Loading...
HomeMy WebLinkAboutWPO202200002 Preconstruction Form 2023-03-22ix Ai Request for Pre -construction Meeting and Grading Permit -+ '_ r .� from Albemarle County — VSMP ,;. ` ..,. tax.,.,. Approved Plan Number: WPO- 202-2-00002 DEQ Permit # (if applicable): VAR10- C'60 b Approved Plan Name: N6 r-i'ti I%1 'ta. S e c-'Ae...--. Z (Plans must be approved prior to a pre -construction meeting.) Bond approved date: Z l 21 % Z3 (Bonds must be approved and posted prtor to a pre -construction meeting or permit.) Responsible Land Disturber: [� Print Name: DrW `) � N) TC, 4f ZL State RLD Number: aL D M 0 0 Q Address: City: State: Vk Zip: ZZ fO I Daytime Phone: 69q sbD gZ�� E-mail: tj 4V1O� 507 ua5$t G . Primary Contractor: Print Name: CUI/ I (S 60,•s: Address: G M City: (I jes4 PO1�+ State:V✓1— Zip: Z3 Daytime Phone: O$) � yq E-mail �. e� 1�� G UJ 1 15 Cfiv1 l�tr 90+ — T Permit Issuance Fees (Request must include payment) [Code §17-708]: Total acres proposed to be disturbed as shown on the approved plan and application: o17.4JY Acres Acres to be Disturbed Total Fee Due for Grading Permit Total Fee = (Application Fee +4^"/ Technology Surcharge) Less than 1 $74.88 ($72 + $2.88 Single -Family Dwelling only — $74.88 less than 5 ($72 + $2.88) 1 and less than 5 acres $700.96 $674 + $26.96 5 and less than 10 acres $881.92 $848 + $33.92) 10 and less than 50 acres $1,167.92 $1,123+ 50 and less than 100 acres 1,58 .84 $1,521 + $60.84 100 acres and more , $2,395 + $95.80 Annual maintenance fees are assessed in arrears on April 1 each year or portion of a year that this permit is active [Code § 17-2081. 7/1/14, Revised: 8/29/14, 10/18/18, 7/l/2021, 7/26/2021, 9/15/2021 Page 1 oO Person(s) attending the Pre -construction Meeting: Names (type or print) Firm Contact Number or email The second part of the application fee is required to be paid with this request. This fee amount is: FOR OFFICE USE ONLY Permit Issued Date By who? 7/l/14, Revised: 8/29/14, 10/18/18, 7/1/2021, 7/26/2021, 9/15/2021 Page 2 of