Loading...
HomeMy WebLinkAboutSDP200500091 Calculations 2005-08-30 i Brown Automart Rainwater Recycling Retention Design Calculations Located in: Albemarle County, Virginia Project Number: 1525.0 ® ` �' 0 •Date: August 26, 2005 C8 lCHAEL G. .q No. 17 6D 4(4i y sciv siONAL OA- ,, GAY AND KEESEE, INCORPORATED 328 MOUNTAIN AVENUE, SW RECEIVED ROANOKE, VA 24016 (540)345-1110 (540) 345-5560 FAX A115! 3 0 2005 info@gayandkeesee.com COt LAITY �y��„t�,�r'llfiEtdT Brown Automart— Rainwater Recycling Retention GNI Job#1525.0—Rainwater Management Solutions Project Description: Rainwater runoff from Phase I and Phase II buildings will be piped into 60" RCP retention structures to be reused for washing cars on the display lot. Runoff from Phase I will direct rainwater through previously designed and approved oil/water separators (OWS) before being stored in the Phase I retention structure. Oil water Separators are used because of the garage and parking areas that are contained in the Phase I building and will ensure quality of the water being reused. Runoff from Phase II will be piped directly in to the Phase II retention structure without an OWS. There are no contaminates associated with the roof runoff of Phase II to require an OWS. The retention structures are designed to have a retention capacity of at least 24,000 gallons for Phase I and at least 8,000 gallons for Phase II. All hydrologic calculations are based on VDOT Hydraulic Design Advisory-HDA 05-03 data for Albemarle County, Virginia. Project Design Considerations: The Phase I retention structure consist of 217.3' of 60" RCP with a watertight gasket in all pipe joints. The inflow into the Phase I retention structure is by means of 15"RCP from each OWS which are located in the parking lot. The outlet of the Phase I retention structure is a 15" RCP which ties into existing storm drainage in the construction of Phase I parking lot area. The outlet and inlets are sized to adequately handle the peak flow from the 10-year storm event. The Phase II retention structure consists of 70.0' of 60" RCP with a watertight gasket in all pipe joints. The inflow into the Phase II retention structure is by means of 15"RCP. The runoff is piped directly into the retention structure without the need for an OWS. The outlet of the Phase II retention structure is a 15" RCP which ties into existing storm drainage in the construction of Phase I / Phase II parking lot area. The outlet and inlets are sized to adequately handle the peak flow from the 10-year storm event. Project Summary: The following table compares the inflow runoff and the outlet capacities for Phase I and Phase II retention systems. The outlet of each retention structure exceeds the peak flow of runoff as well as the calculated peak discharge of the applicable retention system. 10 Year Event Basin Peak Runoff Peak Outlet Discharge Outlet Capacity Phase I 8.23 cfs 7.01cfs 8.25cfs Phase II 2.22 cfs 2.00cfs 9.22cfs Hydrograph Summary Report Page 1 Hyd. Hydrograph Peak Time Time to Volume Return Inflow Maximum Maximum Hydrograph No. type flow interval peak period hyd(s) elevation storage description (origin) (cfs) (min) (min) (cuft) (yrs) (ft) (cuft) 1 Rational 8.23 1 5 2,470 10 =--- -- ___= PHASE I BUILDING 2 Rational 2.22 1 5 665 10 PHASE II BUILDING 4 Reservoir 7.01 1 6 2,470 10 1 405.87 4,211 PH I PIPE STORAGE 6 Reservoir 2.00 1 6 637 10 2 422.96 1,219 PH II PIPE STORAGE Proj. file: PH I AND PH II DESIGV.G1131Afile: ALBEMARLE county.IDFRun date: 08-27-2005 Hydrograph Plot English Hyd. No. 1 PHASE I BUILDING Hydrograph type = Rational Peak discharge = 8.23 cfs Storm frequency = 10 yrs Time interval = 1 min Drainage area = 1.3 ac Runoff coeff. = 0.95 Intensity = 6.67 in Time of conc. (Tc) = 5 min I-D-F Curve = ALBEMARLE county.IDF Reced. limb factor = 1 Total Volume=2,470 cuft 1 - Rational - 10 Yr - Qp = 8.23 cfs 10 8_ -- en 6 a 4 • 2 - 0 0 2 4 6 8 10 Time (min) / Hyd. 1 Hydrograph Plot English Hyd. No. 2 PHASE II BUILDING Hydrograph type = Rational Peak discharge = 2.22 cfs Storm frequency = 10 yrs Time interval = 1 min Drainage area = 0.3 ac Runoff coeff. = 0.95 Intensity = 6.67 in Time of conc. (Tc) = 5 min I-D-F Curve = ALBEMARLE county.IDF Reced. limb factor = 1 Total Volume=665 cuft 2 - Rational - 10 Yr - Qp = 2.22 cfs 2.5— — 2.0— cn 1 .5— c0 Cl 1 .0- 0.5— 0.o I I I 0 2 4 6 8 10 Time (min) /, Hyd. 2 Hydrograph Plot English Hyd. No. 4 PH I PIPE STORAGE Hydrograph type = Reservoir Peak discharge = 7.01 cfs Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 1 Reservoir name = PHASE I PIPE ST Max. Elevation = 405.87 ft Max. Storage = 4,211 cuft Storage Indication method used. Total Volume=2,470 cuft 4 - Reservoir - 10 Yr - Qp = 7.01 cfs 10— - 8— to 6 0 a 4 - 2 -- 0 0 10 20 30 40 Time (min) / Hyd. 1 / Hyd. 4 Hydrograph Plot English Hyd. No. 4 PH I PIPE STORAGE Hydrograph type = Reservoir Peak discharge = 7.01 cfs Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 1 Reservoir name = PHASE I PIPE ST Max. Elevation = 405.87 ft Max. Storage = 4,211 cuft Storage Indication method used. Total Volume=2,470 cuft 4 - Reservoir - 10 Yr - Max. El. = 405.87 ft 406.0 405.7 - - 405.5 > m w 405.2 405.0 404.7 I i I 0 10 20 30 40 Time (min) Hydrograph Plot English Hyd. No. 6 PH II PIPE STORAGE Hydrograph type = Reservoir Peak discharge = 2.00 cfs Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 2 Reservoir name = PHASE II PIPE S Max. Elevation = 422.96 ft Max. Storage = 1,219 cuft Storage Indication method used. Total Volume=637 cult 6 - Reservoir - 10 Yr - Qp = 2.00 cfs 2.5— — 2.0 co 1.5 a 1.0 0.5 0.0 0 5 10 15 20 25 Time (min) / Hyd. 2 / Hyd. 6 Hydrograph Plot English Hyd. No. 6 PH II PIPE STORAGE Hydrograph type = Reservoir Peak discharge = 2.00 cfs Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 2 Reservoir name = PHASE II PIPE S Max. Elevation = 422.96 ft Max. Storage = 1,219 cuft Storage Indication method used Total Volume=637 cuft 6 - Reservoir - 10 Yr - Max. El. = 422.96 ft 423.4- 423.2- 423.0— > 422.7- 422.5- 422.3 0 5 10 15 20 25 Time (min) I-D-F Curve - ALBEMARLE county 15 / 1-Yr / 2-Yr 10 3-Yr InJhr / 5-Yr 5 / 10-Yr 25-Yr / 50-Yr 0•-- f 0 5 10 15 20 25 30 35 40 45 50 55 60 / 100-Yr Tc (Min) GA V TillIlli4111141144lIllIllIllIllIlliIllIllillftllftftmimmimimmmmokkT lt[I 2S 0 9A.' ieSP ��_�� E. S8 eoa voe xooro 00 oc m t LA rl R _ 00 14, o .. :tb OS in \ i py - Jtt Lm O os"8 r� I co e, • O z u 0. ; \\\ • _ t m \ . -0,, sr±5 c`4,�e _ z 7, \ �y \c� \ o r y mI \ s ,›... ....._.2 , N -.I A U 0 A D IAA r N C � .. d I N J / r ,iii.\\\ .\\1\41 ,i IV An AI I N =Z 1 O g �� ,8 C O $ iI " 1 88= I. 27 ! n '' m o . - c I z Fi aria A "ASS .4.... N \ - \ \ ba \ \' g”,-; F N �Nu ab 8b" \�. II cl pv7 ■ I ' CO o \ I. b i % 1/1 - . ,, \ 1 in . r I \ \ \ �� \ ...\\ , •�' \\ \ \ z g I >�\ \\ s xos o q \ ,,\ \. A.g:s I 8 r\ A -.,g N R.k8 OS _ CO n"A=m m CO BROWN AUTOMART 4GAY AND KEESEE, INCORPORATED mm D x9 cn -, z m I, o `I ENGINEERS 4, PLANNERS p o o DRAINAGE MAP - D PHASE I AND PHASE II BUILDING DRAINAGE 328 Mountain Avenue S.W. o 0 Roanoke, Virginia 24016 03 N- f. Phone: (540) 345—1 1 10 J 6 OU O -n- ALBEMARLE COUNTY,VIRCINIA Email: info®gayondkeese ecorn PHASE I- PIPE LENGTH DESIGN JN:1525.0—RAINWATER MANAGEMENT—BROWN AUTOMART DESIGNED BY: RBF CHECKED BY: RBF DATE: 8/05/05 24,000 Gallons =3208 Ft 3 217.30' of 60"RCP Pipe With @ 45" of Storage Given Input Data: Shape Circular Solving for Slope Diameter 60.0000 in Depth 45.0000 in Flowrate 0.0001 cfs Manning's n 0.0120 Computed Results: Slope 0.0000 ft/ft Area 19.6350 ft2 Wetted Area 15.7963 ft2 Wetted Perimeter 125.6637 in Perimeter 188.4956 in Velocity 0.0000 fps Hydraulic Radius 18.1012 in Percent Full 75.0000% Full flow Flowrate 0.0001 cfs Full flow velocity 0.0000 fps (217.3') x (15.7963 ft2) = 3,432 ft3>3,208ft3 Water Elevation=401.00+3.75'404.75—See Retention Calculations PHASE II- PIPE LENGTH DESIGN JN:1525.0—RAINWATER MANAGEMENT—BROWN AUTOMART DESIGNED BY: RBF CHECKED BY: RBF DATE: 8/05/05 8,000 Gallons = 1070 Ft.3 70' of 60"RCP Pipe With @ 45" of Storage I l Given Input Data: IShape Circular Solving for Slope Diameter 60.0000 in Depth 48.0000 in Flowrate 0.0001 cfs 11 Manning's n 0.0120 Computed Results: Slope 0.0000 ft/ft Area 19.6350 ft2 Wetted Area 16.8394 ft2 Wetted Perimeter 132.8578 in Perimeter 188.4956 in Velocity 0.0000 fps Hydraulic Radius 18.2516 in Percent Full 80.0000 % Full flow Flowrate 0.0001 cfs Full flow velocity 0.0000 fps (70')x(16.8394 ft2)= 1,179ft3 > 1,070ft3 Water Elevation=418.4+4.00'=422.4—See Retention Calculations 1 I PHASE II STORAGE OUTLET Given Input Data: Shape Circular Solving for Flowrate Diameter 15.0000 in Depth 14.1000 in Slope 0.0150 ft/ft Manning's n 0.0120 Computed Results: Flowrate 9.2195 cfs - Max Flow From Phase II= 2.22 cfs in 10 year event Area 1.2272 ft2 Wetted Area 1.1971 ft2 Wetted Perimeter 39.6999 in Perimeter 47.1239 in Velocity 7.7014 fps Hydraulic Radius 4.3422 in Percent Full 94.0000 % Full flow Flowrate 8.5709 cfs Full flow velocity 6.9842 fps PHASE II STORAGE INFLOW Given Input Data: Shape Circular Solving for Flowrate Diameter 15.0000 in Depth 14.1000 in Slope 0.0100 ft/ft Manning's n 0.0120 Computed Results: Flowrate 7.5277 cfs - Max Flow From Phase II= 2.22 cfs in 10 year event Area 1.2272 ft2 Wetted Area 1.1971 ft2 Wetted Perimeter 39.6999 in Perimeter 47.1239 in Velocity 6.2882 fps Hydraulic Radius 4.3422 in Percent Full 94.0000 % Full flow Flowrate 6.9981 cfs Full flow velocity 5.7026 fps PHASE I STORAGE OUTLET Given Input Data: Shape Circular Solving for Flowrate Diameter 15.0000 in Depth 14.1000 in Slope 0.0120 ft/ft Manning's n 0.0120 Computed Results: Flowrate 8.2462 cfs - Max inflow= 8.23cfs in 10 year event Area 1.2272 ft2 Wetted Area 1.1971 ft2 Wetted Perimeter 39.6999 in Perimeter 47.1239 in Velocity 6.8884 fps Hydraulic Radius 4.3422 in Percent Full 94.0000 % Full flow Flowrate 7.6660 cfs Full flow velocity 6.2469 fps PHASE I STORAGE INFLOW A and B Given Input Data: Shape Circular Solving for Flowrate Diameter 15.0000 in Depth 14.1000 in Slope 0.0050 ft/ft Manning's n 0.0120 Computed Results: Flowrate 5.3229 cfs—Max Flow From OWS =4.12 cfs in 10 year event Area 1.2272 ft2 Wetted Area 1.1971 ft2 Wetted Perimeter 39.6999 in Perimeter 47.1239 in Velocity 4.4464 fps Hydraulic Radius 4.3422 in Percent Full 94.0000 % Full flow Flowrate 4.9484 cfs Full flow velocity 4.0323 fps PHASE II STORAGE OUTLET Given Input Data: Shape Circular Solving for Flowrate Diameter 15.0000 in Depth 14.1000 in Slope 0.0150 ft/ft Manning's n 0.0120 Computed Results: Flowrate 9.2195 cfs - Max Flow From Phase II=2.22 cfs in 10 year event Area 1.2272 ft2 Wetted Area 1.1971 ft2 Wetted Perimeter 39.6999 in Perimeter 47.1239 in Velocity 7.7014 fps Hydraulic Radius 4.3422 in Percent Full 94.0000% Full flow Flowrate 8.5709 cfs Full flow velocity 6.9842 fps PHASE II STORAGE INFLOW Given Input Data: Shape Circular Solving for Flowrate Diameter 15.0000 in Depth 14.1000 in Slope 0.0100 ft/ft Manning's n 0.0120 Computed Results: Flowrate 7.5277 cfs - Max Flow From Phase II=2.22 cfs in 10 year event Area 1.2272 ft2 Wetted Area 1.1971 ft2 Wetted Perimeter 39.6999 in Perimeter 47.1239 in Velocity 6.2882 fps Hydraulic Radius 4.3422 in Percent Full 94.0000% Full flow Flowrate 6.9981 cfs Full flow velocity 5.7026 fps **~..ti SPECIFICATIONS: 1fE ALTN ■ PIPE AND FITTINGS: ASTM D1785 PVC PLAIN-END PRESSURE PIPE, SCHEDULE 80. �. �FG� F-101: FLOATING FILTER, 50 MICRON, 1 1/4" END CONNECTION. • 4 'I)tc...%t P-101: PRESSURE PUMP WITH LOCAL DISCONNECT AND START/STOP CONTROL PANEL. ,� • 120 VAC, 1 PHASE, 3500 RPM. 1 HORSEPOWER. SHALLOW WELL JET PUMP. 15 GPM @ 50 PSIG. 10 JOHN M.RATTENBURY1. EQUAL TO GOULDS MODEL J10S. NEMA 4X PANEL ENCLOSURE. •U �� F-102: 10 MICRON CARTRIDGE FILTER. PVC HOUSING. No.03 3 3 PH-101: JAY R. SMITH MODEL 5910 FROST-RESISTANT POST HYDRANT, 3/4" HOSE THREAD CONNECTION. �� ti� 41 PRESSURE ��SS NAL E �f SWITCH 1" PVC DISCHARGE N� H PS ri , — 3/4"THREADED L 101 i F VALVE All P\n I POST HYDRANT V ( PH ) I I \ J MANWAY ) LJ p F 101 ) 102 X 3/4" PVC 1 1/4" PVC SUCTION IRRIGATION { LSL 101 OPERATION: 1" PVC 1" PVC RAIN WATER> 1. P-101 IS CONTROLLED BY PRESSURE SWITCH PS-101. WHEN PRESSURE 0 ANCHOR SUCTION PIPE DECREASES TO 45 PSIG, THE PUMP STARTS. WHEN THE PRESSURE INCREASES TO SIDES OF MANHOLE TO 60 PSIG, THE PUMP STOPS. 2. LSL-101 IS A LOW LEVEL SWITCH. WHEN THIS SWITCH OPENS, P-101 IS DISABLED TO PREVENT LOW LEVEL STARTS. F 3. THE SYSTEM IS INTENDED TO PROVIDE WATER PRESSURE TO AN EXTERIOR 101 POST HYDRANT AND IN GROUND IRRIGATION WHILE THERE IS RAIN WATER IN THE DETENTION PIPE. WHEN THE DETENTION PIPE IS DRY, THE SYSTEM IS DISABLED UNTIL LSL-101 ALLOWS P-101 TO START. 1260 W.Riverside Drive Notes: PROJECT No XXXXX „� Salem,VA 24153 DATE 08/26/05 BROWN AUTO PARK P S K01 (540)3756750 DRAWN JMR RAIN WATER MANAGEMENT ENGINEERINGLLC CHECKED JMR RECLAIM SYSTEM (540)375-6751(fax) SCALE NONE BROWN A UTO PAR K WATER STORAGE RAIN 1 MANAGEMENT 3EN M -- - - ----- PROPERTY UNE ❑TELE PED EXISTING TELEPHONE PEDESTAL 2100 EXISTING 2' CONTOURS ®GV EXISTING GAS VALVE 1200 PROPOSED 2' CONTOURS ❑cM EXISTING GAS METER x 90.56 EXISTING SPOT ELEVATION *LP EXISTING LIGHT POLE PEN) PROPOSED SPOT ELEVATION EXISTING WELL 90.56 PROPOSED TOP CURB ELEVATION Q DRILL HOLE ( 90.06 PROPOSED BOTTOM CURB ELEVATION EXISTING FIRE HYDRANT EXISTING SANITARY SEWER PROPOSED FIRE HYDRANT -- -- - - - PROPOSED SANITARY SEWER ® NVV EXISTING WATER VALVE W EXISTING WATERLINE PROPOSED WATER VALVE PROPOSED WATERLINE 11 EXISTING WATER METER X24"= = EXISTING STORM SEWER 0m ■ PROPOSED WATER METER • PROPOSED STORM SEWER O EXISTING SEWER CLEANOUT A// EXISTING EDGE OF PAVEMENT 0,0 • PROPOSED SEWER CLEANOUT FEMME] PROPOSED PAVEMENT `; ., ."• .' �'*, =' `' PROPOSED GRAVEL OSMH EXISTING SEWER MANHOLE •.;; PROPOSED SEWER MANHOLE PROPOSED CONCRETE/SIDEWALK I EXISTING SHRUB EXISTING BUILDING EXISTING TREE PROPOSED BUILDING - - - - OHU- - - - EXISTING OVERHEAD UTILITY ��( + PROPOSED TREE EXISTING BURIED ELECTRIC -o -v �- EXISTING SIGN -------- TV -------- EXISTING BURIED CABLE TV LINE PROPOSED SIGN - - - `-G- - - - EXISTING GAS LINE OTP BORE HOLE/TEST PIT - - - TEL- - - EXISTING BURIED TELEPHONE LINE A CONTROL POINT x x x EXISTING FENCE LINE ° PRF IIRON ROD FOUND EXISTING TREELINE ° IfRS IRON ROD SET BENCHMARK LOCATION ° PROPERTY CORNER •U P EXISTING UTILITY POLI: • FP `-ENCE POST. —.E EXISTING GUY WIRE (TBR)) TO BE REMOVED SOLUTIONS ALBEMARLE C01UNry, VIRGINIfil �a• SITE � 'Qeyh s f i Cnr bro 29 VICINITY MAL SCALE: 1"=2000' TABLE OF CONTENTS: SHEET TITTLE I OF 2 COVERSHEET 2 OF 2 PLAN 'VIEW & PROFILES Ra I A W C4 z �CQ ^too 43 � L0 ` .�; , � to �W '►�I rri .� o o W .Cd �, a � Coo:s 0 °?� ` 'a A Cd w CQ P4 0 `y GENERA NO _ S 1. CLIENT: RAIN WATER MANAGEMENT SOLUTIONS c/o DAVID CRAWFORD 1260 WEST RIVERSIDE DRIVE SALEM, ViiRGINIA 241153 __ TAX PARCEL NUMBER - 45 -68D4 ALBEMARLE COUNTY, VIRGINIArii 3. BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY THE OWNER. `^ 4. CONTRACTOR SHALL CALL "MISS UTILITY" AT 1-800-552-7001 AT LEAST �..� �•.> rr`��✓ 48 HOURS PRIOR TO ANY EARTHWORK BEGINNING. v1 5. A PRE—CONSTRUCTION MEETING WITH THE COUNTY WILL BE HELD PRIOR TO F Tn CONSTRUCTION. f 6. CONTRACTOR SHALL VERIFY BUILDING DIMENSIONS WITH ARCHITECTURAL PLANS PRIOR TO STAKING BUILDING. 7. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MEET COMPLIANCE `v Q.� 0 Q REQUIREMENTS WITH SECTI01�� 59.1-406, ET SEQ. OF THE CODE OF VIRGINIA � � Q (OVERHEAD HIGH VOLTAGE LINES SAFETY ACT). 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS BEFORE BEGINNING CONSTRUCTION. 9. ALL CONSTRUCTION WILL BE IN ACCORDANCE WITH COUNTY STANDARDS AND SPECIFICATIONS. 10. UNLESS SHOWN OR SPECIFIED OTHERWISE, METHODS AND MATERIALS SHALL A. BE IN ACCORDANCE WITH "VDOT ROAD AND BRIDGE STANDARDS" LATEST EDITIONS. �py,TH 0�,, 11. CONSTRUCTION OF ALL UTILITIES TO BE DEDICATED TO COUNTY SHALL ADHERE TO COUNTY'S SPECIFICATIONS. COUNTY'S �y 0 COUNTY�S INSPECTOR iCHA�EL f�G.��: 12. ALL UTILITIES WILL BE VISUALLY INSPECTED BY THE PRIOR TO BACKFILLING THE TRENCHES. No. 17560 13. ALL UTILITIES TO BE MAINTAINED BY THE COUNTY SHALL BE WITHIN ��,4 1 ' DEDICATED RIGHTS—OF—WAY OR EASEMENTS. F �s''10NAL 14. CONTRACTOR SHALL BE RESIPONSIBLE FOR REPAIR OF ANY UTILITIES DAMAGED AS A RESULT OF CONSTRUCTION ACTIVITIES. VERIFY LOCATION OF ALL EXISTING UTILITIES PRIOR TO BEGINNING WORK. ' REVISED: DESIGNED/CALC.: RBF F CHECKED: �+ DRAWN: MBL .,, _ SCALE: N/A �3 3, 005 DATE: 08/26/05 -Mil-l� IIY D ,VEL PME.- T JOB NO. 1525.0 F SHEET 1 OF 2 I cc Q n N co -- - - - - - - - - - - - - - - - - - - - - - - - -------------- _ -- ----------- -- _ - \`\\ H 430 / "(! - -- - ---------------- --- --- ----- -_ --- ------ _ _------- -- - ---- ---- _ \ \ \, .� ' H 11 RIM -428.80 / / / / - _ _--1 - �____-- ------------------- _---- --- _ - - - --- --420- - - - - \\\ �\� ' 04 Cp 422.40 INVIn=418. / ' PHASE II INFLOW / / -- -1 -_ _ ----- _ _- - - - - - ---------- --------� - \ \` \\� o INVIn= _ (, -•-f RIM -429.97 - - _- --- -_ _ 91.3"1 1.00% 151n'061, INVout=4231 ----/ -_ --__--1 ---------------------- _ __ ____ _ ____ v t= / ) I -----__- - -- --- ----_- --- --- -'- - _ --- ----- ---- ---- ` �\\�� \\ `\\1 1 Uz Z ^ � v��i PHASE II FUTURE BUILDING ' I '� I 1 / - ---- ------------------- _- __ - --410- - - - - - - y \ \\�\�\ .\ I' I f --I CL � LO 0 SLY If PHASE I BUILDING 1 \ \� \ \� \I \i I ► I i W M M o A2,, \ I I Iii I ILO •►-+ o �» RIM - 4Z6.98I (( INVIn 421.65/ c / r . / IiII IDI i II( I II i w aai cA2 INVtnb INVout 491.26 NEW 0/W NEW 0/W xSEPARATOR SEPARATOR ,w o 2 O O 0 ocd L4j jinn' _ / i I I I I j I I i I I. - Q r ii Low`° aO(on •�g �CVop M n. O)c0 M .- �14g II NNS 'Id. �g 1 ff It I III �- wzz 0 z _ z - CP- -6135--1 _� 0% loin• Eiax �N ' 7 , R___ - W IN OW RIM -410.36 1NVolt=45.55u Kai !3OT.i■s 96" w /-- z 7g- -- ' _ rn --- nnw �p. IRIM=,-410-.0,0 INVIn=405.54r0 \ 151n.RCP TMS�t 0.50% -405.-1_, INVout-422.40 / / - - / INVIns 3 -- - ` RIM -410.00 5 n. CP "' c I I' J INVout-418.40 / NEW \ NEW NEW / / INVout=405.42 V 5 I ( J J J I 6 �TORM SEWER STORM I I I , ,a2 PUMP SUMPS _ i' i� \PARKING O �p1� 2 // B3 I , 1 SEWER 2 / r / i \ N � ,/ k�0 RIM -409.75 � M Q �' I \ `` / / �� INVIn=403.95 i NEW NEW RIM 0.00 \ \ \ \ \ \ / NVIn-402.18 ASPHALTSTORM SEWER CQ \ 1 \ INV o t �9 58 PAASPRKINGHALT -rR \INVIn t 40.30 3x1 \1 \\ \i \\ / /, % / �, I \ fes/ // k - - _ _ S S - - Lo_ / TINANI1Wf�\Y \\ (/ -gus- , iS W�R\ �}ANHQLE \ EX TING SANITAR-Y i / / \ ` - ' _ �' - - --- S -/ S " 60in.R� Q�OCp / 1 11 -- 1� EX / S WER MANH¢LE I /� \ S - h / L J, AlO - -476 _ _ = S , / • i 0.00% ■ ■ r ■ _ _ -�:- .� -�--+ ► , 1, , \ �, ---------------------- -----------------� � ----------------------- ------ ----------- - -------- -----------� -1---- S - `- ' - --� � 54' ....- '�'""''RIM=410.03 / I - -416- _ - _ / �,. I�' 189. ■= ■ .., INVIn-405.00 g __ S _ - - - - - - _ _ - EXISTING SANITARY PH 1 #1 ,27.76' ■ r • INVin-401.00 ,,�� 1 \ ` - - i _ - _ 0 \ %c - _ SEWER' MANHOLE RIM =408.21 r • !""""�� HE- I - -/- - _- 't` - --i �- _ - _ _INVin=405.00 r - .�• ....."""�' -- �OHE- cn \ \\ ` \ _ - - - �.y S/ - N i --- - -ata- ----- ----- - !YO -401.00 N ` 412-- _-----------------__ -- RIM=407.95 __'�' INVin-401 00 41 ---�- 0 - 410- -- - - -INVout=404.75 EX �a10---ANVout-401.00�IrHE: -7-OHE-- 4oa-� l ----- ---__---- -0 H ---OHE-- -OH�-406-L -PUMP SUMP -399.00 4-0a4o6-------_-_-_-_-_-- -- ---------- ---------------- 02 - - - - - - - - - - 404- - "-----40 --_- - r - --- - �- -400 406-__ -� _ --------------404- S E M I N 0 L E T R A I L ( U S. R T E 2 9 S O U T H B O U N D L A N E S) 0 15 30 60 90 120 SCALE IN FEET j PHASE I PHASE II 0 T t_ M m 412 40 40 40 396 392 DATUM ELEV 390.00 00 of O cc Low`° aO(on •�g �CVop M n. O)c0 M .- �14g II NNS 'Id. �g 1 ff It M m 412 40 40 40 396 392 DATUM ELEV 390.00 00 of O 0 420 Oi rn 0PP0 11 004,::. gg`�gN II II 7 d �zzza a- 412 412 40 40 400 396 392 DATUM! AZEV 380.00 O O cc .o Lull L h0a-O ��oj}} g g g -" -1C- 1C- 7 :2ss> �zzz M n. •x-ZZZ �yy> I III �- wzz 0 z _ z - CP- -6135--1 _� 0% loin• _0 R___ u' .N !3OT.i■s 96" w 42 z 7g- -- ' _ rn 412 84.53 0.50% 151n.RCP Y 0.50% AND INSTALLATION REQUIREMENTS. SUMP PUMPS ARE 15in.RCP - - d 00 O) r- 0 420 Oi rn 0PP0 11 004,::. gg`�gN II II 7 d �zzza a- 412 412 40 40 400 396 392 DATUM! AZEV 380.00 O O r00 N O .- c6 Ld 0 II IC 7 _ irzZ a 412 40 4 400 396 392 DATUM ELEV 380.00 N O d' cc .o _ c 0_ M O N 0 .- 00U'g •x-ZZZ �yy> I III �- wzz 0 z _ z - - LO 0 _0 R___ u' CHECKED,: DRAWN: MBL !3OT.i■s 96" �z - 42 z 7g- -- ' _ rn 412 84.53 0.50% 151n.RCP Y 0.50% AND INSTALLATION REQUIREMENTS. SUMP PUMPS ARE 15in.RCP - - __27J+_ 000 1 400 SAFETY SLAB 396 cvn)� XO w d- DATUM �o 8-11ro Opo �-g� 416 O tD C14 O 41 <t N �- g u g� uN O O "t 40E NV) .O C- Via. mss 404 DATUd! ELEV =:x _ >_ FxZZ 400.00 O a x -Z Za a PROP SED GRADE d- d' EXISTING RADE ---"- 54--- ----- 0.0(Oy; 60in. CP_� 7.76 601n.RCP to u7 N r00 N O .- c6 Ld 0 II IC 7 _ irzZ a 412 40 4 400 396 392 DATUM ELEV 380.00 N O d' ... cc .o _ c 0_ M O N 0 .- 00U'g •x-ZZZ �yy> I III �- wzz 0 z _ z 428 - LO 0 1` #5 0 8" O.C. EACH WAY TYP. u' CHECKED,: DRAWN: MBL !3OT.i■s 96" �z - 42 z 7g- -- ' _ - 412 84.53 0.50% 151n.RCP Y 0.50% AND INSTALLATION REQUIREMENTS. SUMP PUMPS ARE 15in.RCP - - __27J+_ 4 14 1 400 SAFETY SLAB 396 cvn)� XO w d- DATUM ELEV 390.00 416 O tD C14 O 41 <t 412 - O O "t 40E NV) .O O) O_ ... cc .o _ c 0_ M �-0- opo egg II C C •x-ZZZ �yy> I =:2S>° 0-®� 0vg �g C 0 z _ z 428 LO 0 1` #5 0 8" O.C. EACH WAY TYP. 00 O0 II � CHECKED,: DRAWN: MBL !3OT.i■s 96" �z - 42 z 7g- -- ' _ - 412 EXISTING GRADE ARE TO BE PLACED ON SAFETY 40 5.00 Y 0.50% AND INSTALLATION REQUIREMENTS. SUMP PUMPS ARE 15in.RCP - - __27J+_ 4 14 -0:50% 11i P 151n.RC 400 SAFETY SLAB 396 SHEET 2 OF 2 392 DATUM ELEV 390.00 416 O tD C14 O 41 <t egg c6 c4 c6 '-N04d = =ass �Ee?? cc ?a� _ c 0_ M �-0- opo egg II C C •x-ZZZ �yy> O O -p F4 o�'g it II C 7II ° =:2S>° 0-®� 0vg �g C 0 z _ :RCP-` 428 42 1` #5 0 8" O.C. EACH WAY TYP. 00 O0 II � CHECKED,: DRAWN: MBL !3OT.i■s 96" �z - 42 -� 8 7g- -- ' _ 42 GASKET IN JOINTS. CONSULT VENDOR FOR GASKET EXISTING GRADE ARE TO BE PLACED ON SAFETY Y JOB NOS• 1525.0 AND INSTALLATION REQUIREMENTS. SUMP PUMPS ARE O - - __27J+_ -0:50% 11i P 151n.RC BE USED FOR CAR WASHING ON THE DISPLAY LOT. SAFETY SLAB 42 SHEET 2 OF 2 NOT TO SCALE 3" CLEAR 151n.R 41f 416 tD C14 N d- 41 412 - O O "t 40E NV) .O 4 4 x0 Li �t 404 DATUd! ELEV DATUM ELEV 400.00 400.00 O <} 00 •d' egg c6 c4 c6 '-N04d = =ass �Ee?? cc ?a� _ c 0_ M \ \ •x-ZZZ �yy> r2» °12z9 \ 91.37 -79:00--0 0%--601 :RCP-` 428 42 1` #5 0 8" O.C. EACH WAY TYP. 00 O0 II � CHECKED,: DRAWN: MBL !3OT.i■s 96" �z - 42 -� 8 7g- -- ' _ 42 GASKET IN JOINTS. CONSULT VENDOR FOR GASKET EXISTING GRADE ARE TO BE PLACED ON SAFETY Y JOB NOS• 1525.0 AND INSTALLATION REQUIREMENTS. SUMP PUMPS ARE 151n RCP DETAIL. SAFETY PLATE TO BE PL 1"x96"x8'-0' 42C BE USED FOR CAR WASHING ON THE DISPLAY LOT. SAFETY SLAB 42 SHEET 2 OF 2 NOT TO SCALE 3" CLEAR 41f 416 tD C14 N d- 41 412 - O O "t 40E 408 4 4 404 DATUd! ELEV DATUM ELEV 400.00 400.00 O <} 00 •d' d- d' egg c6 c4 c6 '-N04d = =ass �Ee?? cc ?a� _ c 0_ M \ \ �� \ 91.37 -79:00--0 0%--601 :RCP-` SCALES: 1 =30 SCHORIZ., VERT. 1` #5 0 8" O.C. EACH WAY TYP. CHECKED,: DRAWN: MBL !3OT.i■s 96" SCALE: 1"-30# RETENTION PIPING IS TO HAVE WATERTIGHT RUBBER ALL MANHOLES GREATER THAN 4' BELOW DATE: 08110105 GASKET IN JOINTS. CONSULT VENDOR FOR GASKET EXISTING GRADE ARE TO BE PLACED ON SAFETY Y JOB NOS• 1525.0 AND INSTALLATION REQUIREMENTS. SUMP PUMPS ARE SLAB OR PLATE. SAFETY SLAB TO BE AS SHOWN 0 0 0 0 0 0 0 0 0 0 J TO ACTIVATE ONLY WHEN WATER IN STORAGE IS TOIN DETAIL. SAFETY PLATE TO BE PL 1"x96"x8'-0' BE USED FOR CAR WASHING ON THE DISPLAY LOT. SAFETY SLAB SHEET 2 OF 2 NOT TO SCALE 3" CLEAR tD C14 N d- gg C4 cd ui c*1;O It U N >>:3 Wzz a a. 42 42 4 416 412 408 404 DATUM ELEV 400.00 00 00 N �t W gg cn Od N °D Q r- a =11�c =�ZZ 0+00 0+00 0+00 ?a� M \ \ �� \ 91.37 151n.RC DESIGNEDI/CALC.: RBF SCALES: 1 =30 SCHORIZ., VERT. 1` #5 0 8" O.C. EACH WAY TYP. CHECKED,: DRAWN: MBL !3OT.i■s 96" SCALE: 1"-30# RETENTION PIPING IS TO HAVE WATERTIGHT RUBBER ALL MANHOLES GREATER THAN 4' BELOW DATE: 08110105 GASKET IN JOINTS. CONSULT VENDOR FOR GASKET EXISTING GRADE ARE TO BE PLACED ON SAFETY Y JOB NOS• 1525.0 AND INSTALLATION REQUIREMENTS. SUMP PUMPS ARE SLAB OR PLATE. SAFETY SLAB TO BE AS SHOWN 0 0 0 0 0 0 0 0 0 0 J TO ACTIVATE ONLY WHEN WATER IN STORAGE IS TOIN DETAIL. SAFETY PLATE TO BE PL 1"x96"x8'-0' BE USED FOR CAR WASHING ON THE DISPLAY LOT. SAFETY SLAB SHEET 2 OF 2 NOT TO SCALE 3" CLEAR O O) � O O "t REVISED: r r; 0+00 0+00 1+00 2+00 0+00 0+00 1+00 0+00 0+00 0+00 ?a� M I STORAGE LINE �� PHASE I OUTLET A PHASE PHAPHASE I INFLOW B SEI INFLOW SCALES: 1"=30' HORIZ., 1"=5' VERT. SCALES: 1"=30' HORIZ., 1"=5' VERY. SCALES: 1"=30' HORIZ., 1"=5' VERT. 1 A"=5 PHASE II OUTLET PHASE II STORAGE LINE PHASE II INFLOW SCALES: 1 "=30' HORIZ., 1"=;5' SCALES: 1 "=30' HORIZ., 1 "=5' VERT. SCALES: 1"=30' HORIZ., 1"=5* VERT. 2' DESIGNEDI/CALC.: RBF SCALES: 1 =30 SCHORIZ., VERT. #5 0 8" O.C. EACH WAY TYP. CHECKED,: DRAWN: MBL !3OT.i■s 96" SCALE: 1"-30# RETENTION PIPING IS TO HAVE WATERTIGHT RUBBER ALL MANHOLES GREATER THAN 4' BELOW DATE: 08110105 GASKET IN JOINTS. CONSULT VENDOR FOR GASKET EXISTING GRADE ARE TO BE PLACED ON SAFETY Y JOB NOS• 1525.0 AND INSTALLATION REQUIREMENTS. SUMP PUMPS ARE SLAB OR PLATE. SAFETY SLAB TO BE AS SHOWN 0 0 0 0 0 0 0 0 0 0 J TO ACTIVATE ONLY WHEN WATER IN STORAGE IS TOIN DETAIL. SAFETY PLATE TO BE PL 1"x96"x8'-0' BE USED FOR CAR WASHING ON THE DISPLAY LOT. SAFETY SLAB SHEET 2 OF 2 NOT TO SCALE 3" CLEAR