HomeMy WebLinkAboutARB202300020 Action Letter 2023-04-05,S.{.OF AL8
County of Albemarle
Community Development Department - Planning
April 3, 2023
Maria Minnick
Dewberry
4805 Lake Brook Drive, Suite 200
Glen Allen, VA 23060
Khris Taggart, Senior Planner I
ktaggart@albemarle.ora
Telephone: (434) 296-5832 ext. 3278
RE: ARB-2023-20: Birdwood Mansion Initial Site Plan (TMP 07500-00-00-06300)
Dear Applicant,
Staff has forwarded the following recommendations on the above -noted Initial Site Development Plan to the
agent for the Site Review Committee:
• Regarding requirements to satisfy the design guidelines as per § 18-30.6.4c(2), (3) and (5) and
recommended conditions of initial plan approval:
o Prior to Initial Plan approval the following items shall be resolved to the satisfaction of the staff:
None.
• Regarding recommendations on the plan as it relates to the guidelines: None.
• Regarding conditions to be satisfied prior to issuance of a grading permit: None.
• Regarding the final site plan submittal:
A Certificate of Appropriateness is required prior to final site plan approval. The following items and all
items on the ARB Final Site Plan Checklist must be addressed:
1. Revise the site plan set to consistently note that the tent locations shown in the plans are for
temporary events.
2. Revise the site plan to include the standard mechanical equipment note: Visibility of all mechanical
equipment from the Entrance Corridor shall be eliminated.
3. Buxus Mircophylla (Little Leaf Boxwood) has been identified as an invasive species. Consider
revising this planting to a noninvasive species.
4. Revise the site plan to include the standard landscaping note: All site plantings of trees and shrubs
shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited.
Shrubs and trees shall be pruned minimally and only to support the overall health of the plant.
5. Revise the lighting plan to provide complete cutsheets on the lighting shown, cutsheets should
include lamp color temperature.
6. Revise the lighting plan to provide illumination values for lighting shown along Birdwood Drive and
the connector travelway to Boars Head Drive.
7. Revise the grading plan to show contours that are more rounded in nature along the north end of
the parking area east of the Birdwood Mansion.
8. Revise the plan set to show tree protection consistently throughout the grading, landscaping, and
erosion and sediment control plans.
WWW.ALBEMARLE.ORG
401 McIntire Road, North Wing, I Charlottesville, VA 22902-4579
You may submit your application for continued ARB review at your earliest convenience. Application forms,
checklists and schedules are available on-line at httl)s://www.albemarle.org/government/community-
development/apply-for/planning-and-site-development-applications. Please be certain that your ARB submittal
addresses all checklist items and the above -noted comments. If you have any questions concerning any of the
above, please feel free to contact me.
If you have any questions concerning any of the above, please feel free to contact me.
Sincerely,
Khris Taggart, Senior Planner I
cc: University of Virginia Foundation, PO Box 400218, Charlottesville, VA 22904
File
WWW.ALBEMARLE.ORG
401 McIntire Road, North Wing, I Charlottesville, VA 22902-4579