Loading...
HomeMy WebLinkAboutZMA201000017 Study 2012-03-08ER TRAFFIC IMPACT STUDY Redfields Phase 5 Residential Development Albemarle County, VA Prepared for: Collins Engineering Prepared by: Charles Smith, PE, PTOE Bill Wuensch, PE, PTOE Engineering & Planning Resources Charlottesville, VA June 2011 TABLE OF CONTENTS 1.0 Project Overview 2.0 Background 3.0 Future Year Traffic Volumes 4.0 Intersection Capacity Analyses 5.0 Summary LIST OF FIGURES Figure 1 Vicinity Map Figure 2 Existing Peak Hour Volumes Figure 3 Year 2013 No Build Peak Hour Volumes Figure 4 Traffic Distribution Percentages Figure 5 Site Trip Generation Figure 6 Year 2013 Build Peak Hour Volumes Figure 7 Year 2013 Build LOS LIST OF TABLES Table 1 Site Generated Traffic Table 2 LOS & Delay Thresholds TECHNICAL APPENDICES Appendix A Site Plan Appendix B Traffic Count Data Appendix C Intersection Capacity Analysis Worksheets — Existing Scenario Appendix D Intersection Capacity Analysis Worksheets — Year 2013 Build Scenario 1.0 PROJECT OVERVIEW This technical memorandum summarizes the work effort undertaken by Engineering & Planning Resources, P.C. (EPR) for Collins Engineering (Collins) to document the traffic impacts of the Redfields Phase 5 residential development. The proposed development is located just south of I- 64 (between Exit 118 and Exit 120), off of Sunset Avenue Ext. As proposed, the site includes 39 single family homes and 87 townhomes. The site is proposed as an additional phase of the current residential development served by Redfields Road; therefore, Redfields Road will provide access to this new phase as well. Figure 1 shows the site location and a vicinity map. The purpose of this traffic study is to evaluate traffic distribution and potential traffic impacts at three adjacent intersections along Sunset Avenue (Mountainwood Road, Redfields Road and Country Green Road) near the proposed development. 2.0 BACKGROUND The proposed development is located just south of I -64, off of Sunset Avenue, as part of the existing residential community served by Redfields Road. Sunset Avenue, Mountainwood Road, Redfields Road and Country Green Road are all two lane roads serving primarily residential uses. All three of the study intersections are "T" intersections. At Mountainwood Road and at Redfields Road, the side street is controlled by a STOP sign. The Sunset Avenue and Country Green intersection is All Way STOP controlled. Figure 1 is a vicinity map of the project area. A site plan (from Collins) is provided in Appendix A. Traffic Volumes Peak hour turning movement counts were conducted at the three study intersections on Wednesday, June 1, 2011 and Thursday, June 2, 2011. The counts were performed during the AM peak period (7:00 AM — 9:00 AM) and during the PM peak period (4:OOPM — 6:00 PM). The existing peak hour volumes are illustrated in Figure 2. The turning movement count data sheets are provided in Appendix B. It is important to note that the counts were performed after immediately after the end of the spring semester, thus the counts might be slightly lower than would have been with the University in session. The larger of the peak hours summed up to 399 vph, which would translate to 4,433 vpd assuming a "k" factor of .09, or 3990 assuming a "k" factor of .1. The VDOT traffic count database indicates that the 2009 ADT for Sunset Avenue is 4,600 vpd (no "k" factor listed). By comparison, the project TMCs may be between 4% and 13% lower than would have been with the University in session. Also worth noting is that the JPA bridge is out of service, therefore the distribution of traffic could have been skewed away from Old Lynchburg Road (into the City) with more traffic traveling to and from 5` Street Extended. 3 REDFIELDS PHASE 5 R IR TR AFFIC IMPACT S TUDY 5.1`.r 1 „s"..' . ontar O ' yr '' ' x F H y . •.+ f " ,„rr d,.. 11-, ,'Y., ilh * 'F„* y414°' a v' Y .- f., - dtu• - ' . " - ` a y " i t^'t r 4 y y . t 4.. «rk h a t 4 t"XT 4:1*.`"1t T t 4 JO f may ° mac " ' ` x t y« 'R a i x T. 4- , 'n' +IAA . i € 4 t r k. i ate a T[ l '. 7 x Y r r f rr'ai " p-s A s : :71 , ry tom , , ym., 1 S0 Rip I ag ryDefe- 7ti3 2 j ,. - *, , vertt, :,,, .2,41.1 ....:4 ,,, ***: di, t 11 fie _t",,i„ 44‘4,... 1* 411ft4E • 0 'n , , g 4 i. , Sf1 @tMr00d Md , , ' eiti,r db- s ViUes 4" ',- them - * 4 C :;:"a r c gy ,L.k .r i i ic.r w 5 Ste 3F ig ji It,,P , 3 t tm 9e 201t COmmanwe ithul til rq nl C).;0.14''''''',C C D11 Europa h.4 lapl s 2° a ImaperyDele t2 31'2tM8 1951 38'00'28.0' N 76`3 Pa6 35 W alev 5071 l EYe`N5772 g . N Figure 1D' Cl Vicinity Map 4 REDFIELDS PHASE 5 EPR TRAFFIC IMPACT STUDY 59) 15)t 127 43 19 (65) 1 7) 1 r Mountainwood I 35 6 76) 8) 3) (64) Ch 4 133 5 Redfields 5) 6 70) 159 41 40 116) 79) Site 122) (16) 270 23 t 18 (54) 1 L. 1 (20) Country Green I r 62 3 207) 14) Figure 2t' 11 Existing Year 2011 xxx(xxx) = am(pm) Peak Hour Volumes Peak Hour Volumes Not to Scale 5 3.0 FUTURE YEAR TRAFFIC VOLUMES Background Traffic For the purpose of this study, the build year was assumed to be year 2013. Given that there are no other new developments proposed in the study area, though there will be continued in -fill from an adjacent development, and there are no roadway connections that would generate background traffic growth, it can be assumed that any traffic volume growth would be very modest. As a conservatively high estimate, it was assumed that the background traffic would increase two percent per year to build year 2013. Figure 3 illustrates the resulting year 2013 no build traffic volumes in the study area. Proposed Site Trip Generation The trip generation potential of the proposed development was determined using data published in the Institute of Transportation Engineers' (ITE) Trip Generation Manual (8`" Edition). The resulting number of trips estimated to be generated by the proposed development is identified in Table 1. TABLE 1 Site Generated Traffic Vehicles Per Hour) ADT AM PEAK PM PEAK LOCATION IN OUT IN OUT 39 Single Family 437 9 28 28 17 Land Use Code 210) 87 Townhomes 570 8 38 36 18 Land Use Code 230) TOTAL NEW TRIPS 1007 17 66 64 35 Source: ITE Trip Generation Manual Traffic Distribution The projected traffic volumes generated by the proposed development were assigned to the immediate adjacent roadway network by examination of the existing traffic patterns in the study area. The current directional distribution into and out of Redfields Road was utilized for the site ingress and egress trips (as all site trips will utilize Redfields Road). The current turning percentages at Mountainwood Road and Country Green Road were then also applied to the site trips. Figures 4 and 5 illustrate the resulting trip distribution percentages and site generated trips. Figure 6 illustrates the projected year 2013 build traffic volumes. 6 REDFIELDS PHASE 5 EPR TRAFFIC IMPACT STUDY 61) 16)t 132 45 20 (68) 1 7 (7) Mountainwood Tr 36 6 79) 8) i) 3) 67) 4 138 5) 6 1 Redfields 73) 165 43 42 121) 82) Site 127) 17) 281 24 t 19 (56) 1 L. 1 (21) Country Green Tr 65 3 N 215) 15) Figure 3D' No Build Year 2013 xxx(xxx) = am(pm) Peak Hour Volumes Peak Hour Volumes Not to Scale 7 REDFIELDS PHASE 5 R TRAFFIC IMPACT STUDY 9% (3 %) Mountainwood 4% a) 3 %) 9%E Redfields 7 %) 4% 0 93 %) 96% 97 %) Site 83 %) (11%) 89% 8%T 21% (20 %) Country Green 71% N 77 %) Figure 4D' Traffic Distribution % o xxx(xxx) = am(pm) Peak Hour Volumes Or Distribution Percentage Not to Scale 8 REDFIELDS PHASE 5 EPRTRAFFIC IMPACT STUDY 1 (1) Mountainwood 1) 1)6, 1 Redfields 1) 1 16) 27 8 27) Site 14) (2) 25 2 2 (6) Country Green 6 N 22) Figure 5t'14 Site Trips xxx(xxx) = am(pm) Peak Hour Volumes Peak Hour Volumes Not to Scale 9 REDFIELDS PHASE 5 E & ' R TRAFFIC IMPACT STUDY 61) 16)t 132 45 20 (68) i 8 (8) Mountainwood 1r 36 7 79) 9) 4) (67) 5 138 Redfields 6) 7 t 4 89) 192 51 42 148) 82) Site 141) (18) 306 26 t 21 (62) 1 (21) Country Green Tr 71 3 237) 15) Figure 61:1/ fei Build Year 2013 xxx(xxx) = am(pm) Peak Hour Volumes Peak Hour Volumes Not to Scale 10 Background + Site) 4.0 INTERSECTION CAPACITY ANALYSES The intersection capacity analyses were performed using Synchro (version 6) per the methodology documented in the Highway Capacity Manual (HCM 2000) (Transportation Research Board, Special Report #209, Revised 2000). The HCM based calculations are reported in this report. Capacity analyses are utilized to determine a Level of Service (LOS) for a given intersection operating under either signalized or unsignalized control. The LOS is based on estimated delay and range from LOS A, the best, to LOS F, the worst. In general LOS A and LOS B indicate little or no delay, LOS C indicates average delay, LOS D indicates delay is increasing and noticeable, LOS E indicates the limit of acceptable delay and LOS F is characteristic of over saturated conditions. The actual delays associated with these levels of service are identified in Table 2. TABLE 2 LOS and Delay Thresholds UNSIGNALIZED SIGNALIZED INT. DELAY INT. DELAY LOS secs)secs) A 0 — 10 10 B 10— 15 10 -20 C 15 -25 20 -35 D X25 -35 35 -55 E 35 -50 55 -80 F 50 80 Source: Highway Capacity Manual Capacity analyses were conducted for each of the study intersections for existing conditions and year 2013 build conditions. All three of the study intersections are expected to operate satisfactorily with all movements operating at LOS A or LOS B during both peak hours given the build scenario. The build level of service is illustrated in Figure 7 on the following page. The HCM based intersection capacity analysis worksheets from Synchro are provided in the Appendix (existing in Appendix C and build 2013 in Appendix D). Also note that the traffic volumes for this study were collected after the University of Virginia had completed the spring semester. However, the capacity analysis results indicate that there is ample capacity remaining at the study intersections to account for any missing University related trips. Likewise, by inspection of the intersection /approach levels of service, if there is a shift in 11 the travel pattern resulting from re- opening of the JPA bridge, we would not expect to see a significant decrease in levels of service for any of the movements at the various intersection approaches. 5.0 SUMMARY Based on the analyses conducted, the proposed development will not have significant traffic impacts and no improvements are recommended. Regarding the distribution of new site trips across the immediate roadway network, as shown in Figure 4, it is anticipated that the site trips will replicate existing travel patterns and therefore the majority of the site trips will utilize Sunset Avenue out to Old Lynchburg Road (5 Street Extended) versus Mountainwood or Country Green. If the travel patterns shift with the reopening of the JPA bridge, since there is an abundance of available intersection capacity as demonstrated in the intersection analyses, we would not expect to see an overall adverse affect on any of the intersections considered in this study. 12 REDFIELDS PHASE 5 EPR TRAFFIC IMPACT STUDY A) A I_ A (A) Mountainwood A A) A) A 4- 4 Redfields A) B A A) Site A) A A (A) Country Green A N B) Figure 7t Build Year 2013 xxx(xxx) = am(pm) Peak Hour Volumes LOS Summary Not to Scale 13 Appendix A Site Plan iI' ni 1.' 4.. 1 v Z ZEIe.;. g7.i? 6) P. t, 1. 4. Z ril r 1 1, t ,,-.,, 4g3-;;','-- 27, 7.:-';' i i6,; .. I I 1 % 110 '-' 13 i ','' 6 F,... c2ii,7;', III '' 1 ' ' - Z 1 r, 4 / 911---- ''' -.- -,,,,. -"-------- ---- 0, v•,;. Pg 5.tel ND St74 0 Ed8R 7 • 6 r e r,- N ice'; 7 /_'\ f ' t5 S N H r - ''---.. 1 1 4 t . '''- '''' ' ' '''. - ''' - ' . • ' - E I; 1 - c_27. I. 1 i PI IV 1 / P x) 1 , q 'I' 1- 11- t J 41to i j. %,, V , 7 / 84 d-________,- / z c--- i r)':! 7 s,, N 1I i . i ---- f t F , 1 ( li . La 3-- C P s I': A 1 1 I= 4 i 1_ f A i 0 m - 1 I y ,,,,,.- , -, 1, \ ' \-\-. I 3' L/77 6 7 I I, I \ , , 7, \'- \ \ A 6, r• ':/ 6 - 1 „..., i _.: \ 1 1 _ :_, i - r , 0,, 2, Y• c,.' T. -.- 7. L- 7 ''- l ' r ----- i f 1. r. g ''' - ' '" ' V AI. ' • 14 a, 16,“' 7, F, I i67.24 t 11 r---- t., i T 44- 1111111411114k, , -" 4;:-,,,. 1 7 i 1 7' / 0 1 li 1 . 74,„_______ ) ---- ,, , -----; i '--- Ai-- .• '',- -- • ' \ s ‘ • .), E ;.' CI •-... ' ' ' 1--.•-- r r , n E FTT' \ \ 7 e r t--- ‹. 0 1 „ Ninlla 1 1 1 c)r 5 vlo - P , 1 1 1 I 6 • I ' 11 ' 1 Appendix B Count Data i6 0) N CO N 0) c V , h CO O) N OL- r O VD CO O O) O CO O O O0 LL 1-- N d p ' N OD V CW N OD N CV N0 V CD M N V N o o c- r.- - 0 N f 0) a) a 4- Q N 0/ to 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NCL. N r 5. L N c - O OM NNCn CV c V mN V 000 CO — D E o I O) o co o O N LL O 2 0 0) 10 r rr0OM 0) 0) r C p C\ l L0 N h N 6 OO N CD M VJ O r F T 0' `- ( 3) N 0 Of 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a z J Z 0 i LnN W InO O r- O) O) un Cn O) V M I O 0 co ^ 0 NI- N CO Ma) O 12 L. L (/) C/) CI. n D7 Qrn O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 a)a L N 3 5 „,, A L M r- Nt up 0 r co 7 N- N V N r N T O • NCO r0 -{ o O Q . • O N s Li O U 2 O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 i L 0. F F'' 0 T r r 6 N r- r In N O In O M 0 M OO O 0 J U U V O M Cn d' n M N O) O n U A M M CO O O CO O , O M p C M ( N IQ T 0 1 - N V O) aa ( B N .) N 000OO 00000 000 OOO V a ` a) a d 0) 0 m U) U r` y LL 2 0 0000 00000 0000000 J 3 rn LL 2 — O) O 2n 2n Ln o a) V r N ' 7 l'- L'? ,- Cn NLn MNNM O N u) CS) 0 O H V N M O) O N co O) CO O O O) M 0) CO J N N N Mc- N 00 M V N^ 6 N CT' 0 co a) m 0 0 0 0 0 0 0 0 0 0 O O O O O O 0Ha aQN 0 0 0 0 0 O O O O O 0 0 0 0 0 0 0 aa LtZ L O O O O O O O O O O 0 0 0 0 0 0 0 cn E 62 OLL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 rFOf 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a)JN 2E 2E 2E 2E 63 2E 2E 2E 2E 76 c6 o N N' Y Y aaaa o aaaCL 0 o U H o 0 0 v F o T-° v F 1- a o H H 0 0 0 0 ' 0 0 0 0 E. Q F>> >> T.$ 0 0 o N CO N 1 N- O CO O O M CO G C a m N CO d' M h CO o, Y- Y v CV CO CV o F 4) n.a N m 0 0 0 0 0 O' O C' d o. 00 ( V to L OONMu Q) d' Q VD D cn Q N a Q N L N( Ornm C/) cc) N m o0OOOOO E - a cu O J o Z 00Z Z 0 i m N CO N 0 ( 0 Q) : 1 J ( B F h Li_ (/) aQ 0 0 0 0 0 0 0 o O O O a' cn nr t f oOO 0 N e- r.... c7 N O ii. 0 cc N a 7 0 0 0 0 0 0 0 CI L O H L E. N In N- N 1 UCD oD0c U) N 0 o MMCOCOO M 0CO a iB a CO0OOOO V 0 o t a E n 1) N W L 0 0 0 0 0 0 0 J c( 2' 0 D r o oa 2 O) O ( n N O) ( n V L N M f 0 co F V Lo 00 000)(O InCO O N N M N N a j o J tr ., C 0 0 0 0 0 O o 0 CD 0 . d N - Q' Y6 0 C5 a a o 0 0 0 0 0 0 c a If 0 0 0 0 Z oo 000000'( m 0 0 X o C o a D a— 0 0 0 0 0 0 0 0 H o 0 0 0V 5 O N 0 E a5 0 0 0 o 0 0 0 0 J O L C 0 aN Nin 2 2 2 2 0 m a E aaa E i H Q o OLno - H c vo o n = o 0 o O m Q0 Y Y 0 ( O CU Nas ciL2D-u)Da)1)c0 N a) 0 0 0 0 NN U) 0 CO CO 4) N 0 E - a 4 1.6 0 Z U 0 z Sunset Out In Total i 1 34 195 329' u. (/) CO 0_ 0; 791 116' 0 Right Thru Left Peds C7 N o f d NO V — o d a i m O H o a o 1 o o L r t` a J C C in t o a O o 2 Z F m v 1 L o o 2' o y Q rti o B o F- rn V d' V N N N LL a x LJ 1 9a1 n 14 spad 0 i 49 I £ 0 1. 9 I. i i L9 49 letol ur 1n0 tasuns Q p CO CO O t` N Ln M O M M V V d1 0 ( f)( 0 O 6) N I— 06)( 0 N 0 M N M co O O co • ID C a)4' M( O(O M V LO6) r CO CO L C ) O N N M M { N V N r M u i N N N N / H N CO N 6) L_ l_ a a D an O O O O O O O O O O 0 0 0 0 0 0 0 as — r r.. N r O D N O a C CO N r Cr) or rM rooN n O( q > L O n O a) L N NM M 7- N CV 0/ 111 V CV r - CV OD 117N CC 0 F r r 01 o c o CO 0 t Z U CD 4= O O r 0 r 0 0 0 0 0 r V N r 0 0 0 J O O O Li- ( A( na. p V N C) O 6) N O O r M N O 2 ( O V 4 N M L() V V M V In N 6) 4 W cO r N N a aQ'rn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 aO 'CL t 0 3 N L M N W V o0 CO 0 O 6) ( 0 N- 6) M r O N M ( n M M M V N CO 6 N W r N N O V N 6) O CO • LL U O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 L Q H H OO r r r N ( 0 r N d' O t-- 0. 1 r ( O r t r M 0 r 7r r 0) O 0) N O Ti 0) CO O N O O 6) LC) 00 N O O CO r O N N N N r r r I M N, r 0 o a CO a a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 aQ) N f C LL o0000 00000 Oo00000 C CD: CO o'LL 0 MM N ( 0( O r6) 0)}N 00 M 6) N I- ( OM L r N r M LO V W u") O O H V 1 co r O«) N 7 6) Oh V O 01 t NNN( f)(0 N r M r r V N. 6 r ( O M 6 J L0 r 0) , p O O O O O O O O O O O O O O O O oHaaQN O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 aNCI- i L, I O L' O O O O O O O O O O 0 0 0 0 O' 0 0 a) O F LL 7 O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 LH O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 J0) 2222 2222 5 mo o 0) w E Q Q << O Q< Q O O O O D U O ( f) O ( f) H O ( f) O ( O I- H U 2, U U `` i_ O r CO V O r CO V 0 O O N 0 H H 0000t- CO CO 66 00 0 F2 Q H ' > o > > 03 CD O To O) - uuM V O d1 I 0 W CO C 0 O LC) M , T CO d' Td M M N V 01 M Q//) F LL a C u) 0 0 0 0 0 0 0 CB r 0 o N N CD d C CO N i r r rvrno U) r co CN 7 o CC N 1) CO CO N M 6 r- E 0 0 i r O7 Z 0 CD CU N co 0) JOD o N U VJ VJ La ' M O NOLC CO 0 LC) V CO V CO r a nQu) 0 0 0 0 0 0 0 0 O N O s a 73 = 1., N CO CO 6) V .. Zr m N co co M Lc) ' O CO C L_ N LL o 0 0 0 0 0 0 0 s o o CL F O L rNrNCO ( OO C J M r 1 U O N O Q r O m N N N r CO N m URSi a 1 N o o O o 0 o O L d E I Iii C/) y LLt 0000000 J C of o LL To O) o V M H V C O co sT O) O r CON C) l r M ct J I- m O O O o o coO p aQ - a)d Q O o 0 0 0 0 0 a 2 0 0 s Q M Co in o Z L'v 0000000 m o U) C7 C O C O O ._ Li m 2< Nm 0 0 0 0 0 0 0 O p o O O 0 U o N E 0 0 0 0 0 0 0 J 2 C o LL - W Q Q Q Q E p 2 Q O O Ln OLO - E M V o r O co = n n 1- CO CO > C1 0 0 0 0 0 ( p < Y F- Y o Q) Nas 2QD0D4)Ctc r- 3 —0 - N 0 CO CO N Mct CO M N N tv Z O p ZCD CO Sunset Out In Total 292 81 373 Or 40' 41! 0 Right Thru Left Peds S?7O o as Q o 0 i Q d o U A LT r CD O J D L N o),- In L O 2 z N N a co 2 CD H Y 5 2 F- 0 0' W N N N J O al EJ 4 Mal nit- 11 1462 1 sPad l EC I4 0 1781, 9El i 94 letol uJ - TnO tasuns 1 COOO N vNMO6) a_ o My ct CC) CO O CO O 0O) CIO F N d' o0 C0 ` N M O OD CV O) CV h CO CO v C F co N N N CO LO M CD a C a Do N O O O O O O o 0 0 o O O O 2 0a C m > 0) 0 CD N N - L 4MCntnr- N 0) 0 MNO) Cr) u o m co N co C O — ii D O N O) CO M LO O) 0- 0- m CV N CO Cfl COOC t wri F 7- rN O N 0 Of 00000 00000 000 0 CB o ca Z J Z04... a) L- m 0 0000 00000) 0 o a) F L . U) c!) Cl_ 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 a 0 ... CD 0 0 0 0 0 0 0 0 0 0 0 0 n LO E a O C a O o 0 0 0 0 0 0 0 0 O o 0 0 Q72 2 NU 0 0 0 0 0 0 0 0 0 0 0 0 0 CD ig C J oUN aN O T - VD O 00 O O) O v 0 M o N[ O MNNM d) c i U v 3 a n D a 01 0) 0 0 0 0 0 0 0 0 0 0 0 0 V a E m N W L up s,- M O M O N Cow COv I_ C/3 E m r- N o v co ° a Li_ i OD O) O vO) I- MM MNQD CV 10 M N N M CV N- O CO W 0) C) o 0 0 0 0 0 0 0 0 0) 0 0 0JT„ OD W( 0 0 V 0 v 0) d 1- N H N N r` N a nQ0 O o 0 0 o O O O O o O o 0 0 o a OC Z L 0- ( O 10 CV O N N W r- C") 0/ M 10 0) Cn N T N CO id co E E' r co N O O O LL_ 2 L O O O O o 0 0 0 0 0 0 0 0 L H r N O- v V N 10 M V CO N- J H M M 1 - 0 3 Q 3 - 3 - 3 aaaao o _ c - O LO O LO I o CO 0 LO H F 0 m O7 M , F OY- MV O Q0 4 4 44 0 iii Cn6 0 0_ t0' 0'0' 0 0 0 0 12 < CD 0 0 °) r— v 0 LO o V oo N co OC @ N N h O o co CC c D c O 0) 0 0 0 0 0 0 0 G O O LL DC 6C/) > ON CU N T L M U LO N 10 c'') O O O O lf7 N r CO N u. O ( \ I 7 0) CO C4 Cr) r co U) O CD N 1— r- ) . N O Q) 0 000000 E ' D " O 0 0 co 00Z W L 00( 00'0 0 LL U) U) 0_ a aQN 0 0 0 0 0 0 0 a o O O LL 0 0 0 0 0 0 0 r o E E) 0 o ii 0 0 0 0 0 0 0 r o Q. o nO i0 0000000o O J O U 0 N CO N. V' O o r N M CO CO Uas a ca a 0 \ N 0000000CD v 0 O C 0 4 E @ C/) W c' MMO V) CO oLL m L N M t O 0 0 0 0 0 0 0 0 O J O m O I. 0 M c0 N N N 0) F o O Cr) aQ YCO O 0_ 0000000 x O 0 a 2 LC) O0 r d „ O O o O Z L O c0 A N N U) c•') 0) cTs X117 ( 6 Nc0OM C E E O C O O o . ) LL . co 0_ O o 0 OV ° O 0 E N O 1 V r h 0 O C C LL — H 0 Oin oc00 0I LL M < t O > O c0 = 3 V V V Iii -0000 c0 Q O o Y H CO 0) 0) N LL a 20_00casCD02pcC6 N r M N 0 • I• O C p NN Cr) O CO CO E - o to 0 CB 0 o Z Sunset Out In Total t CD N N 66 84' 150 i, ( B U (/) Cf) CL 8 76 01 0 Right Thru Left Peds x Io as n _ O o N U o a; L L o o 4 o C O C o Z o o r c 1 L D 2 3 F- 0 O 4 1L CLJ lief nu41 74612, 1 sPed 0 6g 01. j0 0I. Z i PL 1P1. latol ul tnO tasung 2Q 6 O(` 7 M O( f) 4O V ('') f I -- O c1 0 0 CO N- CO ,- CO 7 N- ( 0 N Nt C N CV V V CV ( n CV CV N CO H h _ aQ' DO W 0 0 0 0 0 0 0 0 0 0 O O O 0 C N- 0 CO r- N2 L 00000 00000 Ooo C p c o C M u_' D et ---- r 7 N V' N C) V O) 10 CO 1- r- et r NN 07 (' 0, N' ct N ,- O J CD OD r F- N f) O Q) a) M N 1)) O O 10 M C') CO (- N- O) M E - 0 " O J cn N O OZ a) L Ti 0 0 0 0 0 0 0 0 0 0 O O H LL(/)(/) a. aaQfn O O O O O 0 0 0 0 0 O O O aNd 7 O O O O O O O O O O 0 0 0 n LCT OLL O O O O O 0 0 0 0 0 O O O Q L O 0 00000 00000 000 C J O5 aN V T CO N r O 7 . 71 . l( 7 0 CA O C ' o N M O U IL a a iO a C -(:) 1 (13 C o 0 0 o O 0 0 0 0 0 0 O O V O EC/) 4j W r o r- M N CO r 0 0) LO 7 ( n CO J C c CT2 M CO 0) C` N O O) CO CO O N 10 7 t N M n N '-- H O 0 0 0 0 0 O O O O O 0 0 0 NJm N r r ( O CO F- O, f ( 0 O O r p N Ch Ha aQN O O O O O O O O O O 0 0 0 a h . 77 N 0 al o - trz L 7 0) ' V O CO , f V co r- I- ( n C'•) D o) N r- C 0 7 LLI 2 O O O O O O O O O O 0 0 0 H r N N O r N O O M O) to V J ' N N CD 2222 m 2222 ( 9 7. 5 o EQ Q Q Q O Q Q Q Q O O L _ CD U7 CD U0 1 O( n0))I H O @ F_ O.- ('') V O .- co V : p Q O 0 t 0 0 0 0 0 0 0 0 9< O 0 co CO co M LC) oH N OD O c O I- co CO , r O I— CU o V d' Nlf) co -- aa 0o a 0 0 0 0 0 0 0 N O a C r N CB r e- N L 0000000 NN- 7 o 4) N O u) O co N LL._ M r D N co I— I` V vJ co N MM N V h_ O 0 0 at in O In co M CO O QZ C• 1 Z U L CD 0 0 0 0 0 O' O O LL CO CO C. o a arn 0 0 0 0 0 0 0 O O O a LDO 0 0 0 0 0 0 0 L Oo O X - 0) 0) 00) 0) 0) 0) L 0 Q H O 7O I 0 0 0 0 0 0 0 C 0 O, O J O 1 UNO o r v Lo U H co RI a co a Ci N 0 0 0 0 0 0 0 a) o 0 L a E N -- 4 U) 6 a) M N COCD0O J O Cn • LL i O IOOCn ( O L co • u H 0) O 0 0 0 0 0 0 0 0 J' O p CO r CD ( O)' o N F O a mN W a Q 0 0 0 0 0 0 0 0 d 2 0 O O c O t r o L 0 O • Z L V CO V ( 0 - 0) •- N D E O -- LL O i Qm 0 0 0 0 0 0 0 H O p O O . 2O O N E N N N .- N CO CD J 2 75 N W' LL —Cn N N E Tw «« E o= H Q 0 0 0 0 0 0 O H a M tO u) _= 0000 ( L7 < Y Y H o CO CO O Nas 2Q00cascD02Dc r- 03 r-N N- 0 N O a) CO N C M1- ( 1) d -" C.C3M N N 0 CO 0 0 Z Sunset Z ( 3 Out In Total i 134 41 175 lL U) U) a 6 35 I 0; 0 Right Thru Left Peds 4 II to Ur t o a Cv o r O O to 2 Z C O O UCD 2 o F m H rn 0 0 5 v rn 00 2 5 O m m r O CL LEJ 4 1101 n141 14 SPad E I LZl 10 10 4ZZ OLl I 4S 1 ul 1nO I lasung G 01 N M N8M4 C') O 0 1 ( flN O 00- 4 I c F- 0a)V OM 04 M N M M M C)) M MO F-a N CO C Q O N 0 0 0 0 0 O O O O O O O O U a c r— CO N m r 0 0 0 0 0 0 0 0 0 0 0 0 0 m CD O ) ( o c CO M Mll7 M m CD CO ON M ( 0 C/) ^1 I N .- M M 0 M N 0') 0) CV M d c() ( c) - F- N co M n Qc) 0 Q) 4- r! h- M ( D M Cr 64 M4 CO f) N ( 0 E D 715 O J M01 O Z N 0 OoOOO 00000 0 0 LL( D aa1) 0 0 0 0 0 0 0 o O o 0 0 0 om c CL 0 0 0 0 0 0 0 0 0 0 0 0 0 CD E 6E , 0i 0 0 0 0 0 0 0 0 0 0 0 0 0 0_ r DO CD J 0 0 0 0 0 0 0 0 0 0 0 0 0 c s I o c J ' as U M M M ( t) 4 1) CD N O m O C N M CU C2' a aa 0 oo b0100, 00)0) 00000 000 a ._ 4 E 1- 15 U) N W L N N N ( n 444 N4 MNM J c E m N o Cn O`LL c ONO) OO M .- OMI- rco0) L M M N 4 4 4 ( f) ( f) CO O 4 (,.) SO F N M Cr) 4 Q 10 O O O O O 0 0 0 0 0 O O O Jm OOCV6 CO 0N- N( O4 O O) o 4 N N I- CA 6 a aQt o 0 0 0 0 0 0 0 0 0 0 0 0 0 N o 1 d a) 0 a) C .0Z L 0) 6 6 O M CD V 0) 0 CV CO 0 C O tY 7 LL 0 2 O O O O O 0 0 0 0 0 O O O LF- NMCO ( q O 04 0010 J N M M 4 • O 2222 To 2222 Ta RT3 82 0 aaaa a 0- CLQ Cl- p p CD6C O6o( DF F- ° -.- f— o.- ? v o( hv a Q 4 444 ntf) ln(n n 1 0 0 0 0 0 0 0 0 Q 0 V1 2 N V' M . t M O Q 0OT <- M f) V 0) 0 C 0L V m U) N N. ' 1 00 N C O M P I C O C O CO I Cr) L a C Q D0 0) 0 0 0 0 0 0 0 U N a C , a) cp N , s 00 00000 1.-• CO .-- O CD 71" O cA o C o J N. \ C co M OM N V 60) n CO CO N 1 co 00 co N CO V O M O CO 00ZL O ) O O O O 0 O y-+ CU F o LL U) U) 0_ n aQ0 0 0 0 0 0 0 0 0 O a) O a 0 0 0 0 0 0 0 0 L O E O O OLi O 0 0 0 0 0 0 0o a F O 7O u 0 0 0 0 0 0 0 0 0 J O UN N-. v In 0 O o Cl n n 0 N CO CO Q OS01 0 0 0 0 0 o O0 C a 0 E 0 4_ 0 u, W r t V N V co u7 a) D O O A em u '. 2 1 0In tOO ce 5 N H N CO 0 0 0 0 0 0 0 a) O J O 2,- O h N L0' N N I co O aQ O a) u) d a o 0 0 0 0 0 0 0 0 a p 0 n o c_ DZL ( 6 10C( C)c (? ) OLL L1 7, m oo 0 0 0 0 0 I- o ,_, C 0 oV O O N a) E N CO V 1.-- M 0 N V J ` O C r- O Nm' Li m LL 2 222 ' o ch v > a ' m 0 = Li ( ii i Li a CI) _ 0 0 0 0 0 o Q Y Y F o 1) ( 6 m a)as 20_ca)20 0CDOUCC6 N N cF O C LC) N CO n 00 ( O co O N a 0 0 a z Sunset Z 0 .- r a) Out In Total a) rtI 0) 142 221 363 11 CI) CO a ' 14 1 2071 01 0 Right Thru Left Peds CQC0 o c o o_ m o ai d m a Q o o d di O o 0 0 CD CD i 7.. 1- J D O C E o C o z N o U O r m t IS U F 0 H J oy _ m o 0 O a, N m o O @` a ' - s N C J LE4s)J y. 4 11e1 mei 14 seed 9L I ZZL I0 0 66£ 8£ L L9Z lelol ul 1n0 lasuns O ( O r cp O) 2 L? 0 W ( 0 N E c H T - M M CO O c' 0 M N W V M (!) N OJ F,?- r L() 7,! ( n M O) ( O h n L` t` M N N In N- CO a C Q OO N O O O O O 66666 O O O U CL 1: 3 IZ c N CB 1— c- L o 000o OOOOO OOO 4-• CD O O o 00 O N LL C O O O O OD ) O co V OO ( O CO COCV N 17 CO O CC) r I-- N N V 0 ! O Q) O J M V CO CO V L- ( O M OCV V 0) r O 0 0 Z O O L m O O O O O 0 0 0 0 0 O O ll -.- ^ ' '' C6 1- LL VJ VJ a aaQCn 0 0 0 0 0 0 0 0 0 0 0 0 0 77OCL L7O O O O O O O O O O O O O O LD) OLL 0 0 0 0 0 O O O O O 0 0 0 Q LH N 0) 0 0 0 0 0 0 0 0 0 0 O O O O L ( 1) J o c UO al LO CV CV N V 23 O CV U a a D 3o v) o 0 0 0 o O O O O O O O O C 7 0a E m' c_ 0_, N W L OT O.- N O N7 7 V CO ( O O) c r- CD O M O Q' LL 2 UP 7 N 07 N- V 7- CV V 7 V M V T " f) O ct LO H O) 7- 4 0 0 0 0 0 O O O O O O O O 0JT, N N CO M M M N. M CT N f) M p N CO 6 a aQN O O O O O O O O O O O O O DN c a m - t,O NN COMM MM , - CO, CO 7 ( O h O Z L C co co 66 4 m OOLi- C) 0 0 0 0 0 0 0 0 0 0 O O O L H 00000 O7 . 7t VV CO J p 0 s -Cu O L — O ( O O UP O ( n O UP I H U@ O 7- M V O c- M V D Q O c H 00 00 OOOO m < 0 0 2Q o o UP N- r'... o T- rn r- or OD CO CO a)a)LV m N CO OD Lo M 0 o 0 CO UP r - O) CD N r a C a Do N 0 0 0 0 0 0 0 U a> o a N C 04 Z5 O) 03 I- N> L 0 0 0 0 0 0 0 4-* CD I-- O a) O O co C CD O O U) O N LL O \ OD OD LO CO OCV M CO O CO N H C.-: 0 0 tr.' t op . 72- r- MOOm E - o Nr ca 0CD m 00000 0 0 C6 o LL (!) (!) aN 0 0 0 0 0 0 0 O O d O L7O 0 0 0 0 0 0 0 0 L o O O E7 0 0 0 0 0 0 0 L 0 Q I O 0OL9 o 0 0 0 0 0 0 0 C J o 0 ili Uo CVO .. 1 O) OD M O H N( o U m ci CZ a 0 0 0 0 0 0 0 0 0 L CL, O c1 E ca C!) N WL O- 0NM J CD 4 M co 2LLL 7 CA Q> V N d' CO L M F O Lo 00 0 0 0 0 0 0 0 CD O J O @ 0 M M N 0 O) o G. O aQ YOd Q 0 0 0 0 0 0 CD CD C d O O O)N Q r O CO Z CO CO CO M 00 7 LC) E. O O O • C O) OIL m o Q m00000000 r 0 0 0 or ; U O N E N 000 . - M0 J CD ` O C N LL. -N N 2 W 0 0 0 Q O= Q 8 0 113 c) Li, 15 F- d M V O al = 0 t` r - CO CO > d O 0 0000 0 m 13 22 oQ Y Y F- o N O] O) N CL a 2Qca)a2LnLcD0UC N CO N — N 0 0 O O N C 0 W O C Cr) 0 0 0 ECB C 1- ii Sunset z 00 In Total i 271 65 336 CO U. C/) W 0 3 62 0 0 Right Thru Left Peds 4 NCC17O CO C a CO 0- H lb O c o m z 0 4 r C 2 OZ a s no 2 a U i— r 1 1— o N ry m CT3 x o 0V O E, a J o t a. . E i - J 4 110 N41 11- 1 SPad EZ OLZ ' 0 10 L£ 6Z 00 1e101 ui 1no tesuns Appendix C HCS Based Synchro Output Existing HCM Unsignalized Intersection Capacity Analysis 3: Sunset & Country Green 6/8/2011 d Movement EBL EBT WBT WBR SBL SBR Lane Configurations 4 1 Sign Control Free Free Stop Grade 0% 0%0% Volume (veh /h)207 14 20 54 16 122 Peak Hour Factor 0.85 0.85 0.84 0.84 0.93 0.93 Hourly flow rate (vph) 244 16 24 64 17 131 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 88 559 56 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 88 559 56 tC, single (s)4.1 6.4 6.2 tC, 2 stage (s) tF (s)2.2 3.5 3.3 p0 queue free %84 96 87 cM capacity (veh /h)1508 411 1011 Direction, Lane #EB 1 WB 1 SB 1 Volume Total 260 88 148 Volume Left 244 0 17 Volume Right 0 64 131 cSH 1508 1700 864 Volume to Capacity 0.16 0.05 0.17 Queue Length 95th (ft) 14 0 15 Control Delay (s)7.4 0.0 10.0 Lane LOS A B Approach Delay (s)7.4 0.0 10.0 Approach LOS B Intersection Summary Average Delay 6.9 Intersection Capacity Utilization 34.0%ICU Level of Service A Analysis Period (min)15 6/5/2011 Existing PM Synchro 6 Report III Page 1 HCM Unsignalized Intersection Capacity Analysis 3: Sunset & Country Green 6/8/2011 4/ Movement EBL EBT WBT WBR SBL SBR Lane Configurations 4 Sign Control Stop Stop Stop Volume (vph)62 3 1 18 23 270 Peak Hour Factor 0.81 0.81 0.70 0.70 0.80 0.80 Hourly flow rate (vph)77 4 1 26 29 338 Direction, Lane #EB 1 WB 1 SB 9 Volume Total (vph)80 27 366 Volume Left (vph)77 0 29 Volume Right (vph)0 26 338 Hadj (s)0.22 0.53 0.50 Departure Headway (s) 4.9 4.2 3.7 Degree Utilization, x 0.11 0.03 0.37 Capacity (veh /h)680 775 958 Control Delay (s)8.5 7.3 8.8 Approach Delay (s)8.5 7.3 8.8 Approach LOS A A A intersection Summary Delay 8.7 HCM Level of Service A Intersection Capacity Utilization 34.9%ICU Level of Service A Analysis Period (min)15 6/5/2011 Existing AM Synchro 6 Report Page 1 HCM Unsignalized Intersection Capacity Analysis 7: Mountainwood & Sunset 6/8/2011 Movement WBL WBR NBT NBR SBL SBT Lane Configurations r 4 Sign Control Stop Free Free Grade 0%0%0% Volume (veh /h)7 65 76 8 15 59 Peak Hour Factor 0.69 0.69 0.57 0.57 0.80 0.80 Hourly flow rate (vph)10 94 133 14 19 74 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 245 133 147 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 245 133 147 tC, single (s)6.4 6.2 4.1 tC, 2 stage (s) tF (s)3.5 3.3 2.2 p0 queue free %99 90 99 cM capacity (veh /h)734 916 1434 Direction, Lane #WB 1 NB 1 NB 2 SB 1 Volume Total 104 133 14 92 Volume Left 10 0 0 19 Volume Right 94 0 14 0 cSH 894 1700 1700 1434 Volume to Capacity 0.12 0.08 0.01 0.01 Queue Length 95th (ft) 10 0 0 1 Control Delay (s)9.6 0.0 0.0 1.6 Lane LOS A A Approach Delay (s)9.6 0.0 1.6 Approach LOS A Intersection Summary Average Delay 3.3 Intersection Capacity Utilization 21.7%ICU Level of Service A Analysis Period (min)15 6/5/2011 Existing PM Synchro 6 Report Page 1 HCM Unsignalized Intersection Capacity Analysis 7: Mountainwood & Sunset 6/8/2011 Movement WBL WBR NBT NBR SBL SBT Lane Configurations V 4 Sign Control Stop Free Free Grade 0%0%0% Volume (veh /h)7 19 35 6 43 127 Peak Hour Factor 0.93 0.93 0.85 0.85 0.79 0.79 Hourly flow rate (vph)8 20 41 7 54 161 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 311 41 48 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 311 41 48 tC, single (s)6.4 6.2 4.1 tC, 2 stage (s) tF (s)3.5 3.3 2.2 p0 queue free %99 98 97 cM capacity (veh /h)658 1030 1559 Direction, Lane #WB 1 NB 1 NB 2 SB 1 Volume Total 28 41 7 215 Volume Left 8 0 0 54 Volume Right 20 0 7 0 cSH 894 1700 1700 1559 Volume to Capacity 0.03 0.02 0.00 0.03 Queue Length 95th (ft)2 0 0 3 Control Delay (s)9.2 0.0 0.0 2.1 Lane LOS A A Approach Delay (s)9.2 0.0 2.1 Approach LOS A intersection Summary Average Delay 2.4 Intersection Capacity Utilization 25.7%ICU Level of Service A Analysis Period (min)15 6/5/2011 Existing AM Synchro 6 Report I I Page 1 HCM Unsignalized Intersection Capacity Analysis 5: Redfields & Sunset I 6/8/2011 Movement EBL EBR NBL NBT SBT SBR Lane Configurations 4 T Sign Control Stop Free Free Grade 0%0% 0% Volume (veh /h)5 70 116 79 64 3 Peak Hour Factor 0.75 0.75 0.76 0.76 0.73 0.73 Hourly flow rate (vph)7 93 153 104 88 4 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 499 90 92 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 499 90 92 tC, single (s)6.4 6.2 4.1 tC, 2 stage (s) tF (s)3.5 3.3 2.2 p0 queue free %99 90 90 cM capacity (veh /h)477 968 1503 Direction, Lane#EB 1 NB 1 SB 1 Volume Total 100 257 92 Volume Left 7 153 0 Volume Right 93 0 4 cSH 906 1503 1700 Volume to Capacity 0.11 0.10 0.05 Queue Length 95th (ft)9 8 0 Control Delay (s)9.5 4.9 0.0 Lane LOS A A Approach Delay (s)9.5 4.9 0.0 Approach LOS A Intersection Summary Average Delay 4.9 Intersection Capacity Utilization 28.5%ICU Level of Service A Analysis Period (min)15 6/5/2011 Existing PM Synchro 6 Report EPR Page 1 HCM Unsignalized Intersection Capacity Analysis 5: Redfields & Sunset 6/8/2011 4 t Movement EBL EBR NBL NBT SBT SBR Lane Configurations 4 I Sign Control Stop Free Free Grade 0%0% 0% Volume (veh /h)6 159 41 40 133 4 Peak Hour Factor 0.78 0.78 0.92 0.92 0.78 0.78 Hourly flow rate (vph)8 204 45 43 171 5 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 306 173 176 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 306 173 176 tC, single (s)6.4 6.2 4.1 tC, 2 stage (s) tF (s)3.5 3.3 2.2 p0 queue free %99 77 97 cM capacity (veh /h)664 870 1401 Direction, Lane #EB 1 NB 1 SB 1 Volume Total 212 88 176 Volume Left 8 45 0 Volume Right 204 0 5 cSH 861 1401 1700 Volume to Capacity 0.25 0.03 0.10 Queue Length 95th (ft) 24 2 0 Control Delay (s)10.5 4.0 0.0 Lane LOS B A Approach Delay (s)10.5 4.0 0.0 Approach LOS B Intersection Summary Average Delay 5.4 Intersection Capacity Utilization 31.8%ICU Level of Service A Analysis Period (min)15 6/5/2011 Existing AM Synchro 6 Report EPR Appendix D HCS Based Synchro Output Build HCM Unsignalized Intersection Capacity Analysis 3: Sunset & Country Green 6/8/2011 4/ Movement EBL EBT WBT WBR SBL SBR Lane Configurations 4 Sign Control Stop Stop Stop Volume (vph)237 15 21 62 18 141 Peak Hour Factor 0.85 0.85 0.84 0.84 0.93 0.93 Hourly flow rate (vph) 279 18 25 74 19 152 Direction, Lane #EB 1 WB 1 SB 1 Volume Total (vph)296 99 171 Volume Left (vph)279 0 19 Volume Right (vph)0 74 152 Hadj (s)0.22 0.41 0.48 Departure Headway (s) 4.6 4.2 4.3 Degree Utilization, x 0.38 0.12 0.21 Capacity (veh /h)746 796 767 Control Delay (s)10.5 7.8 8.5 Approach Delay (s)10.5 7.8 8.5 Approach LOS B A A intersection Summary Delay 9.4 HCM Level of Service A Intersection Capacity Utilization 37.0%ICU Level of Service A Analysis Period (min)15 6/5/2011 Build PM Synchro 6 ReportEPRPage1 HCM Unsignalized Intersection Capacity Analysis 3: Sunset & Country Green 6/8/2011 a. 4/ Movement EBL EBT WBT WBR SBL SBR Lane Configurations 4 I Sign Control Stop Stop Stop Volume (vph)71 3 1 21 26 306 Peak Hour Factor 0.81 0.81 0.70 0.70 0.80 0.80 Hourly flow rate (vph)88 4 1 30 32 382 Direction, Lane #EB 1 WB 1 SB 1 Volume Total (vph)91 31 415 Volume Left (vph)88 0 33 Volume Right (vph)0 30 383 Hadj (s)0.23 0.54 0.50 Departure Headway (s) 5.0 4.3 3.7 Degree Utilization, x 0.13 0.04 0.43 Capacity (veh /h)661 747 947 Control Delay (s)8.7 7.5 9.4 Approach Delay (s)8.7 7.5 9.4 Approach LOS A A A Intersection Summary Delay 9.2 HCM Level of Service A Intersection Capacity Utilization 37.8%ICU Level of Service A Analysis Period (min)15 6/5/2011 Build AM Synchro 6 Report EPR Page 1 HCM Unsignalized Intersection Capacity Analysis 7: Mountainwood & Sunset 6/8/2011 Movement WBL WBR NBT NBR SBL SBT Lane Configurations 4 Sign Control Stop Free Free Grade 0%0%0% Volume (veh /h)8 68 79 9 16 61 Peak Hour Factor 0.69 0.69 0.57 0.57 0.80 0.80 Hourly flow rate (vph)12 99 139 16 20 76 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 255 139 154 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 255 139 154 tC, single (s)6.4 6.2 4.1 tC, 2 stage (s) tF (s)3.5 3.3 2.2 p0 queue free %98 89 99 cM capacity (veh /h)724 910 1426 Direction, Lane#WB 1 NB 1 NB 2 SB 1 Volume Total 110 139 16 96 Volume Left 12 0 0 20 Volume Right 99 0 16 0 cSH 886 1700 1700 1426 Volume to Capacity 0.12 0.08 0.01 0.01 Queue Length 95th (ft) 11 0 0 1 Control Delay (s)9.6 0.0 0.0 1.7 Lane LOS A A Approach Delay (s)9.6 0.0 1.7 Approach LOS A Intersection Summary Average Delay 3.4 Intersection Capacity Utilization 22.1%ICU Level of Service A Analysis Period (min)15 6/5/2011 Build PM Synchro 6 Report EPR Page 1 HCM Unsignalized Intersection Capacity Analysis 7: Mountainwood & Sunset 6/8/2011 I Movement WBL WBR NBT NBR SBL SBT Lane Configurations r 4 Sign Control Stop Free Free Grade 0%0%0% Volume (veh /h)8 20 36 7 45 132 Peak Hour Factor 0.93 0.93 0.85 0.85 0.79 0.79 Hourly flow rate (vph)9 22 42 8 57 167 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 323 42 51 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 323 42 51 tC, single (s)6.4 6.2 4.1 tC, 2 stage (s) tF (s)3.5 3.3 2.2 p0 queue free %99 98 96 cM capacity (veh /h)646 1028 1556 Direction, Lane #WB 1 NB 1 NB 2 SB 1 Volume Total 30 42 8 224 Volume Left 9 0 0 57 Volume Right 22 0 8 0 cSH 880 1700 1700 1556 Volume to Capacity 0.03 0.02 0.00 0.04 Queue Length 95th (ft)3 0 0 3 Control Delay (s)9.2 0.0 0.0 2.1 Lane LOS A A Approach Delay (s)9.2 0.0 2.1 Approach LOS A intersection Summary Average Delay 2.5 Intersection Capacity Utilization 26.1 %ICU Level of Service A Analysis Period (min)15 6/5/2011 Build AM Synchro 6 Report EPR Page 1 HCM Unsignalized Intersection Capacity Analysis 5: Redfields & Sunset 6/8/2011 Movement EBL EBR NBL NBT SBT SBR Lane Configurations rrf 4 t Sign Control Stop Free Free Grade 0%0% 0% Volume (veh /h)6 89 148 82 67 4 Peak Hour Factor 0.75 0.75 0.76 0.76 0.73 0.73 Hourly flow rate (vph)8 119 195 108 92 5 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 592 95 97 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 592 95 97 tC, single (s)6.4 6.2 4.1 tC, 2 stage (s) tF (s)3.5 3.3 2.2 p0 queue free %98 88 87 cM capacity (veh /h)408 962 1496 Direction, Lane #EB 1 NB 1 SB 1 Volume Total 127 303 97 Volume Left 8 195 0 Volume Right 119 0 5 cSH 886 1496 1700 Volume to Capacity 0.14 0.13 0.06 Queue Length 95th (ft) 12 11 0 Control Delay (s)9.7 5.4 0.0 Lane LOS A A Approach Delay (s)9.7 5.4 0.0 Approach LOS A Intersection Summary Average Delay 5.4 Intersection Capacity Utilization 31.7%ICU Level of Service A Analysis Period (min)15 6/5/2011 Build PM Synchro 6 ReportEPRPage1 HCM Unsignalized Intersection Capacity Analysis 5: Redfields & Sunset 6/8/2011 Movement EBL EBR NBL NBT SBT SBR Lane Configurations 4 t Sign Control Stop Free Free Grade 0%0% 0% Volume (veh /h)7 192 51 42 138 5 Peak Hour Factor 0.78 0.78 0.92 0.92 0.78 0.78 Hourly flow rate (vph)9 246 55 46 177 6 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 337 180 183 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 337 180 183 tC, single (s)6.4 6.2 4.1 tC, 2 stage (s) tF (s)3.5 3.3 2.2 p0 queue free %99 71 96 cM capacity (veh /h)633 863 1392 Direction, Lane #EB 1 NB 1 SB 1 Volume Total 255 101 183 Volume Left 9 55 0 Volume Right 246 0 6 cSH 852 1392 1700 Volume to Capacity 0.30 0.04 0.11 Queue Length 95th (ft) 32 3 0 Control Delay (s)11.0 4.4 0.0 Lane LOS B A Approach Delay (s)11.0 4.4 0.0 Approach LOS B intersection Summary Average Delay 6.0 Intersection Capacity Utilization 34.9%ICU Level of Service A Analysis Period (min)15 6/5/2011 Build AM Synchro 6 Report EPR Page 1