Loading...
HomeMy WebLinkAboutWPO201500047 Preconstruction Form 2015-12-17 Request for Pre-construction Meeting and Grading Permit ,<4,13 from Albemarle County Ilt Approved Plan Number: WPO- Z.0/5- - doOy7 Approved Plan Name: —Mc /3 n>IT e- 1 c Of" (Plans must be approved prior to a pre-construction meeting.) Bond approved date: 4/7//5 (Bonds must be approved and posted prior to a pre-construction meeting or permit.) Responsible Land Disturber: Print Name: A4.i114n All U State Certification Number: £2LD Address 4223 1/9Sv/fie I �� U City Q/ S h/4 g /ni4 State Y/ Zip 2293,c Daytime Phone(y3 y ) '/6G -7�/Y E-mail nakdI'Tcr/re(&g/Yfd/t Coit Primary Contractor: Print Name 'Perri, Oa, 1rJin RnI LUYI Y Ok Address V2-Z3 la1,14G /e City 6(18.5 /IL State Of Zip 2213.6 Daytime Phone( ) �(p4"7// E-mail iQ/a r1err mu/. evoi Permit Issuance and First Year Maintenance Fees: (Request must include payment) Total acres proposed to be disturbed is contained on the approved plan and application: VSMP: Acres to be disturbed Fee Due at Grading Permit Less than 1 $63.80 1 and less than 5 $594.00 5 and less than 10 $748.00 10 and less than 50 $990.00 50 and less than 100 $1,342.00 100 and more $2,112.00 For plans exempt from VSMP,VESCP fees were paid with the application. 7/1/14,Revised:8/29/14 Page 1 of3 Person(s)to attend the Pre-construction Meeting: Names(type or print) Firm Contact Number or email bre" ad ,4nn ,darken Amite utt 4)►5 1 /va f! Phis Ph terra. WY- 44-goy /*4 w' Crane. Pr/trrh '/3 y- 9$/ - '/96/ Chad /Gt,vS a+l i na oe. V.3Y -531 - /273 The second part of the application fee is required to be paid with this request. This fee amount is; FOR OFFICE USE ONLY Permit Issued Date By who? 7/1/14,Revised: 8/29/14 Page 2 of 3 6I-C R-(4,ef-vo_-1/0.4 la (( , ntr\e ,e, Sf C-v ‘at,e.1 UA- Oackl 6 (5 - fo6 .. ) �c&