HomeMy WebLinkAboutSDP202100038 Plan - Revision 2023-04-06 (2)MAIN PLANT ENTRANCE
PROPERTY LINE, TYP. /
z N CITY OF CHARLOTTESVILLE LIMITS %
Ld
'K. MnYDInAl IRADDnWRACKIYO
°a
1
' ' // ' ' ' ' ' ' ' ' ...... i /�° ?qFT e 1NTERgTPTE 64 CORRIDOR
/
— PROPOSED CHANGES /
TO SITE PLAN
m
I I MOORES CREEK PUMP STATION
EXPANSION, SDP2010-82
DIGESTER IMPROVEMENTS,
\ SDP2012-40 /
CLARIFIER DEMOLITION,
/ SDP2021-38
r
i..'.'. T
RIVANNA PUMP STATION
CONSTRUCTION, SDP2013-33
Im
}
PARCEL NO.: 07700-00-00-040A0
TAX MAP: 77-40A
DB: 768 PG: 277 /
ZONING: LIGHT INDUSTRY O
,w 2
•1
i
X --
1 _
�x _---
GRIT REMOVAL FACILITY
IMPROVEMENTS, SDP2015-145
CLARIFIER COVER
CONSTRUCTION, SDP2015-145
150' 75' 0 150,
SCALE: 1" = 150'
ASSOCIATED SITE PLANS:
SDP200800100 (APPROVED MAR 2009)
/ _ �" �� / THIS SITE IS SUBJECT TO THE ALBEMARLE COUNTY FLOOD SITE PLAN SUBMITTAL FOR THE EXPANSION OF MOORES CREEK WWTP WITH REGARDS TO THE
p PROPOSED USE: INDUSTRIAL (UTILITY) NUTRIENT REMOVAL IMPROVEMENT PROJECT.
( T� HAZARD OVERLAY DISTRICT. THIS SITE IS NOT LOCATED WITHIN
i'- '- - '- - �' / THE WATERSHED OF A PUBLIC WATER SUPPLY RESERVOIR. ASSOCIATED SITE PLAN REVISIONS:
OWNER: RIVANNA WATER & SEWER AUTHORITY
Q ..: PROPERTY: MOORES CREEK ADVANCED WATER 100 YEAR FLOODPLAIN ELEVATION: 324.00' SDP2010-82 (APPROVED JAN 2011)
RESOURCE RECOVERY FACILITY REFERENCE: FEMA MAP # 51003CO289D, EFFECTIVE 2/4/2005 SITE PLAN SUBMITTAL FOR IMPROVEMENTS TO THE EXISTING MOORES CREEK PUMP
TOTAL PROPERTY SIZE: 89.46 ACRES AND LOMR 16-03-1107P, EFFECTIVE 2/6/2017. STATION AND ITS ASSOCIATED PROPOSED FORCE MAIN.
..... `.'.......'.' '.. .
TAX MAP/PARCEL: 077-40A
.........'� .".... ZONING: LI (LIGHT INDUSTRIAL); ENTRANCE CORRIDOR (EC) WAIVERS FOR DETENTION, TRAVELWAY WIDTH AND LANDSCAPE SDP2012-40 (APPROVED OCT 2012)
MAGISTERIAL: SCOTTSVILLE PLAN REQUIREMENTS HAVE BEEN GRANTED UNDER THE MAJOR SITE PLAN SUBMITTAL FOR DIGESTER IMPROVEMENTS AT THE EXISTING MOORES CREEK
PARCELS COUNTY: ALBEMARLE AMENDMENT REVIEW OF SDP200800100. WWTP
STATE: VIRGINIA
j NO. OWNER TAX MAP PARCEL NO DB-PG ZONING USE SETBACKS (MET OR N/A) SDP2013-033 (APPROVED SEPT 2013)
....... / ��
q 1 RIVANNA WATER AND SEWER AUTHORITY 77 38B 768-277 LIGHT INDUSTRY INDUSTRIAL ENGINEER: HAZEN AND SAWYER FRONT MINIMUM: 10' FROM THE R-O-W OR EXTERIOR SITE PLAN FOR CONSTRUCTION OF NEW RIVANNA PUMP STATION AND INTERCEPTOR
,•� 2 RIVANNA WATER AND SEWER AUTHORITY 78 22A 639-193 LIGHT INDUSTRY INDUSTRIAL 4011 WESTCHASE BLVD EDGE OF SIDEWALK IF SIDEWALK IS OUTSIDE OF R-O-W TUNNEL.
• / 3 RIVANNA WATER AND SEWER AUTHORITY 77 40A 768-277 LIGHT INDUSTRY INDUSTRIAL SUITE 500 / SDP 2015-045 (APPROVED SEPT 2015)
RALEIGH NC 27607 FRONT MAXIMUM: NONE % �% MINOR SITE PLAN AMENDMENT FOR ODOR CONTROL IMPROVEMENTS.
4 RIVANNA WATER AND SEWER AUTHORITY 77 22A 757-011 LIGHT INDUSTRY INDUSTRIAL
/ 5 BLACKBIRD OF CHARLOTTESVILLE LLC 77 20A 5111-166 LIGHT INDUSTRY OPEN NO SURVEY CONDUCTED FOR THIS PROJECT; SITE TOPOGRAPHY IS FROM SIDE AND REAR MINIMUM: 50' BETWEEN PUBLIC R-O-W, RURAL SDP 2020-046 (APPROVED OCT 2020)
�BASE FILES FROM PREVIOUS PLANT IMPROVEMENT SURVEYS. AREAS, OR THE MONTICELLO HISTORIC MINOR SITE PLAN AMENDMENT FOR LIGHTING IMPROVEMENTS (NO STRUCTURES TO DEPICT) 6 FRANKLIN STREET LAND TRUST III 77 20 5125-573 RURAL OPEN DISTRICT AND STRUCTURE; 30' BETWEEN
�., 7 FALLS, JOHN HARVEY OR VIRGINIA S. 77 21A 700-314 LIGHT INDUSTRY INDUSTRIAL OFF-STREET PARKING AND THE DISTRICT BOUNDARY. , SDP 2021-038 (APPROVED JULY 2021)
DATUM: HORZ: NAD83 VIRGINIA SOUTH ZONE I I MINOR SITE PLAN AMENDMENT FOR IN -PLANT CLARIFIER AND LIME SILO DEMOLITION
8 RIVANNA WATER AND SEWER AUTHORITY 77 21 3594-660 LIGHT INDUSTRY INDUSTRIAL VERT: NAVD88 SIDE AND REAR MAXIMUM: NONE ------ LETTER OF REVISION #1: ELECTRICAL IMPROVEMNTS (DEC 2021)
9 1 ELEMENTAL ECOTECH LLC 77 40B 1 495-325 1 LIGHT INDUSTRY I OPEN
PROJECT
ENGINEER: B. PORTER
NOT ISSUED FOR
CONSTRUCTION
azeCHARLOTTESVILLE,
_
HAZEN AND SAWYER
4011 WESTCHASE BOULEVARD, SUITE 500
RALEIGH, NORTH CAROLINA 27607
LICENSE NO.: C-0381
RIVANNA WATER & SEWER AUTHORITY
VIRGINA
LETTER OF REVISION
CIVIL
SDP202100038 SITE PLAN
DATE:
DESIGNED BY: A. MARCH
HAZEN NO. 31442-018
DRAWN BY: A. MARCH
CONTRACT NO.: 1
MOORES CREEK ADVANCED WATER RESOURCE
RECOVERY FACILITY
ENTRANCE IMPROVEMENTS
CHECKED BY: M. SANTOWASSO
NDRAWING
UMBER
IF THIS BAR DOES NOT 0 1/2" ill
MEASURE 1 "THEN DRAWING I
IS NOT TO FULL SCALE
REV
ISSUED FOR
DATE
BY