Loading...
HomeMy WebLinkAboutVA200300011 Other 2003-10-27 FIELD WORKS Project AL0310 P 1 of 5 SOIL SUMMARY REPORT Date: 10/27/2003 Submitted to Albemarle County Health Department Applicant:Brenda Moon Telephone:(434)831-2419 Address:8781 Howardsville Turnpike Schuyler,VA 22969 Owner: same Address: Location:East of Route 800,0.6 miles south of Route 6 Tax Map: 126-34 Position in landscape:upland Slope:4% Depth to rock or impervious strata: Max.: 72"+ Depth to seasonal water table:none encountered Estimated Soil Percolation rate:40 minutes per inch Texture Group: II Installation Depth:54" DESIGN BASIS A. Estimated Percolation Rate:40 minutes per inch B. Trench Bottom: 54" C. square feet required per bedroom: 314 C.(350 gallons per day) 2 bedroom+store(2 employees-no public restroom)209 square feet/100 gals. AREA CALCULATIONS Reserve D. Length of trenches: 50' E. Width of trenches: 3' F. Number of trenches: 5 G. Center-to-center spacing: 9' H. Width required: 39' I. Total square footage required: 731.5 J. Square footage in design: 750 K. Is reserve area required? Yes(100%) SOIL EVALUATION: ,n Site P 3 of 5 SOIL PROFILE DESCm.TIONS FIELD WORKS JOB#:AMO310 Hole# Horizon Depth tint Description Texture Group Comment SP1 20"to rock exclude 30"to rock- high shrink-swell exclude 18"to rock exclude spa A 0-5 Olive Brown (2.5Y 4/4) Loam II Bt 5-24 Strong Brown (7.5YR 5/6) Clay, slightly sticky, IV slightly plastic BCt 24-40 Strong Brown (7.5YR5/6) Clay Loam, friable, III increasing Loam C 40-72 Strong Brown (7.5YR 5/6) Loam, very friable II $p5 A 0-4 Yellowish Brown (10YR 4/6) Loam II exclude Bt 4-24 Yellowish Red (5YR 5/6) Clay, slightly sticky, IV slightly plastic Ct 24-40+ Olive Brown (2.5Y 4/4) Loam, common Light Olive II w/ IV Brown (2.5Y 5/3) Clay plugs, Dark Grayish Brown (10YR 4/2) mottles and few fine Red (10YR 4/8) iron concentrations Sp" A 0-5 Dark Yellowish Brown (10YR 4/4) Loam I I Bt 5-26 Strong Brown (7.5YR 5/6) Clay, slightly sticky, IV slightly plastic C 26-72 Strong Brown (7.5YR 5/6) Loam, very friable, 5% II schistose rock fragments from 55" sr/ 24"+ shrink-swell, highly plastic exclude Spa A 0-5 Dark Yellowish Brown (10YR 4/4) Loam II Bt 5-33 Strong Brown (7.5YR 5/6) Clay, slightly sticky, IV slightly plastic C 33-72 Strong Brown (7.5YR 5/6) Loam, very friable II spa A 0-4 Dark Yellowish Brown (10YR 4/4) Loam II Bt1 4-28 Strong Brown (7.5YR 5/6) Clay, slightly sticky, IV slightly plastic Bt2 28-36 Strong Brown (7.5YR 4/6) Silty Clay Loam, friable III C 36-72 Strong Brown (7.5YR 5/6) Loam/Very Fine Sandy II Loam, loose FIELD WORKS Project: AL0310 P 5 of 5 CERTIFICATION STATEMENT County: Albemarle Date: 10/27/2003 Property Identification: Moon Property- TM 126-34 Submitted by: James P. Fulcher CPSS 3401 000079 This is to certify according to 32.1-163.5 of the Code of Virginia that work submitted for the referred property is in accordance to and complies with the Sewage Handling and Disposal Regulations of the Virginia Department of Health. I recommend an approval for reserve area design be issued. Soil Consultant: Date: 10/27/2003 James Fulcher PO Box 1502 Amherst, VA 24521 (434)277-9620 OCT— 9-03 THU 19 :4? THE RED DOOR 80 "--90213 P. 02 American Ele ewer PO Box 2021 Roanoke,VA 24022-2121 AMA*il'eAN. ;LEC)I'1! ;fC POWER Ms. Brenda Moon 8781 Howardsville Turnpike Schuyler, VA 22969 October 8,2003 RE: PROPOSED SEWAGE DISPOSAL SYSTEM 8429 Schuyler Road, Schuyler,VA Map No. 3879-812C,Easement#12 dated 6-27-1967 Between poles 812-C-71 and 812-C-127 Dear Ms.Moon: Appalachian Power Company hereby grants permission for your proposed installation of 8 sewage disposal system within Appalachian's right of way, but subject to the following conditions, Your installation of the sewage disposal system within Appalachian's right of way will constitute your acceptance of and agreement to abide by these conditions: 1. That the installation and existence of said sewage disposal system shall not interfere with the rights of Appalachian to operate and maintain its facilities. 2. That no grading or excavation shall be done within five (5) feet of Anpalachian's poles, structures, guy or anchors. 3. That Brenda Moon will assume liability for any and all damages done to Appalachian's facilities while engaged in the construction, installation, operation or maintenance of the sewage disposal system. 4. Should it become necessary for Appalachian to relocate its facilities within its right of way, and said relocated facilities will now fall within the area of the sewage disposal system, Brenda Moon will promptly aba>udon the sewage diepocal eyetem or remove it to another location on receipt of written notice of Appalachian's intent to relocate its facilities. Appalachian will not be responsible for any damage done to the sewage disposal system in the course of relocating its facilities. 5. Brenda Moon releases Appalachian in advance from any liability of whatsoever kind or nature for damage to the sewage disposal system arising out of or resulting from Appalachian's use of its right of way, including without limitation Appalachian's trucks and other equipment driving across the area where the sewage disposal system is located. In addition to the above,extreme care should be exercised by everyone working under or adjacent to Appalachian's facilities. iris ely, d191A-A-- R d H.Payne Right-of-Way Coordinator Charleston Region This document(Including any attachments)contains confidential lnfo oration Intended fora specific individual end purpose,end is protected by law. if you ane not the Intended recipient,you should destroy Chia document end are hereby notified that any disclosure, copying or distribution of this document,or the taking of any action based on if.is strictly prohibited. American Electric rower 3 ,p w FF°r I J tv I P4of5 i Proposed Reserve Drainfield \� I TM 126-34 I 1 i SITE SKETCH Scale: 1"= 100' 1tu ty FIELD WORKS Project AL0310 l �� ( N li ra3\ a'x emei u~N4�a�' r d 1- •�, rNpry0 �� Q0). N .1 �mI�VS CQw \ \ — Zti drOzO os !r', - VI is.\ ->-.<12 0- '-' I I 7 •ri'CYQ ems'` 11 \TP.<4 \\ co � 1 \gym\ ) 1 \ NA ?� `fir N, N. \- \ 0 — 41.1 40- \ 4. I r' Eu'i / l'..II" --------______ , f 3,. ..c. -- ... ,,,,. • ''�,da•p SBI 'i t 'o vQ. r 0 3 lik: Z''.:7 ° 744 Crk , , • 111- 8 --- itt [1 /- g• '1r .Clf — to N� \ ti N