No preview available
HomeMy WebLinkAboutSDP202100026 Correspondence 2023-04-04ANHOLD ASSOCIATES April 4, 2023 Project: SDP202100026 Brook Hill River Park Phase 1 River Access Improvements LwD.SWEARCHffwmRE Subject: A/E Responses to Final Site Plan review comments. URMNDESMvV Submitted by: David Anhold, PLA, ASLA LAND PUNNING CAMPUS PUMXG B DEBIGN Review Comments By: Kevin McCollum — Planner Division: Planning Services PMKP. NINGBDESIGN Date: October 13, 2022 12. Please note that the following approvals will be required prior to County approval (as may be applicable) of a final site plan for this proposed project: A. [Z.O. Sections 32.4.2.2 and 32.4.3.31: Architectural Review Board Certificate of Appropriateness B. [Z.O. Section 32.7.4.1(a)]: Water Protection Ordinance Plan (and corresponding legal documents) C. [Z.O. Sections 32.7.4.2 and 32.7.5.3]: Easement Plat(s) (and corresponding legal documents) D. [Z.O. Section 32.4.3.6(a) and 32.4.3.6(c)]: Tentative approvals (review status of "No Objection") from all applicable SRC members for final site plan; please see below for the review status of each applicable SRC member. Response: Will comply with all submission and comments. Review Comments By: Khristopher Taggart Division: Architectural Review Board 1. The screening of a portion of the proposed parking area and travelway elements is reliant on the existing vegetation along Rt. 29 which is largely located in the right-of-way. Additionally, this vegetation will allow for increased visibility into the site during the months when leaves are not on the trees. Revise the plan to provide shrubs to screen the three parking spaces near the portable toilet and an additional grouping of trees in the planting area east of the opening to the turning loop. Response: Landscape Plans was revised to include the additional tree and shrub groupings that will provide screening east of the opening to the turning loop. 8311 Rockfish Gap Turnpike Greenwood, Virginia 22943 434.882.3420 ANHOLDLA.COM ANHOLD ASSOCIATES Page 2 Review Comments By: Engineering Division: Engineering Anhold will re -submit WPO Plans to Engineering in order to address most recent plan review comments.