HomeMy WebLinkAboutARB202300026 Staff Report 2023-04-13Figure 1: Location of the proposed development.
12
Figure 2a: View of a portion of the cleared/graded site with buildings under construction in early Spring.
Figure 2b: Trees along the Interstate in the summer months screen the view of the site from the EC street.
13
11FfiNF33CN001 a<CNMLOT1FSVli2 MCNtFFC7u"LE"W
KMf Ifsā¢