Hello, team.
The County zoning department came back with no comments on our updates. Frank (other
department staff) also mentioned that we can submit the Site Plan with all updates and then the
County will determine if there is an issue. We will need to prepare the Site Plan submittals.
Thank you.
Best,
Stella Kim
Adapture Renewables, Inc.
Direct: 510.520.5527
From: Bill Fritz <BFRITZ(cdalbemarle.ore>
Date: Thursday, July 29, 2021 at 6:07 AM
To: Stella Kim <skim(qadapturerenewables.com>
Subject; RE: Rivanna Updated Site Plan
I have no comments. The important thing to do to get this project done is to submit the site
plan so that official comments can be prepared. Please remember that it is a two step process,
initial and final. This provides an opportunity to address any issues that come up or even for
you to amend the plan as you get closer to the t00% design level.
William D. Fritz, AICP
Development Process Manager/Ombudsman
Albemarle County
hfrit7l7a alhPmarlP nrn
434-296-5823 ext3242
401 McIntire Road, North Wing, Charlottesville, VA 22902
From: Stella Kim <skim(@adaoturerenewables.com>
Sent: Wednesday, July 28, 2021 6:24 PM
To: Bill Fritz <BFRITZ(@albemarle.org>; Francis MacCall <FMACCALL(Oalbemarle.org>
Cc: Goran Arya <ga!i4a(@adapturerenewables.com>; Ian Susslin <isusslin(@adapturerenewables.com>;
Morgan Zinger <mzinger(oadapturerenewables.com>
Subject: Re: Rivanna Updated Site Plan
CAUTION This message originated outside the County of Albemarle email system. DO NOT
CLICK on links or open attachments unless you are sure the content is safe.
Hi, Francis and Bill.
I am reaching out to you to know if you had a chance to review the latest updates on the Rivanna Solar
Site Plan. Based on your confirmation on the updates, we will move ahead to finalize the Plan and be
ready to submit the Site Plan for the County's approval. Please let me know if you have any comments,
or questions.
Thank you.
Best,
Stella Kim
Adapture Renewables, Inc.
Direct: 510.520.5527
From: Stella Kim <skim(a)adapturerenewables.com>
Date: Thursday, July 22, 2021 at 10:41 AM
To: Bill Fritz <BFRITZPalbemarle.org>, Francis MacCall <FMACCALL(@albemarle.org>
Cc: Goran Arya<garya(@adapturerenewables.com>, Ian Susslin
<isusslinPadapturerenewables.com>, Morgan Zinger <mzinger(c,)adapturerenewables.com>
Subject: Re: Rivanna Updated Site Plan
Hello, Bill and Francis.
I am following up on the previous email. Please let me know if you have any comments/questions on
the addressed updates on the Site Plan. We can set up a call or provide any supporting documents if
needed. Thank you.
Best,
Stella Kim
Adapture Renewables, Inc.
Direct: 510.520.5527
From: Stella Kim <skim(a)adanturerenewables.com>
Date: Friday, July 16, 2021 at 11:35 AM
To: Bill Fritz <BFRITZO)albemarle.ore>, Francis MacCall <FMACCALL(a)albemarle.org>
Cc: Goran Arya<garya(@adapturerenewables.com>, Ian Susslin
<isusslinCo)adapturerenewables.com>, Morgan Zinger<mzinger(a)adanturerenewables.com>
Subject: Rivanna Updated Site Plan
Hello, Francis and Bill.
I hope you are doing well. As you may know, we had a meeting with Frank Pohl and Scott Clark
regarding the wetland delineation on the Rivanna Solar's Site. Overall, we are finalizing a Project Site
Plan to submit for Site Plan Approval, and we would like to present the updates on the draft Plan
comparing to the Conceptual Plan for the SUP.
Attached you will find the updated Rivanna Solar Site Plan. Here is a list of items that have changed
following:
1. Updated property lines based on ALTA Survey
1. Property lines are now accurate compared to the Conceptual Plan for the SUP, which
used GIS data.
2. Offsets from the Property lines are the same as the SUP. 50 ft 75 off route 729, 100ft off
route 53.
3. Fence locations at these offsets are the same as the SUP.
4. Vegetation buffers have been adjusted to match the updated Property lines from the
accurate ALTA survey.
2. Updated topography lines
1. The topography survey has been conducted and is more accurate than GIS topography on
the Conceptual Plan.
2. Critical Slopes (25%+) have been documented. Locations have slightly changed in the
southeast area.
- Some new areas are now showing in the southwest corner and the wetland buffer
area.
3. Small Critical Slope Islands that were in the SUP layout now do not exist due to the more
accurate Topo analysis.
3. The project fence is now encompassing the whole project site. The Original SUP had the project
broken up into three different sections.
1. Dominion's Transmission line easement will now not be fenced in.
- This has been discussed with Dominion. They have given a verbal blessing.
2. The fence will cross the Transmission line at close to 90-deg (2 locations).
3. The fence will Cross wetland Buffer and wetlands.
4. Wetlands & Stream have been documented more accurately, and a site visit has been
conducted.
1. Wetland & Stream are in more areas than in the SUP layout. There are now three
additional "Fingers" shapes that were documented in the Water Protection Ordinance.
2. 100ft buffer has been placed around the Wetlands and Stream.
In the attached Rivanna Updated Solar Site Plan, we have tried to keep the same parameters in the
SUP. The listed Items were updated due to a proper ALTA survey, Topography survey, and a wetland/
steam location site visit. The updated Rivanna Solar Envelope is decreased in size by a fair amount, but
we are confident that we can still create the same size project and produce the same production
results.
If there are any questions, comments, or concerns, please let us know. We would like to make sure
that the Zoning Department considers these updates in general accord with the SUP. Also, it would be
better to set up a call to walk through the updates with our engineering and design team; please let me
know when the best time for the call would be.
Thank you.
Best Regards,
Stella Kim I skimnaadanturerenewables.com
Development Manager Direct: 510.520.5527
Adapture Renewables, Inc. 1 1901 Harrison Street, Suite 1630, Oakland, CA 94612
IMPORTANT NOTICE: This e-mail message is intended to be received only by persons entitled to receive the
confidential information it may contain. E-mail messages to clients of Adapture Renewables. may contain information
that is confidential and legally privileged. Please do not read, copy, forward, or store this message unless you are an
intended recipient of it. If you have received this message in error, please forward it to the sender and delete it
completely from your computer system.
IG�
1:3
C
n
E
85 FT
PL TO FENCE
F
VEGETATION BUFFER
G
r�
1
7
5
4
3
r-a
1
EXISTING SUBSTATION
NEW OH POLE LINE
AND DRIVEWAY TO
CONNECT SOLAR SITE
TO UTILITY
VEGET
BUCK ISLAND ROAD
ROUTE 729
THOMAS JEFFERSON HIGHWAY
ROUTE 53
C
G
r
��•�.'�'.i•�.�.ir'`�.�=jai � � � ..
.s,......., i 50 FT
14 oo SETBACK PROPOSED
O EASEMENT CROSSING
35 FT
PL TO FENCE
O O Oo
0
X
v o
r�A
►ss♦
M50
100 FT
SETBACK
EXISTING ROAD
CROSSING WETLANDS
o
O ❑ o / N
J \0 175 350 525
f7^ \ GRAPHIC SCALE
ARRAY LAYOUT a -
1
U o /
C
�= L
REV DESCRIPTION DATE
A UPDATED SOLAR ENVELOPE 07/12/21
CONFIDENTIAL:
THE INFORMATION DEPICTED ON THIS DOCUMENT IS
_ PROPRIETARY AND THE SOLE PROPERTY OF
ADAPTURE RENEWABLES INC. ANY USE OR
/ DISCLOSURE OF THIS INFORMATION IS EXPRESSLY
PROHIBITED WITHOUT THE PRIOR WRITTEN
/ CONSENT OF ADAPTURE RENEWABLES INC
/ UPDATED SOLAR DEVELOPMENT ENVELOPE
ADAPTURE
RENEWABLES
TRANSMISSION LINE EASEMENT
FENCE
PROPERTY LINE
1901 Harrison St, Ste 1630
Oakland, CA 94612, USA
PROJECT NAME:
RIVANNA SOLAR
PROJECT ADDRESS:
2627 BUCK ISLAND RD
CHARLOTTESVILLE, VA 22902
37.9664,-78.4056
SEAL: DATE:
07/12/2021
PROJECT #:
DRAWN BY:
Is
CHECKED BY:
ZZ
TITLE:
UPDATED SOLAR ENVELOPE
LOCATION: Z:\SHARED\08 PROJECTS\PUBLIC\3 IPP\44 RIVANNA\06 ENGINEERING-AND-DESIGN\06 CURRENT DESIGN DRAWINGS\CURRENT CAD\ELECTRICAL\RIVANNA- LAYOUT-20210712.DWG PLOTTED BY: IAN SUSSLIN