TO: W. Thomas Muncaster
FROM: Yolanda A. Hipski, Planner`
DATE: March 16, 1995
RE: Site Review Committee Comments - SUB-95-026 -
Rivanna Ridge/Woodburn Ridge Final Plat
The Site Review Committee reviewed the above referenced plan/plat on
March 16, 1995. Pertinent comments from the following agencies are attached:
o Planning Department - contact Planner - 296-5823
• County Engineer & Watershed Resources Management - contact
Glenn Brooks/Don Franco - 296-5861
• Fire Officer - contact Jay Schlothauer - 296-5832
o Service Authority - contact Pete Gorham - 977-4511
o Health Department - contact Gary Rice - 972-6259
o Virginia Department of Transportation - contact
Bill Mills/John DePasquale - (703) 829-7547
• Soil Conservation Service - contact Gordon Yager - 296-9337
• Zoning - contact Janice Sprinkle - 296-5875
The Committee's comments will reflect information available at the time the plan/plat
was reviewed, but should not be considered final.
Please revise the plan/plat to include the attached comments and submit seven (7) full
size copies and one 11" x 17" copy of the revised plan/plat no later than 5:00 p.m.
March 27, 1995.
Site Review Comments - Rivanna Ridge/Woodburn Ridge Final Plat
Page 2
March 16, 1995
No plan/plat will be approved administratively or scheduled for Planning Commission
review until all necessary information and items marked with ** on the comments are
submitted, in a form satisfactory to the Director of Planning and Community
Development.
Provided that you meet the stated deadline for revisions, and the revisions are
satisfactory, your plan/plat will be reviewed under the Planning Department's
administrative review process unless the plan is appealed by a member of
the Planning Commission or Board of Supervisors or an adjacent property owner
by March 27, 1995. If necessary the application would be heard by the Planning
Commission on April 18, 1995, 7:00 p.m.,Meeting Room #7, Second Floor County
Office Building, 401 McIntire Road. THE APPLICANT OR REPRESENTATIVE
MUST BE PRESENT AT THE PLANNING COMMISSION MEETING.
The Planning Commission will not review plans/plats which occasion sight distance,
grading, or other easements (excluding those for public utilities), without evidence from
the developer that permission is obtainable. This evidence must be submitted by the
revision deadline for this item to proceed to the Planning Commission at the above-
noted date.
In such case in which the developer does not revise the plan to include
recommendations of the committee, the developer shall submit in writing to the agent
by the revision date a statement as to the reasons and justification for not incorporating
such recommendations in the revised plan.
Thank you.
YAH/blb
cc: Wendell Wood
SITE REVIEW COMMENTS -SUB-95-026 - RIVANNA RIDGE/WOODBURN RIDGE
FINAL PLAT
The following items must be addressed by the revision deadline March 27, 1995, in
order to be eligible for administrative approval or to remain tentatively scheduled for
Planning Commission review on April 18, 1995. If you choose not to incorporate a
comment of the Site Review Committee, you should submit a written justification
detailing the reason the revision was not made. All information, studies, maps,
arguments, or other materials which you wish to be considered by the Planning
Commission must be submitted in writing to this Department no later than the revision
deadline. Information submitted after this date or during the public hearing will not be
considered by the Planning Commission in its deliberation. If the plan is not
resubmitted by the revision deadline, your item will be removed from the Planning
Commission's tentative agenda and rescheduled after this Department has had an
opportunity to review the revised plan.
** 7. Please renumber the lots so there is only one number assignment to each lot.
*'Y2°°/ Please revise the title to include Rivanna Ridge/Woodburn Ridge.
N.
**3. Please add the note stating that parts of lots located on Parcel 30 are subject to
acquisition for a greenway as proffered in ZMA 89-23 River Heights Associates.
**e. / This Department has been advised by the County Attorney that we can require
neither the alternative 10 bypass alignment nor the additional right of way along
Rio Road. This department recommends that the applicant consider these
'5 CV/
requests since they would be in the tax payers best interest.
04a**y Consider deleting the temporary cul-de-sac since completion of Rivanna Ridge
Q Road is only an additional one hundred (100) feet.
boo **�6r` This item must go back to the Planning Commission in order to allow for private
O roads. As was previously done, please submit your request in accord with
section 18-36 of the Subdivision Ordinance.
)5
v *7. Show the reserve area on lot 1 of the Rivanna Ridge Section.
0
** .. Confirm with the Zoning Department that you do not need a twenty five foot (25)
setback from the access easement to cemetery located on lot 1 of the Rivanna
Ridge subdivision.
**9. Address comments from all other agencies. If you choose not to incorporate a
comment, submit a written justification as to why the comment was not
addressed.
**10. Submit an 11 X 17 inch reduction of the revised plan.
rl RECEIVED
MAR l91995
COMMONWEALTH of VIRGINIA Planning Dept.
DEPARTMENT OF TRANSPORTATION
P 0 BOX 2013
DAVID R. GEHR CHARLOTTESVILLE,22902-2013 A.G.TUCKER
COMMISSIONER RESIDENT ENGINEER
March 8, 1995
Site Plan Review Meeting
March 16, 1995
Ms. Yolanda Hipski
Department of Planning &
Community Development
401 McIntire Road
Charlottesville, VA. 22902
Dear Ms. Hipski:
The following are our comments:
(SDP-95-015) Branchlands Village, Phase 2 Preliminary Site Plan, Rt. 866
No comments, development is served by private roads.
(SUB-95-026) Rivanna Ridge Final Plat, Rt. 631
1) Plat should indicate tie in to proposed centerline of Route 631. (See
attached copy of plan)
2) Recommend right of way dedication to accommodate proposed improvements to
Route 631.
3) The proposed subdivision is located in the path of the proposed Route 29
Bypass (also known as Alternative 10) .
4) Upon approval, the applicant will need to acquire a permit for the
entrance and improvements.
(SUB- - ) Woodburn Ridge Preliminary Plat, Rt. 659
1) The proposed subdivision is located in the path of the proposed Route 29
Bypass (Alternative 10) . Lots 1,2, & 3 will be affected.
2) Plan was previously approved for entrance design.
3) Applicant will need to apply for a permit prior to beginning work with the
right of way.
i
TRANSPORTATION FOR THE 21 ST CENTURY
• Sof A
1111
COUNTY OF ALBEMARLE
Department of Inspections
401 McIntire Road
Charlottesville, Virginia 22901-4596
(804) 296-5832
RECEIVE
MEMORANDUM *$ .91995
Planning Dept.
To: Yolanda Hipski - Planner
From: Jay Schlothauer - Deputy Director of Inspections`
Date: March 8, 1995
Re: Rivanna Ridge/Woodburn Ridge (SUB-95-026) (95-00317)
The Inspections Department and the Fire/Rescue Division have no comments.
JS/js
cc: file
COUNTY OF ALBEMARLE
pgALy�
��� ";,I RECED
IVE
.A . #ty-o .r- 4 1 41995
�� „,v,
pl9rnar;9 DO -.
MEMORANDUM
TO: Yolanda Hipski - Planner
FROM: Glenn E. Brooks - Civil Engineer II Tr,
DATE: 10 March 1995 �9'
RE: Site Review Comments
Rivanna Ridge and Woodburn Ridge, Preliminary and Final Plats
Watershed Boundary - South Fork Rivanna River watershed, South Fork Rivanna Reservoir
subwatershed, unnamed intermittent tributary drainage basins.
Streams/Watercourses - Four unnamed intermittent tributaries to the South Fork Rivanna
Reservoir.
Wetlands - There are potential wetlands associated with the streams.
Water Resources Ordinances - The Water Resources Protection Areas Ordinance and the Runoff
Control Ordinance apply.
A preliminary plat for Rivanna Ridge was approved by the Planning Commission on 8 March
1994, and a preliminary plat for Woodburn Ridge was approved on 14 Dec. 1993. Those
approvals have now expired. Albemarle County Engineering cannot recommend final approval
of the plats until the following required items are satisfactorily addressed. Where possible, each
item is preceded by the applicable section of the Subdivision Ordinance.
1. Location and dimensions of proposed...easements [18-52(e)] On Rivanna Ridge, indicate
the lengths of the permanent drainage easements through lots 4, and show dimensions to
property lines or corners to establish locations.
2. In addition to the requirements of the preliminary plat and plans [18-55] On Rivanna
Ridge, show the property lines north of the entrance on State Route 659 and T.M.45-28.
3. Plans and specications...shall be prepared by a certified land surveyor, to the limit of his
license or licensed engineer[18-51] Have the plats sealed, with date and signature, by a
•
Site Review Comments
10 March 1995
Page 2
qualified professional.
4. The final plat shall include...Temporary cul-de-sacs where needed. [18-55(l)] Show and
specify the dimension of the temporary cul-de-sac on Rivanna Ridge Lane.
5. Location and dimensions of proposed...easements [18-52(e)J On Woodburn Ridge,
indicate the lengths of the permanent drainage easements through lots 3, 4 and 11, and
show dimensions to property lines or corners to establish locations.
In addition, final plat approvals will be subject to the following conditions.
a. VDOT approval of entrance locations and right-of-way improvements.
b. Albemarle County Engineering approval of an Erosion Control Plan.
c. Construction and/or bonding of the roads in accordance with the approved final private
road plans.
Please contact me at your earliest convenience if you have questions regarding these comments
or require additional information.
GEB/sms
Copy: SUB-95-026
SUB-93-003
COUNTY OF ALBEMARLE
��QE ALi
ffil
MEMORANDUM
TO: Glenn Brooks ( l �
FROM: David Hirschman - Water Resources Manage p'
DATE: March 8, 1995
RE: Woodburn Ridge & Rivanna Ridge
The above-mentioned plats border and drain into the South Fork
Rivanna Reservoir. Since the developments create less than 5%
impervious cover, a Runoff Control permit is not required.
However, due to the sensitive location of the proposed
developments, I strongly recommend the voluntary use of runoff
control structures.
The proposed developments each have man-made channels to convey
runoff from the roads into intermittent streams that feed the
reservoir. The use of check dams in these channels would slow down
storm flows and allow sediment and some nutrients to settle out.
Check dams would be appropriate measures to control runoff for
these sites. If check dams are constructed, they should conform to
the specifications in the Virginia Erosion and Sediment Control
Handbook, but should be permanent structures. Check dams cannot be
required through the Runoff Control Ordinance for these
developments.
/djh
copy: Bob Shaw
4111
ALBEMARLE OUNTY SERVICE AUTHORIT Y
MEMO
TO: Yolanda A. Hipski , Planner
FROM : Peter C. Gorham, Civil Engineer II
DATE: March 16, 1995
RE: Site Plan Technical Review for: Woodburn Ridge Preliminary Plat
The below checked items apply to this site. (TM 45 , Parcel 29 )
X 1. This site plan is//iawithin the Authority's jurisdictional
area for:
A. Water and sewer
B. Water only
X C. Water only to existing structure
D. Limited service
2. A inch water line is located approximately distant.
3. Fire flow from nearest public hydrant, located distant
from this site plan, is gpm+ at 20 psi residual.
4. A inch sewer line is located distant.
_ 5. An Industrial Waste Ordinance survey form must be completed.
6. No improvements or obstructions shall be placed within existing
or future easements.
7. and plans are currently under review.
2. and plans have been received and approved.
9. No plans are required. `
19. Final and plans are required for our review and
approval prior to construction.
11. Final site plan may/may not be signed.
12. RWSA approval for water and/or sewer connections.
Comments:
The site plan does not show or incorrectly shows:
meter locations water line size
water line locations sewer line size
sewer line locations expected wastewater flows
easements expected water demands
ALBEMARLECOUNTY SERVICE AUTHORITY
MEN/ 0
TO: Yolanda A. Hipski , Planner
FROM: Peter C . Gorham, Civil Engineer II
DATE: March 16 , 1995
RE: Site Plan Technical Review for: Rivanna Ridge Final Plat
The below checked items apply to this site.
(TM 45, Parcels 25 , 30)
X 1. This site plan isAaXMIECwithin the Authority's jurisdictional
area for:
A. Water and sewer
B. Water only
X C. Water only to existing structure
D. Limited service
2. A inch water line is located approximately distant.
_- 3. Fire flow from nearest public hydrant, located distant
from this site plan, is gpm+ at 20 psi residual.
4. A inch sewer line is located distant.
5. An Industrial Waste Ordinance survey form must be completed.
6. No improvements or obstructions shall be placed within existing
or future easements.
7. and plans are currently under review.
8. and plans have been received and approved.
9. No plans are required.
19. Final and plans are required for our review and
approval prior to construction.
11. Final site plan may/may not be signed.
12. RWSA approval for water and/or sewer connections.
Comments: _ I
The site plan does not show or incorrectly shows:
_ meter locations water line size
water line locations sewer line size
sewer line locations expected wastewater flows
easements expected water demands
Project 95-0317 ( SUB-95-026)
I
COUNTY OF ALBEMARLE
(-,..iiiir. RECEIVED
MAR ,9 1995
Panning Dept.
MEMORANDUM
TO: Yolanda Hipski, Planner
FROM: Larry W. Davis, County Attorney 244;2-
DATE: March 9, 1995
RE: (SUB 94-026) Rivanna Ridge/Woodburn Ridge Final Plat
This is in response to your memorandum to me dated March 9, 1995
regarding the above referenced subject.
It is my opinion that the County cannot require reservation of the right-of-
way for the Route 29 (Alternative 10) bypass unless the need for the right-of-way is
substantially necessitated by the subdivision or the County (or VDOT) is prepared to
initiate condemnation proceedings to take the property and compensate the owner. This
is consistent with Mr. St. John's opinion given to staff in 1993. Of course, the County
can request the reservation in the hope that the landowner will voluntarily reserve the
right-of-way recognizing that if the bypass is built that its impact on the development
would be better planned by reserving the right-of-way.
On the greenway issue, the proffer clearly says that "upon demand" the
County can require the dedication of a minimum of a 100 foot strip for a pathway along
the reservoir frontage. If the County is prepared to identify the property which will be
demanded for dedication, it is my opinion that the property can be required to be
reserved for that purpose on the subdivision plat.
If you need additional clarification, please contact me.
LWD:rcs
94-068 001
COUNTY OF ALBEMARLE
f°;:i AI
MEMORANDUM
TO: Yolanda Hipski, Planner
►-L�--cam.
FROM: Jan Sprinkle, Zoning Assistant 06'
DATE: March 13, 1995
RE: Rivanna Ridge (including Woodburn Ridge) Final Plat
I have reviewed the subdivision preliminary and final plats and have no comments.