Loading...
HomeMy WebLinkAboutSDP202100038 Plan - Revision 2023-04-06 (2)MAIN PLANT ENTRANCE PROPERTY LINE, TYP. / z N CITY OF CHARLOTTESVILLE LIMITS % Ld 'K. MnYDInAl IRADDnWRACKIYO °a 1 ' ' // ' ' ' ' ' ' ' ' ...... i /�° ?qFT e 1NTERgTPTE 64 CORRIDOR / — PROPOSED CHANGES / TO SITE PLAN m I I MOORES CREEK PUMP STATION EXPANSION, SDP2010-82 DIGESTER IMPROVEMENTS, \ SDP2012-40 / CLARIFIER DEMOLITION, / SDP2021-38 r i..'.'. T RIVANNA PUMP STATION CONSTRUCTION, SDP2013-33 Im } PARCEL NO.: 07700-00-00-040A0 TAX MAP: 77-40A DB: 768 PG: 277 / ZONING: LIGHT INDUSTRY O ,w 2 •1 i X -- 1 _ �x _--- GRIT REMOVAL FACILITY IMPROVEMENTS, SDP2015-145 CLARIFIER COVER CONSTRUCTION, SDP2015-145 150' 75' 0 150, SCALE: 1" = 150' ASSOCIATED SITE PLANS: SDP200800100 (APPROVED MAR 2009) / _ �" �� / THIS SITE IS SUBJECT TO THE ALBEMARLE COUNTY FLOOD SITE PLAN SUBMITTAL FOR THE EXPANSION OF MOORES CREEK WWTP WITH REGARDS TO THE p PROPOSED USE: INDUSTRIAL (UTILITY) NUTRIENT REMOVAL IMPROVEMENT PROJECT. ( T� HAZARD OVERLAY DISTRICT. THIS SITE IS NOT LOCATED WITHIN i'- '- - '- - �' / THE WATERSHED OF A PUBLIC WATER SUPPLY RESERVOIR. ASSOCIATED SITE PLAN REVISIONS: OWNER: RIVANNA WATER & SEWER AUTHORITY Q ..: PROPERTY: MOORES CREEK ADVANCED WATER 100 YEAR FLOODPLAIN ELEVATION: 324.00' SDP2010-82 (APPROVED JAN 2011) RESOURCE RECOVERY FACILITY REFERENCE: FEMA MAP # 51003CO289D, EFFECTIVE 2/4/2005 SITE PLAN SUBMITTAL FOR IMPROVEMENTS TO THE EXISTING MOORES CREEK PUMP TOTAL PROPERTY SIZE: 89.46 ACRES AND LOMR 16-03-1107P, EFFECTIVE 2/6/2017. STATION AND ITS ASSOCIATED PROPOSED FORCE MAIN. ..... `.'.......'.' '.. . TAX MAP/PARCEL: 077-40A .........'� .".... ZONING: LI (LIGHT INDUSTRIAL); ENTRANCE CORRIDOR (EC) WAIVERS FOR DETENTION, TRAVELWAY WIDTH AND LANDSCAPE SDP2012-40 (APPROVED OCT 2012) MAGISTERIAL: SCOTTSVILLE PLAN REQUIREMENTS HAVE BEEN GRANTED UNDER THE MAJOR SITE PLAN SUBMITTAL FOR DIGESTER IMPROVEMENTS AT THE EXISTING MOORES CREEK PARCELS COUNTY: ALBEMARLE AMENDMENT REVIEW OF SDP200800100. WWTP STATE: VIRGINIA j NO. OWNER TAX MAP PARCEL NO DB-PG ZONING USE SETBACKS (MET OR N/A) SDP2013-033 (APPROVED SEPT 2013) ....... / �� q 1 RIVANNA WATER AND SEWER AUTHORITY 77 38B 768-277 LIGHT INDUSTRY INDUSTRIAL ENGINEER: HAZEN AND SAWYER FRONT MINIMUM: 10' FROM THE R-O-W OR EXTERIOR SITE PLAN FOR CONSTRUCTION OF NEW RIVANNA PUMP STATION AND INTERCEPTOR ,•� 2 RIVANNA WATER AND SEWER AUTHORITY 78 22A 639-193 LIGHT INDUSTRY INDUSTRIAL 4011 WESTCHASE BLVD EDGE OF SIDEWALK IF SIDEWALK IS OUTSIDE OF R-O-W TUNNEL. • / 3 RIVANNA WATER AND SEWER AUTHORITY 77 40A 768-277 LIGHT INDUSTRY INDUSTRIAL SUITE 500 / SDP 2015-045 (APPROVED SEPT 2015) RALEIGH NC 27607 FRONT MAXIMUM: NONE % �% MINOR SITE PLAN AMENDMENT FOR ODOR CONTROL IMPROVEMENTS. 4 RIVANNA WATER AND SEWER AUTHORITY 77 22A 757-011 LIGHT INDUSTRY INDUSTRIAL / 5 BLACKBIRD OF CHARLOTTESVILLE LLC 77 20A 5111-166 LIGHT INDUSTRY OPEN NO SURVEY CONDUCTED FOR THIS PROJECT; SITE TOPOGRAPHY IS FROM SIDE AND REAR MINIMUM: 50' BETWEEN PUBLIC R-O-W, RURAL SDP 2020-046 (APPROVED OCT 2020) �BASE FILES FROM PREVIOUS PLANT IMPROVEMENT SURVEYS. AREAS, OR THE MONTICELLO HISTORIC MINOR SITE PLAN AMENDMENT FOR LIGHTING IMPROVEMENTS (NO STRUCTURES TO DEPICT) 6 FRANKLIN STREET LAND TRUST III 77 20 5125-573 RURAL OPEN DISTRICT AND STRUCTURE; 30' BETWEEN �., 7 FALLS, JOHN HARVEY OR VIRGINIA S. 77 21A 700-314 LIGHT INDUSTRY INDUSTRIAL OFF-STREET PARKING AND THE DISTRICT BOUNDARY. , SDP 2021-038 (APPROVED JULY 2021) DATUM: HORZ: NAD83 VIRGINIA SOUTH ZONE I I MINOR SITE PLAN AMENDMENT FOR IN -PLANT CLARIFIER AND LIME SILO DEMOLITION 8 RIVANNA WATER AND SEWER AUTHORITY 77 21 3594-660 LIGHT INDUSTRY INDUSTRIAL VERT: NAVD88 SIDE AND REAR MAXIMUM: NONE ------ LETTER OF REVISION #1: ELECTRICAL IMPROVEMNTS (DEC 2021) 9 1 ELEMENTAL ECOTECH LLC 77 40B 1 495-325 1 LIGHT INDUSTRY I OPEN PROJECT ENGINEER: B. PORTER NOT ISSUED FOR CONSTRUCTION azeCHARLOTTESVILLE, _ HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO.: C-0381 RIVANNA WATER & SEWER AUTHORITY VIRGINA LETTER OF REVISION CIVIL SDP202100038 SITE PLAN DATE: DESIGNED BY: A. MARCH HAZEN NO. 31442-018 DRAWN BY: A. MARCH CONTRACT NO.: 1 MOORES CREEK ADVANCED WATER RESOURCE RECOVERY FACILITY ENTRANCE IMPROVEMENTS CHECKED BY: M. SANTOWASSO NDRAWING UMBER IF THIS BAR DOES NOT 0 1/2" ill MEASURE 1 "THEN DRAWING I IS NOT TO FULL SCALE REV ISSUED FOR DATE BY