
0'-00"
Level 01
-14'-6"
scale: 1 / 16" = V-0"
SOUTH ELEVATION - SHOWROOM
BMW OF CHARLOTTESVILLE
APPLICATION FOR A CERTIFICATE OF APPROPIATENESS
APRIL 03 2023
10
L.
EXTERIOR FINISH MATERIALS:
1. EXTERIOR INSULATION FINISH SYSTEM
- COLOR TO MATCH RAL-9010 PURE
WHITE. FINISH AS SCHEDULE
2. EXTERIOR PAINT - RAL-9010 PURE WHITE
(BRICK)
3. EXISTING STOREFRONT
4. FINISH TO REMAIN
5. N.A.
6. EXISTING OVERHEAD DOOR
EXISTING
Roof Top
25'- 4" Ft
Level 01
0'-00"
Roof Top
25'- 4" Ft
Level 01
0'-00"
scale: 1 / 16" = V-0"
EAST ELEVATION - SHOWROOM
BMW OF CHARLOTTESVILLE
APPLICATION FOR A CERTIFICATE OF APPROPIATENESS
APRIL 03 2023
EXTERIOR FINISH MATERIALS:
1. EXTERIOR INSULATION FINISH SYSTEM
- COLOR TO MATCH RAL-9010 PURE
WHITE. FINISH AS SCHEDULE
2. EXTERIOR PAINT - RAL-9010 PURE WHITE
(BRICK)
3. EXISTING STOREFRONT
4. FINISH TO REMAIN
5. N.A.
6. EXISTING OVERHEAD DOOR
EXISTING
Roof Top
25'- 4" Ft
Level 01
0'-00"
Roof Top
25'- 4" Ft
Level 01
0'-00"
scale: 1 / 16" = V-0"
WEST ELEVATION - SHOWROOM
BMW OF CHARLOTTESVILLE
APPLICATION FOR A CERTIFICATE OF APPROPIATENESS
APRIL 03 2023
12
EXTERIOR FINISH MATERIALS:
1. EXTERIOR INSULATION FINISH SYSTEM
- COLOR TO MATCH RAL-9010 PURE
WHITE. FINISH AS SCHEDULE
2. EXTERIOR PAINT - RAL-9010 PURE WHITE
(BRICK)
3. EXISTING STOREFRONT
4. FINISH TO REMAIN
5. NEW SIGNAGE TO BE SUBMITTED
SEPARETLY
6. EXISTING OVERHEAD DOOR
EXISTING
Roof Top
25'- 4" Ft
Level 01
0'-00"
Roof Top
25'- 4" Ft
Level 01
0'-00"
scale: 1/16"= 1'-0"
MAIN ELEVATION - SERVICE
BMW OF CHARLOTTESVILLE
APPLICATION FOR A CERTIFICATE OF APPROPIATENESS
APRIL 03 2023
13
EXTERIOR FINISH MATERIALS:
1. EXTERIOR INSULATION FINISH SYSTEM
- COLOR TO MATCH RAL-9010 PURE
WHITE. FINISH AS SCHEDULE
2. EXTERIOR PAINT - RAL-9010 PURE WHITE
(BRICK)
3. EXISTING STOREFRONT
4. FINISH TO REMAIN
5. N.A.
6. EXISTING OVERHEAD DOOR
EXISTING
Roof Top
25'- 4" Ft
Level 01
0'-00"
Roof Top
25'- 4" Ft
Level 01
0'-00"
scale: 1/16"= 1'-0"
MAIN ELEVATION - SERVICE
BMW OF CHARLOTTESVILLE
APPLICATION FOR A CERTIFICATE OF APPROPIATENESS
APRIL 03 2023
14
EXTERIOR FINISH MATERIALS:
1. EXTERIOR INSULATION FINISH SYSTEM
- COLOR TO MATCH RAL-9010 PURE
WHITE. FINISH AS SCHEDULE
2. EXTERIOR PAINT - RAL-9010 PURE WHITE
(BRICK)
3. EXISTING STOREFRONT
4. FINISH TO REMAIN
5. N.A.
6. EXISTING OVERHEAD DOOR
EXISTING
Roof Top
25'- 4" Ft
Level 01
0'-00"
Roof Top
25'- 4" Ft
Level 01
0'-00"
scale: 1/16"= 1'-0"
EAST ELEVATION - SERVICE
BMW OF CHARLOTTESVILLE
APPLICATION FOR A CERTIFICATE OF APPROPIATENESS
APRIL 03 2023
15
EXTERIOR FINISH MATERIALS:
1. EXTERIOR INSULATION FINISH SYSTEM
- COLOR TO MATCH RAL-9010 PURE
WHITE. FINISH AS SCHEDULE
2. EXTERIOR PAINT - RAL-9010 PURE WHITE
(BRICK)
3. EXISTING STOREFRONT
4. FINISH TO REMAIN
5. N.A.
6. EXISTING OVERHEAD DOOR
EXISTING
Roof Top
25'- 4" Ft
Level 01
0'-00"
Roof Top
25'- 4" Ft
Level 01
0'-00"
scale: 1/16"= 1'-0"
WEST ELEVATION - SERVICE
BMW OF CHARLOTTESVILLE
APPLICATION FOR A CERTIFICATE OF APPROPIATENESS
APRIL 03 2023
16
4
lot
�A /
c
' r
I r
RAL 9010 PURE WHITE
RAL 9010 PURE WHITE
The exterior insulation finish system (EIFS) -
color to match RAL-9010 pure white.
Hex Color Code: #F 1 ECE 1
RGB Color Code: RGB(241, 236, 225)
CMYK Values*: 0.0%, 2.1 %, 6.6%, 5.5%
Exterior paint on existing brick walls - color to
match RAL-9010 pure white.
Hex Color Code: #F 1 ECE 1
RGB Color Code: RGB(241, 236, 225)
CMYK Values*: 0.0%, 2.1 %, 6.6%, 5.5%
MATERIALS
BMW OF CHARLOTTESVILLE
APPLICATION FOR A CERTIFICATE OF APPROPIATENESS
APRIL 03 2023
IN
1•: :/w R C H I T E C T S
V 112 fourth street NE
Charlottesville, VA 22902
2 434 971 7160
M info@brw-architects.com
0 https://brw-architects.com